CN1953397A - A method to establish soft permanent connection in intelligent optical network - Google Patents

A method to establish soft permanent connection in intelligent optical network Download PDF

Info

Publication number
CN1953397A
CN1953397A CNA2006101275793A CN200610127579A CN1953397A CN 1953397 A CN1953397 A CN 1953397A CN A2006101275793 A CNA2006101275793 A CN A2006101275793A CN 200610127579 A CN200610127579 A CN 200610127579A CN 1953397 A CN1953397 A CN 1953397A
Authority
CN
China
Prior art keywords
network management
control plane
plane
management system
building
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CNA2006101275793A
Other languages
Chinese (zh)
Other versions
CN100417097C (en
Inventor
高峰
刘建国
马恒
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZTE Corp
Original Assignee
ZTE Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZTE Corp filed Critical ZTE Corp
Priority to CNB2006101275793A priority Critical patent/CN100417097C/en
Publication of CN1953397A publication Critical patent/CN1953397A/en
Application granted granted Critical
Publication of CN100417097C publication Critical patent/CN100417097C/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The invention relates to a method for building soft permanent connection in intelligent light network. Wherein, it comprises that network manage system (1) sends soft permanent connection (4) request; the control plane (2) based on request and parameter calculates out route, obtains connection path, initializes the signal process in control nodes (21), and stores the route information; the control plane (2) feedbacks the route information via network manage protocol to the network manage system (1) to be browsed by operator; based on the browsed result, instructing the detachment of said connection path at the control plane (2) or build at the intelligent light network transmit plane (3). The invention browses the connection method to replace direct build, with which the connected route information can be seed before building SPC at transmit plane.

Description

Soft permanent connection method for building up in a kind of ASON
Technical field
The present invention relates to the communication technology, be specifically related in the ASON, especially the soft permanent SPC in the ASON connects method for building up.
Background technology
Automatically exchange light networking ASON utilizes control plane to finish automatic exchange and the optical transfer network that is connected control, and it is to be the physical transfer medium with optical fiber, the optical transfer network with intelligence that optical transmission systems such as SDH and OTN constitute.The ASON server is a network intelligence, comprises that signaling, route and automatic discovery feature are to realize the intelligent network controlled function.The ASON network configuration can be divided into three planes according to function: control plane, transmit plane and management plane, also comprise the data communication network that is used to control with supervisory communications in addition.Wherein control plane is the core of ASON, and it is made of one group of control assembly that specific functions such as route and signaling are provided, and is supported by a signaling network.The major function of control plane comprises: set up, remove and safeguard the end-to-end ability that is connected by the signaling support, select suitable route by route for connecting; Automatically find syntople and link information, the issue Link State; During network failure, execute protection and restore funcitons.
According to the promoter who connect to set up with set up the different of mode, have following three kinds of connection: PC, SPC and SC in the ASON network.By network management system one by one the connection of the point-to-point set up of the network element on the configuration path be called as permanent connection Permanent Connection, be called for short PC, it does not use signaling; Initiated by client, the connection of setting up by the mutual signaling message between Control Node is called as switch type and connects Switched Connection, is called for short SC; And initiate by network management system, use PC at network edge, the connection of using signaling procedure to set up in network internal is called as soft permanent connections SoftPermanent Connection, abbreviation SPC.
Traditional SPC sets up, and as shown in Figure 1, thick line is that SPC connects 4 among the figure, and dotted line is the control information in the establishment step, and the process of foundation comprises following concrete steps:
110) operating personnel send SPC by network management system 1 and set up request, and the request that network management system 1 will have been carried various parameters sends to control plane 2;
120) after control plane 2 is received request, carry out route and calculate, initiate signaling procedure according to the path that calculates then, the order transmission is carried out in pointwise 21 in control plane;
130) control plane pointwise 21 sends to transmission plane 3 with the intersection information of each point, transmits plane 3 and carries out cross-over configuration according to configuration information in corresponding node 31;
140) signaling procedure executes, and transmits the configuration on plane 3 and also finishes simultaneously, and control plane 2 feeds back to network management system 1 with link information, checks for operating personnel.
From said process as can be seen, SPC also disposes transmitting the plane, after receiving the feedback of control plane when carrying out route calculating and signaling transmission, operating personnel can see the information of SPC from network management system, include, but are not limited to route, time slot or wavelength.If through after checking analysis, operating personnel think that control plane is unreasonable for this SPC connects the route and the time slot that distribute, need adjust, the plane is set up because SPC is connected transmission, operating personnel must delete this connection from transmitting the plane by first transmitting order to lower levels, and then carry out new connection and set up the purpose that reaches oneself.In the process of adjusting, need the operation on transmission plane repeatedly, not only efficient is low, and has increased the risk that breaks down.
Summary of the invention
The technical issues that need to address of the present invention are how soft permanent connection method for building up in a kind of ASON is provided, and can submit necessary information in advance by transmitting the foundation operation on plane, the risk that reduction is broken down after operating personnel's affirmation again.
Above-mentioned technical problem of the present invention solves like this, and soft permanent connection method for building up in a kind of ASON is provided, and it is characterized in that, adopts the preview connected mode, may further comprise the steps:
1.1) the ASON network management system sends soft permanent connection by network management protocol to this ASON control plane and set up request;
1.2) described control plane carries out route according to the subsidiary parameter of described request and calculates, draws access path and initiate signaling procedure between Control Node by this path: the order transmission is carried out in pointwise, preserves the routing iinformation of this access path simultaneously;
1.3) described control plane utilizes network management protocol to feed back to described network management system described routing iinformation and check and preview for operating personnel;
1.4) operating personnel transmit actual foundation on plane according to described checking with this access path of object command of preview in the dismounting of described control plane or at this ASON.
According to method for building up provided by the invention, described step 1.4) demolishing process in may further comprise the steps:
1.4.1.1) described network management system sends the described access path order of deletion by network management protocol to described control plane;
1.4.1.2) after described control plane received described order, initiate signaling procedure between Control Node by described path: the order transmission was carried out in pointwise, with described routing iinformation pointwise ground deletion;
1.4.1.3) the described control plane execution result that previous step is rapid utilizes network management protocol to feed back to described network management system.
According to method for building up provided by the invention, described pointwise is meant by the order of corresponding Control Node on the described path to be carried out one by one.
According to method for building up provided by the invention, step 1.4) in the actual process of setting up may further comprise the steps:
1.4.2.1) described network management system sends to described control plane by network management protocol and activate described access path order;
1.4.2.2) after described control plane received described order, initiate signaling procedure between Control Node by described path: the order transmission was carried out in pointwise;
1.4.2.3) described control plane pointwise passes to this ASON with described routing iinformation and transmit the plane, after configuration information is received on described transmission plane, carries out the configuration of respective quadrature fork on the transmission node corresponding with Control Node, sets up soft permanent connection;
1.4.2.4) the described control plane execution result that previous step is rapid utilizes network management protocol to feed back to described network management system.
According to method for building up provided by the invention, described step 1.4.2.3) the described transmission node in is included on the described path.
According to method for building up provided by the invention, described network management system comprises server and connected client.
According to method for building up provided by the invention, described step 1.1) request in is initiated to the network management system server by network management system client by operating personnel.
Seeing with preview according to method for building up provided by the invention, described step 1.3) carried out in network management system client.
According to method for building up provided by the invention, described routing iinformation comprises time slot or wavelength or time slot and wavelength.
According to method for building up provided by the invention, described step 10.3) the described transmission node in is included on the described path.
Soft permanent connection method for building up in the ASON provided by the invention, adopt the preview connected mode to replace directly setting up, in the process that SPC sets up, allow the webmaster operating personnel that the routing iinformation (comprising time slot or wavelength) of SPC is carried out preview, if confirm rationally, can give an order and on the transmission plane, set up this connection; If unreasonable, just can delete this connection not needing to transmit under the situation that the plane participates in.This method is transmitting the routing iinformation that just can see connection on the plane before the foundation at SPC, makes things convenient for the use of webmaster operating personnel to SPC, reduces the operation that transmits the plane under the situation that needs are adjusted, and has to a certain degree reduced the wrong risk of setting up SPC.
Description of drawings
Further the present invention is described in detail below in conjunction with the drawings and specific embodiments.
Fig. 1 is traditional SPC connection procedure schematic diagram.
Fig. 2 is that SPC of the present invention connects foundation/delete procedure schematic diagram.
Fig. 3 is the flow chart corresponding with Fig. 2.
Fig. 4 is the process schematic diagram that back activation situation is confirmed in SPC preview of the present invention.
Fig. 5 is the process schematic diagram that back deletion situation is confirmed in SPC preview of the present invention.
Embodiment
SPC of the present invention connects method for building up, detailed process such as Fig. 2, and thick line is that SPC connects 4 among the figure, and dotted line is the control information in the establishment step, and corresponding establishment step comprises:
200) request that will carry various parameters of (operating personnel 11 send SPC by network management system 1 and connect 4 and set up request) network management system 1 sends to control plane 2.
210) after control plane 2 is received request, carry out route and calculate, initiate signaling procedure according to the path that calculates then, the order transmission is carried out in pointwise 21 in control plane, and preserves the routing iinformation (comprising information such as time slot or wavelength) that connects in control plane.
220) control plane 2 feeds back to network management system 1 with the routing iinformation (comprising information such as time slot or wavelength) of SPC connection 4.
230) operating personnel 11 can check on network management system 1 and analyze.If confirm that the route assignment of this connection is reasonable, then execution in step 240); If think that the route assignment that connects is unreasonable, then execution in step 270).
240) operating personnel 11 send by network management system 1 and activate bind command to control plane 2.
250) after control plane 2 receives order, by signaling procedure in 21 transferring command of Control Node.
260) control plane 2 pointwises 21 pass to transmission plane 3 with the information of this connection of its preservation, after configuration information is received on the transmission plane, carry out corresponding cross-over configuration at corresponding each node 31, thereby finish the foundation of SPC connection 4 in transmitting the plane.Go to step 290 then).
270) operating personnel 11 send deletion SPC connection 4 orders by network management system 1 and give control plane 2.
280) after control plane 2 receives order,, carry out the order transmission, this SPC that is kept in the control plane 2 is connected 4 information pointwise ground deletion by signaling procedure.
290) behind control plane 2 end of signalings, above-mentioned execution result is fed back to network management system 1.
The idiographic flow of said process correspondence as shown in Figure 3, comprising:
300) beginning;
310) user 11 initiates SPC connection 4 by network management system 1 and sets up request;
320) network management system 1 sends to control plane 2 with this request;
330) control plane 2 carries out route calculating;
340) corresponding signaling transmission is carried out in pointwise 21 in control plane;
350) control plane 2 preservation SPC connect 4 routing iinformations;
360) control plane 2 connects 4 routing iinformations with SPC and feeds back to network management system 1;
370) 11 couples of SPC of user connect 4 routing iinformations and confirm, judge whether rationally? be to enter next step; , do not change step 3711 over to).
3701) user 11 sends by network management system 1 and activates SPC and connect 4 routing commands;
3702) network management system 1 sends to control plane 2 with this request;
3703) corresponding signaling transmission is carried out in pointwise 21 in control plane 2;
3704) control plane 2 connects 4 information with the SPC that preserves and sends to and transmit plane 3 and be configured;
3705) transmit plane 3 and be configured, finish and transmit SPC connection 4 foundation in the plane 3, change step 380 over to);
3711) user 11 by network management system 1 send the deletion SPC connect 4 routing commands;
3712) network management system 1 sends to control plane 2 with this request;
3713) corresponding signaling transmission is carried out in pointwise 21 in control plane 2;
3714) control plane 2 connects 4 information deletions with the SPC that preserves;
380) control plane 2 feeds back to network management system 1 with the result that SPC connects 4 operations.
With the back process that activates of (one) SPC connection preview affirmation with after (two) SPC is connected preview, think that the process of unreasonable deletion specifies the present invention below:
(1) SPC connects the process that preview confirms that the back is activated, and as Fig. 4, thick line is that SPC connects 4 among the figure, and dotted line is the control information in the establishment step, and corresponding establishment step comprises:
400) (operating personnel 11 wish to set up a SPC from node A to node F and connect 4, operating personnel 11 by) network management system 1 is sent the SPC connection request of foundation from node A to node F.
410) after control plane 2 is received request, carry out route and calculate, the route of calculating is: A → B → C → E → F.Control plane 2 is initiated signaling procedures, in control plane according to A → B → C → E → F (C a→ C b→ C c→ C e→ C f) the order pointwise carry out the order transmission, relevant each control point 21 is carried out finer time slot (or wavelength) and is distributed, and this time slot (or wavelength) information is kept in the Control Node 21.
420) control plane 2 is covered signaling procedure, SPC is connected 4 routing iinformation (comprising information such as time slot or wavelength) and feeds back to network management system 1.
430) operating personnel 11 can check on network management system 1 and analyze, and confirm that the route assignment of this SPC connection 4 is reasonable, require to activate this SPC and connect 4, promptly finish this configuration of SPC connection 4 in transmission plane 3;
440) (operating personnel 11 by) network management system 1 is sent and is activated this SPC and connect 4 routing commands and give control plane 2.
450) after control plane 2 receives order, by signaling procedure according to A → B → C → E → F (C a→ C b→ C c→ C e→ C f) order pointwise 21 transferring command, require to activate configuration.
460) each Control Node 21 that receives orders all passes to time slot (or wavelength) configuration information of this connection of its preservation and transmits plane 3, transmits after plane 3 receives configuration information, carries out corresponding cross-over configuration, is connected the foundation that transmits in the plane thereby finish.
470) behind control plane 2 end of signalings, SPC is connected 4 activation results feed back to network management system.
(2) after SPC connects preview, think the process of unreasonable deletion, as Fig. 5, thick line is that SPC connects 4 among the figure, and dotted line is the control information in the establishment step, and corresponding establishment step comprises:
500) (operating personnel 11 wish to set up a SPC from node A to node F and connect 4, operating personnel 11 by) network management system 1 is sent the SPC connection request of foundation from node A to node F.
510) after control plane 2 is received request, carry out route and calculate, the route of calculating is: A → B → C → E → F.Control plane 2 is initiated signaling procedures, in control plane according to A → B → C → E → F (C a→ C b→ C c→ C e→ C f) the order pointwise carry out the order transmission, relevant each control point 21 is carried out finer time slot (or wavelength) and is distributed, and this time slot (or wavelength) information is kept in the Control Node 21.
520) control plane 2 is covered signaling procedure, SPC is connected 4 routing iinformation (comprising information such as time slot or wavelength) and feeds back to network management system 1.
530) operating personnel 11 can check on network management system 1 and analyze, and think that the route assignment of this SPC connection 4 is unreasonable, need adjust, thereby wish this connection of deletion earlier.
540) (operating personnel 11 by) network management system 1 is sent deletion SPC and is connected 4 routing commands and give control plane 2.
550) after control plane 2 receives order, by signaling procedure according to A → B → C → E → F (C a→ C b→ C c→ C e→ C f) the order pointwise in 21 transferring command of Control Node, deletion is kept at time slot (or wavelength) configuration information of this connection in each Control Node 21.
560) behind control plane 2 end of signalings, SPC is connected 4 deletion results feed back to network management system 1.
In this case, operating personnel 11 can initiate new SPC connection 4 as required and set up process.

Claims (8)

1, soft permanent connection method for building up in a kind of ASON is characterized in that, adopts the preview connected mode, may further comprise the steps:
1.1) ASON network management system (1) sends soft permanent connection (4) by network management protocol to this ASON control plane (2) and set up request;
1.2) described control plane (2) carries out route according to the subsidiary parameter of described request and calculates, draws access path and initiate signaling procedure between Control Node (21) by this path: the order transmission is carried out in pointwise, preserves the routing iinformation of this access path simultaneously;
1.3) described control plane (2) with described routing iinformation utilize network management protocol feed back to described network management system (1) for operating personnel (11) check and preview;
1.4) operating personnel (11) transmit actual foundation on plane (3) according to described checking with this access path of object command of preview in the dismounting of described control plane (2) or at this ASON.
2, according to the described method for building up of claim 1, it is characterized in that described step 1.4) in demolishing process may further comprise the steps:
1.4.1.1) described network management system (1) sends the described access path order of deletion by network management protocol to described control plane (2);
1.4.1.2) after described control plane (2) received described order, initiate signaling procedure between Control Node (21) by described path: the order transmission was carried out in pointwise, with described routing iinformation pointwise ground deletion;
1.4.1.3) described control plane (2) execution result that previous step is rapid utilizes network management protocol to feed back to described network management system (1).
According to claim 1 or 2 described method for building up, it is characterized in that 3, described pointwise is meant by the order of corresponding Control Node (21) on the described path to be carried out one by one.
4, according to the described method for building up of claim 1, it is characterized in that described step 1.4) in the actual process of setting up may further comprise the steps:
1.4.2.1) described network management system (1) send to activate described access path order by network management protocol to described control plane (2);
1.4.2.2) after described control plane (2) received described order, initiate signaling procedure between Control Node (21) by described path: the order transmission was carried out in pointwise;
1.4.2.3) described control plane (2) pointwise passes to this ASON with described routing iinformation and transmit plane (3), after configuration information is received on described transmission plane, on the transmission node (31) corresponding, carry out the configuration of respective quadrature fork, set up soft permanent connection (4) with Control Node (21);
1.4.2.4) described control plane (2) execution result that previous step is rapid utilizes network management protocol to feed back to described network management system (1).
According to the described method for building up of claim 1, it is characterized in that 5, described network management system (1) comprises server and connected client.
6, according to claim 1 or 5 described method for building up, it is characterized in that described step 1.1) in request initiate to described server by described client by operating personnel (11).
7, according to claim 1 or 5 described method for building up, it is characterized in that described step 1.3) in check with preview and carry out in described client.
According to claim 1,2 or 4 described method for building up, it is characterized in that 8, described routing iinformation comprises time slot or wavelength or time slot and wavelength.
CNB2006101275793A 2006-09-14 2006-09-14 A method to establish soft permanent connection in intelligent optical network Expired - Fee Related CN100417097C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNB2006101275793A CN100417097C (en) 2006-09-14 2006-09-14 A method to establish soft permanent connection in intelligent optical network

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNB2006101275793A CN100417097C (en) 2006-09-14 2006-09-14 A method to establish soft permanent connection in intelligent optical network

Publications (2)

Publication Number Publication Date
CN1953397A true CN1953397A (en) 2007-04-25
CN100417097C CN100417097C (en) 2008-09-03

Family

ID=38059535

Family Applications (1)

Application Number Title Priority Date Filing Date
CNB2006101275793A Expired - Fee Related CN100417097C (en) 2006-09-14 2006-09-14 A method to establish soft permanent connection in intelligent optical network

Country Status (1)

Country Link
CN (1) CN100417097C (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2009065274A1 (en) * 2007-11-21 2009-05-28 Zte Corporation An automatically switched optical network and method for data transmission in the network
CN101394303B (en) * 2007-09-19 2012-01-11 中兴通讯股份有限公司 Batch regulation method and system for path
CN114448505A (en) * 2022-01-19 2022-05-06 武汉烽火技术服务有限公司 Method, device and storage medium for calculating optical signal-to-noise ratio based on TE link

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1187993C (en) * 2003-01-16 2005-02-02 上海交通大学 Signaling cascading method of exchange connection in automatic exchange optic/transport network
US7697445B2 (en) * 2003-06-05 2010-04-13 Tellabs Operations, Inc. Autonomous data path verification in multi-module shelf configuration
KR100542362B1 (en) * 2004-02-18 2006-01-10 삼성전자주식회사 Network management system of soft Permanent Virtual Circuit and method thereof

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101394303B (en) * 2007-09-19 2012-01-11 中兴通讯股份有限公司 Batch regulation method and system for path
WO2009065274A1 (en) * 2007-11-21 2009-05-28 Zte Corporation An automatically switched optical network and method for data transmission in the network
CN101563866B (en) * 2007-11-21 2012-10-03 中兴通讯股份有限公司 An automatically switched optical network and method for data transmission in the network
US8781320B2 (en) 2007-11-21 2014-07-15 Zte Corporation Automatically switched optical network and method for data transmission in the network
CN114448505A (en) * 2022-01-19 2022-05-06 武汉烽火技术服务有限公司 Method, device and storage medium for calculating optical signal-to-noise ratio based on TE link
CN114448505B (en) * 2022-01-19 2023-06-09 武汉烽火技术服务有限公司 Method, device and storage medium for calculating optical signal to noise ratio based on TE link

Also Published As

Publication number Publication date
CN100417097C (en) 2008-09-03

Similar Documents

Publication Publication Date Title
CN1866806B (en) Method for realizing shared grid network recovery
JP2005521334A (en) Network management system
JP2007500955A (en) Method for transition between fixed connection and destination selection connection in a transmission network
CN101083564A (en) Method for updating automatically optical network unit and optical line terminal
CN103731373B (en) The method of adjustment of bandwidth resources, apparatus and system
CN101170482B (en) Method for realizing SPC activation/deactivation via control plane in ASON network
US20060209816A1 (en) Method and equipment for implementing synchronous switching of CLOS cross connection matrix
CN100417097C (en) A method to establish soft permanent connection in intelligent optical network
CN102970621B (en) Transmission resource management device and method in a kind of network element
CN1929407B (en) Method for obtaining network information and network management system
CN101360349B (en) Resistant boundary node and establishing method for connection between resistant boundary nodes
CN100531079C (en) Method for controlling SC/SPC connection in automatic exchange optical network
WO2010069246A1 (en) Route establishment method and device for a connection
EP1612978B1 (en) Channel protection method between boards in wave division multiplex system
US20030177213A1 (en) Determining connectivity in communication networks
CN102281158A (en) Line fault processing method and device
JP2003318983A (en) Fault recovery method for optical cross connect network
CN101133601B (en) Complex control node in automatic exchanging transmission network and control method thereof
CN101272278B (en) System and method for distributing command line interface command in network management system
EP2219328B1 (en) A method for soft re-routing in ASON
CN1964509A (en) A method to preview soft permanent connection in intelligent optical network
CN101198077A (en) Connection control method in automatic exchange optical network
WO2022101970A1 (en) Upper device, optical access system, transfer method, and computer program
CN100411347C (en) Self consulting method for data communicationchannel bandwidth
CN101228736B (en) Connecting and controlling method and device for automatically exchanging optical network multicast business

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20080903

Termination date: 20150914

EXPY Termination of patent right or utility model