CN200950104Y - Tube blanking adapter for oil sleeve explosive experiment - Google Patents
Tube blanking adapter for oil sleeve explosive experiment Download PDFInfo
- Publication number
- CN200950104Y CN200950104Y CN 200620045964 CN200620045964U CN200950104Y CN 200950104 Y CN200950104 Y CN 200950104Y CN 200620045964 CN200620045964 CN 200620045964 CN 200620045964 U CN200620045964 U CN 200620045964U CN 200950104 Y CN200950104 Y CN 200950104Y
- Authority
- CN
- China
- Prior art keywords
- plug
- limbers
- pipe
- tubing
- diameter
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Landscapes
- Investigating Strength Of Materials By Application Of Mechanical Stress (AREA)
Abstract
The utility model discloses a pipe bulkhead for oil sleeve burst test, which includes a front bulkhead and a rear bulkhead; the front bulkhead is a water filling bulkhead,while the rear bulkhead is a gas discharge bulkhead; both bulkheads have basically the same structure of conic frustum, the large diameter is bigger than the outer diameter of the largest pipe to be tested, the small diameter is smaller than the inner diameter of the smaller pipe to be tested, the conic angle is 30 degrees to 45 degrees, a pressure increase limber hole and a plurality of water filling limber holes are positioned at the front bulkhead, and a limber hole is arranged at the rear bulkhead. The model is universally applicable to steel pipes with different outer diameters within a certain range, which improves the changeability, saves the design and processing cost, shortens the water filling time and improves the test efficiency.
Description
Technical field
The utility model relates to the port plug of pipeline, particularly a kind of heavy caliber tubing and casing explosion bulge test body plug.
Background technology
Petroleum gas is everlasting with tubing and casing and is used under the condition of high temperature, high pressure, in the world pressure energy power in this tubing and casing body anti-is all had corresponding requirement and test method.Tubing and casing production firm make and R﹠D process in, must testing laboratory use explosion bulge test equipment simulate the oil well actual condition and to tubing and casing anti-in the pressure energy masterpiece go out evaluation, draw data-guiding production and R﹠D work.
The application of plug mainly is to be used for occasions such as low-pressure system, finding pass structure, Hardware fitting sealing, be applied in the explosion bulge test of steel pipe high pressure plug seldom.Jap.P. JP08005501A discloses a kind of steel pipe internal pressure test plug, adopts non-electroplating equipment wielding machine formula to connect plug, by screw thread and packoff sealing pipe two ends.This complete equipment is applicable to the internal pressure test of small tubes, but for big caliber pipe, plug is too heavy, and difficulty is installed.And complicated integral structure, operation inconvenience, interchangeability is poor.
The tubing and casing bursting test machine is that a cover is strongly professional, the equipment that working pressure is very high, and pressure will be higher in the about 182Mpa of maximum internal pressure in the API tubing and casing, the thick-walled pipe of the nonstandard design of some specific uses.Therefore have only oil exploitation research institution and oil well pipe manufacturer to be equipped with such equipment.
CNPC's Xi'an tubing explosion bulge test equipment, designed capacity covers tubing and casing and all specifications of line pipe.Weld with the semisphere plug at the pipe two ends, and after the single test, cutting plug can reuse, and the structure of this plug 11 and the tubing and casing of connection 12 thereof are as shown in Figure 1.Although this semicircle plug 11 is stressed more even, processed complex; Be used for the large diameter pipe period of the day from 11 p.m. to 1 a.m and be difficult for the location, the welding difficulty; Plug interchangeability is poor, and the pipe of different size, different wall all will be joined the plug of a corresponding specification; Entery and delivery port 121 is opened on body by the mode of welding, fills with pipe though can guarantee water, and the welding position has become the weak link of a recessiveness, and explosion from here probably causes test failure in the process of boosting; Each test all need hole on body and welded the water-in and water-out joint, processing difficulties, and this contradiction of specification thick-walled pipe is more outstanding greatly.
The bursting test machine set of equipments that Japan's Yamamoto hydraulic pressure industry is developed, the structure of its plug 21 and the tubing and casing of connection 22 thereof are as shown in Figure 2, whole plug 21 is cap-like, radially be provided with a limbers 211 at plug 21, two limberss 212 that are axially arranged with at plug 21 communicate with limbers 211 radially, in order to reduce weight, the plug inboard is groove shape, guarantees that 8-10 that final plug thickness is the pipe wall thickness doubly.After the single test, cutting plug can reuse, and test specification covers 2 3/8 " 5 but also 1/2 " tubing and casing not only.Find that in process of the test also there are a lot of deficiencies in this plug of Japan: the test pipe of each specification wall thickness of the first all will have the plug of a corresponding specification to be complementary, and interchangeability is poor; It two is that water injection hole has only one, and according to standard-required, the length L of test pipe must not be less than 10 times of pipe diameter.For tubule footpath oil pipe, the test pipe is shorter, and by a water injection hole water filling, the time of fills with water can be not oversize yet, as 2 and 7/8 " pipe probably only need 15~20 minutes." sleeve pipe has increased to 3m according to the requirement of caliber developmental tube length, and by a water injection hole water filling, efficient sharply reduces, and needs more than 30 hours, and the test period is oversize but when experimental sample tube is the heavy caliber sleeve pipe, as 20.
The utility model content
The purpose of this utility model is to provide a kind of tubing and casing explosion bulge test body plug of novel structure, enables in the steel pipe of various outer diameter within the specific limits general.
The purpose of this utility model is achieved in that a kind of tubing and casing explosion bulge test body plug, plug and back plug before comprising, plug is a water filling end plug before described, back plug is the exhaust end plug, the structure of two plugs is basic identical, be class circular cone stage body, its outside diameter is greater than the external diameter of the maximum pipe of needs test, its end diameter is less than the internal diameter of the minimum pipe of needs test, its conical surface angle is 30 °-45 °, plug is provided with boost limbers and a plurality of water fillings limbers before described, and described back plug is provided with an air hole.
Before described plug and back plug all within it middle side part be provided with a groove, the interior thickness that its bottom land thickness is plug for the 2-3 of the maximum pipe wall thickness that needs test doubly.
The limbers of boosting before described being arranged on the plug is arranged on the outer ring of plug, minimum pipe inside radius 30~40mm that it is tested less than needs apart from the distance in the plug center of circle, a plurality of water fillings limbers is arranged on the inner ring of plug, minimum pipe inside radius 40~50mm that it is tested less than needs apart from the distance in the plug center of circle; The position of an air hole after described being arranged on the plug is corresponding with the limbers of boosting on being arranged on preceding plug.
Water filling limbers before described being arranged on the plug is two, and two water filling limberss are with respect to the limbers of boosting and are symmetrical arranged, and respectively and boost and form 30 °-50 ° central angle between the limbers.
The diameter of the water filling limbers before described being arranged on the plug is greater than the diameter of the limbers of boosting.
The explosion bulge test of the utility model tubing and casing owing to adopted above technical scheme, makes it compared with prior art with the body plug, has following advantage:
1, because plug is designed to have certain thickness class circular cone stage body, general in the steel pipe of various outer diameter that can be within the specific limits, the pipe of avoiding each specification all must supporting a pair of different joint, has improved interchangeability,
2, owing to be provided with boost limbers and a plurality of water fillings limbers on plug, water injection time has been shortened in the several water fillings limbers and the limbers water filling simultaneously of boosting greatly during water filling, has improved test efficiency.
3, owing to be provided with a groove in the middle inside of plug, the interior thickness that its bottom land thickness is plug for the 2-3 of the maximum pipe wall thickness that needs test doubly, when guaranteeing plug intensity, reduced the gross weight of plug effectively.
Description of drawings
Fig. 1 is the structural representation of the tubing and casing of a kind of semisphere plug of prior art and connection thereof;
Fig. 2 is the structural representation of the tubing and casing of another kind of plug of prior art and connection thereof;
Fig. 3 is the structural representation of the preceding plug in the utility model;
Fig. 4 is the sectional structure synoptic diagram of preceding plug shown in Figure 3;
Fig. 5 is the structural representation of the back plug in the utility model;
Fig. 6 is the sectional structure synoptic diagram of back shown in Figure 5 plug;
Fig. 7 is used for the assembling synoptic diagram of big specification pipe for the utility model;
Fig. 8 is used for the assembling synoptic diagram of small dimension pipe for the utility model.
Embodiment
The utility model tubing and casing explosion bulge test body plug, plug 3 and back plug 4 before comprising, wherein, preceding plug 3 is water filling end plug, its structure is as shown in Figure 3, Figure 4; Back plug 4 is the exhaust end plug, its structure such as Fig. 5, shown in Figure 6.The structure of preceding plug 3 and back plug 4 is basic identical, is class circular cone stage body, and its outside diameter is greater than the external diameter of the maximum pipe of needs test, and its end diameter is less than the internal diameter of the minimum pipe of needs test, and its conical surface angle is 30 °-45 °.In addition, for weight reduction, preceding plug 3 and back plug 4 all within it middle side part be provided with a groove, the interior thickness that its bottom land thickness is plug for the 2-3 of the maximum pipe wall thickness that needs test doubly.Different is, is provided with boost limbers 31 and a plurality of water fillings limbers 32 on preceding plug 3, is being provided with an air hole 41 on the plug 4 of back.
Continuation is referring to Fig. 3, Fig. 4, the outer ring of plug before the limbers 31 of boosting before being arranged in the utility model on the plug is arranged on, minimum pipe inside radius 30~40mm that it is tested less than needs apart from the distance in the plug center of circle, the liquid level that can guarantee water when water filling like this is the highest, can satisfy boosting of interior each specification pipe of respective range simultaneously.The inner ring of plug before two water filling limberss 32 are arranged on, minimum pipe inside radius 40~50mm that it is tested less than needs apart from the distance in the plug center of circle, its diameter is far longer than the diameter of the limbers of boosting, can supply auxilliary coordinative composition of equipments with conventional waterflood, guarantee the height of water filling liquid level, and satisfy the quick water filling of each specification pipe in the respective range.In order not take place to interfere mutually with the hole of boosting when mounted, two water filling limberss are with respect to the limbers of boosting and are symmetrical arranged, and respectively and boost and form 30 °-50 ° central angle between the limbers.
Continuation is referring to Fig. 5, Fig. 6, and the position that is arranged on an air hole 41 on the plug 4 of back in the utility model is corresponding with the limbers of boosting on being arranged on preceding plug.
The assembling situation that the explosion bulge test of the utility model tubing and casing is used for the maximum specification pipe with the body plug as shown in Figure 7; The assembling situation that is used for the minimum gauge pipe as shown in Figure 8.
Adopt the explosion bulge test of the utility model tubing and casing tubing and casing to be carried out explosion bulge test and be divided into 7 steps: 1, pipe processing two chamfers with the body plug; 2, select the plug and the processing of appropriate size according to the specification of pipe; 3, the front and back plug is welded on the two ends of developmental tube respectively; 4, install; 5, water filling; 6, boost; 7, follow-up data is handled and the work of dealing with problems arising from an accident.
Cooperation is referring to Fig. 7, Fig. 8, program after test pipe end and the plug processing is as follows: the two ends that preceding plug 3 and back plug 4 are welded on developmental tube 5 respectively, and the developmental tube 5 that the air hole 41 on boost limbers 31 and the back plug 4 on the plug 3 remains on same horizontal line → will weld plug before making is placed on the test fixed mount fixing, boost limbers 31 and air hole 41 of assurance directly is connected water swivel and the hole water flowing device 6 that boosts at upside → water flowing flexible pipe, the hole water flowing device 6 that boosts links to each other by fastening bolt 7 and the corresponding plug limbers 31 of boosting, water filling limbers 32 by water injection hole water flowing device 8 directly be connected with flexible pipe with water swivel → back plug air hole 41 usefulness fastening bolts 9 are connected with air-breather 10 → water filling → treat that air-breather sprays after the water, stop up all water filling limberss of sealing earlier, change air-breather 10 with stopping up again, sealing air hole 41 → the unload water service pipe of the limbers of boosting is with fastening bolt 7 connection booster systems and plug 3 → boost to explosion.
Claims (5)
1, a kind of tubing and casing explosion bulge test body plug, plug and back plug before comprising, it is characterized in that: plug is a water filling end plug before described, back plug is the exhaust end plug, the structure of two plugs is basic identical, be class circular cone stage body, its outside diameter is greater than the external diameter of the maximum pipe of needs test, its end diameter is less than the internal diameter of the minimum pipe of needs test, its conical surface angle is 30 °-45 °, plug is provided with boost limbers and a plurality of water fillings limbers before described, and described back plug is provided with an air hole.
2, tubing and casing explosion bulge test body plug as claimed in claim 1, it is characterized in that: before described plug and back plug all within it middle side part be provided with a groove, the interior thickness that its bottom land thickness is plug for the 2-3 of the maximum pipe wall thickness that needs test doubly.
3, tubing and casing explosion bulge test body plug as claimed in claim 1, it is characterized in that: the limbers of boosting before described being arranged on the plug is arranged on the outer ring of plug, minimum pipe inside radius 30~40mm that it is tested less than needs apart from the distance in the plug center of circle, a plurality of water fillings limbers is arranged on the inner ring of plug, minimum pipe inside radius 40~50mm that it is tested less than needs apart from the distance in the plug center of circle; The position of an air hole after described being arranged on the plug is corresponding with the limbers of boosting on being arranged on preceding plug.
4, tubing and casing explosion bulge test body plug as claimed in claim 1, it is characterized in that: the water filling limbers before described being arranged on the plug is two, two water filling limberss are with respect to the limbers of boosting and are symmetrical arranged, and respectively and boost and form 30 °-50 ° central angle between the limbers.
5, tubing and casing explosion bulge test body plug as claimed in claim 1 is characterized in that: the diameter of the water filling limbers before described being arranged on the plug is greater than the diameter of the limbers of boosting.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 200620045964 CN200950104Y (en) | 2006-09-19 | 2006-09-19 | Tube blanking adapter for oil sleeve explosive experiment |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 200620045964 CN200950104Y (en) | 2006-09-19 | 2006-09-19 | Tube blanking adapter for oil sleeve explosive experiment |
Publications (1)
Publication Number | Publication Date |
---|---|
CN200950104Y true CN200950104Y (en) | 2007-09-19 |
Family
ID=38892644
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 200620045964 Expired - Lifetime CN200950104Y (en) | 2006-09-19 | 2006-09-19 | Tube blanking adapter for oil sleeve explosive experiment |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN200950104Y (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102581557A (en) * | 2012-02-23 | 2012-07-18 | 滁州安迈达特种铝业有限公司 | Processing technology for seamless plug of handle of refrigerator door |
CN104295853A (en) * | 2014-09-26 | 2015-01-21 | 天津钢管集团股份有限公司 | Blocking end plug for external pressure gas sealing test of pipes |
CN107989766A (en) * | 2017-11-27 | 2018-05-04 | 浙江艾力芬特泵业科技有限公司 | Pump head for plunger type metering pump and outlet valve with exhaust structure |
CN112196999A (en) * | 2020-10-26 | 2021-01-08 | 中国人民解放军军事科学院国防工程研究院工程防护研究所 | Explosion cavity pressure equalizing structure for medium-high pressure explosive load generator |
CN112824046A (en) * | 2019-11-20 | 2021-05-21 | 宝山钢铁股份有限公司 | Inner wall combined sand prevention plug for sand blasting of external threads of oil casing and anti-blocking method thereof |
-
2006
- 2006-09-19 CN CN 200620045964 patent/CN200950104Y/en not_active Expired - Lifetime
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102581557A (en) * | 2012-02-23 | 2012-07-18 | 滁州安迈达特种铝业有限公司 | Processing technology for seamless plug of handle of refrigerator door |
CN104295853A (en) * | 2014-09-26 | 2015-01-21 | 天津钢管集团股份有限公司 | Blocking end plug for external pressure gas sealing test of pipes |
CN104295853B (en) * | 2014-09-26 | 2016-04-06 | 天津钢管集团股份有限公司 | The shutoff end plug of tubing external pressure hermetic seal test |
CN107989766A (en) * | 2017-11-27 | 2018-05-04 | 浙江艾力芬特泵业科技有限公司 | Pump head for plunger type metering pump and outlet valve with exhaust structure |
CN112824046A (en) * | 2019-11-20 | 2021-05-21 | 宝山钢铁股份有限公司 | Inner wall combined sand prevention plug for sand blasting of external threads of oil casing and anti-blocking method thereof |
CN112196999A (en) * | 2020-10-26 | 2021-01-08 | 中国人民解放军军事科学院国防工程研究院工程防护研究所 | Explosion cavity pressure equalizing structure for medium-high pressure explosive load generator |
CN112196999B (en) * | 2020-10-26 | 2024-02-09 | 中国人民解放军军事科学院国防工程研究院工程防护研究所 | Explosion cavity pressure equalizing structure for medium-high pressure explosion load generator |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN200950104Y (en) | Tube blanking adapter for oil sleeve explosive experiment | |
CN107893884A (en) | A kind of submarine pipeline connects device | |
CN107701834B (en) | A kind of sealing force adjustable water lower flange | |
CN205640034U (en) | Submarine pipeline device is restoreed to split type hydraulic pressure | |
CN201875311U (en) | Seal joint in hydraulic system | |
CN1126892C (en) | Expansion shaped insertion-type steel tubes for both flexible and rigid joining and its manufacture technology | |
CN214309928U (en) | Tool for pressure test of pipe body of ultra-high pressure container | |
CN205826412U (en) | A kind of tubing special fixture for hydrostatic tester | |
CN212722336U (en) | Automobile pier head type pipeline blasting test tool | |
CN2748739Y (en) | Conduit coupling apparatus | |
CN107838669A (en) | A kind of seabed clamp coupling tools for bolts ' pretension instrument | |
CN102951383A (en) | Sealed oil nozzle used for oil bag | |
CN207179004U (en) | A kind of underwater Management of Pipeline Mechanical Equipment connector | |
CN207454984U (en) | A kind of slide-in type bellmouth pipe fitting | |
CN200946727Y (en) | Push-insert-press tight type connecting tube and pipe adaptor | |
CN203431405U (en) | Mounting device for mounting water pressure barrel on pipe connector in water pressure test | |
CN109253914A (en) | A kind of threaded connection carrying sealing device for the full-scale evaluation test of tubing | |
CN105782635A (en) | Split type hydraulic repair device for submarine pipelines | |
CN201466660U (en) | Split type cable connection structure for oil gas exploitation intellect drill string adapter | |
CN1234992C (en) | Combustion gas pipes house lead-in connecting equipment | |
CN219389004U (en) | Plugging tool for perforating welding branch pipe of oil and gas gathering and transportation pipeline | |
CN218719453U (en) | Throttling device applied to pipe joint | |
CN102011905A (en) | Sealing joint in hydraulic system | |
CN220302435U (en) | Complete pressure-resistant test fixture for energy accumulator | |
CN220930504U (en) | Joint |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CX01 | Expiry of patent term |
Granted publication date: 20070919 |
|
EXPY | Termination of patent right or utility model |