CN200952804Y - Float and double-switch motion combination for drain device of air conditioner - Google Patents

Float and double-switch motion combination for drain device of air conditioner Download PDF

Info

Publication number
CN200952804Y
CN200952804Y CN 200620046298 CN200620046298U CN200952804Y CN 200952804 Y CN200952804 Y CN 200952804Y CN 200620046298 CN200620046298 CN 200620046298 CN 200620046298 U CN200620046298 U CN 200620046298U CN 200952804 Y CN200952804 Y CN 200952804Y
Authority
CN
China
Prior art keywords
actuating
actuating member
arm
floating drum
aircondition
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 200620046298
Other languages
Chinese (zh)
Inventor
萧裕明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Hebi Electric Appliances Co Ltd
Shanghai Hebi Electronic Co Ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 200620046298 priority Critical patent/CN200952804Y/en
Application granted granted Critical
Publication of CN200952804Y publication Critical patent/CN200952804Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Air Conditioning Control Device (AREA)

Abstract

A combination of a float and a twin action switch for a water drain of an air conditioner is provided, which comprises a float and two switches. The float is provided with a connection arm, which is swingably connected with water drain of the air conditioner. The connection arm is provided with two action parts, each switch is placed on the water drain of the air conditioner. Each switch is provided with one actuation arm. Each actuation arm corresponds to each action part, and is located above each action part. Wherein, the distance from an actuation arm to its corresponding action part is bigger than the distance from another actuation arm to its corresponding action part. Therefore, the utility model generates sectional action relationship by the up-and-down movement of the float in relative to the water level, so as to control the motor of the water drain of the air conditioner to start or stop pumping water.

