CN1888329A CN 200610200761 CN200610200761A CN1888329A CN 1888329 A CN1888329 A CN 1888329A CN 200610200761 CN200610200761 CN 200610200761 CN 200610200761 A CN200610200761 A CN 200610200761A CN 1888329 A CN1888329 A CN 1888329A
Authority
CN
China
Prior art keywords
well
protecting wall
open caisson
tie beam
collar tie
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN 200610200761
Other languages
Chinese (zh)
Inventor
谷成
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 200610200761 priority Critical patent/CN1888329A/en
Publication of CN1888329A publication Critical patent/CN1888329A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Revetment (AREA)

Abstract

The present invention relates to a construction method of sunk well structure. Said construction method includes the following steps: firstly, prospecting and selecting the position of sinking well; placing reinforcing cage, building ring beam of reinforced concrete, after the concrete ring beam is solidified and reached to a preset strength, continuously downwards excavating in the interior of said ring beam, removing partial earth body from ring beam interior and bottom portion to make the ring beam be uniformly downwards sunk; on the ring beam building well-protecting wall, after the well-protecting wall is reached to preset strength, removing earth body from well interior and well-protecting wall bottom portion to make the well-protecting wall be continuously sunk; continuously building well-protecting wall until the depth of the sunk well is reached to requirements; finally building well edge until the well is formed.

Description

The job practices of open caisson structure
(1) technical field
The present invention relates to a kind of job practices of building.
(2) background technology
The job practices of tradition open caisson structure has following steps: a, select the address of open caisson through exploration; B, dig pit in the place of need well-diggings and to fetch earth; C, brick and mortar are transported in the well; D, build well body, well by laying bricks or stones from bottom to top, until completion.Its shortcoming is that the duration is longer, and cost is higher, and well body difficult quality guarantee, usually repeats to do manual work, and constructor's personal safety can not get ensureing.During shoveling, because soil property is softer or underground water is gushed out, the borehole wall is very easy to landslide, and the workman is dangerous at downhole operation, has occurred the workman is embedded in the down-hole by landslide major accident.Especially when soft foundation, phreatic high ground or coastal sandy subgrade drilling well, wellhole shaping difficulty is bigger, becomes the difficult problem of engineering construction.
(3) content of the present invention
The invention provides a kind of job practices of open caisson structure, the borehole wall that solve soft foundation, phreatic high ground or coastal sandy subgrade easily subsides, the construction period is long, time-consuming, the workman constructs unsafe technical problem.
Technical scheme of the present invention, the job practices of this open caisson structure is characterized in that following steps are arranged:
A, select the position of open caisson through exploration;
B, place reinforcing cage, break the collar tie beam of steel concrete;
C, treat that the concrete collar tie beam solidifies and reaches predetermined strength after, dig under in collar tie beam, continuing, take away in the collar tie beam and the part soil body of bottom, collar tie beam is evenly sunk;
D, on collar tie beam, build well-protecting wall by laying bricks or stones;
E, treat that well-protecting wall reaches predetermined strength after, take away in the well and the well-protecting wall bottom soil body, well-protecting wall is evenly sunk;
F, continue to build by laying bricks or stones well-protecting wall, repeating step e reaches requirement up to the degree of depth of open caisson;
G, build the well by laying bricks or stones at last, until Cheng Jing.
In step b, also can dig an annular ditch groove earlier, in groove, place reinforcing cage, break the collar tie beam of steel concrete.
In step c, the collar tie beam height is a 0.7-1.0 rice, and bore is a 0.5-1.5 rice.
In step c, e, take the method for the soil body away and can select mechanical execution, artificial construction or half mechanical half artificial construction.
In steps d, well-protecting wall can be concrete well-protecting wall or masonry well-protecting wall.
In step g, the well can be concrete well edge or masonry well.
Beneficial effect of the present invention: open caisson section construction method of the present invention is on probation in the coastal area, and none subsides the well body, and the duration shortens, and the open caisson quality is guaranteed, and construction cost is not high, has obtained good effect.The down-hole construction safety is guaranteed, and the shaft bottom has collar tie beam, the borehole wall that well-protecting wall is arranged, and the workman does not worry that the landslide of well body is buried, and has avoided engineering accident, has ensured constructor's personal safety.Compare with traditional method of digging a well, can play a multiplier role.Solved soft foundation dig a well easily collapse the hole, pound people's problem, the construction period is shorter, the saving of labor, saves time, and is particularly useful for soft foundation, phreatic high ground or coastal sand soil ground Cheng Jing.
(4) description of drawings
Fig. 1 is the schematic diagram of step b;
Fig. 2 is the schematic diagram of step b;
Fig. 3 is the schematic diagram of step c;
Fig. 4 is the schematic diagram of steps d, e;
Fig. 5 is the schematic diagram of step f;
Fig. 6 is the schematic diagram of step g.
(5) specific embodiment
The job practices of this open caisson structure has following steps:
Step a, select the address of open caisson through exploration.
Step b, place reinforcing cage 1, break the collar tie beam 2 of steel concrete.Referring to Fig. 1, Fig. 2.The collar tie beam height is a 0.7-1.0 rice, and bore is a 0.5-1.5 rice.Also can dig an annular ditch groove earlier, in groove, place reinforcing cage, break the collar tie beam of steel concrete.
Step c, treat that the concrete collar tie beam solidifies and reaches predetermined strength after, dig under in collar tie beam, continuing, take away in the collar tie beam and the part soil body of bottom, collar tie beam is evenly sunk to the direction of arrow.The method of taking the soil body away can be mechanical execution, artificial construction or half mechanical half artificial construction.
Steps d, on collar tie beam, build well-protecting wall 3 by laying bricks or stones, referring to Fig. 4.Well-protecting wall can be steel concrete well-protecting wall or masonry well-protecting wall.
Step e, treat that well-protecting wall reaches predetermined strength after, take away in the well and the well-protecting wall bottom soil body, well-protecting wall is evenly sunk to the direction of arrow.Referring to Fig. 4.The method of taking the soil body away still can be mechanical execution, artificial construction or half mechanical half artificial construction.
Step f, continue to build by laying bricks or stones well-protecting wall 3, repeating step e reaches instructions for use up to the degree of depth of open caisson, referring to Fig. 5.For increasing the bonding strength between well section and the well section, can in well-protecting wall, place embedded bar or built-in fitting.
Step g, build well 4 by laying bricks or stones at last, until Cheng Jing, referring to Fig. 6.The well can be concrete well edge or masonry well.

