CN1884774A - Method of employing assembled steel arch truss to reinforce metal arch corrugated plate roofing - Google Patents

Method of employing assembled steel arch truss to reinforce metal arch corrugated plate roofing Download PDF

Info

Publication number
CN1884774A
CN1884774A CNA200610200572XA CN200610200572A CN1884774A CN 1884774 A CN1884774 A CN 1884774A CN A200610200572X A CNA200610200572X A CN A200610200572XA CN 200610200572 A CN200610200572 A CN 200610200572A CN 1884774 A CN1884774 A CN 1884774A
Authority
CN
China
Prior art keywords
arch
truss
ripple
steel
assembled steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CNA200610200572XA
Other languages
Chinese (zh)
Other versions
CN100398770C (en
Inventor
司炳君
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Dalian University of Technology
Original Assignee
Dalian University of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Dalian University of Technology filed Critical Dalian University of Technology
Priority to CNB200610200572XA priority Critical patent/CN100398770C/en
Publication of CN1884774A publication Critical patent/CN1884774A/en
Application granted granted Critical
Publication of CN100398770C publication Critical patent/CN100398770C/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Roof Covering Using Slabs Or Stiff Sheets (AREA)

Abstract

The invention relates to a method for using assembly steel truss to strengthen the metallic arc ripple roof cover, wherein it is characterized in that: it uses assembly steel truss to be arranged at the inner side of arc ripple plate while their distance is 6-9m; and adds 2-3 longitudinal trusses between each arc truss, to make steel truss and ripple plate share external load, to strengthen the roof cover. And the invention can avoid increasing steel consumption most, to improve the safety and the application of roof cover.

Description

A kind of method that adopts the assembled steel arch truss reinforce metal arch corrugated plate roofing
Technical field
A kind of method of assembled steel arch truss reinforce metal arch corrugated plate roofing that adopts belongs to civil engineering large-span steel technical field.
Background technology
At present space structures worldwide obtains fast development, and in numerous space structures, it is few that metal arch form ripple roof structure has materials, from heavy and light, short construction period, span ability is big, and integrate advantages such as stressed, maintenance function, be subjected to vast building circle personage's concern and approval deeply.In recent years, the engineering practice of China shows that it has significant technical economic benefit and social benefit, has vast potential for future development, will become one of important development direction of lightweight steel construction.But, owing to become arch to need, being pressed with many horizontal ripplets on the circular arc frid, the existence of these ripplets causes the structure tension performance more complicated, does not form unified computation model, design formulas and analytical method at home as yet.In recent years, because design theory disunity, can not guarantee work quality, engineering accident frequently occurs, especially in the north, snow load is bigger, unstable phenomenon very easily takes place partly striding under the inhomogeneous snow load effect in this structure, in January, 1997, the snowstorm weather of Anshan Area made this area have 6 ripple arch shell structures to cave in, direct economic loss reaches 4,000,000 yuan, and after this accident that large quantities of ripples arch shells cave in because of strong wind or heavy snow all takes place in succession in hinterland such as coastal areas of southern China various places and Xinjiang.The applicant also presided over the identification and analysis of the arch contour plate roof system cave-in accident of Zhuanghe City's great achievement food (Dalian) Co., Ltd storehouse.The incident of caving in of arch contour plate roof system has caused the extensive attention of industry.Analyzing summary cave-in accident reason mainly contains: (1) profiled sheet arch cover structure is the defective sensitive structure, and the construction quality difference will cause engineering accident easily; (2) owing to have ripple to exist along arch axis, unstable failure especially partly striding under the load action, easily takes place in the stress performance more complicated, causes unsound, the disunity of various places design theory.Generally speaking, the mode of failure of profiled sheet arch cover is whole unstability, and the bearing capacity of structure is by its monolithic stability control, and the structure reliability index is on the low side, is very limited at aspects such as applied environment, use spans.
Abroad studied for many years for arch contour plate roof system, it is perfect that design theory is tending towards, and arch contour plate roof structure form is applied to little building of span or temporary building more.
In China, Liu of University Of Tianjin tin very waits the people that arch contour plate roof structure has been made number of research projects, the design and construction of instructing the profiled sheet arch cover and the establishment of relevant rules many constructive achievements have been provided, clearly proposing arch die mould plank house, to change the structure design degree of safety on the low side, should limit the suggestion of the scope of application.
In view of above situation, for a change arch contour plate roof structure uses restricted situation, avoid engineering accident as far as possible, applicant's combination is for many years to the stable research work of large-span steel, square steel pipe assembling arch truss and corresponding longitudiual truss have been proposed rationally to set up, reinforce the arch corrugated plate roof system thereby reach, improve the use span and the degree of safety of arch contour plate roof system, to change the situation of China in arch contour plate roof structure application.Summary of the invention
Purpose of the present invention: a kind of method of reinforcing metal arch form ripple roof system is provided, avoids engineering accident,, can be applicable to simultaneously use span to improve in the new building to improve the degree safe in utilization of arch form ripple roof system.
Technical scheme of the present invention is as follows:
(1) lays assembled steel pipeline overhead lifting truss in large span metal arch form ripple roof system inboard according to 6-9 rice spacing, and the fore-and-aft plane truss in 2-3 road is set at length direction.
(2) assembling arch truss sections is prefabricated, and four bolt tie points are reserved in every section assembling arch truss end, answer the prefabricated monomer of prefabricated corresponding arch truss for different spans, the high corrugated sheet roof system of mistake.
(3) arch truss end with the bearing of former ripple arch bar after treatment as the bearing that encircles truss.Longitudiual truss also is to be connected with Steel-pipe Arch Truss by the mode of reserving the connecting bolt hole, arch truss, longitudiual truss are provided with vertical square tube post at the position of joints that winds up, and the column upper end is mutually bonding with the ripple upper plate of ripple arch bar by rubber pad, adhesive material.
Effect of the present invention and benefit are by to setting up the arch truss arch corrugated plate being reinforced:
Partly stride the load bearing capacity and be greatly enhanced, also increase though stride the load bearing capacity entirely, increase rate is obviously not as partly striding the load action situation;
Because the effect of truss destroys mode variation has taken place, stress performance also is significantly improved, and has improved the stability limit bearing capacity of structure, has improved the stability of metal arch form ripple roof system;
The quality of the truss of being set up is relatively low, and the amplitude that bearing capacity improves is bigger, and economic performance is better;
Can increase substantially the safe in utilization degree of arch corrugated plate in permanent construction.
Improve roof system integral rigidity and conformal ability.
Description of drawings
Fig. 1 is corrugated sheet and arch truss combination model schematic diagram.
Fig. 2 is the arch truss and vertically links the member schematic diagram.
Fig. 3 is that the ripple arch bar of not setting up Steel-pipe Arch Truss destroys mode figure.
Fig. 4 is that the ripple arch bar of setting up Steel-pipe Arch Truss destroys mode figure.
Fig. 5 is the P-Uy curve map at maximum vertical displacement point place, and wherein P is a power, and Uy is the displacement of y direction.
Fig. 6 is the P-Ux curve map at maximum horizontal displacement point place, and wherein P is a power, and Ux is the displacement of x direction.
The specific embodiment
Below in conjunction with technical scheme and accompanying drawing, be described in detail specific embodiments of the invention.
Concrete wavy metal arch bar and arch truss and longitudiual truss position concern that schematic diagram sees Fig. 1 and Fig. 2.Arch corrugated plate adopts MIC-240 plate commonly used in the market, roof system span 36m, ratio of rise to span 0.25, thickness of slab 1mm's, the arch truss space is got 6.1m, space arch truss and fore-and-aft plane truss all adopt the pipe of ¢ 30*1.2mm, arch depth of truss in space is got 0.8m, and the assembling truss nodal pitch that winds up is 0.81m, and the lower-chord panel point spacing is 0.5m, the truss width that winds up is 500mm, and the lower edge width is 300mm.The longitudiual truss height is 0.622m, adopts plane frame.Lower-chord panel point place, the two ends hinged securement of arch truss is on the supporter of former ripple arch bar.
According to carrying out numerical simulation with upper type, result of calculation be analyzed as follows:
(1) destroys mode
The concrete destruction mode of structure is seen Fig. 3 and shown in Figure 4.
Based on theory analysis and verification experimental verification, the main mode of failure of metal arch form ripple roof structure is whole unstability before reinforcing, and this structure bearing capacity is controlled by the resistance to overturning in its plane.Pure wave line Arch Bar Structure is the antisymmetry bulk deformation partly striding under the load action, and distortion is very big.And after setting up Steel-pipe Arch Truss, the distortion of this structure obviously diminishes, and final destruction be that destruction by local arch bar causes, has avoided whole destruction.
(2) bearing capacity and deformation analysis
See Fig. 5 and Fig. 6 in order to find out the variation of setting up Steel-pipe Arch Truss front and back stability of structure energy intuitively, provide the load-displacement curve of setting up Steel-pipe Arch Truss front and back maximum vertical displacement and maximum horizontal displacement place.
(3) set up Steel-pipe Arch Truss and do not set up Steel-pipe Arch Truss ripple arch bar result of calculation contrast and see the following form
Reduced parameter Do not set up the ripple arch bar of Steel-pipe Arch Truss Set up the ripple arch bar of Steel-pipe Arch Truss
Mass area ratio (kg/m2) 12.06 16.22
Quality improves 25.6%
Ultimate bearing capacity (N/m2) 216.85 1832.2
Maximum vertical displacement (mm) 827 57
Maximum horizontal displacement (mm) 563 16
Destroy mode The integral inverted symmetry is destroyed Local failure

Claims (1)

1. method that adopts the assembled steel arch truss reinforce metal arch corrugated plate roofing is characterized in that the following step poly-:
(1) lays assembled steel pipeline overhead lifting truss in large span metal arch form ripple roof system inboard according to 6-9 rice spacing, and the fore-and-aft plane truss in 2-3 road is set at length direction;
(2) assembling arch truss sections is prefabricated, and four bolt tie points are reserved in every section assembling arch truss end, answer the prefabricated monomer of prefabricated corresponding arch truss for different spans, the high corrugated sheet roof system of mistake;
(3) arch truss end with the bearing of former ripple arch bar after treatment as the bearing that encircles truss; Longitudiual truss also is to be connected with Steel-pipe Arch Truss by the mode of reserving the connecting bolt hole, arch truss, longitudiual truss are provided with vertical square tube post at the position of joints that winds up, and the column upper end is mutually bonding with the ripple upper plate of ripple arch bar by rubber pad, adhesive material.
CNB200610200572XA 2006-06-16 2006-06-16 Method of employing assembled steel arch truss to reinforce metal arch corrugated plate roofing Expired - Fee Related CN100398770C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNB200610200572XA CN100398770C (en) 2006-06-16 2006-06-16 Method of employing assembled steel arch truss to reinforce metal arch corrugated plate roofing

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNB200610200572XA CN100398770C (en) 2006-06-16 2006-06-16 Method of employing assembled steel arch truss to reinforce metal arch corrugated plate roofing

Publications (2)

Publication Number Publication Date
CN1884774A true CN1884774A (en) 2006-12-27
CN100398770C CN100398770C (en) 2008-07-02

Family

ID=37583074

Family Applications (1)

Application Number Title Priority Date Filing Date
CNB200610200572XA Expired - Fee Related CN100398770C (en) 2006-06-16 2006-06-16 Method of employing assembled steel arch truss to reinforce metal arch corrugated plate roofing

Country Status (1)

Country Link
CN (1) CN100398770C (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102345392A (en) * 2010-07-29 2012-02-08 湖北银河建筑工程有限责任公司 Roof installation process for enhancing corrugated arch bearing capacity in upright post-cantilever beam mode
CN105863144A (en) * 2016-05-14 2016-08-17 李雄彦 Large-span double-curvature-arch structure
CN107816209A (en) * 2017-11-09 2018-03-20 浙江中南建设集团钢结构有限公司 The large-scale Roof Truss construction technology of installation is lifted across outer both sides
CN109987492A (en) * 2019-04-04 2019-07-09 上海蓝天房屋装饰工程有限公司 Staircase glass construction technology
CN112922322A (en) * 2021-02-01 2021-06-08 中建八局第三建设有限公司 Construction method of two-way cosine three-dimensional corrugated steel plate arch-shaped supporting system
CN113718958A (en) * 2021-10-13 2021-11-30 成都东南钢结构有限公司 Steel-wood combined truss structure and construction method thereof

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08215764A (en) * 1995-02-20 1996-08-27 Kyowa Seikeiki:Kk Roll forming device
AU4869796A (en) * 1995-02-21 1996-09-11 Serrot Corporation Fabric mesh reinforced monolithic thermoplastic membrane
CN2233958Y (en) * 1995-12-25 1996-08-28 北京市朝阳区银河金属屋顶成型技术研究所 Large span metal arch corrugated roof plate
CN1170040C (en) * 2002-12-30 2004-10-06 徐国彬 Manufacture for metal thin-wall non-ripple arch shell and arch strips

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102345392A (en) * 2010-07-29 2012-02-08 湖北银河建筑工程有限责任公司 Roof installation process for enhancing corrugated arch bearing capacity in upright post-cantilever beam mode
CN102345392B (en) * 2010-07-29 2014-02-26 湖北银河建筑工程有限责任公司 Roof installation process for enhancing corrugated arch bearing capacity in upright post-cantilever beam mode
CN105863144A (en) * 2016-05-14 2016-08-17 李雄彦 Large-span double-curvature-arch structure
CN107816209A (en) * 2017-11-09 2018-03-20 浙江中南建设集团钢结构有限公司 The large-scale Roof Truss construction technology of installation is lifted across outer both sides
CN109987492A (en) * 2019-04-04 2019-07-09 上海蓝天房屋装饰工程有限公司 Staircase glass construction technology
CN109987492B (en) * 2019-04-04 2020-04-17 上海蓝天房屋装饰工程有限公司 Escalator glass construction process
CN112922322A (en) * 2021-02-01 2021-06-08 中建八局第三建设有限公司 Construction method of two-way cosine three-dimensional corrugated steel plate arch-shaped supporting system
CN113718958A (en) * 2021-10-13 2021-11-30 成都东南钢结构有限公司 Steel-wood combined truss structure and construction method thereof

Also Published As

Publication number Publication date
CN100398770C (en) 2008-07-02

Similar Documents

Publication Publication Date Title
CN100398770C (en) Method of employing assembled steel arch truss to reinforce metal arch corrugated plate roofing
CN105525686A (en) Structure for connecting prefabricated concrete composite floor slab with H-shaped steel beam through bolts
CN109680796A (en) High-strength steel frame-overlapping corrugated sheet steel wall anti-side cold formed steel structure
WO2011113088A1 (en) A domed non-steel roof structure
CN203271199U (en) Totally-closed assembly type steel membrane plant
CN215564819U (en) Novel steel construction factory building
CN205153145U (en) Adopt precast concrete coincide floor of bolt and connection structure of H shaped steel roof beam
CN112302252B (en) Post-earthquake repairable assembled lattice column with shear type energy dissipation damper
CN202090483U (en) Round structure with prestressed sheet metal roof
CN2782805Y (en) Steel board type adjustable curving free vibration damping support
CN106436969A (en) Intersecting reinforcement profiled steel plate shear wall with broadside slotting
CN207905104U (en) A kind of assembled architecture truss structure
CN112878544A (en) Mi-shaped truss stiffening double-steel-plate combined shear structure of assembled steel structure building
CN204059756U (en) The truss of a kind of pre-stressed steel pipe concrete purlin sheet and structure thereof
CN2752358Y (en) Channel steel non-buckling energy-dissipating support
CN208105587U (en) A kind of steel structure earthquake-resistant workshop
CN111549906B (en) Steel-concrete combined special-shaped lattice column
CN2583234Y (en) On site pouring reinforced concrete hollow cavity shearing wall
CN109653359B (en) Large-clearance self-resetting steel frame center support system with flange plate
CN109610640B (en) Portal rigid frame connection structure based on composite column limb
CN106760100A (en) A kind of floor system framework and floor system
CN208396133U (en) A kind of combined hollow grillage structure
RU2422582C1 (en) Span
CN105275113A (en) Rhombus steel grid shear wall structure
CN213804914U (en) Length-adjustable assembled bent cap support

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20080702

Termination date: 20150616

EXPY Termination of patent right or utility model