CN1888324A - Piling method and piling device for borehole pump pouring large flow concrete ring pile - Google Patents
Piling method and piling device for borehole pump pouring large flow concrete ring pile Download PDFInfo
- Publication number
- CN1888324A CN1888324A CN 200610010311 CN200610010311A CN1888324A CN 1888324 A CN1888324 A CN 1888324A CN 200610010311 CN200610010311 CN 200610010311 CN 200610010311 A CN200610010311 A CN 200610010311A CN 1888324 A CN1888324 A CN 1888324A
- Authority
- CN
- China
- Prior art keywords
- oil
- concrete
- connecting axle
- overcoat
- hollow
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Landscapes
- Piles And Underground Anchors (AREA)
- Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
- Earth Drilling (AREA)
Abstract
The present invention relates to a concrete pile-forming method used in pile foundation engineering and its pile-forming equipment. Said invention is aimed at solving the problem of forming pile in poor subgrade with high underground water level and thick sand bed. Te invented method is characterized by that at the same time of forcedly injecting concrete, lifting the drill bit to designed height and making secondary diameter expansion, at the same time of opening drill bit plate, starting slurry pump to inject slurry, the height of diameter-expanded body is 800-1000 mm.
Description
Technical field
The present invention relates to a kind of concrete piling method and pile making device that is used for pile foundation engineering.
Background technology
In existing piling technique, the technology that has the multiple Kong Houzai of being drilled to carry out reaming (squeezed or bore and expand), as: do the following DX stake of operation, ring stake etc., an expansion etc. behind multiple-limb establishment dish stake wet trade under and the borehole pump pouring large flow concrete.Above-mentioned technical matters is first pore-forming or fills with concrete and mud, proposes after the drilling tool toward the hole in or that concrete is interior to be reached in the mud next and overlap Counterboring apparatus and carry out reaming in the hole in again, finishes pile after the hole enlargement several times by designing requirement.So do cumbersome, can not the disposal pore-forming pile, time-consuming, require great effort, take a lot of work, take machinery, not ideal enough.Though now have the people to propose the technical scheme of the disposal pore-forming pile under wet trade, the technical scheme of this disposal pore-forming pile is unreasonable, is difficult to carry out.Such as the patent No. is that the patent of invention that ZL02132652.5, name are called " piling method and the equipment therefor of boring high-pressure jetting reaming pressure concrete injecting shaped pile " just exists the problems referred to above.From the content of this patent, know at a glance, it be one only according to the imagination, without facts have proved whether feasible technology.This patented method is, rig is drilled into design elevation, carry when boring by the drill bit spray orifice to around penetrate and starch hole enlargement and then pour into concrete, form shaped pile, last when carrying drilling tool to the middle part of pile body, to the local reaming of stake hole sidewall whitewashing carrying out repeatedly, then stop whitewashing, pressure concrete injecting forms the stake of sugarcoated haws shape, simultaneously, drilling tool is constantly moved carry, by the sidewall whitewashing of four nozzles on the drill bit to the stake hole, and pour into concrete simultaneously and form the stake of many prismatics, continue whitewashing and perfusion concrete carrying boring, whitewashing with the nozzle of drilling tool one side to form a kind of spiral pile body.Above-mentioned piling method can be understood as: described shaped pile should comprise: the stake of A, sugarcoated haws shape; The stake of B, many prismatics; C, spiral stake.If, should be cannot stand by the described activities of its patent specification.Inventor's hope is good, but is difficult to realize.One, to form multiple shape on a pile be not to finish with machinery, but finish with gunite, how can form shaped pile and make us querying.Must need simultaneously how long to finish? if need the time long nonsensical, then concrete water loss, stone sink, and reinforcing cage is laid and is difficult to finish.The technical scheme of this patent is that four nozzles are set on drill bit, and the intermittent time that stops to spray is arranged when finishing shaped pile, and at this moment nozzle is not taked any safeguard measure.Facts have proved that if stop whitewashing, nozzle just returns the cement mortar of choking at once, nozzle is blocked, and several rice in the return pipe of will choking, deal with pretty troublesome.Facts have proved, after nozzle is finished and penetrated slurry, must press wind or non retern valve is set with air compressor machine.Two, last when carrying drilling tool, drilling tool limit pressure concrete injecting is carried on the limit, slurry, limit hole enlargement are penetrated in the limit, and so, the soil body that is got off by hole enlargement slumps to that (nozzle is on discharging opening) forms interlayer above the concrete.Can say so, in forming the process of shaped pile, carry drilling tool because of on being, not creep into downwards and go up, it is up that the drilled soil body that gets off has reaction trying hard to recommend the suitable blade of the soil body of front, is transported to outside the hole.On when proposing the drilling tool hole enlargement soil body to have be to fall in the hole formation interlayer or broken pile in the concrete along the drilling tool and the gap of hole wall greatly.Three, under the situation that drilling tool does not rotate, on carry drilling tool, penetrate slurry, the perfusion concrete forms the stake of many prismatics, as you know, at soft stratum, the groundwater table height, and under the thick geological conditions of layer of sand buried depth, will cause " bury drills " if stop boring, drilling tool has been carried to be come up, so the stake of many prismatics can not realize.So this patent does not possess practicality.The patent No. is that ZL03214051.7, name are called the utility model patent of " slip casting is stirred and expanded subdrilling bar center pump-injecting concrete device ", facts have proved that it also is a patent that is difficult to implement.Its slip casting hydraulic gyration drill bit of this patent does not disclose its structure, but all under the reducer central siphon centre between two motor above the unit head, draw to drill bit along drilling tool from its three pipes (feed pipe for mortar, two oil pipes), because of its central siphon space limited, three pipes pass through simultaneously, it is big to take up space, it is unimpeded to influence concrete, and the probability of stopping up central siphon is very high.Simultaneously, the space length between two motors in unit head top, just present available dynamic head (reducer) do not satisfy at all both installs the pressure concrete injecting device, also slurry spray device, hydraulic transmission will be installed simultaneously.In addition, two oil cylinders are arranged on drilling tool blade place simultaneously, have almost taken whole spaces of blade, hinder the transmission get out soil, and the oil cylinder piston bar weares and teares by the silt particle concrete after stretching out for a long time, cause cut, leakage of oil and can't work.
Summary of the invention
The objective of the invention is can not the disposal pore-forming pile for solving prior art, and time-consuming, require great effort, take a lot of work, take machinery, the problem that particularly is difficult for the pore-forming pile under the thick geological conditions of soft foundation and groundwater table height, sand bed provides a kind of piling method and pile making device of borehole pump pouring large flow concrete ring stake.But method of the present invention and device have the disposal pore-forming pile, particularly the characteristics of pore-forming pile under the thick geological conditions of soft foundation and groundwater table height, sand bed.Method of the present invention realizes by following steps: one, auger machine is carried drilling tool and is opened the detachable bit plate reaming that is arranged on the bit blades both sides on being drilled into after the design elevation; Two, in step 1, start slush pump mud jacking and play drilling tool up and down, drilling tool is fallen after rise at the bottom of the hole, mention drilling tool then, 30~50cm at the bottom of the end distance hole under the drilling tool; Three, start concrete pump pressure concrete injecting, the limit is pressed to irritate on the limit and is carried drilling tool to hole enlargement body upper edge; Four, regain the detachable bit plate and stop mud jacking (at this moment should change the air compressor machine pipe presses wind or nozzle just to have non retern valve originally) simultaneously; Five, pressure concrete injecting limit in limit is carried drilling tool to design height and is carried out the secondary hole enlargement, open the detachable bit plate and start the slush pump mud jacking simultaneously, the height of hole enlargement body is 800~1000mm, six, make drilling tool play up and down, the distance of play is in the scope of secondary hole enlargement height degree about the drilling tool, during the downward play of drilling tool, stop pressure concrete injecting closing simultaneously the concrete discharging opening (purpose of doing like this be when preventing from down to bore concrete along the up obstruction of drilling tool core pipe in order to avoid influence concrete pumping again), drilling tool drops to 30~50cm (this purpose is to prevent broken pile) more than the secondary hole enlargement body lower edge; Seven, carry drilling tool on, decontrol the discharging valve plate of drilling tool simultaneously, pressure concrete injecting, drilling tool is carried on the pressure concrete injecting limit in the limit, on regain the detachable bit plate and stop mud jacking when carrying upper edge to secondary hole enlargement body; Eight, after drilling tool was lifted from the aperture, install reinforcing cage is concrete acceptance of the bid eminence pile in the hole.Pile making device of the present invention is by detachable bit plate 1, movable axis 2, orientation axes 3, rope 4, hydraulic jack 5, feed pipe for mortar 11, threeway whitewashing mouth 12, drill bit 13, discharging cover plate control rope 14, band steel 15, drive link 16, pressure bearing 17, nut 18, load basket 19, bale handle 20, the gripper shoe 27 of detachable bit plate, discharging cover plate 29, carry and draw hook 30, concrete feed pipe 31, reducer 32, hollow drill 33, overcoat 34, first joint ring 36, second joint ring 37, flange 38, hollow connecting axle 39, swivel plate 44, drilling rod flange 46, the 3rd joint ring 47 and the 4th joint ring 48 are formed, the lower end of concrete feed pipe 31 is fixed on above the shell of reducer 32, the hollow shaft of reducer 32 is fixedlyed connected with the upper end of hollow connecting axle 39, fixedly connected with the upper end of flange 38 in the lower end of hollow connecting axle 39, fixedly connected with the upper end of hollow drill 33 in the lower end of flange 38, load basket 19 is arranged on the upper end of concrete feed pipe 31, bale handle 20 is fixed on the upper end of load basket 19, pressure bearing 17 be arranged in the load basket 19 below, nut 18 is arranged on the upside of load basket 19 internal pressure bearings 17, drive link 16 is arranged on concrete feed pipe 31, reducer 32, in the concrete passage 26 in hollow drill 33 and the hollow connecting axle 39, the upper end of drive link 16 spins with nut 18 by the bottom and the pressure bearing 17 of load basket 19, band steel 15 is welded on the lower end of drive link 16, swivel plate 44 is fixed in the drilling rod flange 46, slot 45 in band steel 15 and the swivel plate 44 matches, fixedly connected with band steel 15 in the upper end of discharging cover plate control rope 14, feed pipe for mortar 11 is arranged in the concrete passage 26 in hollow drill 33 and the hollow connecting axle 39, threeway whitewashing mouth 12 is arranged on the downside in the concrete passage 26 of hollow drill 33, the slurry outlet nozzle 12-1 of threeway whitewashing mouth 12 is fixed on the wall of hollow drill 33 and with the external world and communicates, be provided with plug in the inspection mouth 12-2 of threeway whitewashing mouth 12, the slurry intake 12-3 of threeway whitewashing mouth 12 is fixedlyed connected with the lower end of feed pipe for mortar 11, overcoat 34 is arranged on the outer wall of hollow connecting axle 39, be respectively equipped with hydraulic cylinder oil-in 8 on the overcoat 34, hydraulic cylinder oil-out 9 and stock inlet 10, with hydraulic cylinder oil-in 8, have oil-feed annular groove 41 on the inwall of hydraulic cylinder oil-out 9 and stock inlet 10 corresponding overcoats 34, go out oil ring groove 42 and advance to starch annular groove 43, be provided with first joint ring 36 between the overcoat 34 of oil-feed annular groove 41 upsides and the hollow connecting axle 39, oil-feed annular groove 41 and go out overcoat 34 between the oil ring groove 42 and hollow connecting axle 39 between be provided with the 3rd joint ring 47, advance to starch annular groove 43 and go out overcoat 34 between the oil ring groove 42 and hollow connecting axle 39 between be provided with second joint ring 37, advance to starch between the overcoat 34 of annular groove 43 downsides and the hollow connecting axle 39 and be provided with the 4th joint ring 48, the upper end of feed pipe for mortar 11 is fixed on the wall of hollow connecting axle 39 and is connected with the annular groove 43 that advances to starch on the overcoat 34, have oil inlet passage 7 and oil discharge passage 6 in the wall of hollow connecting axle 39, one end of oil inlet passage 7 is connected with oil-feed annular groove 41 on the overcoat 34, the other end of oil inlet passage 7 is connected with the oil inlet pipe of the hydraulic jack 5 that is fixed on flange 38 downside hollow drills 33 outsides, one end of oil discharge passage 6 is connected with the oil ring groove 42 that goes out on the overcoat 34, the other end of oil discharge passage 6 is connected with the flowline of the hydraulic jack 5 that is fixed on flange 38 downside hollow drills 33 outsides, the hydraulic stem of hydraulic jack 5 is fixedlyed connected with the upper end of rope 4, the gripper shoe 27 of detachable bit