Claims (6)

1. the job practices of an open caisson structure is characterized in that following steps are arranged:
A, select the position of open caisson through exploration;
B, place reinforcing cage, break the collar tie beam of steel concrete;
C, treat that the concrete collar tie beam solidifies and reaches predetermined strength after, dig under in collar tie beam, continuing, take away in the collar tie beam and the part soil body of bottom, collar tie beam is evenly sunk;
D, on collar tie beam, build well-protecting wall by laying bricks or stones;
E, treat that well-protecting wall reaches predetermined strength after, take away in the well and the well-protecting wall bottom soil body, well-protecting wall is evenly sunk;
F, continue to build by laying bricks or stones well-protecting wall, repeating step e reaches requirement up to the degree of depth of open caisson;
G, build the well by laying bricks or stones at last, until Cheng Jing.
2. the job practices of open caisson structure according to claim 1 is characterized in that: in step b, dig an annular ditch groove, place reinforcing cage in groove, break the collar tie beam of steel concrete.
3. the job practices of open caisson structure according to claim 1 and 2, it is characterized in that: in step b, the collar tie beam height is a 0.7-1.0 rice, and bore is a 0.5-1.5 rice.
4. the job practices of open caisson structure according to claim 1 and 2 is characterized in that: in step c, e, the method for taking the soil body away is mechanical execution, artificial construction or half mechanical half artificial construction.
5. the job practices of open caisson structure according to claim 1 and 2, it is characterized in that: in steps d, well-protecting wall is concrete well-protecting wall or masonry well-protecting wall.
6. the job practices of open caisson structure according to claim 1 and 2 is characterized in that: in step g, the well be concrete well along or the masonry well.
CN 200610200761 2006-07-31 2006-07-31 Open caisson structure construction method Pending CN1888329A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200610200761 CN1888329A (en) 2006-07-31 2006-07-31 Open caisson structure construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200610200761 CN1888329A (en) 2006-07-31 2006-07-31 Open caisson structure construction method

Publications (1)

Publication Number Publication Date
CN1888329A true CN1888329A (en) 2007-01-03

Family

ID=37577617

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200610200761 Pending CN1888329A (en) 2006-07-31 2006-07-31 Open caisson structure construction method

Country Status (1)

Country Link
CN (1) CN1888329A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101545268B (en) * 2009-04-29 2010-09-01 陈良保 Method for mounting well tools of inspection well on asphalt concrete pavement
CN106760620A (en) * 2016-12-27 2017-05-31 同济大学 A kind of utilization open caisson increases the construction method for building the underground space under existing building
CN106958258A (en) * 2017-03-21 2017-07-18 国网冀北电力有限公司唐山供电公司 A kind of pole and tower foundation excavates the construction method of collapse structure

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101545268B (en) * 2009-04-29 2010-09-01 陈良保 Method for mounting well tools of inspection well on asphalt concrete pavement
CN106760620A (en) * 2016-12-27 2017-05-31 同济大学 A kind of utilization open caisson increases the construction method for building the underground space under existing building
CN106760620B (en) * 2016-12-27 2019-03-29 同济大学 It is a kind of to increase the construction method for building the underground space under existing building using open caisson
CN106958258A (en) * 2017-03-21 2017-07-18 国网冀北电力有限公司唐山供电公司 A kind of pole and tower foundation excavates the construction method of collapse structure

Similar Documents

Publication Publication Date Title
CN110344400B (en) Hole-forming pile-forming construction process for rotary drilling rig in hard rock
CN103184734B (en) A kind of construction method implanting slip casting compound pile
CN100501011C (en) Hole drilling mudjack pile construction method
WO2021082767A1 (en) Method for constructing reinforced fiber and metakaolin-based pressurized cast-in-place pile
CN104631438B (en) Long auger guncreting uplift pile construction method
CN105780763A (en) Construction method of medium-hole vibrating casing wall protection type long spiral cast-in-situ bored pile
CN1657711A (en) Rotary spray anchoring pile construction process
CN101130991A (en) Caisson cofferdam based on prepacked foundation bed
CN103510510A (en) Reinforced long spiral drilling concrete grouting pile and construction method thereof
CN112761076A (en) Lock catch steel pipe pile cofferdam applied to water level change condition and construction method
CN103603379A (en) Anti-floating system combining anti-floating cement soil pile and anti-floating anchor rod and construction process of anti-floating system
CN206070508U (en) Device for reinforcing foundation
CN106837382A (en) A kind of subway tunnel country rock pre grouting from the surface reinforcement process
CN112942399A (en) Open caisson mechanical construction device and method for penetrating rock stratum
CN1167857C (en) Foundation pit side-wall flexible support method
CN103821140B (en) A kind of construction method of reinforcing soft foundation
CN203613568U (en) Anti-floating cement soil pile and anti-floating anchor rod combined anti-floating system
CN1888329A (en) Open caisson structure construction method
CN1182301C (en) Technology for boring and prefabricating cast piles for foundation of building
CN203594023U (en) Enhanced type long auger drilling pressure-grouting concrete pile
CN113445516A (en) Drilling and pouring type cement soil pile and construction method thereof
CN112627199A (en) Construction method for foundation pit support of cyclone well
CN100545357C (en) A kind of cement-soil build-in piling wall and job practices thereof that is used for pattern foundation pit supporting structure
CN106337418A (en) Supporting structure and supporting method of deep foundation pit in narrow area
CN1078282A (en) Pile shoe pouring process and special reinforcing steel cage thereof

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication