CN200952369Y - Cartridge container hanger delivery tool assembly - Google Patents

Cartridge container hanger delivery tool assembly Download PDF

Info

Publication number
CN200952369Y
CN200952369Y CN 200620117562 CN200620117562U CN200952369Y CN 200952369 Y CN200952369 Y CN 200952369Y CN 200620117562 CN200620117562 CN 200620117562 CN 200620117562 U CN200620117562 U CN 200620117562U CN 200952369 Y CN200952369 Y CN 200952369Y
Authority
CN
China
Prior art keywords
joint
main body
ring
wheel
send
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN 200620117562
Other languages
Chinese (zh)
Inventor
胡国强
杨道平
翟亚锋
蒋刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Karamay Drilling Technology Institute of CNPC Western Drilling Engineering Co Ltd
Original Assignee
Drilling Technology Research Institute of Xinjiang Petroleum Administration
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Drilling Technology Research Institute of Xinjiang Petroleum Administration filed Critical Drilling Technology Research Institute of Xinjiang Petroleum Administration
Priority to CN 200620117562 priority Critical patent/CN200952369Y/en
Application granted granted Critical
Publication of CN200952369Y publication Critical patent/CN200952369Y/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Earth Drilling (AREA)

Abstract

The utility model relates to a tail pipe hanger running tool assembly in tail pipe well completion, mainly including a running rod (5), a running rod joint (6), a pressure block (8), a wheel ball bearing fixed seat ring (10), a slip back-off wheel (13), a key shaft (14), a back-off joint (15), a double public short-circuit (16), an upper main body of sleeve pipe packer (17), a rotary joint (24), a lower main body of sleeve pipe packer (26). The running rod (5) and the running rod joint (6), the running rod joint (6) and the key shaft (14) are connected by a T-shaped button. The slip back-off wheel (13) is connected with the back-off joint (15) by a T-shaped button. The double public short-circuit is connected with the back-off shaft (15) and the upper main body of the sleeve pipe packer (17) by screw thread. The rotary joint (24) is connected with the upper main body of the sleeve pipe packer (17) and the upper main body of the sleeve pipe packer (26) by a T-shaped button. The running tool could pressurize the packer directly through the pressure block and facilitate the base sealing of the packer.

Description

Extension hanger running tool assembly
Technical field
The utility model relates to solid, the completion tool of a kind of oil gas well tail pipe, the solid completion extension hanger running tool assembly of particularly a kind of oil gas well.
Background technology
Tail pipe is solid, completion technique is solid at the oil gas well, it is increasingly extensive to use in the completion, and the extension hanger running tool is solid as tail pipe, the main tool of completion technique has obtained fast development.Liner completion mode commonly used has two kinds: a kind of is the liner completion mode that needs cementing well; Another kind is the liner completion mode that need not cement the well.For the liner completion mode that need not cement the well, adopt usually the hanger running tool will with the supporting use of pressure ball seat of spraining, and seat is hung the back ball seat and ball all can not reclaim,
Summary of the invention
This practical purpose is to overcome above-mentioned technical deficiency, the extension hanger running tool that provides a kind of liner completion mode that need not cement the well to use, can not need and the supporting use of ball seat, when suspension finishes, running tool and ball can reclaim, also can directly pressurize, make packer set by pressurizing block.
The utility model by crossover sub 1, centralizer 4, send into bar 5, send into knock-off joint 6, pressurizing block 8, pressurizing block spring 9, wheel ball bearing permanent seat ring 10, just ball 11, wheel ball bearing are forwarded main body 17 on circle 12, slip back-off wheel 13, key axle 14, back-off joint 15, two public short circuit 16, the casing packer, are gone up guide ring 18, pressure ring 19, support ring 20, locating ring 21, V-shaped seal ring 22, main body 26 etc. is formed under guide ring 23, swivel joint 24, the casing packer down.Crossover sub 1 with send into bar 5 and link by the T type and connect, centralizer 4 is enclosed within to be sent on the bar 5, send into bar 5 and send into knock-off joint 6 and link by the T type and connect, crossover sub 1, send into bar 5, send into and all adopt O RunddichtringO sealing between the knock-off joint 6, wheel ball bearing is forwarded circle 12 and wheel ball bearing permanent seat ring 10 is enclosed within on the key axle 14, and firm ball 11 is contained in the middle of them.Send into knock-off joint 6 and link by the T type with key axle 14 and connect, adopt the sealing of O RunddichtringO between them.Pressurizing block spring 9 is loaded in the groove on the pressurizing block 8, pressurizing block 8 is contained in sends between knock-off joint 6 and the wheel ball bearing permanent seat ring 10 then.Slip back-off wheel 13 is enclosed within key axle 14, and links by the T type with back-off joint 15 and to connect, and adopts the sealing of O RunddichtringO between them.Two public short circuits 16 are connected on back-off joint 15 and the casing packer between the main body 17 by tubing thread.Last guide ring 18, pressure ring 19, support ring 20, locating ring 21, V-shaped seal ring 22, guide ring 23 all is enclosed within on the casing packer main body 26 under the main body 17 and casing packer down, seals at the hanger inwall.Swivel joint 24 snaps onto on the casing packer under the main body 17 and casing packer between the main body 26 by the T type, and adopts the sealing of O RunddichtringO, and has fluid course on swivel joint 24.
Advantage of the present utility model is: this running tool can make packer set by pressurizing block directly to packer pressurization, and it does not need ball seat during with the supporting use of hanger, and when suspension finished, running tool and ball can reclaim.
Description of drawings
Fig. 1 the utility model structural representation.
Specific embodiments
The utility model is described in more detail below in conjunction with accompanying drawing.This assembly mainly by crossover sub 1, centralizer 4, send into bar 5, send into knock-off joint 6, pressurizing block 8, pressurizing block spring 9, wheel ball bearing permanent seat ring 10, just ball 11, wheel ball bearing are forwarded main body 17 on circle 12, slip back-off wheel 13, key axle 14, back-off joint 15, two public short circuit 16, the casing packer, are gone up guide ring 18, pressure ring 19, support ring 20, locating ring 21, V-shaped seal ring 22, main body 26 etc. is formed under guide ring 23, swivel joint 24, the casing packer down.Crossover sub 1 links by the T type and connects with sending into bar 5, and centralizer 4 is enclosed within to be sent on the bar 5, sends into bar 5 and send into knock-off joint 6 to link by the T type and connect, and crossover sub 1, sends into bar 5, sends into and all adopt the O-ring seals sealing between the knock-off joint 6.Wheel ball bearing is forwarded circle 12 and wheel ball bearing permanent seat ring 10 is enclosed within on the key axle 14, and firm ball 11 is contained in the middle of them.Send into knock-off joint 6 and link by the T type with key axle 14 and connect, adopt the O-ring seals sealing between them.Pressurizing block spring 9 is loaded in the trough on the pressurizing block 8, pressurizing block 8 is contained in sends between knock-off joint 6 and the wheel ball bearing permanent seat ring 10 then.Slip back-off wheel 13 is enclosed within key axle 14, and links by the T type with back-off joint 15 and to connect, and adopts the O-ring seals sealing between them.Two public short circuits 16 are connected on back-off joint 15 and the casing packer between the main body 17 by tubing thread.Last guide ring 18, pressure ring 19, support ring 20, locating ring 21, V-shaped seal ring 22, guide ring 23 all is enclosed within on the casing packer main body 26 under the main body 17 and casing packer down, seals at the hanger inwall.Swivel joint 24 snaps onto on the casing packer under the main body 17 and casing packer between the main body 26 by the T type, adopts the O-ring seals sealing between them, and have fluid course on swivel joint 24.
The specific embodiment of the present utility model: the slip back-off of running tool wheel 13 is connected with the back-off joint of the suspension packing assembly that connects.Be connected with crossover sub 1 with drilling rod suspension packing assembly is delivered to the precalculated position by running tool, the pitching pressure of spraining then, at this moment liquid is given hanger by the fluid course pressure transmission on the swivel joint 24, and the hanger seat is hung.Carry out back-off operation then, certain altitude will be carried after having fallen to detain on the running tool, at this moment pressurizing block 8 is suggested the tieback tube, and pressurized spring 9 ejects, at this moment the pressurizing block external diameter is greater than tieback tube internal diameter, press down running tool, pressurizing block is just pressing the tieback tube to move down, thereby realizes packer set.At last pit shaft is proposed running tool.

Claims (6)

1, a kind of extension hanger running tool assembly, it is characterized in that: by crossover sub (1), centralizer (4), send into bar (5), send into knock-off joint (6), pressurizing block (8), pressurizing block spring (9), wheel ball bearing permanent seat ring (10), firm ball (11), wheel ball bearing is forwarded circle (12), slip back-off wheel (13), key axle (14), back-off joint (15), two public short circuits (16), main body on the casing packer (17), last guide ring (18), pressure ring (19), support ring (20), locating ring (21), V-shaped seal ring (22), following guide ring (23), swivel joint (24), main body under the casing packer (26) is formed, crossover sub (1) with send into bar (5) and link by the T type and connect, centralizer (4) is enclosed within to be sent on the bar (5), send into bar (5) and send into knock-off joint (6) and link by the T type and connect, wheel ball bearing forwards circle (12) and wheel ball bearing permanent seat ring (10) is enclosed within on the key axle (14), firm ball (11) is contained in wheel ball bearing and forwards in the middle of circle (12) and the wheel ball bearing permanent seat ring (10), sending into knock-off joint (6) and key axle (14) links by the T type and connects, pressurizing block spring (9) is loaded in the groove on the pressurizing block (8), then pressurizing block (8) is contained in and sends between knock-off joint (6) and the wheel ball bearing permanent seat ring (10), slip back-off wheel (13) is enclosed within key axle (14), lower end and back-off joint (15) link by the T type and connect, two public short circuits (16) are connected on back-off joint (15) and the casing packer between the main body (17) by tubing thread, last guide ring (18), pressure ring (19), support ring (20), locating ring (21), V-shaped seal ring (22), following guide ring (23) all is enclosed within main body on the casing packer (17) and the casing packer on the main body (26), and swivel joint (24) snaps onto under main body on the casing packer (17) and the casing packer between the main body (26) by the T type.
2, extension hanger running tool assembly according to claim 1 is characterized in that: crossover sub (1), send into bar (5), send between the knock-off joint (6) and to adopt the sealing of O RunddichtringO.
3, extension hanger running tool assembly according to claim 1 is characterized in that: send into and adopt the sealing of O RunddichtringO between knock-off joint (6) and the key axle (14).
4, extension hanger running tool assembly according to claim 1 is characterized in that: adopt the sealing of O RunddichtringO between slip back-off wheel (13) and the back-off joint (15).
5, extension hanger running tool assembly according to claim 1 is characterized in that: adopt the sealing of O RunddichtringO on swivel joint (24) and the casing packer under main body (17) and the casing packer between the main body (26).
6, extension hanger running tool assembly according to claim 1, it is characterized in that: swivel joint has fluid course on (24).
CN 200620117562 2006-05-25 2006-05-25 Cartridge container hanger delivery tool assembly Expired - Lifetime CN200952369Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200620117562 CN200952369Y (en) 2006-05-25 2006-05-25 Cartridge container hanger delivery tool assembly

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200620117562 CN200952369Y (en) 2006-05-25 2006-05-25 Cartridge container hanger delivery tool assembly

Publications (1)

Publication Number Publication Date
CN200952369Y true CN200952369Y (en) 2007-09-26

Family

ID=38810670

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200620117562 Expired - Lifetime CN200952369Y (en) 2006-05-25 2006-05-25 Cartridge container hanger delivery tool assembly

Country Status (1)

Country Link
CN (1) CN200952369Y (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101503952B (en) * 2008-02-04 2012-05-23 中国石油化工股份有限公司 Seat seal mechanism used for packing type tail pipe hanger
CN103140647A (en) * 2010-08-23 2013-06-05 阿克深海有限公司 Subsea running tool with emergency release
CN105484692A (en) * 2014-10-11 2016-04-13 通用电气石油和天然气压力控制有限公司 Comprehensive wellhead operation tool and application method thereof

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101503952B (en) * 2008-02-04 2012-05-23 中国石油化工股份有限公司 Seat seal mechanism used for packing type tail pipe hanger
CN103140647A (en) * 2010-08-23 2013-06-05 阿克深海有限公司 Subsea running tool with emergency release
US9121238B2 (en) 2010-08-23 2015-09-01 Aker Subsea Limited Subsea running tool with emergency release
CN103140647B (en) * 2010-08-23 2015-12-16 阿克深海有限公司 With the running tool under water of urgent release
CN105484692A (en) * 2014-10-11 2016-04-13 通用电气石油和天然气压力控制有限公司 Comprehensive wellhead operation tool and application method thereof
CN105484692B (en) * 2014-10-11 2018-04-24 通用电气石油和天然气压力控制有限公司 A kind of comprehensive shaft mouth operation instrument and its application method

Similar Documents

Publication Publication Date Title
CN200952369Y (en) Cartridge container hanger delivery tool assembly
CN201650203U (en) Double rubber-barrel isolation packer
CN102268974A (en) Special tail pipe hanging packing assembly for shallow horizontal well
CN202338247U (en) Three-phase releasing tool
CN201258843Y (en) Pumping unblocking pump
CN201778744U (en) Releasing packer for oil well
CN2651433Y (en) Small diameter inflatable packer for water injection well
CN2908761Y (en) Hanger for rotary cartriage container
CN2654845Y (en) Built in bag type leaking stoppage apparatus
CN2806750Y (en) Flexile anchorage device for oil well
CN206707670U (en) Automatic reset hole packer
CN2660108Y (en) Double balance cylinder compression packer
CN2470626Y (en) Non-return reflux valve
CN2632304Y (en) Diameter variable drivepipe hanging mechanical plugger
CN201024942Y (en) Drilling free blind plate device
CN202148879U (en) Hanging packer for horizontal well
CN202249924U (en) Tail pipe suspending packing assembly special for shallow horizontal well
CN2711377Y (en) Subsidizing device for unlimited extending casing
CN2734979Y (en) Rotary eccentric tubing anchor
CN2616672Y (en) Oil-gas well cementation apparatus
CN2660107Y (en) Rotary packer
CN2929251Y (en) Tubular deep well oil pump supercharger
CN201170167Y (en) Anti-wear apparatus of oil pump
CN2453127Y (en) Ground anchor
CN2675851Y (en) Leakage stopper with externally placed bag

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20081212

Address after: Hongyan Karamay Road, the Xinjiang Uygur Autonomous Region No. 80, zip code: 834000

Patentee after: Western Drilling Kelamayi Drilling Technology Institute

Address before: Hongyan Karamay Road, the Xinjiang Uygur Autonomous Region No. 80, zip code: 834000

Patentee before: Research Inst of Drilling Technology, Xinjiang Petroleum Administration

ASS Succession or assignment of patent right

Owner name: WEST DRILLING KARAMAY DRILLING CRAFT RESEARCH INST

Free format text: FORMER OWNER: DRILLING WELL TECHNOLOGY INSTITUTE, PETROLEUM ADMINISTRATION BUREAU, XINJIANG

Effective date: 20081212

CX01 Expiry of patent term

Granted publication date: 20070926

EXPY Termination of patent right or utility model