CN1962882A - Tuyere cover of blast furnace - Google Patents
Tuyere cover of blast furnace Download PDFInfo
- Publication number
- CN1962882A CN1962882A CN 200610098275 CN200610098275A CN1962882A CN 1962882 A CN1962882 A CN 1962882A CN 200610098275 CN200610098275 CN 200610098275 CN 200610098275 A CN200610098275 A CN 200610098275A CN 1962882 A CN1962882 A CN 1962882A
- Authority
- CN
- China
- Prior art keywords
- cover
- conservancy diversion
- blast furnace
- water conservancy
- tuyere
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Vertical, Hearth, Or Arc Furnaces (AREA)
Abstract
The invention discloses a tuyere sleeve to connect vent oxygen pipe in the iron-smelting furnace or steel-smelting furnace, which comprises the following parts: flannel, vent sleeve bulk and cooling water conduct liner, wherein the vent is set on the flannel; the cooling water conduct inner connects the flannel, which is plugged in the vent sleeve bulk cavity with conductive sleeve; the spiral conduct piece is set on the conduct sleeve; the flannel and cooling water conduct liner is made of iron; the vent sleeve bulk is made of copper; the cooling water inlet and outlet are set on the flannel; the cross section of inlet and outlet displays conical shape in the vent sleeve; the inlet and outlet are set at the connecting position of conduct sleeve and flannel; the liner of cooling water conduct liner welds flannel directly.
Description
Technical field
What tuyere cover of blast furnace of the present invention related to is the air port cover in air-supply oxygen deliverng pipe road in a kind of iron-smelting blast furnace or the steel melting furnace.
Background technology
Steel melting furnace, the manufacturing of the whole employing of ironmaking tuyere of blast furnace cover copper material at present, cost height, internal structure complicated processing be difficulty relatively.Cover is bolted to connection with flange in the water coolant, overlaps with the easy seepage in flange connection portion in the water coolant, can influence air port cover cooling performance.Can burn out the air port cover when serious, influence the stove ordinary production.
Summary of the invention
The objective of the invention is provides a kind of tuyere cover of blast furnace at above-mentioned weak point, the flange and the air port body of air port cover, adopt two kinds of different metal materials to constitute, flange adopts iron quality metal material to constitute, the air port body adopts copper metal material to constitute, and cover can adopt iron quality metal material to constitute in the water coolant water conservancy diversion.Because cover adopts iron quality metal material in flange, the water coolant water conservancy diversion, can save the noble metal copper material, reduce cost greatly, increase air port cover intensity, improve result of use.
Tuyere cover of blast furnace is to adopt following scheme to realize: the structure of tuyere cover of blast furnace comprises cover in flange, air port body, the water coolant water conservancy diversion.Flange is provided with blast inlet, also is provided with the water coolant entery and delivery port.Cover is connected with flange in the water coolant water conservancy diversion, and the interior suit of water coolant water conservancy diversion is inserted in the air port and overlaps in the intracoelomic cavity, the air port body can be directly and flange integrally welded.Flange adopts iron quality metal material to constitute.The air port body adopts copper metal material to constitute.
Cover has the water conservancy diversion cover in the water coolant water conservancy diversion, and the water conservancy diversion cover is provided with the volution inducer, is provided with pod apertures in the water conservancy diversion cover, is provided with entery and delivery port at the water conservancy diversion cover with flange connections, is connected with entery and delivery port on the flange respectively.Cover adopts iron quality metal material to constitute in the water coolant water conservancy diversion.
Principle of work:
Tuyere cover of blast furnace is installed in ironmaking or steel melting furnace air-supply oxygen deliverng pipe road ventilation opening end when using, the pressed gas of sending here by air supply duct through blast-furnace tuyere cover into be used in the body of heater combustion-supporting etc.Water coolant enters the interior process of cover volution inducer water conservancy diversion in the spirrillum water coolant water conservancy diversion by air port cover, flange cooling water intake place.In water coolant water conservancy diversion cover, carry out volution circulation (seeing arrow indication explanation in the accompanying drawing) and, the air port body is fully cooled off, in order to avoid high-temperature gas burns out tuyere cover of blast furnace in the blast furnace after cooling water outlet is got back to the refrigeration cycle return water pipe.
Tuyere cover of blast furnace is reasonable in design, compact construction.Cover in the flange of air port of the present invention cover, air port body, the water coolant water conservancy diversion, adopt two kinds of different metal materials to constitute, flange adopts iron quality metal material to constitute, and the air port body adopts copper metal material to constitute, and cover can adopt iron quality metal material to constitute in the water coolant water conservancy diversion.Because cover adopts iron quality metal material in flange, the water coolant water conservancy diversion, can save the noble metal copper material, reduce cost greatly, increase air port cover intensity, improve result of use.Because the air port body adopts copper metal material to constitute, cooling heat dissipation is effective.Cover directly and flange welds in the water coolant water conservancy diversion, good seal performance.
Description of drawings
The invention will be further described below with reference to accompanying drawing.
Fig. 1 is the tuyere cover of blast furnace front view.
Fig. 2 is a tuyere cover of blast furnace A-A sectional view.
Fig. 3 is a tuyere cover of blast furnace B-B sectional view.
Embodiment
With reference to accompanying drawing 1~3, the structure of tuyere cover of blast furnace comprises cover 9 in flange 4, air port body 8, the water coolant water conservancy diversion.Flange 4 is provided with blast inlet 3, is provided with also on the flange 4 that water coolant advances 5, water outlet 6, and cover 9 is connected with flange 4 in the water coolant water conservancy diversion, overlap 9 in the water coolant water conservancy diversion and adorn and be inserted in air port body 8 inner chambers 13, air port body 8 can be directly and flange 4 integrally welded.Flange 4 adopts iron quality metal material to constitute.
Body 8 hollows in air port are provided with blast inlet 2 air outlets 1, and the cross section is tapered, and air port body 8 is provided with inner chamber 13, and inner chamber 13 can be arranged to taper.Air port body 8 adopts copper metal material to constitute.
Cover 9 has water conservancy diversion cover 10 in the water coolant water conservancy diversion, water conservancy diversion cover 10 is provided with volution inducer 11, be provided with pod apertures 12 in the water conservancy diversion cover 10, be provided with water-in 14, water outlet 7 in water conservancy diversion cover 10 and flange 4 junctions, be connected with water-in 5, water outlet 6 on the flange 4 respectively.Cover 9 adopts iron quality metal material to constitute in the water coolant water conservancy diversion.
Claims (10)
1, a kind of tuyere cover of blast furnace, it is characterized in that structure comprises cover in the flange, air port body, water coolant water conservancy diversion; Blast inlet is set on the flange, a cover and blue a connection in the water coolant water conservancy diversion, suit is inserted in the cover intracoelomic cavity of air port in the water coolant water conservancy diversion, overlaps in the water coolant water conservancy diversion to be provided with the water conservancy diversion cover, and the water conservancy diversion cover is provided with the volution inducer.
2, tuyere cover of blast furnace according to claim 1 is characterized in that flange adopts iron quality metal material to constitute.
3, tuyere cover of blast furnace according to claim 1 is characterized in that cover adopts iron quality metal material to constitute in the water coolant water conservancy diversion.
4, tuyere cover of blast furnace according to claim 1 is characterized in that the air port body adopts copper metal material to constitute.
5, tuyere cover of blast furnace according to claim 1 is characterized in that flange is provided with the water coolant import and export.
6, tuyere cover of blast furnace according to claim 1 is characterized in that air port cover hollow is provided with inlet and outlet, and the cross section is tapered.
7, tuyere cover of blast furnace according to claim 1 is characterized in that the air port body is provided with inner chamber, and inner chamber is tapered.
8, tuyere cover of blast furnace according to claim 1 is characterized in that being provided with pod apertures in the water conservancy diversion cover.
9, tuyere cover of blast furnace according to claim 1 is characterized in that the water conservancy diversion cover and sends out blue that the junction is provided with entery and delivery port.
10, tuyere cover of blast furnace according to claim 1 is characterized in that the direct and flange welding of cover in the water coolant water conservancy diversion.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 200610098275 CN1962882A (en) | 2006-12-08 | 2006-12-08 | Tuyere cover of blast furnace |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 200610098275 CN1962882A (en) | 2006-12-08 | 2006-12-08 | Tuyere cover of blast furnace |
Publications (1)
Publication Number | Publication Date |
---|---|
CN1962882A true CN1962882A (en) | 2007-05-16 |
Family
ID=38082108
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 200610098275 Pending CN1962882A (en) | 2006-12-08 | 2006-12-08 | Tuyere cover of blast furnace |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN1962882A (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102021256A (en) * | 2010-12-29 | 2011-04-20 | 北京京诚科林环保科技有限公司 | Circulating cooling water system of blast-furnace tuyere small sleeve |
CN102242233A (en) * | 2010-05-13 | 2011-11-16 | 上海宝钢设备检修有限公司 | Oxygen blasting tuyere of COREX (coal reduction extreme) furnace |
CN102489935A (en) * | 2011-11-14 | 2012-06-13 | 武汉钢铁(集团)公司 | Blast-furnace tuyere preparation method |
CN102978314A (en) * | 2011-09-07 | 2013-03-20 | 路达(厦门)工业有限公司 | Blast furnace tuyere small sleeve |
CN115125343A (en) * | 2022-07-29 | 2022-09-30 | 内蒙古工业大学 | Wear-resistant high-temperature-resistant blast furnace tuyere |
-
2006
- 2006-12-08 CN CN 200610098275 patent/CN1962882A/en active Pending
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102242233A (en) * | 2010-05-13 | 2011-11-16 | 上海宝钢设备检修有限公司 | Oxygen blasting tuyere of COREX (coal reduction extreme) furnace |
CN102242233B (en) * | 2010-05-13 | 2013-01-30 | 上海宝钢设备检修有限公司 | Oxygen blasting tuyere of COREX (coal reduction extreme) furnace |
CN102021256A (en) * | 2010-12-29 | 2011-04-20 | 北京京诚科林环保科技有限公司 | Circulating cooling water system of blast-furnace tuyere small sleeve |
CN102978314A (en) * | 2011-09-07 | 2013-03-20 | 路达(厦门)工业有限公司 | Blast furnace tuyere small sleeve |
CN102489935A (en) * | 2011-11-14 | 2012-06-13 | 武汉钢铁(集团)公司 | Blast-furnace tuyere preparation method |
CN102489935B (en) * | 2011-11-14 | 2013-11-27 | 武汉钢铁(集团)公司 | Blast-furnace tuyere preparation method |
CN115125343A (en) * | 2022-07-29 | 2022-09-30 | 内蒙古工业大学 | Wear-resistant high-temperature-resistant blast furnace tuyere |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN1962882A (en) | Tuyere cover of blast furnace | |
CN207622014U (en) | Burner and water heater with it | |
CN201058876Y (en) | Modified blast furnace tuyere cover | |
CN200974846Y (en) | Blast furnace wind muzzle | |
CN102958214B (en) | The protection screen of mineral hot furnace | |
CN201495245U (en) | Stream guidance type blast furnace tuyere small sleeve | |
CN107034329A (en) | One kind can be blown pluralities of fuel blast furnace copper coin tuyere case | |
CN202532930U (en) | Cylindrical plate type heat exchanger of mining coal-fired hot air furnace | |
CN101000216A (en) | Air slag hole middle sleeve and manufacturing method thereof | |
CN215002971U (en) | Flue gas heat exchanger | |
CN212533052U (en) | Scrap steel continuous charging electric arc furnace with double preheating channels | |
CN2195077Y (en) | Oxygen lance for blowing hot material in steel-smelting furnace | |
CN113063298A (en) | Tuyere small sleeve of industrial furnace and its making process | |
CN207730003U (en) | Tuyere device and side-blown converter for side-blown converter | |
CN202519277U (en) | Intermediate sleeve of blast-furnace tuyere | |
CN216898350U (en) | Heat exchange type melting holding furnace | |
CN214842533U (en) | Scrap steel preheating device | |
CN202246721U (en) | Tuyere medium jacket of blast furnace | |
CN201327300Y (en) | Water jacket for feeding outlet flue | |
CN209726184U (en) | A kind of all-oxygen combustion rifle | |
CN201908098U (en) | Blast-furnace tuyere device used for blast-furnace ironmaking | |
CN201548064U (en) | Portable oxygen-oil spray gun | |
CN215725068U (en) | A multi-functional clean energy stove for rock wool production | |
CN2567230Y (en) | Water cooling pipe screw-type ceramic tuyere | |
CN212806589U (en) | Reduction smelting blast furnace for smelting crude matte |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
WD01 | Invention patent application deemed withdrawn after publication |