Description

The aircondition floating drum and the biswitch combination of actions of drainage arrangement
Technical field
The utility model relates to the aircondition field, particularly relevant for floating drum and the biswitch combination of actions of a kind of aircondition with drainage arrangement, begins to draw water or stop pumping in order to the electro-motor of control aircondition with drainage arrangement.
Background technology
No. the 551479th, TaiWan, China patent disclosed " freezing/the air-conditioning equipment drainage arrangement ", drainage arrangement includes a water level sensing switch, the water level sensing switch has a memory switch, a rotary swinging rack and a Poly Foam ball float, wherein memory switch has a linking arm, rotary swinging rack is hubbed at memory switch, it has a curved boom and two hook parts, and the Poly Foam ball float places between two hook parts.When the water level of drainage arrangement rises to full-water level, the Poly Foam ball float can with come-up, and utilize curved boom to touch linking arm, making memory switch start a motor draws water, and when water level dropped to low water level, curved boom can leave linking arm, and memory switch control motor is stopped pumping.
Yet, when the water level of drainage arrangement during near full-water level, rotary swinging rack may separate because of rocking of the water surface contacts with memory switch suddenly to reach, cause motor to be started by memory switch at short notice and close, under permanent use, motor is easy to be damaged, and therefore, utilizes the start of unistage type to influence the service life of motor easily between this rotary swinging rack and this memory switch.
The utility model content
Main purpose of the present utility model is to provide floating drum and the biswitch combination of actions of a kind of aircondition with drainage arrangement, it is to utilize the start of segmented to control this aircondition to draw water or stop pumping with the motor of drainage arrangement, in order to increase the service life of this motor.
For achieving the above object, aircondition of the present utility model includes a floating drum and two switches with the floating drum and the biswitch combination of actions of drainage arrangement; This floating drum has a linking arm, but this linking arm system is connected in this aircondition drainage arrangement in the mode of swing, and this linking arm has two actuating members; Respectively this switch is located at this aircondition drainage arrangement, it has an actuating arm, respectively this actuating arm is distinguished respectively this actuating member of correspondence, and is positioned at respectively this actuating member top, and wherein this relative actuating arm arrives the distance of this actuating member greater than the distance of another this relative actuating arm to this actuating member.
By this, the utility model utilizes the start of segmented between this two actuating member and this two actuation arm to control this aircondition and draws water or stop pumping with the motor of drainage arrangement, in order to increase the service life of this motor.
Description of drawings
Fig. 1 is the three-dimensional exploded view of the utility model first preferred embodiment.
Fig. 2 is the part three-dimensional exploded view of the utility model first preferred embodiment.
Fig. 3 is a schematic diagram, mainly shows the relation between the actuation arm of the actuating member of the floating drum that the utility model first preferred embodiment is provided and switch.
Fig. 4 is a schematic diagram, mainly shows the actuating member that the utility model second preferred embodiment is provided and the relation of actuation arm.
Fig. 5 is a schematic diagram, mainly shows the actuating member that the utility model the 3rd preferred embodiment is provided and the relation of actuation arm.
Fig. 6 is a schematic diagram, mainly shows the actuating member of the utility model the 3rd another aspect that preferred embodiment provides and the relation of actuation arm.
The number in the figure explanation
10 aircondition drainage arrangements
20 housings, 22 bases, 24 lids
26 accommodation spaces, 28 platforms, 282 perforation, 284 hook parts
30 electro-motors, 40 water legs
50 floating drums, 52 linking arms, 54 shanks, 542 lugs
56 first actuating members, 58 second actuating members
60 microswitches, 62 first actuation arm, 64 second actuation arm
72 first actuating members, 74 second actuating members, 80 microswitches
82 first actuation arm, 84 second actuation arm, 92 first actuating members
94 second actuating members, 100 microswitches, 102 first actuation arm
104 second actuation arm 106 thicken part
The specific embodiment
See also Fig. 1, it is the aircondition drainage arrangement 10 that the utility model first preferred embodiment is provided, and this aircondition includes a housing 20, an electro-motor 30, a water leg 40, a floating drum 50 and two microswitches 60 with drainage arrangement 10.
This housing 20 has a base 22 and a cover cap in the lid 24 of this base 22, makes and forms an accommodation space 26 between this base 22 and this lid 24.This housing 20 is provided with a platform 28 in this accommodation space 26, this platform 28 has a perforation 282, and this platform 28 extends upward a hook part 284 respectively in the both sides of this perforation 282.This electro-motor 30 is installed in this platform 28 tops, and is arranged in the accommodation space 26 of this housing 20.
This water leg 40 is fixedly arranged on this platform 28 bottoms, in order to collect the condensate water that is produced when this aircondition uses with drainage arrangement 10.This floating drum 50 has two linking arms 52, and this two linking arm 52 is outwards extended abreast by this floating drum 50 respectively, and the end distance of being separated by.Respectively the end of this linking arm 52 extends upward a shank 54 respectively, the lateral surface of this two shank 54 extends a lug 542 respectively, this floating drum 50 can utilize this two lug 542 to be caught on by this two hook part 284, make this floating drum 50 be arranged in this water leg 40, and can this two lug 542 be the axle center swing, and respectively this linking arm 52 extends upward one first actuating member 56 and one second actuating member 58 in the rear of this shank 54 respectively, wherein the height of this first actuating member 56 is higher than the height of this second actuating member 58, as shown in Figure 2.
Respectively this microswitch 60 is installed in the platform 28 of this housing 20, it has one first actuation arm 62 and one second actuation arm 64, wherein this first actuation arm 62 and this second actuation arm 64 are respectively to should first actuating member 56 and this second actuating member 58, and be positioned at the top of this first actuating member 56 and this second actuating member 58, and this first actuation arm 62 is identical with the height of this second actuation arm 64, make this first actuation arm 62 to the distance of this first actuating member 56 less than the distance of this second actuation arm 64, as shown in Figure 3 to this second actuating member 58.
In the process that aircondition uses, can constantly produce condensate water flows in this water leg 40, water level in this water leg 40 is constantly risen, when water level rises to the height of nearly full-water level, this floating drum 50 also can and float along with the water level rising, make first actuating member 56 of this floating drum 50 understand first actuation arm 62 that up push against earlier this microswitch 60, this moment, this electro-motor 30 did not also have any action, and when the water level in this water leg 40 rises to full-water level, second actuating member 58 of this floating drum 50 can up push against second actuation arm 64 of this microswitch 60, thus, this electro-motor 30 will be subjected to the startup of this microswitch 60 and entry into service is drawn water.
After this electro-motor 30 draws water a period of time, water level in this water leg 40 can begin to descend, when the water level of this water leg 40 drops near low water level, second actuating member 58 of this floating drum 50 can separate with second actuation arm 64 of this microswitch 60 earlier, and under the water level of this water leg 40 continues
When reducing to low water level, first actuating member 56 of this floating drum 50 can then separate with first actuation arm 62 of this microswitch 60, and this electro-motor 30 can be subjected to the control of this microswitch 60 and stop pumping at this moment.
See also Fig. 4, be the utility model second preferred embodiment, its structure is identical substantially with the foregoing description, precisely because difference is:
First actuating member 72 of this floating drum is identical with the height of second actuating member 74 in the present embodiment, respectively the height of first actuation arm 82 of this microswitch 80 then is lower than the height of second actuation arm 84 in the present embodiment, make this first actuation arm 82 to the distance of this first actuating member 72 less than the distance of this second actuation arm 84 to this second actuating member 74; By this, when water level rose, this first actuating member 72 can push against after this first actuation arm 82 earlier, and this second actuating member 74 just can push against this second actuation arm 84, in order to reach the purpose of this utility model.
See also Fig. 5, be the utility model the 3rd preferred embodiment, its structure is identical substantially with above-mentioned two embodiment, precisely because difference is: first actuating member 92 of this floating drum is identical with the height of second actuating member 94 in the present embodiment, respectively first actuation arm 102 of this microswitch 100 is also identical in the present embodiment with the height of second actuation arm 104, wherein this first actuation arm 102 is equiped with one and thickens part 106, this thickens part 106 is a collar in the present embodiment, as shown in Figure 5, in order to shorten the distance of this first actuation arm 102 to this first actuating member 92, make first actuating member 92 of this floating drum can push against this first actuation arm 102 and this second actuation arm 104 along with the rising of water level in regular turn, to reach the purpose of this utility model with this second actuating member 94.
In addition, this thickens part 106 and also can be a block, and as shown in Figure 6, this block adheres on this first actuation arm, 102 belows, equally can be in order to shorten the distance of this first actuation arm 102 to this first actuating member 92.
By this, above-mentioned three embodiment all utilize and change the distance of this two actuating member to this two actuation arm, when making this floating drum following water-level lifting, action relationships with this two microswitches generation segmented, this electro-motor can not be activated suddenly or cut out at short notice, in order to reach the purpose that increases service life, and, in addition, because this first actuating member and this second actuating member are extended upward by this two linking arm respectively, and have a distance between this two linking arm, make that this two linking arm can be close mutually when stressed, the lug of this two linking arm can be caught on by two hook parts of this platform apace.

