CN1968520A - Terminal scheduling authorization handling, cell resource scheduling method, terminal, and base station - Google Patents
Terminal scheduling authorization handling, cell resource scheduling method, terminal, and base station Download PDFInfo
- Publication number
- CN1968520A CN1968520A CNA200610090556XA CN200610090556A CN1968520A CN 1968520 A CN1968520 A CN 1968520A CN A200610090556X A CNA200610090556X A CN A200610090556XA CN 200610090556 A CN200610090556 A CN 200610090556A CN 1968520 A CN1968520 A CN 1968520A
- Authority
- CN
- China
- Prior art keywords
- service
- authorization
- terminal
- scheduling
- module
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Landscapes
- Mobile Radio Communication Systems (AREA)
Abstract
The invention relates to a terminal distribution authorization method, wherein when the non-service authorization index is reduced, and when the service authorization is higher than the service authorization reduced based on the non-service authorization, setting the satisfaction degree as satisfaction. The invention also discloses a method, which adds base station judgment in aforementioned method, to confirm that when the satisfaction degree is satisfaction, the base station only holds or reduces the distribution authorization. The invention provides relative terminal and base station. The invention can improve region throughout.
Description
Technical field
The present invention relates to communication technique field, be specifically related to scheduling authorization processing method, cell resource scheduling method and the relevant terminal and the base station of terminal in wireless network environment.
Background technology
Insert the sixth version of (WCDMA:Wide-band Code Division MultipleAccess) technology in Wideband Code Division Multiple Access (WCDMA) and originally introduced high speed uplink packet access (HSUPA:High Speed Uplink Packet Access) in (R6:Release 6).One of key technology of HSUPA just is based on the fast dispatch of base station (Node B).Node B is by directly sending scheduling authorization to terminal (UE:User Equipment), control UE flexibly apace and strengthening the transmitted power of carrying out transmitting uplink data on the dedicated transmission channel (E-DCH:EnhancedDedicated Channel), data rate etc., can the quick control upstream noise raise.Compare with R99/R5, Node B can be operated in higher load level, has improved the up-link capacity of system and the throughput of sub-district.
In the process of carrying out cell resource scheduling, UE can send scheduling (SI:Scheduling Information) request to Node B when having data to send, and Node B carries out the scheduling authorization processing according to SI request and the cell load of UE; Node B also can initiatively adjust the scheduling authorization of UE according to the loading condition of current area under the situation that does not have the SI request.Node B can be undertaken by three kinds of modes the scheduling authorization of UE:
Transmit absolute grant (AG, Absolute Grant) by service Node B by E-DCH absolute grant channel (E-AGCH); AG provides the spendable up link of UE (UL, UpLink) absolute limitations of maximum resource; Node B can retransmit AG as required, and the AG value that sends is before risen (UP), keeps (HOLD), decline adjustment such as (DOWN);
Transmit service and non-service relative grant (RG, Relative Grant) by service and non-service Node B by E-DCH relative authorization channel (E-RGCH) respectively; RG is as increasing or reduce preceding nonrecoverable authorization value replenishing of AG.For service RG, its value can be :+1,0 ,-1, and expression respectively: UP, HOLD, DOWN; For non-service RG, its value can be: 0 ,-1, and expression respectively: HOLD, DOWN; AG/RG is that HOLD promptly represents UE not to be carried out scheduling authorization, keeps current state.
In existing R6 agreement, UE shows as on each time slot (TTI) border the processing of scheduling authorization and carries out authorization of service (SG, Serving Grant) upgrades, renewal is divided into AG renewal process, service RG renewal process and non-service RG renewal process, and wherein the process of carrying out the SG renewal according to non-service RG is:
If current TTI has any one non-service RG to be designated as " DOWN ", and the non-vanishing mandate of SG,
The minimum value of the SG that gets SG and obtain according to non-service RG " DOWN " is as SG,
(Maximum_Serving_Grant) is updated to SG with the maximum service mandate,
If do not start to carrying out timer (Non_Serving_RG_Timer) regularly the effective time of non-service relative grant, then start, if start, then restart;
If current TTI does not have non-service RG to be designated as " DOWN ",
If Non_Serving_RG_Timer does not stop,
The minimum value of getting SG and Maximum_Serving_Grant is as SG.
Carry out process that SG upgrades as can be seen from above-mentioned according to non-service RG, Non_Serving_RG_Timer after the non-service RG indication RGDown is in the time, if UE receives service RG UP or AG UP, SG has been carried out the adjustment of rising, as long as the SG that obtains is greater than Maximum_Serving_Grant, service RG UP that issues or AG UP in fact to the SG of UE all without any contribution, because the SG that last UE uses still is Maximum_Serving_Grant.Increased resource allocation though so just cause serving Node B by service RG UP or AG UP,, can not bring the lifting of data transmission performance, wasted the load resource of sub-district, reduced the throughput of sub-district because in fact UE can't take to UE.
Summary of the invention
The object of the present invention is to provide and in the effective time that non-service RG issues, to save scheduling authorization processing method, cell resource scheduling method and the relevant terminal and the base station of the terminal of cell load resource.
To achieve the object of the present invention, the technical scheme of being taked is: a kind of terminal comprises the processing method of scheduling authorization: receive the non-service relative grant that non-serving base stations issues; Upgrade current authorization of service according to described non-service relative grant; If the authorization of service before the described renewal is not less than the authorization of service that obtains according to described non-service relative grant, the satisfaction parameter value that then feeds back to serving BS is set to satisfied.
According to described non-service relative grant current authorization of service is upgraded and can adopt: the minimum value of getting authorization of service and the authorization of service that obtains according to described non-service relative grant before the described renewal is as the current service mandate; The maximum service mandate is updated to the current service mandate; If not timer effective time of service relative grant does not start, then start; If start, then restart.
Above-mentioned terminal also can comprise the processing method of scheduling authorization: in each time slot that the effective time of described non-service relative grant, timer did not stop, the minimum value of getting authorization of service and maximum service mandate is as the current service mandate; If the authorization of service of certain time slot is not less than the maximum service mandate, then the satisfaction parameter value that feeds back to serving BS at this time slot is set to satisfied.
The present invention also provides a kind of method of carrying out cell resource scheduling, comprising: non-serving base stations issues non-service relative grant to terminal; Terminal is handled scheduling authorization the processing method of scheduling authorization according to above-mentioned terminal, and the satisfaction parameter is fed back to serving BS; It is satisfied that serving BS judges whether the satisfaction parameter of terminal feedback is set to, if, then in dispatching the process of processing, perhaps this terminal is not carried out scheduling authorization, perhaps only this terminal is issued the scheduling authorization that is designated as decline.
Serving BS is judged when the current satisfaction parameter of terminal is set to satisfaction, the process of dispatching processing can adopt: judge whether terminal has sent dispatch request, if terminal has sent dispatch request, then calculate the scheduling authorization that described dispatch request needs, and according to the mandate of the current use of data computation terminal of the terminal that receives; Judge that scheduling authorization that dispatch request needs whether less than the mandate of the current use of terminal, if then this terminal is issued the scheduling authorization that is designated as decline, does not then carry out scheduling authorization to this terminal if not; If terminal does not send dispatch request, judge that then cell load whether greater than the cell load thresholding, if then this terminal is issued the scheduling authorization that is designated as decline, does not then carry out scheduling authorization to this terminal if not.
In dispatching the process of processing, if terminal has sent dispatch request, serving BS also can detect current enough absolute grant resources that whether has, if then when needs issue the scheduling authorization that is designated as decline, issue the absolute grant that is designated as decline; If not, then when needs issue the scheduling authorization that is designated as decline, issue the service relative grant that is designated as decline;
The present invention also provides a kind of terminal, comprises that authorization of service update module, satisfaction parameter are provided with module; Described authorization of service update module receives the non-service relative grant that non-serving base stations issues, upgrade current authorization of service according to described non-service relative grant, and the authorization of service before described renewal is when being not less than the authorization of service that obtains according to described non-service relative grant, to described satisfaction parameter module is set and sends the satisfaction parameter value and be set to satisfied indication; Described satisfaction parameter is provided with module and receives the indication that described authorization of service update module sends, and the satisfaction parameter is provided with and feeds back to serving BS.
Above-mentioned terminal also can comprise carrying out timer regularly the effective time of non-service relative grant; Described authorization of service update module sends startup or restarts indication to described timer when receiving non-service relative grant; Described timer is notified described authorization of service update module when regularly stopping; Described authorization of service update module and when the authorization of service in crack is not less than the maximum service mandate at a time, is provided with module to described satisfaction parameter and sends the satisfaction parameter value and be set to satisfied indication before receiving the termination notice that described timer sends.
The present invention also provides a kind of base station, comprises scheduling of resource module and satisfaction parameter judge module, and described scheduling of resource module is carried out the processing of scheduling authorization to terminal; It is satisfied that described satisfaction parameter judge module judges whether the satisfaction parameter of terminal feedback is set to, and judged result is sent to described scheduling of resource module; Described scheduling of resource module receives the judged result of described satisfaction parameter judge module, and in the result when being, perhaps described terminal is not carried out scheduling authorization, perhaps only this terminal is issued the scheduling authorization that is designated as decline.
Adopt technique scheme, beneficial technical effects of the present invention is:
1) terminal scheduling authorization processing method provided by the invention adopt authorization of service during greater than the authorization of service that obtains according to the non-service relative grant of receiving the satisfaction parameter be set to satisfied method, greatly reduce service Node B and issue the possibility of serving RG UP or AG UP in the follow-up moment, avoided to a great extent local resource is carried out unnecessary waste, improved cell throughout.
2) cell resource scheduling method provided by the invention is on the basis of above-mentioned terminal scheduling authorization processing method, further adopting Node B to cooperate judges, when receiving the satisfaction parameter, only carry out the method for the scheduling authorization of HOLD or DOWN for satisfaction, guaranteed more reliably under the situation of non-service RG DOWN, the cell load resource can further not improved cell throughout by meaningless waste.
Description of drawings
Also the present invention is described in further detail in conjunction with the accompanying drawings below by embodiment.
Fig. 1 is the schematic flow sheet of the embodiment of the invention one terminal scheduling authorization processing method;
Fig. 2 is the schematic flow sheet of the embodiment of the invention two terminal scheduling authorization processing methods;
Fig. 3 is the method flow schematic diagram that the embodiment of the invention three is carried out cell resource scheduling;
Fig. 4 is the modular structure schematic diagram of the embodiment of the invention four terminals;
Fig. 5 is the modular structure schematic diagram of the embodiment of the invention five Node B.
Embodiment
The invention provides a kind of terminal scheduling authorization processing method, its core concept is when non-service RG is designated as DOWN, as long as the SG that SG obtains greater than non-service RG " DOWN ", just the satisfaction parameter is set to satisfaction, issues the scheduling authorization that is designated as UP in the follow-up moment to avoid serving Node B as far as possible.The present invention also provides a kind of cell resource scheduling method, further added the cooperation of Node B judges for above-mentioned terminal scheduling authorization processing method, guarantee only to carry out the scheduling authorization of HOLD or DOWN, the load resource of effectively saving the sub-district at satisfaction parameter Node B when satisfied.The present invention also provides relevant terminal and the base station.Below respectively the inventive method and equipment are elaborated.
Embodiment one, a kind of terminal scheduling authorization processing method, flow process comprises as shown in Figure 1:
The non-service RG that A1, the non-service of reception Node B issue; Because for non-service RG, its value has only 0 ,-1 two kind of situation, be to represent HOLD at 0 o'clock, this moment, non-service Node B needn't carry out issuing of scheduling authorization, have only for-1 o'clock that non-service Node B just need issue RG DOWN, the non-service RG that therefore non-service Node B issues is the non-service RG that is designated as " DOWN ";
A2, carry out SG according to the non-service RG DOWN that receives and upgrade; For farthest reducing the change to existing protocol, this renewal process can be carried out according to the process that existing non-service RG upgrades SG, comprising:
A21, get the SG that carries out before non-service RG upgrades and the minimum value of the SG that obtains according to non-service RG " DOWN " as SG;
A22, maximum service mandate Maximum_Serving_Grant (in flow chart brief note for M_SG) is updated to SG;
A23, start or restart timer Non_Serving_RG_Timer effective time (in flow chart brief note for NSRG_Timer) of non-service relative grant, comprising:
A231, judge whether Non_Serving_RG_Timer starts, then carry out A232 if not, if then carry out A233;
A232, startup Non_Serving_RG_Timer;
A233, restart Non_Serving_RG_Timer;
A3, judge whether and to indicate the setting of satisfaction parameter (happy bit); The newly-increased step of this step for proposing among the present invention, directly the setting of SG renewal process with happy bit is associated, it is independent of the renewal process of SG, can increase before the non-service RG that existing protocol provides upgrades the process of SG, afterwards or middle, in the present embodiment, this step places before the A2, promptly carries out the judgement that is provided with of happybit earlier, carries out the renewal of SG again; Deterministic process comprises:
A31, judgement are carried out non-service RG and whether are upgraded preceding SG less than the SG that obtains according to non-service RG " DOWN ", then carry out A32 if not, if then do not carry out the indication that is provided with of happy bit;
A32, the happy bit that feeds back to service Node B are set to satisfied, i.e. " HAPPY ".
If UE has data to need to send in current TTI, promptly be set to HAPPY according to above-mentioned indication happy bit, select parameters such as suitable transmitted power and data rate then according to the schedule information that comprises current SG, Dedicated Physical Data Channel (E-DPDCH:E-DCH DedicatedPhysical Data Channel) by E-DCH carries out transfer of data, and by the Dedicated Physical Control Channel (E-DPCCH:E-DCH Dedicated Physical Control Channel) of E-DCH happy bit is fed back to service Node B.
Embodiment two, a kind of terminal scheduling authorization processing method, flow process as shown in Figure 2, present embodiment comprises the Overall Steps of embodiment one, the difference of present embodiment and embodiment one is, embodiment one only comprises the scheduling authorization processing method of terminal when non-service RG issues DOWN, present embodiment continues its invention thought, the terminal scheduling authorization processing method that is provided is expanded to be applicable in follow-up each time slot that Non_Serving_RG_Timer comes into force.Concrete steps comprise:
B1, judge that current TTI has and serve RG nothing but and issue promptly, whether current TTI has any one non-service RG to be designated as " DOWN ", if, and the non-vanishing mandate of SG then carries out B2, then carries out B4 if not; The prerequisite of carrying out B2 in this step also need SG non-vanishing be because, if SG zero authorizes, then can not drop to more low value again, therefore can carry out; This step difference is current be new RGDOWN constantly or before the unspent moment of RG DOWN (certainly, in actual environment, also may neither be, for example this TTI does not issue new RG DOWN, and Non_Serving_RG_Timer is not activated yet, these situations do not belong to the scene that the inventive method is suitable for, and its subsequent step gets final product according to the predetermined processing of existing protocol, does not repeat them here);
B3, judge whether and to indicate the setting of happy bit;
B2, carry out SG according to the non-service RG DOWN that receives and upgrade;
Above-mentioned B2, B3 step are carried out according to the detailed process of A2, A3 among the embodiment one respectively, in this no longer repeat specification;
B4, judge that whether Non_Serving_RG_Timer stops, if then carry out B5;
B5, judge whether and to indicate the setting of happy bit; The newly-increased step of this step for proposing according to the steps A among the embodiment one 3, similar with the steps A among the embodiment one 3, it is independent of the renewal process B6 of SG, can increase before or after B6, in the present embodiment, this step places before the B6, promptly carries out the judgement that is provided with of happy bit earlier, carries out the renewal of SG again; Deterministic process comprises:
B51, whether judge SG, then carry out B52 if not, if then do not carry out the indication that is provided with of happy bit less than Maximum_Serving_Grant;
B52, the happy bit that feeds back to service Node B are set to HAPPY;
B6, get the minimum value of SG and Maximum_Serving_Grant as SG.
As long as UE has data to need to send in current TTI, the happy bit after being provided with can be fed back to service Node B.
Embodiment three, a kind of method of carrying out cell resource scheduling, flow process comprises as shown in Figure 3:
C1, non-service Node B issue non-service RG to UE; Certainly, the non-service RG that issues of non-service Node B is the non-service RG that is designated as " DOWN ";
C2, UE according to the method for describing among the embodiment two non-service RG DOWN issue and follow-up effective time slot in carry out scheduling authorization and handle, and happy bit fed back to serve Node B;
C3, service Node B judge whether the happy bit of the current feedback of UE is set to HAPPY, if then carry out C4, then can handle according to the scheduling flow of existing protocol regulation if not;
C4, service Node B only carry out the scheduling processing of HOLD or DOWN to this UE; That is, perhaps this UE is not carried out scheduling authorization, perhaps only this UE is issued the scheduling authorization that is designated as decline;
In practical operation, specifically whether issue scheduling authorization, issue the scheduling authorization of which kind of type, can comprehensively judge to determine according to the current loading condition in the SI of UE request, the presently used channel quality of UE and sub-district etc.With reference to the regulation of existing protocol, generally speaking, if UE sent the SI request, and there are enough AG resources the sub-district, just dispatches with the form of AG, otherwise dispatches with the form of RG; If UE does not send the SI request, then generally dispatch with the form of RG.Concrete scheduling processing procedure can adopt:
C41, judge whether UE has sent the SI request,, then carry out C451 if not if then carry out C42;
C42, check current whether enough AG resources are arranged,, then carry out C441 if not if then carry out C431;
C431, calculate the scheduling authorization that the SI request needs, and according to the mandate of the current use of data computation UE of the UE that receives;
C432, judge that scheduling authorization that SI request needs whether less than the mandate of the current use of UE, if then carry out C433, then carries out C434 if not;
C433, judged result show that this UE need reduce mandate, this UE are issued the AG that is designated as decline, i.e. AG DOWN;
C434, judged result show that this UE need promote mandate, based on control thought of the present invention, this UE are not sent scheduling authorization, i.e. AG HOLD;
C441, calculate the scheduling authorization that the SI request needs, and according to the mandate of the current use of data computation UE of the UE that receives;
C442, judge that scheduling authorization that SI request needs whether less than the mandate of the current use of UE, if then carry out C443, then carries out C444 if not;
C443, judged result show that this UE need reduce mandate, and this UE is issued the service RG that is designated as decline, promptly serve RG DOWN;
C444, judged result show that this UE need promote mandate, based on control thought of the present invention, this UE are not sent scheduling authorization, promptly serve RG HOLD;
C451, whether judge cell load,, then carry out C453 if not if then carry out C452 greater than the cell load thresholding;
C452, UE is issued the service RG that is designated as decline, promptly serve RG DOWN; Note, be set to HAPPY owing to carry out the prerequisite of scheduling of resource among the step C4 and is the happy bit of UE feedback, therefore, carry out the meaning that RG DOWN issues in this step and in fact show as, when overload appears in cell load, preferentially reduce HAPPY user's scheduling authorization;
C453, UE is not sent scheduling authorization, promptly serve RG HOLD.
Do not comprise that in above-mentioned steps the non-service of non-service Node B use RG dispatches the process of distribution, this is because there is not the situation of UP in non-service RG itself, therefore, can still handle according to the regulation of existing protocol based on the scheduling distribution of non-service RG.
Present embodiment is compared with embodiment one, two, increased the cooperation deterministic process of service Node B based on the UE feedback, in embodiment one, two, UE carries out related setting by SG is upgraded with happy bit value, reduced and served the possibility that Node B issues the UP scheduling authorization of no actual effect, present embodiment more can be guaranteed to avoid cell load because the waste that previous reasons produces by the matching step that increases Node B.
Embodiment four, a kind of terminal as shown in Figure 4, comprise that authorization of service update module 1, satisfaction parameter are provided with module 2 and timer 3,
Authorization of service update module 1,
Reception comprises the scheduling authorization information of the non-service relative grant that non-serving base stations issues, when receiving non-service relative grant, sends startup or restarts indication to timer 3,
Upgrade current authorization of service according to described non-service relative grant,
When the authorization of service before described renewal is not less than the authorization of service that obtains according to described non-service relative grant, to the satisfaction parameter module 2 is set and sends the indication that the satisfaction parameter value is set to satisfaction,
Before receiving the termination notice that timer 3 sends, and when the authorization of service in crack is not less than the maximum service mandate at a time, to the satisfaction parameter module 2 is set and sends the satisfaction parameter values and be set to satisfied indication;
The satisfaction parameter is provided with module 2 and receives the indication that authorization of service update module 1 sends, the satisfaction parameter is provided with and feeds back to serving BS, when authorization of service update module 1 did not send the satisfaction parameter value indication is set, the satisfaction parameter was provided with module 2 and can the satisfaction parameter be provided with according to the mode of existing protocol regulation;
Carry out timing the effective time of 3 pairs of non-service relative grant of timer, notification service mandate update module 1 when regularly stopping.
Embodiment five, a kind of Node B as shown in Figure 5, comprise scheduling of resource module 4 and satisfaction parameter judge module 5,
4 pairs of terminals of scheduling of resource module are carried out the processing of scheduling authorization, receive the judged result of satisfaction parameter judge module 5, and in the result when being, perhaps described terminal is not carried out scheduling authorization, perhaps only this terminal is issued the scheduling authorization that is designated as decline; For not the time, scheduling of resource module 4 can be carried out scheduling authorization according to the mode of existing protocol regulation in the judged result of satisfaction parameter judge module 5;
It is satisfied that satisfaction parameter judge module 5 judges whether the satisfaction parameter of terminal feedback is set to, and judged result is sent to scheduling of resource module 4.
Terminal that above-mentioned two embodiment provide and Node B are applicable to the scheduling authorization processing method and the cell resource scheduling method of terminal provided by the invention.
More than scheduling authorization processing method, cell resource scheduling method and relevant terminal and the base station of terminal provided by the present invention is described in detail, used specific case herein principle of the present invention and execution mode are set forth, the explanation of above embodiment just is used for helping to understand method of the present invention and core concept thereof; Simultaneously, for one of ordinary skill in the art, according to thought of the present invention, the part that all can change in specific embodiments and applications, in sum, this description should not be construed as limitation of the present invention.
Claims (9)
1, a kind of terminal comprises the processing method of scheduling authorization:
Receive the non-service relative grant that non-serving base stations issues;
Upgrade current authorization of service according to described non-service relative grant;
It is characterized in that, also comprise:
If the authorization of service before the described renewal is not less than the authorization of service that obtains according to described non-service relative grant, the satisfaction parameter value that then feeds back to serving BS is set to satisfied.
2, terminal according to claim 1 is characterized in that the processing method of scheduling authorization, according to described non-service relative grant current authorization of service is upgraded employing:
The minimum value of getting authorization of service and the authorization of service that obtains according to described non-service relative grant before the described renewal is as the current service mandate;
The maximum service mandate is updated to the current service mandate;
If not timer effective time of service relative grant does not start, then start; If start, then restart.
3, terminal according to claim 2 is characterized in that the processing method of scheduling authorization, also comprises:
In each time slot that the effective time of described non-service relative grant, timer did not stop, the minimum value of getting authorization of service and maximum service mandate is as the current service mandate;
If the authorization of service of certain time slot is not less than the maximum service mandate, then the satisfaction parameter value that feeds back to serving BS at this time slot is set to satisfied.
4, a kind of method of carrying out cell resource scheduling is characterized in that:
Non-serving base stations issues non-service relative grant to terminal;
Terminal is handled scheduling authorization according to any described method of claim 1~3, and the satisfaction parameter is fed back to serving BS;
It is satisfied that serving BS judges whether the satisfaction parameter of terminal feedback is set to, if, then in dispatching the process of processing, perhaps this terminal is not carried out scheduling authorization, perhaps only this terminal is issued the scheduling authorization that is designated as decline.
5, method of carrying out cell resource scheduling according to claim 4 is characterized in that, serving BS judges that the process of dispatching processing comprised when the current satisfaction parameter of terminal was set to satisfaction:
Judge whether terminal has sent dispatch request,, then calculate the scheduling authorization that described dispatch request needs if terminal sent dispatch request, and according to the mandate of the current use of data computation terminal of the terminal that receives;
Judge that scheduling authorization that dispatch request needs whether less than the mandate of the current use of terminal, if then this terminal is issued the scheduling authorization that is designated as decline, does not then carry out scheduling authorization to this terminal if not;
If terminal does not send dispatch request, judge that then cell load whether greater than the cell load thresholding, if then this terminal is issued the scheduling authorization that is designated as decline, does not then carry out scheduling authorization to this terminal if not.
6, method of carrying out cell resource scheduling according to claim 5, it is characterized in that: in dispatching the process of processing, if terminal has sent dispatch request, serving BS also detects current enough absolute grant resources that whether has, if, then when needs issue the scheduling authorization that is designated as decline, issue the absolute grant that is designated as decline; If not, then when needs issue the scheduling authorization that is designated as decline, issue the service relative grant that is designated as decline;
7, a kind of terminal is characterized in that: comprise that authorization of service update module, satisfaction parameter are provided with module,
Described authorization of service update module receives the non-service relative grant that non-serving base stations issues, upgrade current authorization of service according to described non-service relative grant, and the authorization of service before described renewal is when being not less than the authorization of service that obtains according to described non-service relative grant, to described satisfaction parameter module is set and sends the satisfaction parameter value and be set to satisfied indication;
Described satisfaction parameter is provided with module and receives the indication that described authorization of service update module sends, and the satisfaction parameter is provided with and feeds back to serving BS.
8, terminal according to claim 7 is characterized in that: also comprises carrying out timer regularly the effective time of non-service relative grant,
Described authorization of service update module sends startup or restarts indication to described timer when receiving non-service relative grant;
Described timer is notified described authorization of service update module when regularly stopping;
Described authorization of service update module and when the authorization of service in crack is not less than the maximum service mandate at a time, is provided with module to described satisfaction parameter and sends the satisfaction parameter value and be set to satisfied indication before receiving the termination notice that described timer sends.
9, a kind of base station comprises the scheduling of resource module, and described scheduling of resource module is carried out the processing of scheduling authorization to terminal, it is characterized in that: also comprise satisfaction parameter judge module,
It is satisfied that described satisfaction parameter judge module judges whether the satisfaction parameter of terminal feedback is set to, and judged result is sent to described scheduling of resource module;
Described scheduling of resource module receives the judged result of described satisfaction parameter judge module, and in the result when being, perhaps described terminal is not carried out scheduling authorization, perhaps only this terminal is issued the scheduling authorization that is designated as decline.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNB200610090556XA CN100484305C (en) | 2006-06-27 | 2006-06-27 | Terminal scheduling authorization handling, cell resource scheduling method, terminal, and base station |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNB200610090556XA CN100484305C (en) | 2006-06-27 | 2006-06-27 | Terminal scheduling authorization handling, cell resource scheduling method, terminal, and base station |
Publications (2)
Publication Number | Publication Date |
---|---|
CN1968520A true CN1968520A (en) | 2007-05-23 |
CN100484305C CN100484305C (en) | 2009-04-29 |
Family
ID=38076997
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CNB200610090556XA Expired - Fee Related CN100484305C (en) | 2006-06-27 | 2006-06-27 | Terminal scheduling authorization handling, cell resource scheduling method, terminal, and base station |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN100484305C (en) |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101316404B (en) * | 2007-05-30 | 2011-08-24 | 中兴通讯股份有限公司 | Method for improving scheduling efficiency of wireless communication ascending packet |
CN101600222B (en) * | 2009-07-02 | 2012-01-04 | 华为终端有限公司 | Processing method and processing device for non-service relative grant |
CN102378347A (en) * | 2010-08-20 | 2012-03-14 | 中兴通讯股份有限公司 | Terminal and authorization processing method thereof |
CN101400113B (en) * | 2007-09-29 | 2012-06-06 | 电信科学技术研究院 | Uplink feedback indication method, apparatus and system |
CN101511129B (en) * | 2008-02-13 | 2013-06-26 | 株式会社Ntt都科摩 | Mobile communication method, mobile communication system and radio base station |
CN101436888B (en) * | 2007-11-15 | 2013-08-14 | 华为技术有限公司 | Method for controlling power, system, base station and user equipment |
CN104469955A (en) * | 2014-12-12 | 2015-03-25 | 国家电网公司 | Superposition authorization method and device for semi-static transmission of electric power wireless communication system |
WO2015070437A1 (en) * | 2013-11-15 | 2015-05-21 | 华为技术有限公司 | Uplink scheduling optimization method, user equipment, base station, and radio network controller |
-
2006
- 2006-06-27 CN CNB200610090556XA patent/CN100484305C/en not_active Expired - Fee Related
Cited By (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101316404B (en) * | 2007-05-30 | 2011-08-24 | 中兴通讯股份有限公司 | Method for improving scheduling efficiency of wireless communication ascending packet |
CN101400113B (en) * | 2007-09-29 | 2012-06-06 | 电信科学技术研究院 | Uplink feedback indication method, apparatus and system |
CN101436888B (en) * | 2007-11-15 | 2013-08-14 | 华为技术有限公司 | Method for controlling power, system, base station and user equipment |
CN101511129B (en) * | 2008-02-13 | 2013-06-26 | 株式会社Ntt都科摩 | Mobile communication method, mobile communication system and radio base station |
CN101600222B (en) * | 2009-07-02 | 2012-01-04 | 华为终端有限公司 | Processing method and processing device for non-service relative grant |
CN102378347A (en) * | 2010-08-20 | 2012-03-14 | 中兴通讯股份有限公司 | Terminal and authorization processing method thereof |
CN102378347B (en) * | 2010-08-20 | 2016-06-29 | 中兴通讯股份有限公司 | A kind of terminal and authorization processing method thereof |
WO2015070437A1 (en) * | 2013-11-15 | 2015-05-21 | 华为技术有限公司 | Uplink scheduling optimization method, user equipment, base station, and radio network controller |
CN104469955A (en) * | 2014-12-12 | 2015-03-25 | 国家电网公司 | Superposition authorization method and device for semi-static transmission of electric power wireless communication system |
CN104469955B (en) * | 2014-12-12 | 2017-12-05 | 国家电网公司 | The superposition authorization method and device of the semi-static transmission of electric power wireless communication system |
Also Published As
Publication number | Publication date |
---|---|
CN100484305C (en) | 2009-04-29 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN1968520A (en) | Terminal scheduling authorization handling, cell resource scheduling method, terminal, and base station | |
CN1292547C (en) | Wireless communication control system and its control method | |
CN1692661A (en) | Method for cell modification in mobile communication system | |
CN1729709A (en) | Cordless communication network and flow control methods | |
CN1914835A (en) | An apparatus and method for distributing a transmission power in a cellular communications network | |
CN1781329A (en) | Management of uplink scheduling modes in wireless communication system | |
CN1819696A (en) | Admission control algorithm and device for HSUPA service | |
CN1913489A (en) | Method of flow controlling for IUB-interface | |
CN1819674A (en) | Base-station scheduling method and system for HSUPA | |
CN101060690A (en) | A method and device for realizing the dynamic QoS control during the dispatching of HSUPA base station | |
CN1819677A (en) | Terminal operating method and device based on non-service base station relative commands | |
CN1852581A (en) | Method for transmitting data on downward link | |
CN1694571A (en) | Method and apparatus for selecting serving scheduling cell for soft handover user equipment | |
CN1815925A (en) | Mobile communication system, radio base station, mobile station and mobile communication method | |
CN101080943A (en) | Wireless network control method, wireless communication system, and base station controller | |
CN101043638A (en) | Base station dispatcher, resource distribution module and dispatch control method for HSUPA | |
CN101030794A (en) | Method for updating high-speed shared information channel power controlling parameter | |
CN101064538A (en) | Power control method for time-division synchronous CDMA communication system | |
CN1788436A (en) | Base station, mobile station, communication system, and communication method | |
CN101060656A (en) | Service authorization parameter control method and user equipment in an enhanced special channel | |
CN1859807A (en) | Transmission rate control method and mobile station | |
CN1863007A (en) | Radio communication apparatus and radio communication method | |
CN1960562A (en) | Method of controlling dispatch of down going sharing channel in high speed and switch of sectors | |
CN101047427A (en) | Method and equipment for transmitting and receiving data based on resource dispatching strategy | |
CN1777332A (en) | Method and apparatus for scheduling uplink data transmission for mobile station in soft handover region |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20090429 Termination date: 20210627 |