CN1987734A - Sequence top-and-down electricity system and method for knife sheet type server system initial state - Google Patents
Sequence top-and-down electricity system and method for knife sheet type server system initial state Download PDFInfo
- Publication number
- CN1987734A CN1987734A CN 200610144132 CN200610144132A CN1987734A CN 1987734 A CN1987734 A CN 1987734A CN 200610144132 CN200610144132 CN 200610144132 CN 200610144132 A CN200610144132 A CN 200610144132A CN 1987734 A CN1987734 A CN 1987734A
- Authority
- CN
- China
- Prior art keywords
- power
- module
- blade
- online
- request
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Landscapes
- Power Sources (AREA)
Abstract
A sequence up and down electrical system of the blade service equipment and its method, the system is the thermal mobile status. It includes the fan, blade, exchanger, IOE extended modular, managerial modular and power system which can be divided into initial state power administrative domain which administrate the subsystem and normal working state power mission domain. The system can be steady and safety loading and unloading electricity. Through this invention we can overcome there is a peak current on the blade when it is loaded electricity and the transient current is over stronger, this invention also erases the damage to power system and external electrical net during the loading and unloading process.
Description
Technical field
The present invention relates to a kind of power-on and power-off method of Network of Workstation, specifically is the power-on and power-off strategy that calculates blade server system.
Background technology
Blade server system now is a kind of high-density systems, can hold several to tens, 20 blade servers usually, and power supply is as the power resources of blade system, and its safe reliability direct relation the performance of total system.Because system is a huge power consumption system, the power-on and power-off design for scheme of blade system seems particularly important, in the blade system operational process, need monitor the health status and the running status of its each module at any time, the keeper can in time understand the operation conditions of system, the abnormal conditions that occur in the timely discovery operational process, and carry out respective handling, guarantee the normal operation of blade system.Many blades of system need power on, down during electricity, because there is a peak current problem in each blade at powered on moment, if many blades power on simultaneously, electricity down, also can have a problem that immediate current is excessive.Whole blade system is a huge power consumption system, if power on simultaneously and descend the electricity, also can impact to the electric power system electrical network.
Therefore, need a kind of system and method that calculates the blade server power-on and power-off of design, it makes that blade server system can safety and stability powers on and electricity down, and can support hot plug operations.Eliminate in the upward and downward electric process impact, to solve existing a series of safety problem to power-supply system and extraneous electrical network.
Summary of the invention
One of purpose of the present invention provides a kind of system and method that calculates the blade server power-on and power-off, and it makes that blade server system can safety and stability under original state powering on and down.
Another purpose of the present invention provides a kind of method of calculating the blade server power-on and power-off, and it makes that blade server system can safety and stability under running status powers on and electricity down, and promptly support module carries out hot plug operations.
For achieving the above object, the basic design of technical scheme provided by the present invention is as follows:
The invention provides a kind of order power-on and power-off system of blade type server system, comprising: fan, blade, switch, IOE expansion module, its special character be also to comprise,
Administration module adopts connection of " centralization " formula and control power-supply system, IOE expansion module, switch, blade, fan;
Power-supply system is used for power-on and power-off sequential control, power distribution and recovery, power supply redundancy control, fault analysis and warning, is divided into: power management territory and task domain;
Wherein, described power management territory is the power supply of originate mode ADMINISTRATION SUBSYSTEM, and the power supply task domain is powered for each module is under the normal mode of operation.
Described administration module powers on to the power supply task domain and asks to adopt the pattern of " applying for-examine ", and " notice-affirmation " adopted in following electricity request.
The RS485 bus is adopted in being connected of described administration module and blade, adopts the I2C bus with power-supply system, IOE expansion module, switch, being connected of fan.
Wherein, described power-on and power-off system can support hot plug operations, and for the parts of not supporting hot plug, administration module carries out electric treatment under the system to total system at once.
The parts of described support hot plug are: blade, administration module, gigabit switch, Infiniband switch, the redundant power module of band.
A kind of order power-on and power-off method of blade type server system comprises step:
System powers on from stationary state (original state):
A:AC imports access, power module output 12v Standby, and the ADMINISTRATION SUBSYSTEM of administration module and online other module is started working, and carries out the total system initialization operation;
B: administration module and power module carry out communication, judge online power module power amount, state and quantity, and administration module calculates the whole useful power output that power module can provide;
C: whether power module work is normal:
C1: when working properly, the waiting system request of powering on,
C2: work when undesired, stop power up at once and report the corresponding system mistake;
D: whether system's request of powering on, at first detecting has blade online if being arranged:
D1: there is blade online, carries out the request of powering on,
D2: do not have blade online, stop the request of powering on, send alarm simultaneously;
E: start blower module and whether satisfy the minimalist configuration requirement that starts:
E1: satisfy, the full speed running fan,
E2: do not satisfy, stop power up at once and report the corresponding system mistake;
F: check whether the fan operation is normal:
F1: operation is normal, detects all at wire module,
F2: it is undesired to move, and stops power up at once and reports the corresponding system mistake;
G: detect the whether online or request of blade and power on:
G1: have online or the request of powering on, judge whether switch is online,
G2: do not have the online or request of blade to power on, reduce rotation speed of the fan and wait for that blade powers on;
Whether h: it is online to detect switch:
H1: online, judge whether the IOE module is online,
H2: not online, switch is not carried out the initialization power up;
I: judge whether the IOE module is online:
I1: online, power on for the middle minimum blade server of groove position code that do not power on, power on for simultaneously the IOE associated socket,
I2: not online, power on for the middle minimum blade server of groove position code that do not power on;
J: detection also has or not the blade request to power on:
J1: have, continue to carry out operation,
J2: do not have, jump to the l step;
K: whenever gone up a blade, distributed actual distribution condition to judge whether to allow next blade to power on according to current power:
K1: allow, jump to the i step, continue as next groove position blade and power on,
K2: do not allow, reporting an error stops powering on operation;
L: adjust rotation speed of the fan according to system operation situation, the entire system initialization powers on and finishes.
System is under running status (original state):
M: blade system is in run mode;
N: receive electricity request under the system;
O: judged whether that the IOE module is online:
O1: have, administration module electric requirement under the corresponding PCI-E slot broadcasting of blade server with the IOE module,
O2: do not have, administration module is to blade server broadcasting electric requirement down;
P: wait for that electricity is confirmed under all blades and the IOE respective grooves position;
Q: the notice switch down;
R: wait for switch electricity affirmation down;
S: the notice fan down;
T: wait for fan electricity affirmation down;
U: the notice power module stops 12v output, and following electric process is finished.
Module electric sequence at run mode (hot plug):
Insert HPPM in the blade system of operation;
Whether rated output distributes remaining sum, allow HPPM to power on,
Be, judge whether that blade is online,
Not, provide system's warning, halt system powers on simultaneously;
Judge whether that blade is online,
Be, judge whether to contain the IOE module,
, do not power on to switch module;
Whether contain the IOE module,
Be, power on for the blade server that sends the request of powering on, the IOE associated socket powers on simultaneously,
, power on for the blade server that sends the request of powering on;
HPPM powers on and finishes;
Adjust each rotation speed of the fan according to the final ruuning situation of system.
Electricity order under the module of run mode (hot plug):
Electric module is filed an application down;
The administration module approval;
Electricity and send acknowledge message under the module;
Administration module carries out Power Recovery;
Electricity is finished under the module.
Described system initial state order power-on and power-off method, wherein, the preallocated step of power is in two steps before described the powering on:
Functional module sends to administration module examining to the power demand from the maximum full configuration situation of the storage in fixing Flash,
Finished the application that also will carry out the power actual allocated after the BIOS self check and given administration module on blade.
Compared with prior art, the present invention has the following advantages and beneficial effect:
1, adopts original state power-on and power-off strategy and running status power-on and power-off strategy: make the operation that whole blade system can be safe and reliable;
2, each module of PTD is under the normal mode of operation, carries out " functionalization " control model by administration module, and pattern " is applied for-examine " in the employing that powers on, and following electricity adopts " notice-affirmation " pattern, promptly supports hot plug operations;
3, in the system initial state order power-on and power-off method, the preallocated step of power in two steps before powering on, the strategy of this two steps power distribution: can guarantee that blade can not power on the one hand by mistake, can guarantee the accuracy that power consumption is used on the one hand in addition, it is more reasonable that power consumption is distributed;
4, for the obtaining of the authority that powers on, adopt the mechanism of the authority acquiring that once powers on, can guarantee can not cause the operation that powers on of blade mistake like this, all need once new application because power at every turn; In case apply for successfully, under not electric down situation (even restarting), distribute because change power, also need not apply for once more, reduce the communication number of times;
The present invention adopts above-mentioned blade server order power-on and power-off strategy, solved power on, down during electricity, because there is a peak current problem in each blade at powered on moment, with problem that immediate current is excessive of existence, and in the elimination upward and downward electric process to the impact of power-supply system and extraneous electrical network, to solve existing a series of safety problem; The present invention can be widely used in having a plurality of to the server system of 20 blades.
Description of drawings
Fig. 1: be management system communication bus structural representation of the present invention;
Fig. 2: be supply voltage distribution schematic diagram of the present invention;
Fig. 3: be system initial state electric sequence synoptic diagram of the present invention;
Fig. 4: be electric sequential schematic under the system initial state of the present invention;
Fig. 5: be system running state electric sequence synoptic diagram of the present invention;
Fig. 6: be electric sequential schematic under the system running state of the present invention.
Embodiment
Below in conjunction with accompanying drawing, the invention will be further described.
Referring to Fig. 1 to Fig. 6:
Power-supply system is responsible for providing power supply to each module in the whole blade system and cabinet, carries out electric sequence control and power and distributes; Following electric sequential control and Power Recovery; Power supply redundancy control, power module fault analysis, warning.Power-supply system adopts the mode of operation of two kinds of voltages that power-supply system integral body is divided into two working fields: power management territory (Power Management Domain:PMD) and power supply task domain (PowerTask Domain:PTD).
The order power-on and power-off system of a kind of blade type server system of the present invention comprises: fan (FAN), blade (Blade), switch (SW), IOE expansion module, and its special character is also to comprise:
Administration module (MM) adopts connection of " centralization " formula and control power-supply system, IOE expansion module, switch, blade, fan;
Power-supply system (PS) is used for power-on and power-off sequential control, power distribution and recovery, power supply redundancy control, fault analysis and warning, is divided into: power management territory and task domain;
Wherein, described power management territory is the power supply of originate mode ADMINISTRATION SUBSYSTEM, adopt the 12v Standby power unit of power module, as long as there is the AC input in power module, whole PMD just has power output, the corresponding management subsystem is the energy operate as normal just, the not managed module controls that powers on here; The power supply task domain is powered for each module is under the normal mode of operation, for example parts such as the CPU of blade server, internal memory, hard disk just adopt the power supply of PTD power supply, these systematic unities come from the 12v of power module, and power-on and power-off simultaneously are subjected to ADMINISTRATION SUBSYSTEM control and the management among the PMD.For PTD part power-supply system is the control model of being carried out " functionalization " by administration module.
Described administration module powers on to the power supply task domain and asks to adopt the pattern of " applying for-examine ", " notice-affirmation " adopted in following electricity request, other module is if make change to the PTD state, particularly for the request that powers on, must at first file an application to administration module, after the process administration module is examined, take corresponding operating, what power on employing is " applying for-examine " pattern, and for electric control down, because electricity does not need new power resource down, so what adopt is " notice-affirmation " pattern, implication is exactly that the one side administration module can notify blade and other each module need descend electric control, also can send the following electricity of each module transmission of blade and other in addition and be notified to administration module, and decide down the affirmation that electricity does not wait administration module in its sole discretion, such as situation very urgent in heat radiation, blade server can be decided down the electricity operation in its sole discretion.
The RS485 bus is adopted in being connected of described administration module and blade, adopt the I2C bus with power-supply system, IOE expansion module, switch, being connected of fan, the power-supply system management realizes by various power management command, and power management command is transmitted on the various buses of management system with the form of Frame, System Management Bus embodies central controlled thought, be that various device all is connected with administration module by industrial bus, do not connect each other.
Described power-on and power-off system can support hot plug operations, and for the parts of not supporting hot plug, administration module carries out electric treatment under the system to total system at once.
The parts of described support hot plug are: blade, administration module, gigabit switch, Infiniband switch, the redundant power module of band, in addition, no longer include any hot plug parts, parts for hot plug, there is administration module to control in proper order according to normal power-on and power-off, in a single day pulled out for the parts of not supporting hot plug, administration module descends electric treatment to total system at once, promptly when the IOE module, or pull out too much no longer redundant power module with regard at once again administration module carry out electric treatment under the system.
According to the division of blade system state, electric sequence is divided into two kinds: first kind, and the electric sequence of the whole blade system that begins from resting state; Second kind, can the hot plug module electric sequence the single of run mode.The blade system push button function that powers on is defined as follows: system always goes up eletric button: function is by the administration module software arrangements, and cabinet, fan etc. only power under the default situation; Eletric button on the blade: only for specifying blade to power on, the not operation of total button can't power on.The electric sequence of whole blade system is the important assurance that security of system can safe and reliable operation, also is the process that system changes from the resting state to the run mode.The initial necessary condition that blade system powers on is: have at least a power module to be present in the blade system; Having at least an administration module to be present in needs at least one blade server module online in the blade system.Starting condition: referring to blade system is starting condition in the situation that does not insert the AC input, inserts the electric sequence of the module of combination in any in this case.State input: system's request of powering on, can be from system's request button that powers on, the also request of powering on of the administration interface that can provide from administration module.The basic thought that powers on is: and administration module powers on-fan powers on-switch powers on-and blade and IOE power on simultaneously.
A kind of order power-on and power-off method of blade type server system, concrete steps:
System powers on from stationary state (original state):
A:AC imports access, power module output 12V Standby, and the ADMINISTRATION SUBSYSTEM of administration module and online other module is started working, and carries out the total system initialization operation;
B: administration module and power module carry out communication, judge online power module power amount, state and quantity, and administration module calculates the whole useful power output that power module can provide;
C: whether power module work is normal:
C1: when working properly, the waiting system request of powering on,
C2: work when undesired, stop power up at once and report the corresponding system mistake;
D: whether system's request of powering on, at first detecting has blade online if being arranged:
D1: there is blade online, carries out the request of powering on,
D2: do not have blade online, stop the request of powering on, send alarm simultaneously;
E: start blower module and whether satisfy the minimalist configuration requirement (minimalist configuration requires and can determine the air channel according to the Present-Detect pin of blade, thereby determines the fan minimalist configuration) that starts:
E1: satisfy, the full speed running fan,
E2: do not satisfy, stop power up at once and report the corresponding system mistake;
F: check whether the fan operation is normal:
F1: operation is normal, detects all at wire module,
F2: it is undesired to move, and stops power up at once and reports the corresponding system mistake;
G: detect the whether online or request of blade and power on:
G1: have online or the request of powering on, judge whether switch is online,
G2: do not have the online or request of blade to power on, reduce rotation speed of the fan and wait for that blade powers on;
Whether h: it is online to detect switch:
H1: online, judge whether the IOE module is online,
H2: not online, switch is not carried out the initialization power up;
I: judge whether the IOE module is online:
I1: online, give do not power in the minimum blade server of groove position code power on, give IOE associated socket power on (guaranteeing that main frame and PCI-E interface power on synchronously) simultaneously,
I2: not online, power on for the middle minimum blade server of groove position code that do not power on;
J: detection also has or not the blade request to power on:
J1: have, continue to carry out operation,
J2: do not have, jump to the l step;
K: whenever gone up a blade (, so just comprising corresponding PCI-E slot), distributed actual distribution condition to judge whether to allow next blade to power on according to current power if IOE is arranged:
K1: allow, jump to the i step, continue as next groove position blade and power on,
K2: do not allow, reporting an error stops powering on operation;
L: adjust rotation speed of the fan according to system operation situation, the entire system initialization powers on and finishes.
When powering on for first blade, do not make power calculation, be to be based upon a power module can support under the hypothesis prerequisite of at least one blade server and every other supplementary module, if being false, this hypothesis need before first blade powers on, calculate, calculating was divided into for two steps for power division, the first step is the power predistribution before powering on, in this step functional module is that the power demand from the maximum full configuration situation of the storage in fixing Flash is sent to administration module examining, and what illustrate here is that full configuration is not represented actual disposition.So finished the application that also will carry out the power actual allocated after the BIOS self check and give administration module on blade, this is the second step power distribution result.Such as according to different configurations, can insert 8 internal memories, 4 internal memories, 2 internal memories or two or a hard disk in the blade, even the two CPU differences of list in the future, for power consumption notable difference is arranged still.This two strategies that go on foot power distribution can guarantee that blade can not power on (maximum full configuration power consumption) by mistake on the one hand, can guarantee the accuracy that power consumption is used on the one hand in addition, are that the power consumption distribution is more reasonable.
Following electric process is relative with power up, also divides two kinds: first kind, and the following electricity order of the whole blade system that begins from run mode, second kind, electricity order under the individual module of run mode.
The whole initial electricity order down of blade system, starting condition: be meant that working as blade system is starting condition (having a blade at least in operation) in the situation of operation, state input: electricity request under the system, can be under the system power supply button request, the also request of powering on of the administration interface that can provide from administration module, the basic thought of following electricity is: blade and IOE stop to export 12v voltage with electricity-power module under electricity-fan under electricity-switch at present and get back to resting state.
System descends electric concrete steps from running status (original state):
M: blade system is in run mode;
N: receive electricity request under the system;
O: judged whether that the IOE module is online:
O1: have, administration module electric requirement under the corresponding PCI-E slot broadcasting of blade server with the IOE module,
O2: do not have, administration module is to blade server broadcasting electric requirement down;
P: wait for that electricity is confirmed under all blades and the IOE respective grooves position;
Q: the notice switch down;
R: wait for switch electricity affirmation down;
S: the notice fan down;
T: wait for fan electricity affirmation down;
U: the notice power module stops 12v output, and following electric process is finished.
When blade server was in run mode, independent module can be carried out hot plug operations, so also there is certain electrifying timing sequence problem.Module that can hot plug has: blade, switch, administration module, consider separately for redundant power.Owing to all be operated among the PTD, can adopt identical strategy to power on for blade and switch, unified HPPM (the Hot Plug﹠amp that adopts here; Play Module) expression.And administration module is owing to being operated among the PMD, so the situation when designing the PMD output power greater than two administration modules just can directly power on.
Module electric sequence at run mode (hot plug):
Insert HPPM in the blade system of operation;
Whether rated output distributes remaining sum, allow HPPM to power on,
Be, judge whether that blade is online,
Not, provide system's warning, halt system powers on simultaneously;
Judge whether that blade is online,
Be, judge whether to contain the IOE module,
, do not power on to switch module;
Whether contain the IOE module,
Be, power on for the blade server that sends the request of powering on, the IOE associated socket powers on simultaneously,
, power on for the blade server that sends the request of powering on;
HPPM powers on and finishes;
Adjust each rotation speed of the fan according to the final ruuning situation of system.
The strategy that powers on adopts the pattern of " applying for-examine ", each module at first provides the power number of self-demand to administration module, and administration module is examining according to present power remaining sum, if the power remaining sum is not enough, then do not power on and examine, otherwise the approval that powers on.For obtaining of the authority that powers on, adopt the mechanism of the authority acquiring that once powers on.Such way can guarantee: the first, can not cause blade to miss the operation that powers on, all need once new application because power at every turn.The second, in a single day apply for successfully, under electric down situation (even restarting), distribute, also need not apply for once more, reduce the communication number of times because change power.
Basic thought at electricity under the module of run mode is: following electric module files an application-and electric under the administration module approval-module, and send acknowledge message-administration module and carry out Power Recovery, electricity is finished under the module.Here it should be noted that, when the neither one administration module is online, also to support down the electricity operation, if promptly continuous three the transmission requests of electric module can not be given the ratification down, just think and just descend the electricity operation by local management system immediately by administration module not online (considering whether will increase the online position of administration module).When electric instantly module is last blade server, carry out electric step under the system, close total system.What mainly adopt in the electric strategy down is " notice-affirmation " pattern, is different from the strategy that powers on, and mainly is that rated output reclaims problem.Owing to adopt the power module design proposal of full customization, need to specify the line related function, power interface and relevant communications protocol parts for power module for this reason.Power supply function definition: peak power output 4800W; Supporting N+1 power supply redundancy pattern, unless a power supply is only arranged, is redundant configuration otherwise a power module is necessarily arranged, and can finish redundant the switching automatically when power supply breaks down; Correlation behavior information can be provided, comprise output voltage values, power module temperature value, power module peak power output, power module power operating position, power module health and fitness information, promptly redundant situation; Power interface bus: I2C bus; Power supply communications protocol: TBD.
Electricity order under the module of run mode (hot plug):
Electric module is filed an application down;
The administration module approval;
Electricity and send acknowledge message under the module;
Administration module carries out Power Recovery;
Electricity is finished under the module.
Should be noted that at last: above embodiment is only in order to illustrate that technical scheme of the present invention is not intended to limit, although the present invention is had been described in detail with reference to the foregoing description, those of ordinary skill in the field are to be understood that: still can make amendment or be equal to replacement the specific embodiment of the present invention, and do not break away from any modification of spirit and scope of the invention or be equal to replacement, it all should be encompassed in the middle of the claim scope of the present invention.
Claims (7)
1, a kind of order power-on and power-off system of blade type server system original state comprises: fan, blade, switch, IOE expansion module, it is characterized in that also comprising,
Administration module adopts connection of " centralization " formula and control power-supply system, IOE expansion module, switch, blade, fan;
Power-supply system is used for power-on and power-off sequential control, power distribution and recovery, power supply redundancy control, fault analysis and warning, is divided into: power management territory and task domain;
Wherein, described power management territory is the power supply of originate mode ADMINISTRATION SUBSYSTEM, and the power supply task domain is powered for each module is under the normal mode of operation.
2, the system as claimed in claim 1, wherein, described administration module powers on to the power supply task domain and asks to adopt the pattern of " applying for-examine ", and " notice-affirmation " adopted in following electricity request.
3, the system as claimed in claim 1, wherein, the RS485 bus is adopted in being connected of described administration module and blade, adopts the I2C bus with power-supply system, IOE expansion module, switch, being connected of fan.
4, the system as claimed in claim 1, wherein, described power-on and power-off system can support hot plug operations, for the parts of not supporting hot plug, administration module carries out electric treatment under the system to total system at once.
5, system as claimed in claim 4, wherein, the parts of described support hot plug are: blade, administration module, gigabit switch, Infiniband switch, the redundant power module of band.
6, a kind of order power-on and power-off method of blade type server system original state comprises step:
System powers on from stationary state:
A:AC imports access, power module output 12V Standby, and the ADMINISTRATION SUBSYSTEM of administration module and online other module is started working, and carries out the total system initialization operation;
B: administration module and power module carry out communication, judge online power module power amount, state and quantity, and administration module calculates the whole useful power output that power module can provide;
C: whether power module work is normal:
C1: when working properly, the waiting system request of powering on,
C2: work when undesired, stop power up at once and report the corresponding system mistake;
D: whether system's request of powering on, at first detecting has blade online if being arranged:
D1: there is blade online, carries out the request of powering on,
D2: do not have blade online, stop the request of powering on, send alarm simultaneously;
E: start blower module and whether satisfy the minimalist configuration requirement that starts:
E1: satisfy, the full speed running fan,
E2: do not satisfy, stop power up at once and report the corresponding system mistake;
F: check whether the fan operation is normal:
F1: operation is normal, detects all at wire module,
F2: it is undesired to move, and stops power up at once and reports the corresponding system mistake;
G: detect the whether online or request of blade and power on:
G1: have online or the request of powering on, judge whether switch is online,
G2: do not have the online or request of blade to power on, reduce rotation speed of the fan and wait for that blade powers on;
Whether h: it is online to detect switch:
H1: online, judge whether the IOE module is online,
H2: not online, switch is not carried out the initialization power up;
I: judge whether the IOE module is online:
I1: online, power on for the middle minimum blade server of groove position code that do not power on, power on for simultaneously the IOE associated socket,
I2: not online, power on for the middle minimum blade server of groove position code that do not power on;
J: detection also has or not the blade request to power on:
J1: have, continue to carry out operation,
J2: do not have, jump to the e step;
K: whenever gone up a blade, distributed actual distribution condition to judge whether to allow next blade to power on according to current power:
K1: allow, jump to the i step, continue as next groove position blade and power on,
K2: do not allow, reporting an error stops powering on operation;
E: adjust rotation speed of the fan according to system operation situation, the entire system initialization powers on and finishes;
System is under running status:
M: blade system is in run mode;
N: receive electricity request under the system;
O: judged whether that the IOE module is online:
O1: have, administration module electric requirement under the corresponding PCI-E slot broadcasting of blade server with the IOE module,
O2: do not have, administration module is to blade server broadcasting electric requirement down;
P: wait for that electricity is confirmed under all blades and the IOE respective grooves position;
Q: the notice switch down;
R: wait for switch electricity affirmation down;
S: the notice fan down;
T: wait for fan electricity affirmation down;
U: the notice power module stops 12v output, and following electric process is finished.
7, systematic order power-on and power-off method as claimed in claim 6, wherein, the preallocated step of power is in two steps before described the powering on:
Functional module sends to administration module examining to the power demand from the maximum full configuration situation of the storage in fixing Flash,
Finished the application that also will carry out the power actual allocated after the BIOS self check and given administration module on blade.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNB2006101441327A CN100535832C (en) | 2006-11-28 | 2006-11-28 | Sequence top-and-down electricity system and method for knife sheet type server system initial state |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNB2006101441327A CN100535832C (en) | 2006-11-28 | 2006-11-28 | Sequence top-and-down electricity system and method for knife sheet type server system initial state |
Publications (2)
Publication Number | Publication Date |
---|---|
CN1987734A true CN1987734A (en) | 2007-06-27 |
CN100535832C CN100535832C (en) | 2009-09-02 |
Family
ID=38184555
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CNB2006101441327A Active CN100535832C (en) | 2006-11-28 | 2006-11-28 | Sequence top-and-down electricity system and method for knife sheet type server system initial state |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN100535832C (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101441506B (en) * | 2007-11-20 | 2011-05-11 | 中兴通讯股份有限公司 | Blade server system and power consumption management method thereof |
CN102480359A (en) * | 2010-11-30 | 2012-05-30 | 英业达股份有限公司 | Power supply method for providing power to multiple servers |
CN102486723A (en) * | 2010-12-01 | 2012-06-06 | 研祥智能科技股份有限公司 | Method for realizing ChMC (Chassis Management Controller) and VMC (VPX Manager Controller) on VPX (Versatile Protocol Switch) platform veneer and VPX platform |
CN102722231A (en) * | 2011-03-30 | 2012-10-10 | 研祥智能科技股份有限公司 | VPX platform and Payload power-supply management method thereof |
CN104680087A (en) * | 2013-11-27 | 2015-06-03 | 深圳中电长城信息安全系统有限公司 | Blade server hot plugging control circuit and device |
CN102486723B (en) * | 2010-12-01 | 2016-12-14 | 研祥智能科技股份有限公司 | Method and the VPX platform of ChMC and VMC is realized on VPX platform veneer |
-
2006
- 2006-11-28 CN CNB2006101441327A patent/CN100535832C/en active Active
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101441506B (en) * | 2007-11-20 | 2011-05-11 | 中兴通讯股份有限公司 | Blade server system and power consumption management method thereof |
CN102480359A (en) * | 2010-11-30 | 2012-05-30 | 英业达股份有限公司 | Power supply method for providing power to multiple servers |
CN102480359B (en) * | 2010-11-30 | 2014-07-23 | 英业达股份有限公司 | Power supply method for providing power to multiple servers |
CN102486723A (en) * | 2010-12-01 | 2012-06-06 | 研祥智能科技股份有限公司 | Method for realizing ChMC (Chassis Management Controller) and VMC (VPX Manager Controller) on VPX (Versatile Protocol Switch) platform veneer and VPX platform |
CN102486723B (en) * | 2010-12-01 | 2016-12-14 | 研祥智能科技股份有限公司 | Method and the VPX platform of ChMC and VMC is realized on VPX platform veneer |
CN102722231A (en) * | 2011-03-30 | 2012-10-10 | 研祥智能科技股份有限公司 | VPX platform and Payload power-supply management method thereof |
CN102722231B (en) * | 2011-03-30 | 2016-08-24 | 研祥智能科技股份有限公司 | The Payload method for managing power supply of a kind of VPX platform and VPX platform |
CN104680087A (en) * | 2013-11-27 | 2015-06-03 | 深圳中电长城信息安全系统有限公司 | Blade server hot plugging control circuit and device |
CN104680087B (en) * | 2013-11-27 | 2018-02-27 | 深圳中电长城信息安全系统有限公司 | A kind of control circuit and device of blade server hot plug |
Also Published As
Publication number | Publication date |
---|---|
CN100535832C (en) | 2009-09-02 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101689070B (en) | Dynamic converter control for efficient operation | |
US7831860B2 (en) | System and method for testing redundancy and hot-swapping capability of a redundant power supply | |
CN101071392B (en) | Method and system for maintaining backup copies of firmware | |
CN104281511B (en) | Intelligent-platform management interface system, baseboard management controller and implementation method | |
CN100576145C (en) | A kind of order power-on and power-off method of blade server system hot pluggable condition | |
US20110215645A1 (en) | Containerized continuous power system and method | |
CN101123511B (en) | A pci quick bus system and its energy management method | |
CN103618323B (en) | A kind of STATCOM control system based on redundant manipulator | |
CN100535832C (en) | Sequence top-and-down electricity system and method for knife sheet type server system initial state | |
CN101951015A (en) | Hybrid power supply apparatus for data center | |
CN105714879A (en) | M-driving-N type (M converters driving N water pumps) intelligent variable frequency control cabinet, constant-pressure water supply system and control method | |
US9853453B2 (en) | Wind park control system | |
CN112732311B (en) | BMS program hot updating method, system and medium for large energy storage system | |
CN101017472A (en) | Hard disk hot swap system in multiple hard disks system and method | |
CN105138437A (en) | SmartRack multi-node parallel rebot test method based on fatigue test machine and 4U jig | |
CN106598902A (en) | CPU (Central Processing Unit) control board capable of realizing hot plug of board card and implementation method thereof | |
EP3370291B1 (en) | Fuel cell device, fuel cell system, method for controlling fuel cell system, and controller | |
WO2023125511A1 (en) | Power supply management system, battery swapping station and power supply management method and apparatus therefor | |
CN101616031A (en) | The method of single-plate parameters is set in a kind of advanced telecommunication computing structure | |
CN102354261A (en) | Remote control system for power supply switches of machine room servers | |
CN103576819A (en) | Control system, method and device for large-scale startup of servers | |
CN106708668A (en) | BBU accumulator mode switching method based on Rack machine cabinet | |
CN101252762B (en) | Base station power supply main standby switching control method based on minitype electric communication computing architecture standard | |
CN108536046A (en) | Main control unit switching method and locomotive communication equipment for locomotive communication equipment | |
CN104423528A (en) | Power allocation method and power allocation system for data centre |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right |
Effective date of registration: 20220802 Address after: 100193 No. 36 Building, No. 8 Hospital, Wangxi Road, Haidian District, Beijing Patentee after: Dawning Information Industry (Beijing) Co.,Ltd. Patentee after: DAWNING INFORMATION INDUSTRY Co.,Ltd. Address before: 100084 Beijing Haidian District City Mill Street No. 64 Patentee before: Dawning Information Industry (Beijing) Co.,Ltd. |
|
TR01 | Transfer of patent right |