Claims (6)

1. the floating drum and the biswitch combination of actions of aircondition usefulness drainage arrangement mainly are the actions by floating drum following water-level lifting set in this drainage arrangement, and produce action relationships between biswitch, it is characterized in that this floating drum and biswitch combination of actions include:
One floating drum has a linking arm, but this linking arm is connected in this aircondition drainage arrangement in the mode of swing, and this linking arm has two actuating members;
And
Two switches are located at this aircondition drainage arrangement, and respectively this switch has an actuating arm, and respectively this actuating arm is distinguished respectively this actuating member of correspondence, and are positioned at respectively this actuating member top;
Wherein this relative actuating arm arrives the distance of this actuating member greater than another this relative actuating arm to the distance of this actuating member.
2. aircondition as claimed in claim 1 is characterized in that with the floating drum and the biswitch combination of actions of drainage arrangement described two actuating arms are contour, and this two actuating member is one high and one low.
3. aircondition as claimed in claim 1 is characterized in that with the floating drum and the biswitch combination of actions of drainage arrangement described two actuating arms are one high and one low, and this two actuating member is contour.
4. the aircondition as claimed in claim 1 floating drum and the biswitch combination of actions of drainage arrangement, it is characterized in that described two actuating arms are contour, this two actuating member is contour, and wherein an actuating arm is provided with one and thickens part, uses to shorten to act on the distance of this actuating member relatively.
5. aircondition as claimed in claim 4 is characterized in that with the floating drum and the biswitch combination of actions of drainage arrangement the described part that thickens is a collar, and this collar is sheathed on this actuating arm of its correspondence.
6. aircondition as claimed in claim 4 is characterized in that with the floating drum and the biswitch combination of actions of drainage arrangement the described part that thickens is a block, and this block adheres on this actuating arm below of its correspondence.
CN 200620046298 2006-09-26 2006-09-26 Float and double-switch motion combination for drain device of air conditioner Expired - Fee Related CN200952804Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200620046298 CN200952804Y (en) 2006-09-26 2006-09-26 Float and double-switch motion combination for drain device of air conditioner

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200620046298 CN200952804Y (en) 2006-09-26 2006-09-26 Float and double-switch motion combination for drain device of air conditioner

Publications (1)

Publication Number Publication Date
CN200952804Y true CN200952804Y (en) 2007-09-26

Family

ID=38811105

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200620046298 Expired - Fee Related CN200952804Y (en) 2006-09-26 2006-09-26 Float and double-switch motion combination for drain device of air conditioner

Country Status (1)

Country Link
CN (1) CN200952804Y (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101520214B (en) * 2008-02-26 2011-10-26 宁波尔耶思电子有限公司 Automatic level-controlling draining dehumidifier and draining method thereof
CN106704213A (en) * 2017-03-01 2017-05-24 益而益(集团)有限公司 Condensation pump assembly
CN107621065A (en) * 2016-07-14 2018-01-23 东莞市东坑合利美电子电器有限公司 The composition of the micromotion structure of drainage arrangement
CN107763826A (en) * 2016-08-18 2018-03-06 东莞市东坑合利美电子电器有限公司 The composition of the micromotion structure of drainage arrangement
CN107957127A (en) * 2016-10-14 2018-04-24 东莞市东坑合利美电子电器有限公司 The adjustable water level detecting module of drainage arrangement

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101520214B (en) * 2008-02-26 2011-10-26 宁波尔耶思电子有限公司 Automatic level-controlling draining dehumidifier and draining method thereof
CN107621065A (en) * 2016-07-14 2018-01-23 东莞市东坑合利美电子电器有限公司 The composition of the micromotion structure of drainage arrangement
CN107621065B (en) * 2016-07-14 2020-10-16 东莞市东坑合利美电子电器有限公司 Composition of micro-motion structure of drainage device
CN107763826A (en) * 2016-08-18 2018-03-06 东莞市东坑合利美电子电器有限公司 The composition of the micromotion structure of drainage arrangement
CN107957127A (en) * 2016-10-14 2018-04-24 东莞市东坑合利美电子电器有限公司 The adjustable water level detecting module of drainage arrangement
CN107957127B (en) * 2016-10-14 2020-06-19 东莞市东坑合利美电子电器有限公司 Adjustable water level detection module of drainage device
CN106704213A (en) * 2017-03-01 2017-05-24 益而益(集团)有限公司 Condensation pump assembly
CN106704213B (en) * 2017-03-01 2019-01-15 益而益(集团)有限公司 Condense pump assembly

Similar Documents

Publication Publication Date Title
CN200952804Y (en) Float and double-switch motion combination for drain device of air conditioner
CN200956326Y (en) Switch device
CN205048654U (en) Water shortage protection device of air cooler
EP1818656A3 (en) Oil level detection device for internal combustion engine
CN2772012Y (en) Disengaging type level control switch
CN2904265Y (en) Inclined rolling contact switch
CN201600598U (en) Water level controlling device used for water tower
CN2554538Y (en) Drainage device with water full alarm function for freezing/air conditioning equipment
CN200946383Y (en) Automatic controller for parking stall device
CN201195200Y (en) Slagging off head
CN2783514Y (en) Manual star-delta starter
CN2527749Y (en) Water level self-controlled switch for water pump
CN101788828B (en) Water level control device used for water tower
CN202258866U (en) Connecting structure of top-hung auxiliary contact
CN221033175U (en) Condensation water pump
CN202597040U (en) Water pump with built-in float switch
CN2796074Y (en) Float ball switch
CN202792391U (en) Semiconductor dehumidifier
CN2769317Y (en) Vibration resisting electric switcher shift contactor
CN2859795Y (en) Magnetic switch
CN1975954A (en) Liquid level switch quick-break device
CN2502393Y (en) Automatic controller for liquid level
CN2847507Y (en) horizontal floating ball liquid level switch
CN200946835Y (en) Automatic controller for combustion gas
CN200943238Y (en) Bucket type water-discharging valve with one-way gas exhauster

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: HOPPY ELECTRONIC APPLIANCE (SHANGHAI) CO., LTD.

Free format text: FORMER OWNER: YANG ZHICHANG

Effective date: 20100426

Owner name: HOPPY ELECTRONIC COMPONENTS (SHANGHAI) CO., LTD.

Free format text: FORMER OWNER: XIAO YUMING CHEN QINGYU

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 000000 TAOYUAN COUNTY, TAIWAN PROVINCE TO: 201805 NO.318, ANXIAO ROAD, ANTING TOWN, JIADING DISTRICT, SHANGHAI CITY

TR01 Transfer of patent right

Effective date of registration: 20100426

Address after: Anting town Jiading District Shanghai city 201805 Anxiao Road No. 318

Co-patentee after: Shanghai Hebi Electronic Co., Ltd.

Patentee after: Shanghai Hebi Electric Appliances Co., Ltd.

Address before: 000000 Taoyuan County, Taiwan Province

Co-patentee before: Xiao Yuming

Patentee before: Yang Zhichang

Co-patentee before: Chen Qingyu

C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20070926

Termination date: 20130926