plate is fixed on the downside of hollow drill 33, detachable bit plate 1 is hinged with the gripper shoe 27 of detachable bit plate by movable axis 2, orientation axes 3 is fixed on the downside of the gripper shoe 27 of detachable bit plate, the lower end of rope 4 is walked around orientation axes 3 and is fixedlyed connected with detachable bit plate 1, discharging cover plate 29 is hinged with the bottom of hollow drill 33, drill bit 13 is fixed on the downside of discharging cover plate 29, carry and draw the upside that hook 30 is fixed on discharging cover plate 29, carrying on the lower end of discharging cover plate control rope 14 and the discharging cover plate 29 drawn hook 30 and fixedlyed connected.Another kind of pile making device is by rope 4, hydraulic jack 5, feed pipe for mortar 11, threeway whitewashing mouth 12, drill bit 13, discharging cover plate control rope 14, band steel 15, drive link 16, pressure bearing 17, nut 18, load basket 19, bale handle 20, drill bit plate 21, connecting axle 22, outer ring flat-plate 24, discharging cover plate 29, carry and draw hook 30, concrete feed pipe 31, reducer 32, hollow drill 33, overcoat 34, first joint ring 36, second joint ring 37, flange 38, hollow connecting axle 39, swivel plate 44, drilling rod flange 46, the 3rd joint ring 47 and the 4th joint ring 48 are formed, the lower end of concrete feed pipe 31 is fixed on above the shell of reducer 32, the sleeve rotor of reducer 32 is fixedlyed connected with the upper end of hollow connecting axle 39, fixedly connected with the upper end of flange 38 in the lower end of hollow connecting axle 39, fixedly connected with the upper end of hollow drill 33 in the lower end of flange 38, load basket 19 is arranged on the upper end of concrete feed pipe 31, bale handle 20 is fixed on the upper end of load basket 19, pressure bearing 17 be arranged in the load basket 19 below, nut 18 is arranged on the upside of load basket 19 internal pressure bearings 17, drive link 16 is arranged on concrete feed pipe 31, reducer 32, in the concrete passage 26 in hollow drill 33 and the hollow connecting axle 39, the upper end of drive link 16 spins with nut 18 by the bottom and the pressure bearing 17 of load basket 19, band steel 15 is fixed on the lower end of drive link 16, fixedly connected with band steel 15 in the upper end of discharging cover plate control rope 14, feed pipe for mortar 11 is arranged in the concrete passage 26 in hollow drill 33 and the hollow connecting axle 39, threeway whitewashing mouth 12 is arranged on the downside in the concrete passage 26 of hollow drill 33, the slurry outlet nozzle 12-1 of threeway whitewashing mouth 12 is fixed on the wall of hollow drill 33 and with the external world and communicates, be provided with plug in the inspection mouth 12-2 of threeway whitewashing mouth 12, the slurry intake 12-3 of threeway whitewashing mouth 12 is fixedlyed connected with the lower end of feed pipe for mortar 11, overcoat 34 is arranged on the outer wall of hollow connecting axle 39, be respectively equipped with hydraulic cylinder oil-in 8 on the overcoat 34, hydraulic cylinder oil-out 9 and stock inlet 10, with hydraulic cylinder oil-in 8, have oil-feed annular groove 41 on the inwall of hydraulic cylinder oil-out 9 and stock inlet 10 corresponding overcoats 34, go out oil ring groove 42 and advance to starch annular groove 43, be provided with first joint ring 36 between the overcoat 34 of oil-feed annular groove 41 upsides and the hollow connecting axle 39, oil-feed annular groove 41 and go out overcoat 34 between the oil ring groove 42 and hollow connecting axle 39 between be provided with the 3rd joint ring 47, advance to starch annular groove 43 and go out overcoat 34 between the oil ring groove 42 and hollow connecting axle 39 between be provided with second joint ring 37, advance to starch between the overcoat 34 of annular groove 43 downsides and the hollow connecting axle 39 and be provided with the 4th joint ring 48, the upper end of feed pipe for mortar 11 is fixed on the wall of hollow connecting axle 39 and is connected with the annular groove 41 that advances to starch on the overcoat 34, have oil inlet passage 7 and oil discharge passage 6 in the wall of hollow connecting axle 39, one end of oil inlet passage 7 is connected with oil-feed annular groove 41 on the overcoat 34, the other end of oil inlet passage 7 is connected with the oil inlet pipe of the hydraulic jack 5 that is fixed on flange 38 downside hollow drills 33 outsides, one end of oil discharge passage 6 is connected with the oil ring groove 42 that goes out on the overcoat 34, the other end of oil discharge passage 6 is connected with the flowline of the hydraulic jack 5 that is fixed on flange 38 downside hollow drills 33 outsides, the hydraulic stem of hydraulic jack 5 is fixedlyed connected with the upper end of rope 4, outer ring flat-plate 24 is fixed on the bottom of hollow drill 33, discharging cover plate 29 is hinged by connecting axle 22 and outer ring flat-plate 24, drill bit plate 21 is fixed on the downside of discharging cover plate 29, carry and draw the upside that hook 30 is fixed on discharging cover plate 29, carrying on the lower end of discharging cover plate control rope 14 and the discharging cover plate 29 drawn hook 30 and fixedlyed connected, and fixedlys connected with drill bit plate 21 in the rope hole 23 that the lower end of rope 4 is passed through on the drill bit plate 21.The beneficial effect of piling method of the present invention is: one, form the hole enlargement of a plurality of " finger ring " shape on a pile.Improve bearing capacity of single pile; Two, be particularly suited at soft stratum groundwater table height, the geological conditions construction down that the layer of sand buried depth is thick; Three, construction save time, laborsaving, saving of labor, province's machinery.The beneficial effect of pile making device of the present invention is: one, hydraulic jack is arranged on the last outside of hollow drill 33, and hydraulic cylinder piston rod is after stretching out on boring, do not worn and torn by concrete, so can not cause cut, can not cause leakage of oil yet, durable in use; Two, the application of pressure bearing 17, nut 18, load basket 19, bale handle 20, flexibly connect and together rotate by drive link 16 and fixing swivel plate with hollow drill 33, make discharging cover plate 29 folding with convenience, can not return choke mud and concrete, help constructing and keeping the unimpeded of concrete passage.
Description of drawings
Fig. 1 is the work progress schematic diagram of borehole pump pouring large flow concrete ring stake piling method of the present invention, Fig. 2 is the structural representation of a kind of pile making device of the present invention, Fig. 3 is the structural representation of the another kind of pile making device of the present invention, Fig. 4 is the cross-sectional view of overcoat 34 and hollow connecting axle 39 among Fig. 2, Fig. 3, Fig. 5 is the syndeton schematic diagram of discharging cover plate 29 and outer ring flat-plate 24, Fig. 6 is the A-A sectional view of Fig. 2 and Fig. 3, and Fig. 7 is the enlarged drawing of drill bit plate 21.
The specific embodiment
The specific embodiment one: the method for (referring to Fig. 1) present embodiment realizes by following steps: one, auger machine is carried drilling tool and is opened the detachable bit plate reaming that is arranged on the bit blades both sides on being drilled into after the design elevation; Two, in step 1, start slush pump mud jacking and play drilling tool up and down, drilling tool is fallen after rise at the bottom of the hole, mention drilling tool then, 30~50cm at the bottom of the end distance hole under the drilling tool; Three, start concrete pump pressure concrete injecting, the limit is pressed to irritate on the limit and is carried drilling tool to hole enlargement body upper edge; Four, regain the detachable bit plate and stop mud jacking (at this moment should change the air compressor machine pipe presses wind or nozzle just to have non retern valve originally) simultaneously; Carry out the secondary hole enlargement when five, drilling tool is carried on pressure concrete injecting limit in limit to design height, open the detachable bit plate and start the slush pump mud jacking simultaneously, the height of hole enlargement body is 800~1000mm, six, make drilling tool play up and down, the distance of play is in the scope of secondary hole enlargement height degree about the drilling tool, drilling tool bores when moving downwards, stop pressure concrete injecting closing simultaneously the concrete discharging opening (purpose of doing like this be when preventing from down to bore concrete along the up obstruction of drilling tool core pipe in order to avoid influence pumping concrete again), drilling tool drops to the following 30~50cm (this purpose is to prevent broken pile) in secondary hole enlargement body lower edge; Seven, carry drilling tool on, decontrol the discharging cover plate of drilling tool simultaneously, pressure concrete injecting, drilling tool is carried on the pressure concrete injecting limit in the limit, on regain the detachable bit plate and stop mud jacking when carrying upper edge to secondary hole enlargement body; Eight, drilling tool proposes behind the aperture drilling tool to be moved apart the aperture, and install reinforcing cage is concrete acceptance of the bid eminence pile (because of the finger of the shape extraordinary image behind the pile is gone up band " finger ring ", so be named as " finger ring stake ") in the hole.Needs according to pile can carry out for the third time or repeatedly hole enlargement, form on a pile body by a plurality of " finger rings ".
The specific embodiment two: (referring to Fig. 2, Fig. 4) pile making device of present embodiment is by detachable bit plate 1, movable axis 2, orientation axes 3, rope 4, hydraulic jack 5, feed pipe for mortar 11, threeway whitewashing mouth 12, drill bit 13, discharging cover plate control rope 14, band steel 15, drive link 16, pressure bearing 17, nut 18, load basket 19, bale handle 20, the gripper shoe 27 of detachable bit plate, discharging cover plate 29, carry and draw hook 30, concrete feed pipe 31, reducer 32, hollow drill 33, overcoat 34, first joint ring 36, second joint ring 37, flange 38, hollow connecting axle 39, swivel plate 44, drilling rod flange 46, the 3rd joint ring 47 and the 4th joint ring 48 are formed, the lower end of concrete feed pipe 31 is fixed on above the shell of reducer 32, the hollow shaft of reducer 32 is fixedlyed connected with the upper end of hollow connecting axle 39, fixedly connected with the upper end of flange 38 in the lower end of hollow connecting axle 39, fixedly connected with the upper end of hollow drill 33 in the lower end of flange 38, load basket 19 is arranged on the upper end of concrete feed pipe 31, bale handle 20 is fixed on the upper end of load basket 19, pressure bearing 17 be arranged in the load basket 19 below, nut 18 is arranged on the upside of load basket 19 internal pressure bearings 17, drive link 16 is arranged on concrete feed pipe 31, reducer 32, in the concrete passage 26 in hollow drill 33 and the hollow connecting axle 39, the upper end of drive link 16 spins with nut 18 by the bottom and the pressure bearing 17 of load basket 19, band steel 15 is welded on the lower end of drive link 16, swivel plate 44 is fixed in the drilling rod flange 46, slot 45 in band steel 15 and the swivel plate 44 matches, fixedly connected with band steel 15 in the upper end of discharging cover plate control rope 14, feed pipe for mortar 11 is arranged in the concrete passage 26 in hollow drill 33 and the hollow connecting axle 39, threeway whitewashing mouth 12 is arranged on the downside in the concrete passage 26 of hollow drill 33, the slurry outlet nozzle 12-1 of threeway whitewashing mouth 12 is fixed on the wall of hollow drill 33 and with the external world and communicates, be provided with plug in the inspection mouth 12-2 of threeway whitewashing mouth 12, the slurry intake 12-3 of threeway whitewashing mouth 12 is fixedlyed connected with the lower end of feed pipe for mortar 11, overcoat 34 is arranged on the outer wall of hollow connecting axle 39, be respectively equipped with hydraulic cylinder oil-in 8 on the overcoat 34, hydraulic cylinder oil-out 9 and stock inlet 10, with hydraulic cylinder oil-in 8, have oil-feed annular groove 41 on the inwall of hydraulic cylinder oil-out 9 and stock inlet 10 corresponding overcoats 34, go out oil ring groove 42 and advance to starch annular groove 43, be provided with first joint ring 36 between the overcoat 34 of oil-feed annular groove 41 upsides and the hollow connecting axle 39, oil-feed annular groove 41 and go out overcoat 34 between the oil ring groove 42 and hollow connecting axle 39 between be provided with the 3rd joint ring 47, advance to starch annular groove 43 and go out overcoat 34 between the oil ring groove 42 and hollow connecting axle 39 between be provided with second joint ring 37, advance to starch between the overcoat 34 of annular groove 43 downsides and the hollow connecting axle 39 and be provided with the 4th joint ring 48, the upper end of feed pipe for mortar 11 is fixed on the wall of hollow connecting axle 39 and is connected with the annular groove 43 that advances to starch on the overcoat 34, have oil inlet passage 7 and oil discharge passage 6 in the wall of hollow connecting axle 39, one end of oil inlet passage 7 is connected with oil-feed annular groove 41 on the overcoat 34, the other end of oil inlet passage 7 is connected with the oil inlet pipe of the hydraulic jack 5 that is fixed on flange 38 downside hollow drills 33 outsides, one end of oil discharge passage 6 is connected with the oil ring groove 42 that goes out on the overcoat 34, the other end of oil discharge passage 6 is connected with the flowline of the hydraulic jack 5 that is fixed on flange 38 downside hollow drills 33 outsides, the hydraulic stem of hydraulic jack 5 is fixedlyed connected with the upper end of rope 4, the gripper shoe 27 of detachable bit plate is fixed on the downside of hollow drill 33, detachable bit plate 1 is hinged with the gripper shoe 27 of detachable bit plate by movable axis 2, orientation axes 3 is fixed on the downside of the gripper shoe 27 of detachable bit plate, the lower end of rope 4 is walked around orientation axes 3 and is fixedlyed connected with detachable bit plate 1, discharging cover plate 29 is hinged with the bottom of hollow drill 33, drill bit 13 is fixed on the downside of discharging cover plate 29, carry and draw the upside that hook 30 is fixed on discharging cover plate 29, carrying on the lower end of discharging cover plate control rope 14 and the discharging cover plate 29 drawn hook 30 and fixedlyed connected.
Operating principle: detachable bit plate 1 is by the flexible effect of the piston rod of rope 4 and hydraulic jack 5, its pulling is outwards launched to finish reaming, simultaneously by threeway whitewashing mouth 12 water spray mud, the soil that drilled expansion is got off (sand) body part is transported to outside the hole, and residual fraction is stirred into cement mortar.Finish the piston rod that stretches out hydraulic jack 5 after the reaming, drill bit portable plate 1 falls and resets (this moment is stifled if card occurs, on also can be with detachable bit plate 1 pressed home less than the hole wall of hole enlargement when carrying drilling tool) automatically after rise.When carrying on the drilling tool when answering the position of reaming (directly) by designing requirement, operate the piston rod withdrawal of hydraulic system again with hydraulic jack 5, finish hole enlargement.Finish when drilling tool falls after rise after the hole enlargement, by carrying on bale handle 20, load basket 19, drive link 16, the discharging cover plate control rope 14, discharging cover plate 29 is closed, in order to avoid under cause the concrete plugging when being drilled into the following 30~50cm of hole enlargement body, instantly (this purpose is to be connected with the concrete of pressing filling to be drilled into the following 30~50cm of hole enlargement body, in order to avoid broken pile) carries drilling tool on, during the pump pressure concrete, transfer bale handle 20, load basket 19 and drive link 16 and discharging opening is opened (if do not open, concrete also can open it) by discharging cover plate control rope 14.Continue pressure concrete injecting, the limit is pressed to irritate on the limit and is carried drilling tool, stretches out the piston rod of hydraulic jack 5 simultaneously, regains detachable bit plate 1.When drilling tool proposes the aperture, all be concrete in the hole at this moment, the reinforcing cage of slinging is inserted into the absolute altitude place pile in the concrete.
The specific embodiment three: (referring to the pile making device of the present embodiment of Fig. 3~Fig. 5) by rope 4, hydraulic jack 5, feed pipe for mortar 11, threeway whitewashing mouth 12, drill bit 13, discharging cover plate control rope 14, band steel 15, drive link 16, pressure bearing 17, nut 18, load basket 19, bale handle 20, drill bit plate 21, connecting axle 22, outer ring flat-plate 24, discharging cover plate 29, carry and draw hook 30, concrete feed pipe 31, reducer 32, hollow drill 33, overcoat 34, first joint ring 36, second joint ring 37, flange 38, hollow connecting axle 39, swivel plate 44, drilling rod flange 46, the 3rd joint ring 47 and the 4th joint ring 48 are formed, the lower end of concrete feed pipe 31 is fixed on above the shell of reducer 32, the sleeve rotor of reducer 32 is fixedlyed connected with the upper end of hollow connecting axle 39, fixedly connected with the upper end of flange 38 in the lower end of hollow connecting axle 39, fixedly connected with the upper end of hollow drill 33 in the lower end of flange 38, load basket 19 is arranged on the upper end of concrete feed pipe 31, bale handle 20 is fixed on the upper end of load basket 19, pressure bearing 17 be arranged in the load basket 19 below, nut 18 is arranged on the upside of load basket 19 internal pressure bearings 17, drive link 16 is arranged on concrete feed pipe 31, reducer 32, in the concrete passage 26 in hollow drill 33 and the hollow connecting axle 39, the upper end of drive link 16 spins with nut 18 by the bottom and the pressure bearing 17 of load basket 19, band steel 15 is fixed on the lower end of drive link 16, fixedly connected with band steel 15 in the upper end of discharging cover plate control rope 14, feed pipe for mortar 11 is arranged in the concrete passage 26 in hollow drill 33 and the hollow connecting axle 39, threeway whitewashing mouth 12 is arranged on the downside in the concrete passage 26 of hollow drill 33, the slurry outlet nozzle 12-1 of threeway whitewashing mouth 12 is fixed on the wall of hollow drill 33 and with the external world and communicates, be provided with plug in the inspection mouth 12-2 of threeway whitewashing mouth 12, the slurry intake 12-3 of threeway whitewashing mouth 12 is fixedlyed connected with the lower end of feed pipe for mortar 11, overcoat 34 is arranged on the outer wall of hollow connecting axle 39, be respectively equipped with hydraulic cylinder oil-in 8 on the overcoat 34, hydraulic cylinder oil-out 9 and stock inlet 10, with hydraulic cylinder oil-in 8, have oil-feed annular groove 41 on the inwall of hydraulic cylinder oil-out 9 and stock inlet 10 corresponding overcoats 34, go out oil ring groove 42 and advance to starch annular groove 43, be provided with first joint ring 36 between the overcoat 34 of oil-feed annular groove 41 upsides and the hollow connecting axle 39, oil-feed annular groove 41 and go out overcoat 34 between the oil ring groove 42 and hollow connecting axle 39 between be provided with the 3rd joint ring 47, advance to starch annular groove 43 and go out overcoat 34 between the oil ring groove 42 and hollow connecting axle 39 between be provided with second joint ring 37, advance to starch between the overcoat 34 of annular groove 43 downsides and the hollow connecting axle 39 and be provided with the 4th joint ring 48, the upper end of feed pipe for mortar 11 is fixed on the wall of hollow connecting axle 39 and is connected with the annular groove 41 that advances to starch on the overcoat 34, have oil inlet passage 7 and oil discharge passage 6 in the wall of hollow connecting axle 39, one end of oil inlet passage 7 is connected with oil-feed annular groove 41 on the overcoat 34, the other end of oil inlet passage 7 is connected with the oil inlet pipe of the hydraulic jack 5 that is fixed on flange 38 downside hollow drills 33 outsides, one end of oil discharge passage 6 is connected with the oil ring groove 42 that goes out on the overcoat 34, the other end of oil discharge passage 6 is connected with the flowline of the hydraulic jack 5 that is fixed on flange 38 downside hollow drills 33 outsides, the hydraulic stem of hydraulic jack 5 is fixedlyed connected with the upper end of rope 4, outer ring flat-plate 24 is fixed on the bottom of hollow drill 33, discharging cover plate 29 is hinged by connecting axle 22 and outer ring flat-plate 24, drill bit plate 21 is fixed on the downside of discharging cover plate 29, carry and draw the upside that hook 30 is fixed on discharging cover plate 29, carrying on the lower end of discharging cover plate control rope 14 and the discharging cover plate 29 drawn hook 30 and fixedlyed connected, and fixedlys connected with drill bit plate 21 in the rope hole 23 that the lower end of rope 4 is passed through on the drill bit plate 21.
Operating principle: drill bit plate 21 is by the effect of the piston rod retraction of rope 4 and hydraulic jack 5, its pulling is outwards launched to finish reaming, by threeway whitewashing mouth 12 water spray mud, the soil that drilled expansion is got off (sand) body part is transported to outside the hole simultaneously, and residual fraction is stirred into cement mortar.Finish the piston rod that stretches out hydraulic jack 5 after the reaming, drill bit plate 21 falls and resets (this moment is stifled if card occurs, on also can be with drill bit plate 21 pressed home less than the hole wall of hole enlargement when carrying drilling tool) automatically after rise.When carrying on the drilling tool when answering the position of reaming (directly) by designing requirement, operate the piston rod withdrawal of hydraulic system again with hydraulic jack 5, finish hole enlargement.Finish when drilling tool falls after rise after the hole enlargement, by carrying on bale handle 20, load basket 19, drive link 16, the discharging cover plate control rope 14, discharging cover plate 29 is closed, in order to avoid under cause the concrete plugging when being drilled into the following 30~50cm part of hole enlargement body, instantly (this purpose is to be connected with pressing the concrete of irritating to be drilled into the following 30~50cm of hole enlargement body, in order to avoid broken pile) carries drilling tool on, during the pump pressure concrete, transfer bale handle 20, load basket 19 and drive link 16 and discharging opening is opened (if do not open, concrete also can open it) by discharging cover plate control rope 14.Continue pressure concrete injecting, the limit is pressed to irritate on the limit and is carried drilling tool, when drilling tool proposes the aperture, all is concrete in the hole at this moment, and the reinforcing cage of slinging is inserted into the absolute altitude place pile in the concrete.
The specific embodiment four: the difference of (referring to Fig. 3, Fig. 5) present embodiment and the specific embodiment three is, upside in discharging cover plate 29 is fixed with pin 25, downside at outer ring flat-plate 24 has pin-and-hole 28, and the pin 25 on the discharging cover plate 29 matches with pin-and-hole 28 on the outer ring flat-plate 24.Drill bit plate 21 is connected as a single entity with discharging cover plate 29, and when discharging cover plate 29 was closed, the pin 25 on the discharging cover plate 29 was inserted in the pin-and-hole 28 on the outer ring flat-plate 24, the torsion of drill bit plate 21 in the time of can improving boring like this.Because discharging cover plate 29 was at 3 with outer ring flat-plate 24 and was connected this moment.Other composition is identical with the specific embodiment three with annexation.
Claims (4)
1, a kind of piling method of borehole pump pouring large flow concrete ring stake is characterized in that the piling method of borehole pump pouring large flow concrete ring stake is realized by following steps: one, auger machine is carried drilling tool and is opened the detachable bit plate reaming that is arranged on the bit blades both sides on being drilled into after the design elevation; Two, in step 1, start slush pump mud jacking and play drilling tool up and down, drilling tool is fallen after rise at the bottom of the hole, mention drilling tool then, 30~50cm at the bottom of the end distance hole under the drilling tool; Three, start concrete pump pressure concrete injecting, the limit is pressed to irritate on the limit and is carried drilling tool to hole enlargement body upper edge; Four, regain the detachable bit plate and stop mud jacking simultaneously; Five, pressure concrete injecting limit in limit is carried drilling tool to design height and is carried out the secondary hole enlargement, open the detachable bit plate and start the slush pump mud jacking simultaneously, the height of hole enlargement body is 800~1000mm, six, make drilling tool play up and down, the distance of play is in the scope of secondary hole enlargement height degree about the drilling tool, the downward play of drilling tool stops pressure concrete injecting and closes the concrete discharging opening simultaneously, and drilling tool drops to the above 30~50cm in secondary hole enlargement body lower edge; Seven, carry drilling tool on, decontrol the discharging valve plate of drilling tool simultaneously, pressure concrete injecting, drilling tool is carried on the pressure concrete injecting limit in the limit, on regain the detachable bit plate and stop mud jacking when carrying upper edge to secondary hole enlargement body; Eight, drilling tool proposes behind the aperture drilling tool to be moved apart the aperture, and install reinforcing cage is concrete acceptance of the bid eminence pile in the hole.
2, the pile making device that a kind of claim 1 piling method uses, it is by detachable bit plate (1), movable axis (2), orientation axes (3), rope (4), hydraulic jack (5), feed pipe for mortar (11), threeway whitewashing mouth (12), drill bit (13), discharging cover plate control rope (14), band steel (15), drive link (16), pressure bearing (17), nut (18), load basket (19), bale handle (20), the gripper shoe of detachable bit plate (27), discharging cover plate (29), carry and draw hook (30), concrete feed pipe (31), reducer (32), hollow drill (33), overcoat (34), first joint ring (36), second joint ring (37), flange (38), hollow connecting axle (39), swivel plate (44), drilling rod flange (46), the 3rd joint ring (47) and the 4th joint ring (48) are formed, the lower end of concrete feed pipe (31) is fixed on above the shell of reducer (32), the hollow shaft of reducer (32) is fixedlyed connected with the upper end of hollow connecting axle (39), fixedly connected with the upper end of flange (38) in the lower end of hollow connecting axle (39), fixedly connected with the upper end of hollow drill (33) in the lower end of flange (38), it is characterized in that load basket (19) is arranged on the upper end of concrete feed pipe (31), bale handle (20) is fixed on the upper end of load basket (19), pressure bearing (17) be arranged in the load basket (19) below, nut (18) is arranged on the upside of load basket (19) internal pressure bearing (17), drive link (16) is arranged on concrete feed pipe (31), reducer (32), in the concrete passage (26) in hollow drill (33) and the hollow connecting axle (39), the upper end of drive link (16) spins with nut (18) by the bottom and the pressure bearing (17) of load basket (19), band steel (15) is welded on the lower end of drive link (16), swivel plate (44) is fixed in the drilling rod flange (46), slot (45) in band steel (15) and the swivel plate (44) matches, fixedly connected with band steel (15) in the upper end of discharging cover plate control rope (14), feed pipe for mortar (11) is arranged in the concrete passage (26) in hollow drill (33) and the hollow connecting axle (39), threeway whitewashing mouth (12) is arranged on the interior downside of concrete passage (26) of hollow drill (33), the slurry outlet nozzle (12-1) of threeway whitewashing mouth (12) is fixed on the wall of hollow drill (33) and with the external world and communicates, be provided with plug in the inspection mouth (12-2) of threeway whitewashing mouth (12), the slurry intake (12-3) of threeway whitewashing mouth (12) is fixedlyed connected with the lower end of feed pipe for mortar (11), overcoat (34) is arranged on the outer wall of hollow connecting axle (39), be respectively equipped with hydraulic cylinder oil-in (8) on the overcoat (34), hydraulic cylinder oil-out (9) and stock inlet (10), with hydraulic cylinder oil-in (8), have oil-feed annular groove (41) on the inwall of hydraulic cylinder oil-out (9) and the corresponding overcoat of stock inlet (10) (34), go out oil ring groove (42) and advance to starch annular groove (43), be provided with first joint ring (36) between the overcoat (34) of oil-feed annular groove (41) upside and the hollow connecting axle (39), oil-feed annular groove (41) and go out overcoat (34) between the oil ring groove (42) and hollow connecting axle (39) between be provided with the 3rd joint ring (47), advance to starch annular groove (43) and go out overcoat (34) between the oil ring groove (42) and hollow connecting axle (39) between be provided with second joint ring (37), advance to starch between the overcoat (34) of annular groove (43) downside and the hollow connecting axle (39) and be provided with the 4th joint ring (48), the upper end of feed pipe for mortar (11) is fixed on the wall of hollow connecting axle (39) and is connected with the annular groove (43) that advances to starch on the overcoat (34), have oil inlet passage (7) and oil discharge passage (6) in the wall of hollow connecting axle (39), one end of oil inlet passage (7) is connected with oil-feed annular groove (41) on the overcoat (34), the other end of oil inlet passage (7) is connected with the oil inlet pipe of the hydraulic jack (5) that is fixed on flange (38) downside hollow drill (33) outside, one end of oil discharge passage (6) is connected with the oil ring groove (42) that goes out on the overcoat (34), the other end of oil discharge passage (6) is connected with the flowline of the hydraulic jack (5) that is fixed on flange (38) downside hollow drill (33) outside, the hydraulic stem of hydraulic jack (5) is fixedlyed connected with the upper end of rope (4), the gripper shoe of detachable bit plate (27) is fixed on the downside of hollow drill (33), detachable bit plate (1) is hinged with the gripper shoe (27) of detachable bit plate by movable axis (2), orientation axes (3) is fixed on the downside of the gripper shoe (27) of detachable bit plate, the lower end of rope (4) is walked around orientation axes (3) and is fixedlyed connected with detachable bit plate (1), discharging cover plate (29) is hinged with the bottom of hollow drill (33), drill bit (13) is fixed on the downside of discharging cover plate (29), carry and draw the upside that hook (30) is fixed on discharging cover plate (29), carrying on the lower end of discharging cover plate control rope (14) and the discharging cover plate (29) drawn hook (30) and fixedlyed connected.
3, the pile making device that a kind of claim 1 piling method uses, it is by rope (4), hydraulic jack (5), feed pipe for mortar (11), threeway whitewashing mouth (12), drill bit (13), discharging cover plate control rope (14), band steel (15), drive link (16), pressure bearing (17), nut (18), load basket (19), bale handle (20), drill bit plate (21), connecting axle (22), outer ring flat-plate (24), discharging cover plate (29), carry and draw hook (30), concrete feed pipe (31), reducer (32), hollow drill (33), overcoat (34), first joint ring (36), second joint ring (37), flange (38), hollow connecting axle (39), swivel plate (44), drilling rod flange (46), the 3rd joint ring (47) and the 4th joint ring (48) are formed, the lower end of concrete feed pipe (31) is fixed on above the stator of reducer (32), the sleeve rotor of reducer (32) is fixedlyed connected with the upper end of hollow connecting axle (39), fixedly connected with the upper end of flange (38) in the lower end of hollow connecting axle (39), fixedly connected with the upper end of hollow drill (33) in the lower end of flange (38), it is characterized in that load basket (19) is arranged on the upper end of concrete feed pipe (31), bale handle (20) is fixed on the upper end of load basket (19), pressure bearing (17) be arranged in the load basket (19) below, nut (18) is arranged on the upside of load basket (19) internal pressure bearing (17), drive link (16) is arranged on concrete feed pipe (31), reducer (32), in the concrete passage (26) in hollow drill (33) and the hollow connecting axle (39), the upper end of drive link (16) spins with nut (18) by the bottom and the pressure bearing (17) of load basket (19), band steel (15) is fixed on the lower end of drive link (16), fixedly connected with band steel (15) in the upper end of discharging cover plate control rope (14), feed pipe for mortar (11) is arranged in the concrete passage (26) in hollow drill (33) and the hollow connecting axle (39), threeway whitewashing mouth (12) is arranged on the interior downside of concrete passage (26) of hollow drill (33), the slurry outlet nozzle (12-1) of threeway whitewashing mouth (12) is fixed on the wall of hollow drill (33) and with the external world and communicates, be provided with plug in the inspection mouth (12-2) of threeway whitewashing mouth (12), the slurry intake (12-3) of threeway whitewashing mouth (12) is fixedlyed connected with the lower end of feed pipe for mortar (11), overcoat (34) is arranged on the outer wall of hollow connecting axle (39), be respectively equipped with hydraulic cylinder oil-in (8) on the overcoat (34), hydraulic cylinder oil-out (9) and stock inlet (10), with hydraulic cylinder oil-in (8), have oil-feed annular groove (41) on the inwall of hydraulic cylinder oil-out (9) and the corresponding overcoat of stock inlet (10) (34), go out oil ring groove (42) and advance to starch annular groove (43), be provided with first joint ring (36) between the overcoat (34) of oil-feed annular groove (41) upside and the hollow connecting axle (39), oil-feed annular groove (41) and go out overcoat (34) between the oil ring groove (42) and hollow connecting axle (39) between be provided with the 3rd joint ring (47), advance to starch annular groove (43) and go out overcoat (34) between the oil ring groove (42) and hollow connecting axle (39) between be provided with second joint ring (37), advance to starch between the overcoat (34) of annular groove (43) downside and the hollow connecting axle (39) and be provided with the 4th joint ring (48), the upper end of feed pipe for mortar (11) is fixed on the wall of hollow connecting axle (39) and is connected with the annular groove (41) that advances to starch on the overcoat (34), have oil inlet passage (7) and oil discharge passage (6) in the wall of hollow connecting axle (39), one end of oil inlet passage (7) is connected with oil-feed annular groove (41) on the overcoat (34), the other end of oil inlet passage (7) is connected with the oil inlet pipe of the hydraulic jack (5) that is fixed on flange (38) downside hollow drill (33) outside, one end of oil discharge passage (6) is connected with the oil ring groove (42) that goes out on the overcoat (34), the other end of oil discharge passage (6) is connected with the flowline of the hydraulic jack (5) that is fixed on flange (38) downside hollow drill (33) outside, the hydraulic stem of hydraulic jack (5) is fixedlyed connected with the upper end of rope (4), outer ring flat-plate (24) is fixed on the bottom of hollow drill (33), discharging cover plate (29) is hinged by connecting axle (22) and outer ring flat-plate (24), drill bit plate (21) is fixed on the downside of discharging cover plate (29), carry and draw the upside that hook (30) is fixed on discharging cover plate (29), carrying on the lower end of discharging cover plate control rope (14) and the discharging cover plate (29) drawn hook (30) and fixedlyed connected, and fixedlys connected with drill bit plate (21) in the rope hole (23) that the lower end of rope (4) is passed through on the drill bit plate (21).
4, pile making device according to claim 3, it is characterized in that being fixed with pin (25) at the upside of discharging cover plate (29), downside at outer ring flat-plate (24) has pin-and-hole (28), and the pin (25) on the discharging cover plate (29) matches with pin-and-hole (28) on the outer ring flat-plate (24).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNB2006100103111A CN100434595C (en) | 2006-07-21 | 2006-07-21 | Piling method and piling device for borehole pump pouring large flow concrete ring pile |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNB2006100103111A CN100434595C (en) | 2006-07-21 | 2006-07-21 | Piling method and piling device for borehole pump pouring large flow concrete ring pile |
Publications (2)
Publication Number | Publication Date |
---|---|
CN1888324A true CN1888324A (en) | 2007-01-03 |
CN100434595C CN100434595C (en) | 2008-11-19 |
Family
ID=37577612
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CNB2006100103111A Expired - Fee Related CN100434595C (en) | 2006-07-21 | 2006-07-21 | Piling method and piling device for borehole pump pouring large flow concrete ring pile |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN100434595C (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102677666A (en) * | 2012-05-03 | 2012-09-19 | 山东鸿泰建设集团有限公司 | Concrete piling process and drilling machine special for same |
CN103835287A (en) * | 2014-03-27 | 2014-06-04 | 江西中恒岩土工程技术有限公司 | Method and device for constructing compaction reducing pile |
CN106401502A (en) * | 2016-08-31 | 2017-02-15 | 中国冶集团有限公司 | Rotating hole-forming device with hydraulic expanding head and construction method |
Family Cites Families (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1061728C (en) * | 1995-01-06 | 2001-02-07 | 张荣久 | Variable-diameter cast-in-situ pile and its manufacture technology |
CN1441146A (en) * | 2003-03-24 | 2003-09-10 | 周书魁 | Integral pile hole drilling and expanding apparatus |
JP3814761B2 (en) * | 2004-04-12 | 2006-08-30 | 株式会社竹中工務店 | Slime treatment method for expanded diameter part of shaft in cast-in-place concrete pile. |
CN200943204Y (en) * | 2006-08-02 | 2007-09-05 | 刘润郊 | Peg forming device for drilling pump filling large flowing concrete finger ring peg |
-
2006
- 2006-07-21 CN CNB2006100103111A patent/CN100434595C/en not_active Expired - Fee Related
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102677666A (en) * | 2012-05-03 | 2012-09-19 | 山东鸿泰建设集团有限公司 | Concrete piling process and drilling machine special for same |
CN102677666B (en) * | 2012-05-03 | 2014-11-26 | 山东鸿泰建设集团有限公司 | Concrete piling process and drilling machine special for same |
CN103835287A (en) * | 2014-03-27 | 2014-06-04 | 江西中恒岩土工程技术有限公司 | Method and device for constructing compaction reducing pile |
CN103835287B (en) * | 2014-03-27 | 2015-11-04 | 江西中恒岩土工程技术有限公司 | A kind of construction method of compacted diameter-variable pile |
CN106401502A (en) * | 2016-08-31 | 2017-02-15 | 中国冶集团有限公司 | Rotating hole-forming device with hydraulic expanding head and construction method |
Also Published As
Publication number | Publication date |
---|---|
CN100434595C (en) | 2008-11-19 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104763328B (en) | A kind of hydraulic pressure reaming circulation drilling machine and its reaming pile constructing process | |
CN105569560B (en) | A full set of tubular type long auger stake machine and the method for utilizing the ram machine construction | |
CN106192996B (en) | A kind of T shape drilling tools of construction method and T shapes the cast pile driving construction of T shapes stake | |
WO2009049470A1 (en) | A bored pile drilling machine | |
CN106836204A (en) | The device and method of pouring pile bearing capacity under a kind of lifting Soft Soil | |
CN105649083A (en) | All-casing one-time rotary cutting type pile removing device and pile removing method thereof | |
CN104018792A (en) | Reducing screw displacement pile drilling tool and construction method thereof | |
CN2866602Y (en) | Long-auger drill reaming bottom stirring and in-hole reaming concrete pile-grouting piling apparatus | |
CN207296871U (en) | The structure-improved of full-sleeve twist bit | |
CN1814915A (en) | Apparatus and method for long spiral-drilling enlarging-base agitation and reaming-in-hole concrete filling to form pile | |
CN102182186B (en) | Water-flushing sinking-assisting system and construction technical method thereof | |
CN103835287A (en) | Method and device for constructing compaction reducing pile | |
CN205100879U (en) | Crowded counterboring machine is dug soon to sickleleaf style | |
CN1936194A (en) | Drilling-hole press-filling-concrete-pulp agitation base-enlarging method and apparatus | |
CN100434595C (en) | Piling method and piling device for borehole pump pouring large flow concrete ring pile | |
CN205100881U (en) | Side direction is smashed formula and is dug crowded counterboring machine soon | |
CN201826302U (en) | Boring device for large-diameter cast-in-situ thin-walled concrete composite pile | |
CN205387708U (en) | Clear stake device of disposable rotary -cut formula of a complete set of pipe | |
CN101457522B (en) | Long spiral support disk pile construction method | |
CN101319499B (en) | Pile forming method and device for screwed pedestal pile with large flow concrete filled by hole drilling pump | |
CN110805035A (en) | Construction process of anti-floating anchor rod in complex stratum and air intake and exhaust grouting pipeline system | |
CN200943204Y (en) | Peg forming device for drilling pump filling large flowing concrete finger ring peg | |
CN1202318C (en) | Method and apparatus for pile making by boring and pumping mass concrete and rotation jetting slurry | |
CN206015668U (en) | A kind of T-shaped pours into a mould the T-shaped drilling tool of pile driving construction | |
CN201334661Y (en) | Integrated long-spiral drilling tool for squeezed branch pile |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C17 | Cessation of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |