CN1851235A - Thick coal-bed shield hydraulic support - Google Patents

Thick coal-bed shield hydraulic support Download PDF

Info

Publication number
CN1851235A
CN1851235A CN 200610044281 CN200610044281A CN1851235A CN 1851235 A CN1851235 A CN 1851235A CN 200610044281 CN200610044281 CN 200610044281 CN 200610044281 A CN200610044281 A CN 200610044281A CN 1851235 A CN1851235 A CN 1851235A
Authority
CN
China
Prior art keywords
jack
back timber
caving shield
shield
bearing pin
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN 200610044281
Other languages
Chinese (zh)
Inventor
刘宪亮
王其涛
梁开东
孙洪侠
李洪军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Second Machinery Factory Of Zaozhuang Coal Mining (group) LLC
Original Assignee
Second Machinery Factory Of Zaozhuang Coal Mining (group) LLC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Second Machinery Factory Of Zaozhuang Coal Mining (group) LLC filed Critical Second Machinery Factory Of Zaozhuang Coal Mining (group) LLC
Priority to CN 200610044281 priority Critical patent/CN1851235A/en
Publication of CN1851235A publication Critical patent/CN1851235A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

The invention is a thick coal bed hydraulic shield support, able to implement synthetic mechanized mining of thick coal beds, comprising top beam, shield beam, seat, column, balancing jack, front link rod, rear link rod, displacive jack and operating valve set, where the top beam and shield beam are equipped with side push jacks, and long and short guide rods inside and equipped with side backplates and hinged mutually; the top and bottom ends of the balancing jack are equipped on the top beam and shield beam, respectively; the top and bottom ends of the column are arranged on the lower part of the top beam and the seat, respectively; the upper ends of the front and rear link rods are hinged at the rear end of the shield beam and the lower ends of them are hinged on the seat; the displacive jack is equipped on the seat; the operating valve set is equipped on the bottom surface of the top beam. And it has large height regulating range and high moving speed, and improves force bearing conditions of the support and prolongs the service life of the support. And the support is made of high-intensity low-alloy steel sheet, small- bulk and lightweight.

Description

Thick coal-bed shield hydraulic support
Technical field
The present invention relates to a kind of mining hydraulic shield support, relate in particular to a kind of thick coal-bed shield hydraulic support.
Background technology
Comprehensive mining hydraulic bracket is one of colliery comprehensive mechanical coal mining work plane capital equipment, it and coal-winning machine, the supporting use of conveyer, and the major function of hydraulic support is the support and management top board, isolate the goaf, safeguard the coal mining activity space, and can move forward voluntarily, advance coal-face.At present, the hydraulic support that the mine coal seam exploitation is used comprises back timber, caving shield, base, two columns, front rod, back link, passing jack and operating valve set; The rear end of back timber and the front end of caving shield are in the hinge connection by jointed shaft; The upper end of column is installed on the axle bed of back timber bottom surface by bearing pin, and becomes to be rotatably connected relatively with it, and the lower end of column is installed on the base by bearing pin, and becomes to be rotatably connected relatively with it; The upper end of front rod is installed in the rear end of caving shield by jointed shaft, and the lower end of front rod is installed on the base by jointed shaft; Back link is installed in the rear side of front rod, and the upper end of back link is installed in the rear end of caving shield by jointed shaft, and the lower end of back link is installed on the base by jointed shaft; Passing jack is the front and back horizontal positioned, and its rear end is installed on the axle bed of base by bearing pin; The front end of passing jack is fixedly connected with push rod, and the rear end of push rod is installed in the front end of passing jack by bearing pin, and the front end of push rod is fixedly connected with connector by bearing pin; Operating valve set is fixedly mounted on the bottom surface of back timber, and operating valve set is comprising: column control valve and pass the jack control valve; The column control valve is connected with two column hydraulic pressure by the column hydralic hose, passes the jack control valve and is connected with the passing jack hydraulic by passing the jack hydraulic sebific duct.This hydraulic support provides high-pressure emulsion as power by emulsion power pack, controls corresponding functional part respectively by each control valve on the operating valve set, that is: the lifting of the flexible and then control back timber of two columns of column control valve control; Passing the jack control valve controls stretching out of passing jack and then promotes push rod to pass drag conveyor, pass the retraction of jack control valve control passing jack and then to spur push rod with mobile hydraulic support.During this hydraulic support is applicable to, the exploitation of girdle, but the back timber lifting space of this hydraulic support is little, buries deeply for working seam, the geological conditions complexity, tomography is many, big high seam is pressed in the ore deposit, result of use is poor; In addition, the fluid pressure line of this hydraulic support is arranged in disorder, irregular, causes confusion easily in actual use, makes troubles.
Summary of the invention
The object of the invention provides a kind of thick coal-bed shield hydraulic support that is suitable for exploiting high seam.
For achieving the above object, the technical solution used in the present invention is: a kind of thick coal-bed shield hydraulic support, comprising back timber, caving shield, base, column, front rod, back link, passing jack and operating valve set; The rear end of back timber and the front end of caving shield are in the hinge connection by jointed shaft; The upper end of column is installed on the axle bed of back timber bottom surface by bearing pin, and becomes to be rotatably connected relatively with it, and the lower end of column is installed on the base by bearing pin, and becomes to be rotatably connected relatively with it; The upper end of front rod is installed in the rear end of caving shield by jointed shaft, and the lower end of front rod is installed on the base by jointed shaft; Back link is installed in the rear side of front rod, and the upper end of back link is installed in the rear end of caving shield by jointed shaft, and the lower end of back link is installed on the base by jointed shaft; Passing jack is the front and back horizontal positioned, and its rear end is installed on the axle bed of base by bearing pin; The front end of passing jack is fixedly connected with push rod, and the rear end of push rod is installed in the front end of passing jack by bearing pin, and the front end of push rod is fixedly connected with connector by bearing pin; Operating valve set is fixedly mounted on the base, and operating valve set is comprising: column control valve and pass the jack control valve; The column control valve is connected with column hydraulic pressure by the column hydralic hose, passes the jack control valve and is connected with the passing jack hydraulic by passing the jack hydraulic sebific duct; It is characterized in that: this thick coal-bed shield hydraulic support also comprises balance jack, the upper end of balance jack is installed on the axle bed of bottom surface, back timber rear portion by bearing pin, and become to be rotatably connected relatively with it, the lower end of balance jack is installed on the axle bed of bottom surface, caving shield middle part by bearing pin, and becomes to be rotatably connected relatively with it; Back timber has inner chamber, and back timber thruster jack is installed in the inner chamber of back timber, the left side of back timber be equipped with can left and right telescopic movable the back timber side guard board, back timber thruster jack and back timber side guard board interconnect; Caving shield has inner chamber, and caving shield thruster jack is installed in the inner chamber of caving shield, the left side of caving shield be equipped with can left and right telescopic movable the caving shield side guard board, caving shield thruster jack and caving shield side guard board interconnect; Operating valve set also comprises: balance jack control valve and thruster jack control valve, the balance jack control valve is connected with balance jack hydraulic pressure by the balance jack hydralic hose, and thruster jack control valve is connected with back timber thruster jack hydraulic with caving shield thruster jack respectively by thruster jack hydraulic sebific duct.
In technique scheme, long guide rod of back timber and back timber short-range missile bar are installed in the inner chamber of back timber, the long guide rod of back timber and back timber short-range missile bar become to horizontally slip with the inner chamber of corresponding back timber respectively and are connected; Described back timber pushes away jack and described back timber side guard board interconnects by the long guide rod of back timber, and the right-hand member of the long guide rod of back timber is fixedlyed connected with back timber thruster jack, and the left end of the long guide rod of back timber is fixedlyed connected with the back timber side guard board; Have the back timber Internal baffle in the inner chamber of back timber, be installed with top beam spring on the left side wall of back timber Internal baffle, the right-hand member of top beam spring is fixedlyed connected with the left side wall of back timber Internal baffle, the right-hand member of back timber short-range missile bar is fixedlyed connected with the left end of top beam spring, and the left end of back timber short-range missile bar is fixedlyed connected with the back timber side guard board.
In technique scheme, the front end of back timber is connected with the secondary face guard by bearing pin, the front end of secondary face guard is connected with the one-level face guard by bearing pin, back timber be connected with an end of secondary wall supporting jack below by bearing pin, the other end of secondary wall supporting jack is connected below the secondary face guard by bearing pin, the secondary face guard is connected with an end of one-level wall supporting jack below by bearing pin, the other end of one-level wall supporting jack by bearing pin be connected the one-level face guard below.
In technique scheme, be equipped with on the base and lift end jack.
In technique scheme, the structural member of this thick coal-bed shield hydraulic support selects for use Aldecor plate Q550 to make.
The present invention provides high-pressure emulsion as power by emulsion power pack in use, controls corresponding functional part respectively by each control valve on the operating valve set, that is: the lifting of the flexible and then control back timber of two columns of column control valve control; Passing the jack control valve controls stretching out of passing jack and then promotes push rod to pass drag conveyor, pass the retraction of jack control valve control passing jack and then to spur push rod with mobile hydraulic support; Balance jack control valve control balance jack flexible and then adjusted back timber in the horizontal direction; The activity of thruster jack control valve control thruster jack and then control back timber side guard board and caving shield side guard board.Design has a balance jack among the present invention, and when under the guiding function of back timber at column during lifting, balance jack can play coordinative role, in the horizontal direction the adjusted back timber; But the left side of back timber is equipped with the back timber side guard board of left and right sides telescopic movable, but the left side of caving shield is equipped with the caving shield side guard board of left and right sides telescopic movable, the back timber side guard board has increased the supporting area of back timber to the coal seam, and the caving shield side guard board has increased the shielding of caving shield to working space; In the inner chamber of the inner chamber of back timber, caving shield, long and short guide rod device has been installed respectively, has improved the intensity and the reliability of back timber side guard board, caving shield side guard board guiding device; The Front-end Design of back timber has the two-stage face guard, can operate the wall supporting jack when needing wall supporting, makes the face guard bottom be adjacent to rib.Thus, the present invention is applicable to the exploitation of high seam, realizes the high seam fully-mechanized mining.
The invention has the beneficial effects as follows: 1, supporting, to heighten scope big, advancing velocity is fast, work plane output height, 2, by optimal design, improved the force-bearing situation of support, the application life of having improved support.3, move frame voluntarily, pass face conveyor automatically, guarantee operating personnel's safety.4, the structural member of hydraulic support selects for use High-Strength Low-Alloy Q550 steel plate to make, and can alleviate the volume and weight of support.
Description of drawings
Fig. 1 is a structural representation of the present invention;
Fig. 2 is the A-A sectional drawing of Fig. 1;
Fig. 3 is the B-B sectional drawing of Fig. 1;
Fig. 4 is the C-C sectional drawing of Fig. 1;
Fig. 5 is the D-D sectional drawing of Fig. 1;
Fig. 6 is a base plan structure schematic diagram of the present invention.
In the accompanying drawing: 1, one-level face guard; 2, secondary face guard; 3, one-level wall supporting jack; 4, secondary wall supporting jack; 5, back timber; 6, column; 7, back timber active side backplate; 8, caving shield; 9, balance jack; 10, caving shield active side backplate; 11, front rod; 12, operating valve set; 13, back link; 14, base; 15, pass jack; 16, pedal; 17, push rod; 18, connector; 19, lift end jack; 20, the long guide rod of back timber; 21, back timber thruster jack; 22, back timber side guard board; 23, back timber short-range missile bar; 24, top beam spring; 25, back timber Internal baffle; 26, caving shield short-range missile bar; 27, caving shield spring; 28, caving shield Internal baffle; 29, caving shield side guard board; 30, shielding beam length guide rod; 31, caving shield thruster jack.
The specific embodiment
The invention will be further described below in conjunction with the drawings and specific embodiments.
A kind of thick coal-bed shield hydraulic support is as Fig. 1, Fig. 2, Fig. 3, Fig. 4, Fig. 5, shown in Figure 6, comprising back timber 5, caving shield 8, base 14, column 6, front rod 11, back link 13, passing jack 15 and operating valve set 12; The front end of the rear end of back timber 5 and caving shield 8 is in the hinge connection by jointed shaft; The upper end of column 6 is installed on the axle bed of back timber 5 bottom surfaces by bearing pin, and becomes to be rotatably connected relatively with it, and the lower end of column 6 is installed on the base 14 by bearing pin, and becomes to be rotatably connected relatively with it; The upper end of front rod 11 is installed in the rear end of caving shield 8 by jointed shaft, and the lower end of front rod 11 is installed on the base 14 by jointed shaft; Back link 13 is installed in the rear side of front rod 11, and the upper end of back link 13 is installed in the rear end of caving shield 8 by jointed shaft, and the lower end of back link 13 is installed on the base 14 by jointed shaft; Passing jack 15 is the front and back horizontal positioned, and its rear end is installed on the axle bed of base 14 by bearing pin; The front end of passing jack 15 is fixedly connected with push rod 17, and the rear end of push rod 17 is installed in the front end of passing jack 15 by bearing pin, and the front end of push rod 17 is fixedly connected with connector 18 by bearing pin; Operating valve set 12 is fixedly mounted on the base 14, and operating valve set 12 is comprising: column control valve and pass the jack control valve; The column control valve is connected with column 6 hydraulic pressure by the column hydralic hose, passes the jack control valve and is connected with passing jack 15 hydraulic pressure by passing the jack hydraulic sebific duct; It is characterized in that: this thick coal-bed shield hydraulic support also comprises balance jack 9, the upper end of balance jack 9 is installed on the axle bed of bottom surface, back timber 5 rear portion by bearing pin, and become to be rotatably connected relatively with it, the lower end of balance jack 9 is installed on the axle bed of bottom surface, caving shield 8 middle part by bearing pin, and becomes to be rotatably connected relatively with it; Back timber 5 has inner chamber, and back timber thruster jack 21 is installed in the inner chamber of back timber 5, the left side of back timber 5 be equipped with can left and right telescopic movable back timber side guard board 22, back timber thruster jack 21 interconnects with back timber side guard board 22; Caving shield 8 has inner chamber, and caving shield thruster jack 31 is installed in the inner chamber of caving shield 8, the left side of caving shield 8 be equipped with can left and right telescopic movable caving shield side guard board 29, caving shield thruster jack 31 interconnects with caving shield side guard board 29; Operating valve set 12 also comprises: balance jack control valve and thruster jack control valve, the balance jack control valve is connected with balance jack 9 hydraulic pressure by the balance jack hydralic hose, and thruster jack control valve is connected with back timber thruster jack 21 hydraulic pressure with caving shield thruster jack 31 respectively by thruster jack hydraulic sebific duct; In the present embodiment, long guide rod 20 of back timber and back timber short-range missile bar 23 are installed in the inner chamber of back timber 5, the long guide rod 20 of back timber and back timber short-range missile bar 23 become to horizontally slip with the inner chamber of corresponding back timber 5 respectively and are connected; Described back timber pushes away jack 31 and interconnects by the long guide rod 20 of back timber with described back timber side guard board 22, and the right-hand member of the long guide rod 20 of back timber is fixedlyed connected with back timber thruster jack 21, and the left end of the long guide rod 20 of back timber is fixedlyed connected with back timber side guard board 22; Have back timber Internal baffle 25 in the inner chamber of back timber 5, be installed with top beam spring 24 on the left side wall of back timber Internal baffle 25, the right-hand member of top beam spring 24 is fixedlyed connected with the left side wall of back timber Internal baffle 25, the right-hand member of back timber short-range missile bar 23 is fixedlyed connected with the left end of top beam spring 24, and the left end of back timber short-range missile bar 23 is fixedlyed connected with back timber side guard board 22; In the present embodiment, shielding beam length guide rod 30 and caving shield short-range missile bar 26 are installed in the inner chamber of caving shield 8; Shielding beam length guide rod 30 and caving shield short-range missile bar 26 become to horizontally slip with the inner chamber of corresponding caving shield 8 respectively and are connected; Described caving shield thruster jack 31 interconnects by shielding beam length guide rod 30 with described caving shield side guard board 29, the right-hand member of shielding beam length guide rod 30 is fixedlyed connected with caving shield thruster jack 31, and the left end of shielding beam length guide rod 30 is fixedlyed connected with caving shield side guard board 29; Have caving shield Internal baffle 28 in the inner chamber of caving shield 8, be installed with caving shield spring 27 on the left side wall of caving shield Internal baffle 28, the right-hand member of caving shield spring 27 is fixedlyed connected with the left side wall of caving shield Internal baffle 28, the right-hand member of caving shield short-range missile bar 26 is fixedlyed connected with the left end of caving shield spring 27, and the left end of caving shield short-range missile bar 26 is fixedlyed connected with caving shield side guard board 29; In the present embodiment, the front end of back timber 5 is connected with secondary face guard 2 by bearing pin, the front end of secondary face guard 2 is connected with one-level face guard 1 by bearing pin, back timber 5 be connected with an end of secondary wall supporting jack 4 below by bearing pin, the other end of secondary wall supporting jack 4 is connected below the secondary face guard 2 by bearing pin, secondary face guard 2 is connected with an end of one-level wall supporting jack 3 below by bearing pin, the other end of one-level wall supporting jack 3 by bearing pin be connected one-level face guard 1 below; In the present embodiment, be equipped with on the base 14 and lift end jack 19.
Structural member of the present invention is as back timber, caving shield, base, front and rear connecting rods etc. select for use Aldecor plate Q550 (GB/T16270-1996) to substitute low alloy steel plate Q345, the sheet material welding performance is good, cold crack sensitiveness index CET only is 0.235%, welding pre-heating temperature Tp only is 80 ℃, and tensile strength can reach 830MPa.Can alleviate the volume and weight of support.
Operating principle of the present invention:
When use is of the present invention under coal mine, many present invention are arranged in a row,, take to face the frame control operation in order to guarantee operating personnel's personal safety according to the working space under the coal mine.The present invention provides high-pressure emulsion as power by emulsion power pack, high-pressure emulsion from pumping plant, deliver to work plane through main feed tube, and with the importing the present invention that links of feed liquor stop valve, again by each control valve on the operating valve set respectively dosing to the hydraulic cylinder of corresponding functional part, with finish required for the present invention want respectively push work.The low pressure emulsion that refluxes from the present invention flows back to pumping plant emulsion box with returning the liquid stop valve by main liquid back pipe road by operating valve set, for recycling.
The elemental motion that the present invention operates mainly is divided into: back timber landing, whole reach of the present invention, back timber rise the activity of roof supporting, propelling conveyer and back timber side guard board, caving shield side guard board.
1, back timber landing
Column control valve in the operating valve set is pulled to falling the post position, made the column band back timber and descend, when reducing to desired height, the column control valve is turned back the centre position, back timber promptly stops to descend.Guarantee the parallel decline of back timber, need the activity of operation balance jack control valve control balance jack, and then regulate back timber.
2, whole reach of the present invention
After falling post, earlier fixed point is set, connector of the present invention is fixedlyed connected with fixed point, push move the passing jack control valve in the operating valve set to chord position then and put in the place ahead of the present invention, make the piston rod retraction of passing jack, thereby the pulling support moves forward.When the support reach puts in place, will pass the jack control valve and turn back the centre position, support promptly stops reach.
3, back timber rises and supports roof
After support moves on to the position, the column control valve in the operating valve set is pulled to the setting prop position, the column piston rod stretches out supporting top beam and rises, and after back timber and roof are close to, closes the column control valve.In the column uphill process, need the collaborative balance jack control valve of handling to control balance jack equally, and then regulate back timber.
4, advance transporter
When the needs moving conveyor, earlier connector of the present invention is fixedlyed connected with conveyer, the passing jack control valve of then behaviour being knitted in the valve group is pulled to the pushing and sliding position, the passing jack piston rod is stretched out, push anterior conveyer to rib by push rod, will pass the jack control valve after putting in place and turn back the centre position and get final product.
5, the activity of back timber side guard board, caving shield side guard board
When use is of the present invention, spring in back timber and the caving shield ejects back timber side guard board, caving shield side guard board by back timber short-range missile bar, caving shield short-range missile bar respectively, the long guide rod of back timber, shielding beam length guide rod are respectively along with back timber side guard board, caving shield side guard board stretch out, because it is passive state that the interior thruster jack of this moment back timber and caving shield is in unloaded state, the piston rod of thruster jack also stretches out thereupon.When needs back timber side guard board, the travelling backwards of caving shield side guard board, thruster jack control valve on the manipulation valve group, high-pressure emulsion is promptly exported by the control valve liquid outlet, by thruster jack control valve, enter the plunger shaft of thruster jack, make the piston rod retraction of thruster jack, drive the long guide rod of back timber, the travelling backwards of shielding beam length guide rod, and then drive the travelling backwards of back timber side guard board, caving shield side guard board.
6, bottom raising mechanism
Bottom raising mechanism is formed by lifting end jack and bearing pin etc., and main effect is: if pricking at the end appears in the bracket base front end, when moving frame, utilization is lifted the end jack support is lifted, thereby reduces to move the frame resistance.
Remarkable advantage of the present invention is: 1, supporting, to heighten scope big, advancing velocity is fast, working face output Height, 2, by optimal design, improved the force-bearing situation of support, the service life of having improved support. 3, Move voluntarily frame, automatically pass face conveyor, guarantee operating personnel's safety. 4, the knot of hydraulic support Member selects High-Strength Low-Alloy Q550 steel plate to make, and can alleviate the volume and weight of support.

Claims (6)

1, a kind of thick coal-bed shield hydraulic support is comprising back timber (5), caving shield (8), base (14), column (6), front rod (11), back link (13), passing jack (15) and operating valve set (12); The front end of the rear end of back timber (5) and caving shield (8) is in the hinge connection by jointed shaft; The upper end of column (6) is installed on the axle bed of back timber (5) bottom surface by bearing pin, and becomes to be rotatably connected relatively with it, and the lower end of column (6) is installed on the base (14) by bearing pin, and becomes to be rotatably connected relatively with it; The upper end of front rod (11) is installed in the rear end of caving shield (8) by jointed shaft, and the lower end of front rod (11) is installed on the base (14) by jointed shaft; Back link (13) is installed in the rear side of front rod (11), and the upper end of back link (13) is installed in the rear end of caving shield (8) by jointed shaft, and the lower end of back link (13) is installed on the base (14) by jointed shaft; Passing jack (15) is the front and back horizontal positioned, and its rear end is installed on the axle bed of base (14) by bearing pin; The front end of passing jack (15) is fixedly connected with push rod (17), and the rear end of push rod (17) is installed in the front end of passing jack (15) by bearing pin, and the front end of push rod (17) is fixedly connected with connector (18) by bearing pin; Operating valve set (12) is fixedly mounted on the base (14), and operating valve set (12) is comprising: column control valve and pass the jack control valve; The column control valve is connected with column (6) hydraulic pressure by the column hydralic hose, passes the jack control valve and is connected with passing jack (15) hydraulic pressure by passing the jack hydraulic sebific duct; It is characterized in that: this thick coal-bed shield hydraulic support also comprises balance jack (9), the upper end of balance jack (9) is installed on the axle bed of back timber (5) bottom surface, rear portion by bearing pin, and become to be rotatably connected relatively with it, the lower end of balance jack (9) is installed on the axle bed of bottom surface, caving shield (8) middle part by bearing pin, and becomes to be rotatably connected relatively with it; Back timber (5) has inner chamber, and back timber thruster jack (21) is installed in the inner chamber of back timber (5), the left side of back timber (5) be equipped with can left and right telescopic movable back timber side guard board (22), back timber thruster jack (21) interconnects with back timber side guard board (22); Caving shield (8) has inner chamber, caving shield thruster jack (31) is installed in the inner chamber of caving shield (8), the left side of caving shield (8) be equipped with can left and right telescopic movable caving shield side guard board (29), caving shield thruster jack (31) interconnects with caving shield side guard board (29); Operating valve set (12) also comprises: balance jack control valve and thruster jack control valve, the balance jack control valve is connected with balance jack (9) hydraulic pressure by the balance jack hydralic hose, and thruster jack control valve is connected with back timber thruster jack (21) hydraulic pressure with caving shield thruster jack (31) respectively by thruster jack hydraulic sebific duct.
2, thick coal-bed shield hydraulic support according to claim 1, it is characterized in that: long guide rod of back timber (20) and back timber short-range missile bar (23) are installed in the inner chamber of described back timber (5), and the long guide rod of back timber (20) and back timber short-range missile bar (23) become to horizontally slip with the inner chamber of corresponding back timber (5) respectively and are connected; Described back timber pushes away jack (31) and interconnects by the long guide rod of back timber (20) with described back timber side guard board (22), the right-hand member of the long guide rod of back timber (20) is fixedlyed connected with back timber thruster jack (21), and the left end of the long guide rod of back timber (20) is fixedlyed connected with back timber side guard board (22); Have back timber Internal baffle (25) in the inner chamber of back timber (5), be installed with top beam spring (24) on the left side wall of back timber Internal baffle (25), the right-hand member of top beam spring (24) is fixedlyed connected with the left side wall of back timber Internal baffle (25), the right-hand member of back timber short-range missile bar (23) is fixedlyed connected with the left end of top beam spring (24), and the left end of back timber short-range missile bar (23) is fixedlyed connected with back timber side guard board (22).
3, thick coal-bed shield hydraulic support according to claim 1 and 2 is characterized in that: shielding beam length guide rod (30) and caving shield short-range missile bar (26) are installed in the inner chamber of described caving shield (8); Shielding beam length guide rod (30) and caving shield short-range missile bar (26) horizontally slip with the inner chamber one-tenth of corresponding caving shield (8) respectively and are connected; Described caving shield thruster jack (31) interconnects by shielding beam length guide rod (30) with described caving shield side guard board (29), the right-hand member of shielding beam length guide rod (30) is fixedlyed connected with caving shield thruster jack (31), and the left end of shielding beam length guide rod (30) is fixedlyed connected with caving shield side guard board (29); Have caving shield Internal baffle (28) in the inner chamber of caving shield (8), be installed with caving shield spring (27) on the left side wall of caving shield Internal baffle (28), the right-hand member of caving shield spring (27) is fixedlyed connected with the left side wall of caving shield Internal baffle (28), the right-hand member of caving shield short-range missile bar (26) is fixedlyed connected with the left end of caving shield spring (27), and the left end of caving shield short-range missile bar (26) is fixedlyed connected with caving shield side guard board (29).
4, thick coal-bed shield hydraulic support according to claim 3, it is characterized in that: the front end of described back timber (5) is connected with secondary face guard (2) by bearing pin, the front end of secondary face guard (2) is connected with one-level face guard (1) by bearing pin, back timber (5) be connected with an end of secondary wall supporting jack (4) below by bearing pin, the other end of secondary wall supporting jack (4) is connected below the secondary face guard (2) by bearing pin, secondary face guard (2) is connected with an end of one-level wall supporting jack (3) below by bearing pin, the other end of one-level wall supporting jack (3) by bearing pin be connected one-level face guard (1) below.
5, thick coal-bed shield hydraulic support according to claim 4 is characterized in that: be equipped with on the described base (14) and lift end jack (19).
6, thick coal-bed shield hydraulic support according to claim 1 is characterized in that: the structural member of this thick coal-bed shield hydraulic support selects for use High-Strength Low-Alloy Q550 steel plate to make.
CN 200610044281 2006-05-20 2006-05-20 Thick coal-bed shield hydraulic support Pending CN1851235A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200610044281 CN1851235A (en) 2006-05-20 2006-05-20 Thick coal-bed shield hydraulic support

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200610044281 CN1851235A (en) 2006-05-20 2006-05-20 Thick coal-bed shield hydraulic support

Publications (1)

Publication Number Publication Date
CN1851235A true CN1851235A (en) 2006-10-25

Family

ID=37132735

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200610044281 Pending CN1851235A (en) 2006-05-20 2006-05-20 Thick coal-bed shield hydraulic support

Country Status (1)

Country Link
CN (1) CN1851235A (en)

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101333928B (en) * 2008-07-31 2010-06-09 中国矿业大学 Multiple layer double-fork type hyperstatic hydraulic support
CN101333930B (en) * 2008-07-31 2010-06-23 中国矿业大学 Double-fork type hyperstatic hydraulic support
CN102011603A (en) * 2010-10-30 2011-04-13 煤炭科学研究总院太原研究院 Coal mine underground remote control triangle protective shield
CN101240710B (en) * 2007-02-06 2011-05-04 李泽宇 Support moving device
CN102251789A (en) * 2011-08-04 2011-11-23 中平能化集团机械制造有限公司 Integrated self-shift hydraulic support for placing top coal in steeply inclined roadway
CN102337887A (en) * 2010-07-18 2012-02-01 张有贤 Overpass chain cutting tower type lump extraction support protection conveying type combined lump coal machine
CN102536289A (en) * 2012-03-07 2012-07-04 中煤北京煤矿机械有限责任公司 Two-column shielding large-center distance and ultrahigh-working resistance hydraulic support for medium-thickness coal seam
CN102926777A (en) * 2012-11-16 2013-02-13 无锡阳工机械制造有限公司 Top beam structure of hydraulic bracket
CN104594932A (en) * 2014-12-29 2015-05-06 中国神华能源股份有限公司 Mining supporting support equipment and mining method thereof
CN105065053A (en) * 2015-08-28 2015-11-18 三一重型装备有限公司 Pure water hydraulic support for coal mine
WO2018094657A1 (en) * 2016-11-24 2018-05-31 安徽理工大学 Hydraulic support for soil-like coal working face, and protection method for coal seam mining
CN105781600B (en) * 2016-03-10 2019-02-01 山东能源重装集团鲁南装备制造有限公司 A kind of hydraulic support
CN109630165A (en) * 2018-12-28 2019-04-16 上海工程技术大学 A kind of underground mine use two column protected type electrichydraulic control hydraulic support

