CN200948403Y - Spraying tube - Google Patents

Spraying tube Download PDF

Info

Publication number
CN200948403Y
CN200948403Y CN 200620107653 CN200620107653U CN200948403Y CN 200948403 Y CN200948403 Y CN 200948403Y CN 200620107653 CN200620107653 CN 200620107653 CN 200620107653 U CN200620107653 U CN 200620107653U CN 200948403 Y CN200948403 Y CN 200948403Y
Authority
CN
China
Prior art keywords
arm
shower
utility
model
absorption tower
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN 200620107653
Other languages
Chinese (zh)
Inventor
赵博
吴跃
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Tuna Environmental Science and Technology Co Ltd
Original Assignee
Zhejiang Tuna Environmental Science and Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Tuna Environmental Science and Technology Co Ltd filed Critical Zhejiang Tuna Environmental Science and Technology Co Ltd
Priority to CN 200620107653 priority Critical patent/CN200948403Y/en
Application granted granted Critical
Publication of CN200948403Y publication Critical patent/CN200948403Y/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Abstract

The utility model discloses a shower, comprising a main tube arranged in an absorption tower. The main tube is evenly connected with a plurality of branch tubes; the branch tubes are evenly connected with a plurality of small tubes, and a nozzle is arranged on each small tube. The branch tubes of the utility model are connected on the inner wall of the absorption tower by a plurality of hanger plates; no bolt is used for supporting, greatly reducing the production cost; the connection method between the main tubes and the small tubes are improved from the traditional flange connection to the fiberglass resin winding connection, avoiding the use of bolts and nuts for the flange connection, so that the cost is saved greatly. Moreover the utility model is convenient for construction, structure strength reinforcement and anti-corrosion performance, and can avoid the leakage of grouts.

Description

Shower
Technical field
The utility model relates to a kind of shower, belongs to technical field of waste gas treatment.
Background technology
Traditional shower, exist certain defective in the following aspects: 1, connected mode: in the traditional handicraft, the method of attachment of the person in charge and arm, tubule and nozzle adopts flange to be connected, its shortcoming is the use that flange connects alloy bolt, nut, cost is increased, and be not easy to construction, structural strength and antiseptic property are poor, easily cause the seepage of slurries; 2, the arm strong point: it also is bolt, the nut support 21 (as shown in Figure 1) that adopts alloy that traditional arm 4 supports, because the costliness of alloy bolt price is difficult on the cost bear; 3, overflow: FGD hinders when shutting down for some reason, and the slurries that are trapped in shower can flow out from the nozzle of spout hole, if the untimely discharge of slurries in shower the inside precipitation, causes the obstruction of shower and nozzle easily; If slurries flow back to the circulating pump the inside, can cause the damage of circulating pump, cause whole absorption tower to stop work.
The utility model content
The purpose of this utility model is to overcome above-mentioned the deficiencies in the prior art, provide a kind of cost low, connect fastening, leak free shower.
The utility model is achieved through the following technical solutions above-mentioned purpose: a kind of shower, comprise the person in charge who is installed in the absorption tower, on being responsible for, evenly be connected with some arms, on arm, evenly be connected with some tubules, nozzle is installed on the tubule, it is characterized in that: on the inwall of absorption tower, be provided with some tube connectors, link by boatswain chair between arm and the tube connector.
The utility model further is set to: adopt glass fiber resin (hereinafter to be referred as FBR) to be intertwined and connected between the person in charge and the arm;
Described tube connector adopts steel pipe to make, and the surface scribbles one deck anticorrosive coat; Boatswain chair adopts FBR to make, and all is provided with backing plate between boatswain chair and tube connector, boatswain chair and the arm.
Below being responsible for, be provided with spout hole.
The beneficial effects of the utility model are: be responsible for and the method for attachment of tubule is connected from conventional flange and is modified to the glass fiber resin winding, avoid flange to connect the use of alloy bolt, nut, save cost greatly, be convenient to construction, strengthened structural strength and antiseptic property, avoided the leakage problems of slurries; Arm is connected on the inwall of absorption tower by boatswain chair, adopts non-bolt to support, and greatly reduces production cost; The design of arm reinforcement strengthened arm intensity, prolonged the service life of spraying layer integral body, and be easy to the maintenance and the maintenance of manually tying whole spraying layer nozzle; Be provided with spout hole below being responsible for, prevention FGD hinders when shutting down for some reason, and the slurries that are trapped in shower can flow out from the nozzle of spout hole, and can cover the low spray blind area of the thick section of shower.
Description of drawings
Fig. 1 is the arm of original shower and the schematic diagram that connects on absorption tower;
Fig. 2 is a structural representation of the present utility model;
Fig. 3 is an arm described in the utility model and the schematic diagram that connects on absorption tower;
Fig. 4 is the side view of Fig. 3;
Fig. 5 is the structural representation of spout hole described in the utility model.
The specific embodiment
With reference to shown in Figure 2, the utility model comprises is responsible for 3, be responsible for 3 by being responsible for flange 1, brace summer 7 is installed in the absorption tower 8, parallel longitudinal is provided with some arms 4 on 3 being responsible for, parallelly on arm 4 be provided with some tubules 5, nozzle 6 is installed on the tubule 5, below being responsible for 3, also be provided with spout hole 9, with reference to shown in Figure 3, adopt glass fiber resin to be intertwined and connected between the person in charge 3 and the arm 4, thereby replacing original bolt connects, saved cost, strengthened antiseptic property, with reference to Fig. 2, Fig. 3, shown in Figure 4, on absorption tower inwall 2, be provided with some tube connectors 10, tube connector 10 is a round steel pipe, on be coated with anticorrosive coat 11 arranged, boatswain chair 12 is the round-meshed FRP plates in two ends, and an end circle hole sleeve of boatswain chair 12 is on arm 4, and an end circle hole sleeve is on tube connector 10, boatswain chair 12 and tube connector 10, all be provided with backing plate 13 between boatswain chair 12 and the arm 4, to strengthen stability and sealing,, below being responsible for 3, also be provided with spout hole 9 with reference to shown in Figure 5, spout hole 9 by be responsible for the 3 emptying tubules 14 that connect, blowdown nozzles 15 is formed, and blowdown nozzles 15 is installed on the emptying tubule 14 by winding layer 16.
The utility model be responsible for 3 and arm 4 between, adopt the glass fiber resin winding between tubule 5 and the nozzle 6, avoid flange to connect the use of alloy bolt, nut, save cost greatly, be convenient to construction, strengthened structural strength and antiseptic property, avoided the leakage problems of slurries; Arm 4 is connected on the absorption tower inwall 2 by boatswain chair 12, adopts non-bolt to support, and greatly reduces production cost; Be provided with spout hole 9 below being responsible for 3, prevention FGD hinders when shutting down for some reason, and the slurries that are trapped in the shower can flow out from the blowdown nozzles 15 of spout hole 9, and can cover the low spray blind area of the thick section of shower.

Claims (6)

1, a kind of shower, comprise the person in charge (3) who is installed in the absorption tower (8), on the person in charge (3), evenly be connected with some arms (4), on arm (4), evenly be connected with some tubules (5), nozzle (6) is installed on the tubule (5), it is characterized in that: on absorption tower inwall (2), be provided with some tube connectors (10), link by boatswain chair (12) between arm (4) and the tube connector (10).
2, a kind of shower according to claim 1 is characterized in that: be responsible for and adopt glass fiber resin to be intertwined and connected between (3) and the arm (4).
3, a kind of shower according to claim 1 is characterized in that: all be provided with backing plate (13) between boatswain chair (12) and tube connector (10), boatswain chair (12) and the arm (4).
4, a kind of shower according to claim 1 is characterized in that: be provided with spout hole (9) below being responsible for (3).
5, according to claim 1 or 3 described a kind of showers, it is characterized in that: described boatswain chair (12) is made for glass fiber resin.
6, according to claim 1 or 3 described a kind of showers, it is characterized in that: described tube connector (10) adopts steel plate to make, and the surface scribbles one deck anticorrosive coat (11).
CN 200620107653 2006-09-14 2006-09-14 Spraying tube Expired - Lifetime CN200948403Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200620107653 CN200948403Y (en) 2006-09-14 2006-09-14 Spraying tube

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200620107653 CN200948403Y (en) 2006-09-14 2006-09-14 Spraying tube

Publications (1)

Publication Number Publication Date
CN200948403Y true CN200948403Y (en) 2007-09-19

Family

ID=38890940

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200620107653 Expired - Lifetime CN200948403Y (en) 2006-09-14 2006-09-14 Spraying tube

Country Status (1)

Country Link
CN (1) CN200948403Y (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101785968A (en) * 2010-03-31 2010-07-28 中环(中国)工程有限公司 Slurry pipe used in spray tower or washing tower
CN105169915A (en) * 2015-09-18 2015-12-23 江苏华星电力环保设备有限公司 Novel desulphurization absorption tower
CN107569997A (en) * 2017-08-23 2018-01-12 河北可利尔环保设备有限公司 A kind of absorption tower slurries spray equipment for power plant's wet desulphurization
CN109630768A (en) * 2018-12-29 2019-04-16 浙江德创环保科技股份有限公司 A kind of desulfuration spraying tube road and its production technology

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101785968A (en) * 2010-03-31 2010-07-28 中环(中国)工程有限公司 Slurry pipe used in spray tower or washing tower
CN101785968B (en) * 2010-03-31 2012-05-23 中环(中国)工程有限公司 Slurry pipe used in spray tower or washing tower
CN105169915A (en) * 2015-09-18 2015-12-23 江苏华星电力环保设备有限公司 Novel desulphurization absorption tower
CN107569997A (en) * 2017-08-23 2018-01-12 河北可利尔环保设备有限公司 A kind of absorption tower slurries spray equipment for power plant's wet desulphurization
CN109630768A (en) * 2018-12-29 2019-04-16 浙江德创环保科技股份有限公司 A kind of desulfuration spraying tube road and its production technology

Similar Documents

Publication Publication Date Title
CN200948403Y (en) Spraying tube
CN205382005U (en) Can promote formula aeration floats complete piping system
CN202413730U (en) Circulating water vehicle flushing system on construction sites
CN200942329Y (en) Demister
CN209607291U (en) A kind of construction site safe construction alarming device
CN206941730U (en) A kind of general flushometer of Asiatic water closet pan toilet bowl
CN213943582U (en) Anticorrosive paint finishing of major diameter body
CN201246535Y (en) Composite pipe for building
CN206600541U (en) A kind of running water drainage pipeline attachment means of convenient connection
CN201050656Y (en) Three-way tube structure for circulating slurry spraying for wet method flue gas desulfurization
CN212813314U (en) Water tank sprinkling irrigation equipment
CN216865334U (en) Outdoor fire hydrant of integral type
CN217002290U (en) High desulfurization slurry circulating pump of pipeline wearability
CN216344510U (en) Anti-seepage device for water supply and drainage pipes in building engineering
CN217202163U (en) Be used for open channel formula ultraviolet disinfection module framed bent front pillar
CN217710309U (en) Drainage structure applying accumulated water in corrugated web steel-concrete combined box girder
CN209995055U (en) multifunctional water-saving device
CN219549908U (en) Sewage is with exhaust pipe
CN219848876U (en) Spraying layer assembly
CN215916541U (en) Endogenous water pressure mud discharging and cleaning device
CN213361399U (en) Municipal administration water supply and drainage pipeline connection structure
CN220360658U (en) A reform transform formula shower for in aspect of environmental protection
CN217005416U (en) Anti-dripping quench tower
CN216474764U (en) Novel frequency conversion cleans water tank
CN211090652U (en) Water-saving and energy-saving drip irrigation water supply device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee

Owner name: ZHEJIANG TUNA ENVIRONMENTAL SCIENCE + TECHNOLOGY C

Free format text: FORMER NAME: ZHEJIANG TUNA ENVIRONMENTAL PROTECTION SCIENCE + TECHNOLOGY CO., LTD.

CP01 Change in the name or title of a patent holder

Address after: 312000 Zhejiang province Shaoxing Paojiang Industrial Zone Road soup

Patentee after: Zhejiang Tuna Environmental Science & Technology Co., Ltd.

Address before: 312000 Zhejiang province Shaoxing Paojiang Industrial Zone Road soup

Patentee before: Zhejiang Tuna Environmental Protection Science & Technology Co., Ltd.

CX01 Expiry of patent term

Granted publication date: 20070919

EXPY Termination of patent right or utility model