CN1888924A - Transformer local discharging ultra-wide band sensor array positioning system and method thereof - Google Patents

Transformer local discharging ultra-wide band sensor array positioning system and method thereof Download PDF

Info

Publication number
CN1888924A
CN1888924A CN 200610103665 CN200610103665A CN1888924A CN 1888924 A CN1888924 A CN 1888924A CN 200610103665 CN200610103665 CN 200610103665 CN 200610103665 A CN200610103665 A CN 200610103665A CN 1888924 A CN1888924 A CN 1888924A
Authority
CN
China
Prior art keywords
transformer
sensor
sensor array
frequency
array
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN 200610103665
Other languages
Chinese (zh)
Other versions
CN100535677C (en
Inventor
李成榕
唐志国
王伟
程养春
郑书生
丁立健
王景春
詹花茂
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qingdao Huadian High Voltage Electric Co ltd
Original Assignee
North China Electric Power University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by North China Electric Power University filed Critical North China Electric Power University
Priority to CNB2006101036650A priority Critical patent/CN100535677C/en
Publication of CN1888924A publication Critical patent/CN1888924A/en
Application granted granted Critical
Publication of CN100535677C publication Critical patent/CN100535677C/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Testing Relating To Insulation (AREA)

Abstract

This is a transformer local discharge ultrawide-band sensor array orientation system. Four elements ultrawide-band RF sensor arrays are micro size wide-band antenna and their designed upper limit frequency isn't lower than 6 GHz. The elements aren't in one circumcircle and the space between of element isn't smaller than 80cm. Set each group of sensor array at both side of the transformer iron core. Respectively connect the feeder to the four ultrawide-band amplifiers of 1GHz-6GHz by same length and low wastage high frequency RF cable, and the export ending of amplifier connects to the high-speed collecting figure oscillograph. Test the arriving time difference of the element test single with the others by the sensor array to find the position of the transformer local discharge radiant point. The orientation system and method adopt the existing instrument and achieve the veracious orientation and can be used on line.

Description

Transformer local discharging ultra-wide band sensor array positioning system and method thereof
Technical field
The invention belongs to power transformer online measuring technique field, be meant a kind of transformer local discharging ultra-wide band sensor array positioning system and method thereof especially.Non-plane (or hither plane) the radio frequency sensor array of arranging with circumscribed circle of a kind of employing a plurality of (more than 2 or 2) 4 array elements carries out system and the method thereof that Partial Discharge in Power Transformer detects.
Background technology
Along with development and national economy, more and more higher to the requirement of electric system reliability service, and power transformer is the hinge equipment of electric system, its reliability of operation is directly connected to the safety and stablization of electric system.To the statistical results show of physical fault, insulation fault is the main cause that influences the normal operation of transformer, and shelf depreciation is to cause the major reason of insulation fault.
Current, the state maintenance of development power equipment has become a kind of inexorable trend.Not only there is important booster action shelf depreciation location to the assessment of the extent of injury of shelf depreciation accurately, and can provide the guidance of science for the repair based on condition of component of transformer, so that the maintainer carries out maintenance of equipment with a definite target in view, help fixing a breakdown rapidly and improving the maintenance level, also structural design, the raising manufacturing technology level of improving transformer had directive significance simultaneously.
The partial discharge of transformer location technology has been studied more than 20 year at home and abroad, and at present, the method for existing shelf depreciation location mainly contains two kinds of ultrasonic locating method, electrical Location methods.But up to now these classic methods all can't realize accurately, localization of fault reliably.
Method for ultrasonic locating is to begin development the eighties, is tending towards ripe a kind of partial discharge positioning method the nineties, and present this method has obtained using more widely.But the practice of rig-site utilization shows that this method position success rate is very low, and locating effect is very poor.The main cause of its location failure has following 3 points: at first, especially tank envelope is very serious to the decay of ultrasonic signal for various acoustic mediums in the transformer, and the sensitivity of ultrasonic sensor is lower, cause ultrasonic method to be difficult to detection signal effectively thus, cause can't locate or locate inaccurate.Secondly, the electromagnetic interference (EMI) of site environment is strong, and the ultrasonic sensor poor anti jamming capability of using at present causes to be difficult to effective using ultrasound method and accurately to locate.At last, transformer device structure complexity, the equivalent velocity of sound of ultrasonic signal in different medium are difficult to determine that accurately location algorithm is perfect not to the utmost in addition, cause the location inaccurate.
Be called the electrical Location method according to partial discharge pulse along the method that the Transformer Winding propagation law carries out analyzing and positioning.Different with localization by ultrasonic, the position that electric method is determined is the electric position that takes place of shelf depreciation but not geometric position.Although more to the Transformer Winding The Characteristic Study, and multiple electrical Location method has correspondingly appearred, up to the present, seldom adopt electric method in the reality.Its main cause is: at first, the on-the-spot behaviour of electric method institute is complicated, so the scope of application is subjected to bigger restriction; The second, big to the accurate modeling difficulty of Transformer Winding, work is loaded down with trivial details, versatility is poor; The 3rd, because transformer winding structure complexity and shelf depreciation happening part is different, the pulse regularity that propagates into winding overhang is not strong, and its accurate positioning is not high.And because the influence of on-the-spot strong electromagnetic interference (EMI), pulse current method is difficult to online effectively application.
To have highly sensitive a, antijamming capability strong and be suitable for the advantage of online detection in view of the UHF method, and people begin to explore by UHF and detect the location of carrying out Partial Discharge in Power Transformer at present.Someone's the shortest optical path principle of giving chapter and verse is carried out the idea of Partial Discharge in Power Transformer location at present, but research also finds because local discharge signal intensity is limited, and large scale entity metal assemblies such as iron core are very strong to the decay that the UHF signal causes, the latency measurement that causes thus is inaccurate, the latency measurement error in addition up to the number nanoseconds more than, this requires for the partial discharge of transformer orientation problem, and the fault for centimetre magnitude positions in several meters spatial dimension, consider that electromagnetic wave is with near light velocity propagation, the positioning error that causes thus is (even can reach several meters) greatly, therefore is difficult to directly carry out according to the shortest optical path principle the accurate location of partial discharge of transformer.
Summary of the invention
The purpose of this utility model is to avoid above-mentioned weak point of the prior art and a kind of transformer local discharging ultra-wide band sensor array positioning system and method thereof is provided.The present invention has developed non-plane (or hither plane) the radio frequency sensor array of arranging with circumscribed circle of a kind of employing a plurality of (more than 2 or 2) 4 array elements and has carried out system and the method thereof that Partial Discharge in Power Transformer detects.
Purpose of the present invention can reach by following measure:
A kind of transformer local discharging ultra-wide band sensor array positioning system, its positioning system is constructed as follows:
High speed acquisition digital oscilloscope by 4 array element ultra-wide band radio-frequency sensor arraies, isometric low-loss radio frequency feed line, 1GHz-6GHz ultra broadband amplifier, 6GHz analog bandwidth is formed;
4 array element ultra-wide band radio-frequency sensor arraies, the array element of its sensor array is the miniature broadband antenna, its design upper limiting frequency be not less than 6GHz, each array element of the arrangement requirement of sensor array not on same circumscribed circle, floor plan, array element distance is not less than 80cm;
Near the transformer oil tank wall low place or in the magnetic shielding district both sides unshakable in one's determination one group of sensor array at least respectively is installed, each sensor is drawn with isometric low-loss radio frequency feed line, with isometric low-loss high-frequency radio-frequency cable feeder line is received respectively on the ultra broadband amplifier of 4 road 1GHz-6GHz drawing the feeder line structure place, adopted isometric low-loss high-frequency radio-frequency cable that amplifier output is connected on the high speed acquisition digital oscilloscope equally.
A kind of transformer local discharging ultra-wide band sensor array localization method:
(1) analog bandwidth high speed acquisition digital oscilloscope is set to triggering mode, adopts the follow-up relatively concussion wave-shape amplitude of Mintrop wave peak-to-peak amplitude higher, and pulse width do not have the direct wave that becomes big, adopts the sensor array of this side to detect;
(2) selected a certain road array element detection signal is as the reference benchmark, and it is poor with respect to the time of arrival of this array element detection signal to measure other each array elements, and known velocity of wave c and each sensor coordinates are obtained the position of partial discharge of transformer radiation source.
The present invention has following advantage compared to existing technology:
This transformer local discharging ultra-wide band sensor array positioning system and method thereof adopt existing typing instrument and equipment, can directly buy on market, can be not impaired by side transformer, and accurate positioning is reliable.
But this transformer local discharging ultra-wide band sensor array positioning system and method on-line measurement thereof, method is simple, overlaps simple.
Description of drawings
Fig. 1. four array element ultra-wide band radio-frequency sensor arraies, its four array element are that rhombus is arranged, wherein acute angle is 30~60 ° in the rhombus, and array element distance L is more than the 80cm.
Fig. 2. the both sides unshakable in one's determination sensor installation array synoptic diagram of transformer, its S 1, S 2, S 3, S 4Be the iron core one side senser array of transformer, and S 2' ... opposite side sensor array unshakable in one's determination for transformer.
Fig. 3 mistiming is read synoptic diagram, its [τ 12, τ 13, τ 14]=[1.543,0.877 ,-0.179], unit: ns.
Embodiment
The present invention proposes a kind of transformer local discharging ultra-wide band sensor array positioning system and method thereof, non-plane (or hither plane) the radio frequency sensor array of arranging with circumscribed circle of a kind of employing a plurality of (more than 2 or 2) 4 array elements carries out system and the method thereof that Partial Discharge in Power Transformer detects, and can effectively improve measuring accuracy.
Transformer local discharging ultra-wide band sensor array positioning system is made up of the high speed acquisition digital oscilloscope of 4 array element ultra-wide band radio-frequency sensor arraies, isometric low-loss radio frequency feed line, 1GHz-6GHz ultra broadband amplifier, 6GHz analog bandwidth, and its each unit is installed, connects as follows:
1, the installation of sensor array
Shown in accompanying drawing 1. 4 array element ultra-wide band radio-frequency sensor arraies, wherein the array element of sensor array is the miniature broadband antenna, and its design upper limiting frequency is not less than 6GHz.Each array element of the arrangement requirement of sensor array is not on same circumscribed circle, floor plan or almost plane are arranged, array element distance is not less than 80cm, satisfy the rhombus of this requirement and arrange that (the rhombus acute angle is between 30 °-60 °) are preferable, other satisfy array element not the layout on same circumscribed circle also can.
In the transformer production stage not oil-filled before, near can be the transformer oil tank wall low place or near sensor installation array magnetic shielding; Another mode is exactly during transformer returns factory's overhaul, after transformer oil bleeds off, and near low place the transformer oil tank wall or near sensor installation array magnetic shielding.Must guarantee at least respectively to install one group of sensor array in both sides unshakable in one's determination.Isometric sensor feeder line is drawn by transformer valve, manhole, hand hole or special perforate position by special hermetically-sealed construction.
Shown in the both sides unshakable in one's determination sensor installation array synoptic diagram of accompanying drawing 2 transformers, isometric low-loss radio frequency feed line is drawn by specialized structure from transformer valve, manhole or hand hole position, also can go between by the mode of transformer production producer perforate in advance on tank wall, the lead division bit architecture carries out excellent sealing, and a sensor array at least respectively is installed in the transformer core both sides.
2, connect detection system
In transformer operation or pressurization experimentation, transformer is inner to be existed discharge and needs further to determine spark location when carrying out follow-up diagnosis or maintenance when detecting, and with isometric low-loss high-frequency radio-frequency cable feeder line is received respectively on the ultra broadband amplifier of 4 road 1GHz-6GHz drawing the feeder line structure place.The isometric low-loss high-frequency radio-frequency cable of same employing is connected to amplifier output on the high speed acquisition digital oscilloscope.
3, test data sheet signal
Read shown in the synoptic diagram as 3 mistimings of accompanying drawing, draw signal and amplify the back is connected directly to the 6GHz analog bandwidth by the high-frequency radio frequency concentric cable high-speed figure collection oscillograph through the amplifier of four road 1GGHz-6GHz bandwidth.Position detecting system is set to triggering mode, according to the speed of the Mintrop wave peak of gathering discharge waveform, can distinguish discharge signal and whether stop still along direct path arrival sensor through iron core with respect to size, distortion situation and the rising edge of follow-up concussion wave-shape amplitude.Concrete grammar is if the follow-up relatively concussion wave-shape amplitude of Mintrop wave peak-to-peak amplitude is lower, and obviously pulse width becomes big, and then discharge signal is for sensor received after iron core stops and diffraction takes place; Otherwise be direct wave.According to the position of discharge source with respect to iron core, i.e. discharge occurs in which side unshakable in one's determination, detects with regard to the sensor array that adopts this side.According to the size of detection signal-to-noise ratio, decision record discharge waveform size.If disturb greatlyyer, then write down a large amount of discharge waveform samples, to eliminate random disturbance and ambient noise signal, improve the noise that detects, and the discharge signal reference position is highlighted;
Selected a certain road array element detection signal is as the reference benchmark, measure other each array elements with respect to the time of arrival of this array element detection signal poor-be signal time delay, as input parameter, carry out the search location of discharge source with detection signal time delay information by mistiming algorithm (also claiming the hyperboloid algorithm).
Under the situation of selected frequency band of the present invention and sensor mounting means, the radiofrequency signal that shelf depreciation produces can effectively penetrate horizontal, vertical oil duct of Transformer Winding and propagate in the mode of nearly straight line, and this conclusion is confirmed by a large amount of emulation and test.This fact has greatly been simplified the location algorithm development difficulty, has reduced the mistiming location algorithm and has implemented difficulty.Therefore, can be based on signal rectilinear propagation modelling mistiming algorithm.
4, specific algorithm is as follows the mistiming:
Measure the relative time delay between good each sensor array element, and it can be located the coordinate position of shelf depreciation point as parameter substitution location algorithm.
For example 3 mistimings of accompanying drawing read the actual measurement time delay that provides in the synoptic diagram and are [τ 12, and τ 13, and τ 14]=[1.543,0.877 ,-0.179], unit: ns.Utilize delay inequality can determine discharge radiation source, (x, y is z) to sensor S to establish discharge radiation source P 1(x 1, y 1, z 1) travel-time t 1, then the P point is to S 1Apart from r 1Satisfy
r 1 = ( x - x 1 ) 2 + ( y - y 1 ) 2 + ( z - z 1 ) 2 = c · t 1 - - - ( 1 )
In the formula, c is electromagnetic velocity of wave.
If signal arrives sensor S i(x i, y i, z i) and reference sensor S 1Relative time error be τ 1i=t i-t 1, i=2,3,4, then satisfy relation of plane down between the coordinate of radiation source P and each sensor
r 1 = ( x - x 1 ) 2 + ( y - y 1 ) 2 + ( z - z 1 ) 2 = c · t 1 r 2 = ( x - x 2 ) 2 + ( y - y 2 ) 2 + ( z - z 2 ) 2 = c · ( t 1 + τ 12 ) r 3 = ( x - x 3 ) 2 + ( y - y 3 ) 2 + ( z - z 3 ) 2 = c · ( t 1 + τ 13 ) r 4 = ( x - x 4 ) 2 + ( y - y 4 ) 2 + ( z - z 4 ) 2 = c ( t 1 + τ 14 ) - - - ( 2 )
Measure each sensor with respect to sensor S 1Relative time error τ 1i, known velocity of wave c and each sensor coordinates then can be obtained the position of radiation source by formula (2).From geometric meaning, what formula (2) was represented is the hyperboloid equation, so the mistiming location algorithm is also referred to as the hyperboloid algorithm.A P three bi-curved intersection points are in fact put in office.
This transformer local discharging ultra-wide band sensor array positioning system and method thereof adopt existing typing instrument and equipment, and accurate positioning is reliable, but on-line measurement, and method is simple.

Claims (2)

1, a kind of transformer local discharging ultra-wide band sensor array positioning system is characterized in that: its positioning system is constructed as follows:
High speed acquisition digital oscilloscope by 4 array element ultra-wide band radio-frequency sensor arraies, isometric low-loss radio frequency feed line, 1GHz-6GHz ultra broadband amplifier, 6GHz analog bandwidth is formed;
4 array element ultra-wide band radio-frequency sensor arraies, the array element of its sensor array is the miniature broadband antenna, its design upper limiting frequency be not less than 6GHz, each array element of the arrangement requirement of sensor array not on same circumscribed circle, floor plan, array element distance is not less than 80cm;
Near the transformer oil tank wall low place or in the magnetic shielding district both sides unshakable in one's determination one group of sensor array at least respectively is installed, each sensor is drawn with isometric low-loss radio frequency feed line, with isometric low-loss high-frequency radio-frequency cable feeder line is received respectively on the ultra broadband amplifier of 4 road 1GHz-6GHz drawing the feeder line structure place, adopted isometric low-loss high-frequency radio-frequency cable that amplifier output is connected on the high speed acquisition digital oscilloscope equally.
2, a kind of transformer local discharging ultra-wide band sensor array localization method is characterized in that:
(1) analog bandwidth high speed acquisition digital oscilloscope is set to triggering mode, adopts the follow-up relatively concussion wave-shape amplitude of Mintrop wave peak-to-peak amplitude higher, and pulse width do not have the direct wave that becomes big, adopts the sensor array of this side to detect;
(2) selected a certain road array element detection signal is as the reference benchmark, and it is poor with respect to the time of arrival of this array element detection signal to measure other each array elements, and known velocity of wave c and each sensor coordinates are obtained the position of partial discharge of transformer radiation source.
CNB2006101036650A 2006-07-27 2006-07-27 Transformer local discharging ultra-wide band sensor array positioning system and method thereof Expired - Fee Related CN100535677C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNB2006101036650A CN100535677C (en) 2006-07-27 2006-07-27 Transformer local discharging ultra-wide band sensor array positioning system and method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNB2006101036650A CN100535677C (en) 2006-07-27 2006-07-27 Transformer local discharging ultra-wide band sensor array positioning system and method thereof

Publications (2)

Publication Number Publication Date
CN1888924A true CN1888924A (en) 2007-01-03
CN100535677C CN100535677C (en) 2009-09-02

Family

ID=37578211

Family Applications (1)

Application Number Title Priority Date Filing Date
CNB2006101036650A Expired - Fee Related CN100535677C (en) 2006-07-27 2006-07-27 Transformer local discharging ultra-wide band sensor array positioning system and method thereof

Country Status (1)

Country Link
CN (1) CN100535677C (en)

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101833060A (en) * 2010-05-26 2010-09-15 四川电力试验研究院 Positioning device for monitoring partial discharge of gas-insulater switchgear on line
CN101581746B (en) * 2009-05-21 2011-06-01 华北电力大学 Sensor used for transformer partial discharge ultra wideband radio-frequency location
CN101581745B (en) * 2009-05-21 2011-07-20 华北电力大学 Location method of partial discharge fault source of transformer
CN102445641A (en) * 2011-11-01 2012-05-09 上海交通大学 Mobile device for detecting local discharging of electric equipment of substation, and positioning method
CN102650686A (en) * 2012-05-14 2012-08-29 云南电力试验研究院(集团)有限公司电力研究院 Method for assessing technical parameters of narrow-band non-contact ultrasonic partial discharge testing instruments for power systems
CN101743484B (en) * 2007-07-02 2012-11-21 韩国电力公社 System and method for detecting partial discharge position
CN102959414A (en) * 2010-06-16 2013-03-06 阿尔斯通技术有限公司 Method for locating partial discharge transmission area and associated device
CN103149513A (en) * 2013-02-26 2013-06-12 中国科学院电工研究所 Positioning method and device for reestablishing local discharge ultrasonic source of transformer
CN105334480A (en) * 2014-08-11 2016-02-17 国家电网公司 Spatial position determining method and device for sensor array with four array elements
CN105403814A (en) * 2014-08-11 2016-03-16 国家电网公司 Positioning method and device for partial discharge source of transformer
CN106896342A (en) * 2017-04-17 2017-06-27 国网江苏省电力公司电力科学研究院 Transformer surface characteristics location device and method based on UWB range finder modules
CN109490728A (en) * 2018-11-30 2019-03-19 合肥工业大学 A kind of substation's partial discharge positioning method based on regularization
CN109917252A (en) * 2019-04-25 2019-06-21 国网山东省电力公司临沂供电公司 Partial Discharge Sources within Transformer localization method, device and server
CN111693828A (en) * 2020-05-25 2020-09-22 国网安徽省电力有限公司亳州供电公司 Transformer substation space partial discharge positioning system and method based on MLE

Cited By (22)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101743484B (en) * 2007-07-02 2012-11-21 韩国电力公社 System and method for detecting partial discharge position
CN101581746B (en) * 2009-05-21 2011-06-01 华北电力大学 Sensor used for transformer partial discharge ultra wideband radio-frequency location
CN101581745B (en) * 2009-05-21 2011-07-20 华北电力大学 Location method of partial discharge fault source of transformer
CN101833060A (en) * 2010-05-26 2010-09-15 四川电力试验研究院 Positioning device for monitoring partial discharge of gas-insulater switchgear on line
CN101833060B (en) * 2010-05-26 2014-09-10 四川电力试验研究院 Positioning device for monitoring partial discharge of gas-insulater switchgear on line
CN102959414B (en) * 2010-06-16 2015-04-15 阿尔斯通技术有限公司 Method for locating partial discharge transmission area and associated device
CN102959414A (en) * 2010-06-16 2013-03-06 阿尔斯通技术有限公司 Method for locating partial discharge transmission area and associated device
CN102445641A (en) * 2011-11-01 2012-05-09 上海交通大学 Mobile device for detecting local discharging of electric equipment of substation, and positioning method
CN102650686B (en) * 2012-05-14 2014-06-18 云南电力试验研究院(集团)有限公司电力研究院 Method for assessing technical parameters of narrow-band non-contact ultrasonic partial discharge testing instruments for power systems
CN102650686A (en) * 2012-05-14 2012-08-29 云南电力试验研究院(集团)有限公司电力研究院 Method for assessing technical parameters of narrow-band non-contact ultrasonic partial discharge testing instruments for power systems
CN103149513A (en) * 2013-02-26 2013-06-12 中国科学院电工研究所 Positioning method and device for reestablishing local discharge ultrasonic source of transformer
CN103149513B (en) * 2013-02-26 2015-06-24 中国科学院电工研究所 Positioning method and device for reestablishing local discharge ultrasonic source of transformer
CN105334480B (en) * 2014-08-11 2018-09-18 国家电网公司 The determination method and apparatus of the sensor array spatial position of four array elements
CN105334480A (en) * 2014-08-11 2016-02-17 国家电网公司 Spatial position determining method and device for sensor array with four array elements
CN105403814A (en) * 2014-08-11 2016-03-16 国家电网公司 Positioning method and device for partial discharge source of transformer
CN106896342A (en) * 2017-04-17 2017-06-27 国网江苏省电力公司电力科学研究院 Transformer surface characteristics location device and method based on UWB range finder modules
CN109490728A (en) * 2018-11-30 2019-03-19 合肥工业大学 A kind of substation's partial discharge positioning method based on regularization
CN109490728B (en) * 2018-11-30 2020-12-01 合肥工业大学 Regularization-based transformer substation partial discharge positioning method
CN109917252A (en) * 2019-04-25 2019-06-21 国网山东省电力公司临沂供电公司 Partial Discharge Sources within Transformer localization method, device and server
CN109917252B (en) * 2019-04-25 2022-02-01 国网山东省电力公司临沂供电公司 Method and device for positioning local discharge source in transformer and server
CN111693828A (en) * 2020-05-25 2020-09-22 国网安徽省电力有限公司亳州供电公司 Transformer substation space partial discharge positioning system and method based on MLE
CN111693828B (en) * 2020-05-25 2022-01-04 国网安徽省电力有限公司亳州供电公司 Transformer substation space partial discharge positioning system and method based on MLE

Also Published As

Publication number Publication date
CN100535677C (en) 2009-09-02

Similar Documents

Publication Publication Date Title
CN100535677C (en) Transformer local discharging ultra-wide band sensor array positioning system and method thereof
US5420589A (en) System for evaluating the inner medium characteristics of non-metallic materials
EP0399583B1 (en) Apparatus and method for analysing the pulse propagation for testing a pipeline or the like
CN101702000A (en) Phased ultrasound locating method and system of partial discharge of transformer
CN107831404B (en) Method and system for positioning XLPE cable partial discharge position based on high-frequency pulse current method
CN102798806B (en) Partial discharge detecting method of transformers
US8564303B2 (en) Systems and methods for detecting anomalies in elongate members using electromagnetic back scatter
Mardiana et al. Partial discharge location in power cables using a phase difference method
CN101865969A (en) Method for on-line monitoring and positioning of partial discharge of gas insulation combined electrical apparatus
CN103983903A (en) Whole substation partial discharge locating method for utilizing oscilloscope to detect radio-frequency signals
Tang et al. Partial discharge location based on time difference of energy accumulation curve of multiple signals
CN112858845A (en) Partial discharge diagnosis method for gas insulated switchgear
CN106841911A (en) Transient state travelling wave signal recognition method and device during a kind of cable fault
CN111929532A (en) 10kV distribution cable intermediate joint positioning method
Parkey et al. Analyzing artifacts in the time domain waveform to locate wire faults
CN101539540A (en) Ultrasonic guided wave testing method of corrosion of partially implanted pole body of steel pipe pole
CN102736116B (en) Electromagnetic wave detection method and device based on medium frequency dispersion difference
CN103698673A (en) Drivepipe local discharge electrified detection device based on directional antenna array
CN103097884A (en) Method and device for determining an orientation of a defect present within a mechanical component
CN109187740A (en) A kind of multifrequency multiple spot ultrasonic guided wave detecting method of defect of pipeline
CN101387683A (en) Partial discharge detecting method for potting breaker
Pinpart et al. Experimental comparison of UHF sensor types for PD location applications
WO2004102056A3 (en) Systems and methods for non-destructively testing conductive members employing electromagnetic back scattering
CN201955430U (en) Cable partial discharge positioning system based on time domain reflection characteristics
Sinaga et al. Partial discharge localization in transformers using UHF sensors

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: QINGDAO HUADIAN HIGH VOLTAGE ELECTRIC CO., LTD.

Free format text: FORMER OWNER: HUABEI POWER UNIV.

Effective date: 20120627

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 102206 CHANGPING, BEIJING TO: 266102 QINGDAO, SHANDONG PROVINCE

TR01 Transfer of patent right

Effective date of registration: 20120627

Address after: Laoshan District of Shandong city in Qingdao province 266102 nine water Road No. 628 (Shazikou River Street Community)

Patentee after: QINGDAO HUADIAN HIGH VOLTAGE ELECTRIC Co.,Ltd.

Address before: 102206 Beijing city Changping District, Zhu Daxinzhuang North Agricultural Road No. 2

Patentee before: North China Electric Power University

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20090902