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101240710B (en) * 2007-02-06 2011-05-04 李泽宇 Support moving device
CN101333930B (en) * 2008-07-31 2010-06-23 中国矿业大学 Double-fork type hyperstatic hydraulic support
CN101333928B (en) * 2008-07-31 2010-06-09 中国矿业大学 Multiple layer double-fork type hyperstatic hydraulic support
CN102337887B (en) * 2010-07-18 2015-09-23 张有贤 Overpass chain cutting tower type lump extraction support protection conveying type combined lump coal machine
CN102337887A (en) * 2010-07-18 2012-02-01 张有贤 Overpass chain cutting tower type lump extraction support protection conveying type combined lump coal machine
CN102011603A (en) * 2010-10-30 2011-04-13 煤炭科学研究总院太原研究院 Coal mine underground remote control triangle protective shield
CN102011603B (en) * 2010-10-30 2012-08-22 煤炭科学研究总院太原研究院 Coal mine underground remote control triangle protective shield
CN102251789A (en) * 2011-08-04 2011-11-23 中平能化集团机械制造有限公司 Integrated self-shift hydraulic support for placing top coal in steeply inclined roadway
CN102536289A (en) * 2012-03-07 2012-07-04 中煤北京煤矿机械有限责任公司 Two-column shielding large-center distance and ultrahigh-working resistance hydraulic support for medium-thickness coal seam
CN102926777A (en) * 2012-11-16 2013-02-13 无锡阳工机械制造有限公司 Top beam structure of hydraulic bracket
CN104594932A (en) * 2014-12-29 2015-05-06 中国神华能源股份有限公司 Mining supporting support equipment and mining method thereof
CN105065053A (en) * 2015-08-28 2015-11-18 三一重型装备有限公司 Pure water hydraulic support for coal mine
CN105781600B (en) * 2016-03-10 2019-02-01 山东能源重装集团鲁南装备制造有限公司 A kind of hydraulic support
WO2018094657A1 (en) * 2016-11-24 2018-05-31 安徽理工大学 Hydraulic support for soil-like coal working face, and protection method for coal seam mining
CN109630165A (en) * 2018-12-28 2019-04-16 上海工程技术大学 A kind of underground mine use two column protected type electrichydraulic control hydraulic support

Similar Documents

Publication Publication Date Title
CN1851235A (en) Thick coal-bed shield hydraulic support
CN100575665C (en) Low coal seam coverture type hydraulic support
CN103233761B (en) Reversed loader moving-assisted large-cycle tunnel advance support bracket
CN103452574A (en) Auxiliary bracket moving device of circular self-moving advance support
CN1149664A (en) Hydraulic shield support
CN112012755B (en) Sliding shoe type anchor net transportation robot
CN201588645U (en) High-end hydraulic support suitable for small drift
CN2908786Y (en) High seam shield hydraulic support
CN1702300A (en) Arrangement for quickly shifting sublevel caving hydraulic support series for fully-mechanized mining of three-soft coal bed
CN2866822Y (en) Thin coal seam shielding hydraulic support
CN102913268A (en) Mobile support bracket of tunneling machine
CN203796302U (en) Circulation self-moving type forepoling auxiliary rack moving device
CN203223239U (en) Roadway advance timbering support used for assisting machine to move
CN113279790B (en) Working face support retracting robot and working method thereof
CN2700562Y (en) Hydraulic support for forepoling of fully mechanized mining workface gate
CN1690361A (en) Fully-mechanized mining working face smooth trough advancing reinforcement support process and hydraulic support therefor
CN2890337Y (en) End hydraulic support
CN2188654Y (en) Combined alternating bracing hydraulic support
CN101852084B (en) Forepoling with large inclination working surface and four transverse connecting rods
CN210068218U (en) Multipurpose roadway advance support hydraulic support
CN201474714U (en) Pulling top beam hydraulic support frame
CN208587180U (en) Adapt to a variety of coal winning technology hydraulic supports
CN2714808Y (en) Self-traveling mechanism of transshipping machine
CN1865661A (en) Chain suspension type hydraulic support
CN2818779Y (en) Hung-chain hydraulic stand

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication