CN200940465Y - Cable anti-blow-out device - Google Patents

Cable anti-blow-out device Download PDF

Info

Publication number
CN200940465Y
CN200940465Y CNU2006200841811U CN200620084181U CN200940465Y CN 200940465 Y CN200940465 Y CN 200940465Y CN U2006200841811 U CNU2006200841811 U CN U2006200841811U CN 200620084181 U CN200620084181 U CN 200620084181U CN 200940465 Y CN200940465 Y CN 200940465Y
Authority
CN
China
Prior art keywords
cable
perforating gun
lower house
upper shell
seal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNU2006200841811U
Other languages
Chinese (zh)
Inventor
吴柏志
陈凡奎
李敬奇
綦耀升
程波
王刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
No3 Downhole Operation Co Shengli Petroleum Administration Bureau Sinopec
Original Assignee
No3 Downhole Operation Co Shengli Petroleum Administration Bureau Sinopec
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by No3 Downhole Operation Co Shengli Petroleum Administration Bureau Sinopec filed Critical No3 Downhole Operation Co Shengli Petroleum Administration Bureau Sinopec
Priority to CNU2006200841811U priority Critical patent/CN200940465Y/en
Application granted granted Critical
Publication of CN200940465Y publication Critical patent/CN200940465Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model discloses a cable blowout preventer which is suitable for workover and logging operation for oilfield, realizing the cable testing operation under the states that the wellhead is confined and controllable. The cable blowout preventer comprises a cable sealing device, a grease pressure compensation device, a gate sealing device, a cable cutting device and a cable clamping device. The utility model is divided into two-body design, which hangs a hanger on a perforating gun after the hanger of the perforating gun passed through the upper shell, connecting the upper shell and the lower shell by big-pitch nuts after the perforating gun passed through the lower shell. The utility model has advantages of light weight, small size, easy operation, practicality, reliable sealing and so on. .

Description

The cable blowout hookup
Technical field
The utility model relates to a kind of well control device, and when the well workover of particularly a kind of oil field, logging operation, cable or rope input operation have the cable blowout hookup that closed operation prevents blowout.
Technical background
At present, in the oil field for the logging operation of high-pressure oil-gas well, especially cable input perforating job is used the conventional well control means, as is used conventional preventer, well head is in complete opening-wide state always, in case the generation blowout because well head can not be directly closed in the effect of cable, can only treat that cable is cut off or the perforating gun ejection after just can close well head, be a kind of spray measure of afterwards robbing, danger is very big.Another kind method is sealing lubricator greater than perforating gun length of upright installation on well head, in case blowout takes place, perforating gun is proposed well head, places the lubricator of upright sealing.If a bite well needs repeatedly perforation, need repeatedly change perforating gun, each perforating gun of changing all will be dismantled lubricator and hang down with hanging device from well head, because the length of perforating gun is generally between 4-12 rice, so sealed tube is greater than this height, loads and unloads very inconvenient.In sum, the perforation of general preventer, well head is in opening-wide state, dangerous property.And with the form perforation of robbing jet pipe,, install, use very inconvenient because structure is too huge.
Summary of the invention
The purpose of this utility model be to realize a kind of in light weight, volume is little, be convenient to operation installs, and can realize the closed perforation blowout hookup of oilfield downhole operation under closed state.The purpose of this utility model is to realize like this, it is by cable sealing device, cable grease pressurization compensation arrangement, flashboard sealing device, the cable clipping apparatus, cable clamping device is formed, in order to alleviate the weight of preventer device, be divided into the design of two bodies, be top and be connected by pitch nut broad in the middle with the lower part.The top latus rectum is less than the lower part latus rectum.The hanger of perforating gun is passed top, then, hanger is hung up perforating gun, by behind the lower part, adopt flange to be connected at top and the bottom and well head with the coarse pitch nut at perforating gun.Partial installation design has like this been avoided because perforating gun diameter and problem that top also will be strengthened thereupon.
Operating principle of the present utility model is: the upper cable hermetic unit adopts multistage packing seal blob of viscose (4) to form high pressure with packing grease compensation water booster system (13) in spacer (3) and follows compensatory grease seal and packing_seal.In spacer (3) space, use cable surface lines gap under the effect of high densification fat, to realize sealing.Cable when moving up and down in spacer (3) space loss of grease by the compensation water booster system (13) replenished, realized the movable sealing that cable moves up and down.Its movable sealing operating pressure is 10MPa.When well head pressure surpassed 10MPa and top seal blob of viscose and can not shunt in a well, the lower part cable clamping device (11) of clockwise direction rotation simultaneously clamped cable, and clockwise direction rotatable cable clipping apparatus (7) is cut off cable then; The outer wellhead cable is mentioned, and closes the full seal apparatus of flashboard (15) and realizes that the reliability of well head is totally-enclosed.Taking kill job elimination borehole pressure fishing.The utlity model has in light weight, volume is little, easy to operate, practical, sealing advantage such as reliable.
Description of drawings
Fig. 1 is a cable preventer master TV structure schematic diagram.
Fig. 2 is a cable preventer side-looking structural representation.
(1) is that blob of viscose pressure cap, (2) are leading screw piston for end cap, (15) for the full seal apparatus of flashboard, (16) for packing grease pressurization compensation arrangement, (14) for vent valve, (13) for cable clamping device, (12) for lower house, (11) for sealing ring, (10) for coarse pitch nut, (9) for cable clipping apparatus, (8) for upper shell, (7) for cushion block, (6) for sealed gluing block, (5) for spacer, (4) for cushion block, (3) among the figure.
The specific embodiment
Describe embodiment of the present utility model in detail below in conjunction with accompanying drawing: coarse pitch nut (8) is dismantled, and top separates with the bottom; To clean up in lower flange bottom surface and the steel ring slot, and be coated with the ring gasket of packing into behind the moderate lubrication fat, the bottom is installed on the well head, guarantee that bottom surface and well head seal with 11 cover well head bolts.And reserve screwhole position at wellhead flange and install the cable transfer gantry, the pressurize end cap (14) of compensation arrangement (13) of packing grease is unloaded, extract leading screw piston (16) out and in tube, fill with lithium base grease, load onto leading screw piston (16) and end cap (14) then respectively, magnetic locator and cable are passed upper diameter 80mm barrel mast; Perforating gun is installed, perforating gun is hung on the magnetic locator, sling in the lump in top and perforating gun, body of a gun aligned with lower diameter 145mm barrel dliameter is put into well, top and bottom centering by hook; After checking that junction surface sealing ring (9) must stand intact, screw connection and sealing that coarse pitch nut (8) guarantees top and the bottom; Putting into cushion block (5) blob of viscose spacer (3), blob of viscose (4), cushion block (2) successively installs blob of viscose pressure cap (1) and screws.Screwing moment of torsion is 50-70kg.m; Vent valve (12) is opened, screw lubricating grease pressurization compensation arrangement (13), the interior air of spacer (3) annular seal space is discharged, from vent valve (12) after having lubricating grease to emerge in the vent valve (12), vent valve (12) is screwed, and screw leading screw piston (16) and can carry out perforating application.Check that the full seal apparatus of flashboard (15), cable clipping apparatus (7), cable clamping device (11) require to be in retracted position; Carry out perforating job.For the first time perforation finishes and when confirming once more perforation, promptly dismantles coarse pitch nut (8), make top and lower part from, perforating gun is proposed, sling simultaneously in perforating gun in top, repetition aforesaid operations process behind the body of a gun that more renews again.Operation when blowout takes place, when blowout took place, if borehole pressure is no more than 10MPa, and the top blob of viscose sealed in the time of still shunting in a well, go up portable cable as early as possible, when perforating gun closes on well head, carry on stopping, behind measures such as kill-job elimination borehole pressure, dismantle coarse pitch nut (8) again, take out perforating gun.If borehole pressure surpasses 10MPa and the top blob of viscose seals in the time of can not shunting in a well, stop to go up portable cable, close cable clamping device (11) clamping cables of symmetry; The cable clipping apparatus (7) of symmetry is mobile to the center rotation simultaneously, cut off cable, external cable is proposed; Then, close the full seal apparatus of flashboard (15) as early as possible, realize reliably shut-in well.After carrying out kill-job, be sure of in the well behind the no pressure of safety coarse pitch nut (8) to be dismantled, mention top, utilize the personality card wireline tool to block to stay the well cable, then the downhole cable and the body of a gun are together proposed well head returning cable clamping device (11).
The utility model can be safe and reliable the generation that prevents gas blowout accident out of control in the wireline test process, avoid cable and downhole tool to salvage, alleviate working strength of workers and save operating cost, social benefit is very remarkable.

Claims (3)

1, a kind of cable blowout hookup, by blob of viscose pressure cap (1), cushion block (2), spacer (3) sealed gluing block (4), vent valve (12), the packing grease compensation full seal apparatus of water booster system (13) flashboard (15), cable clipping apparatus (7), coarse pitch nut (8), sealing ring (9) upper shell (6), lower house (10), cable clamping device (11) is formed, it is characterized in that this device designs for split, be divided into upper shell (6) and lower house (10), after the hanger of perforating gun passes upper shell (6), hanger is hung up perforating gun,, will go up lower house with coarse pitch nut (8) and connect by behind the lower house (10) at perforating gun.
2, cable blowout hookup according to claim 1, it is characterized in that the upper cable hermetic unit adopts multistage packing seal blob of viscose (4) and packing grease compensation water booster system (13), forms high pressure closely with compensatory grease seal and packing_seal in spacer (3).
3, cable blowout hookup according to claim 1 is characterized in that upper shell (6) diameter is 80mm, and lower house (10) diameter is 145mm, adopts big nut (8) to link together between the last lower house, adopts flange to be connected with well head.
CNU2006200841811U 2006-05-08 2006-05-08 Cable anti-blow-out device Expired - Fee Related CN200940465Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2006200841811U CN200940465Y (en) 2006-05-08 2006-05-08 Cable anti-blow-out device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2006200841811U CN200940465Y (en) 2006-05-08 2006-05-08 Cable anti-blow-out device

Publications (1)

Publication Number Publication Date
CN200940465Y true CN200940465Y (en) 2007-08-29

Family

ID=38746643

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2006200841811U Expired - Fee Related CN200940465Y (en) 2006-05-08 2006-05-08 Cable anti-blow-out device

Country Status (1)

Country Link
CN (1) CN200940465Y (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102213082A (en) * 2011-03-23 2011-10-12 承德市开发区富泉石油机械有限公司 Capsule type cable control head
CN105545242A (en) * 2016-01-28 2016-05-04 沈阳工业大学通益科技有限公司 High-temperature wellhead penetrator structure for electric submersible pump
CN116181270A (en) * 2021-11-26 2023-05-30 中国石油天然气股份有限公司 Hydraulic sealing control device for steel wire rope

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102213082A (en) * 2011-03-23 2011-10-12 承德市开发区富泉石油机械有限公司 Capsule type cable control head
CN105545242A (en) * 2016-01-28 2016-05-04 沈阳工业大学通益科技有限公司 High-temperature wellhead penetrator structure for electric submersible pump
CN116181270A (en) * 2021-11-26 2023-05-30 中国石油天然气股份有限公司 Hydraulic sealing control device for steel wire rope

Similar Documents

Publication Publication Date Title
CN201087717Y (en) Integral high-pressure oil water well operation device under pressure
CN208502721U (en) Coiled tubing complex function double ram type preventer
CN108019178A (en) A kind of construction method that non-stop plugging in pipe is carried out to flow string
CN200940465Y (en) Cable anti-blow-out device
CN205823229U (en) A kind of continuous oil pipe anti-blow-out box
CN105089542A (en) Hydraulic self-locking quick-mounting blowout prevention device and method
CN109458153A (en) A kind of oil recovery tree device suitable for setting suspension coiled tubing production forever
CN201794525U (en) Sucker rod trip operating device under pressure
CN203925394U (en) Blowout prevention system for snubbing liquid seal gas well mouth of gas well
CN202866685U (en) Under-pressure energy storage workover rig
CN208473761U (en) A kind of surface pipe suspension arrangement
CN2816339Y (en) Well controlled blowout-proof device
CN208184702U (en) A kind of novel hydraulic greasing spraying-preventing system
CN201627562U (en) Switch plugging blowout control device in wellhead
CN110469286A (en) A kind of combined pressure wellhead assembly for pressure break with pressure
CN202745769U (en) Under-pressure tripping-in device of continuous tube overlong drilling tool
CN207017958U (en) A kind of marine riser hangs special-purpose nipple
CN203420652U (en) Pressure-balanced and controllable workover treatment device
CN207437022U (en) A kind of electric submersible pump mining device for adapting to coiled tubing completion
CN201982035U (en) Independent type high pressure oil-water-gas well snubbing service device
CN102444390A (en) Emergency rescuing device for incontrollable blowout
CN103277064A (en) Hydraulic oil-well blowout preventing device
CN201902191U (en) Blowout preventer with side opening door
CN102071897B (en) Side door blowout preventing box
CN201232535Y (en) Eccentric wellhead double pulley blowout prevention blowout preventer

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20070829