CN1837554B - Method for rebuilding pond communication pipe - Google Patents
Method for rebuilding pond communication pipe Download PDFInfo
- Publication number
- CN1837554B CN1837554B CN2006100256526A CN200610025652A CN1837554B CN 1837554 B CN1837554 B CN 1837554B CN 2006100256526 A CN2006100256526 A CN 2006100256526A CN 200610025652 A CN200610025652 A CN 200610025652A CN 1837554 B CN1837554 B CN 1837554B
- Authority
- CN
- China
- Prior art keywords
- pond
- steel plate
- rebuilding
- pool wall
- pool
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Abstract
The invention relates to a pool connecting tube reconstruction method, it is characterized in that: a, strengthening the pool wall of water pool, and mounting the temporary sealing steel plate on the pool wall, and mounting rubber waterproof ring on the periphery of steel plate; b, digging holes on the pool wall outside the pool; c, mounting connecting tube inside the hole and detaching the temporary sealing steel plate. When reconstructing the water pool connecting tube, diver processed temporary sealing on the pool wall underwater; then digging holes to mount the connecting tube, while one end of connecting tube is connected to the turn-over well, and detaching the steel plate at last. The invention has lower cost and short construction period without water pollution.
Description
Technical field:
The present invention relates to the technical field of construction, specifically a kind of pond that is used for two (or more than) is communicated with the reconstruction method.
Background technology:
Two kinds of following methods of the general employing of rebuilding pond communication pipe at present:
1, the cofferdam push pipe is communicated with in the pond
This method is to construct the cofferdam water proof in the pond, and Nei Shui drains with the cofferdam, builds active well then or accept well at the bottom of the pond, with the jacking construction method two ponds is communicated with, and removes at last and constructs the cofferdam material, finishes the water tank connection pipe engineering.
2, the pool wall cofferdam connection that holes
This method is to construct the cofferdam water proof near the pool wall place, and Nei Shui drains with the cofferdam, pool wall is holed install communicating pipe then, removes at last and constructs the cofferdam material, finishes the water tank connection pipe engineering.
Above-mentioned two kinds of methods are in concrete implementation process, can pollute water body, then have influence on the view in pond, be unsuitable for the environmental requirement height, water surface area is bigger, and do not allow the communicating pipe in the large-scale landscape pond that water emptying or emptying pond cost is bigger to transform, construction period is also longer simultaneously, and cost is higher.
Summary of the invention:
The object of the present invention is to provide a kind of improved pond to be communicated with the reconstruction method, it can overcome the higher some shortcomings of not environmental protection in the prior art, long construction period and cost.
To achieve these goals, technical scheme of the present invention is: a kind of method for rebuilding pond communication pipe, it is characterized in that: the step of described method for rebuilding pond communication pipe is as follows: a, at pond external reinforcement pool wall, in the pond, interim shutoff steel plate is installed on pool wall under water then and carries out interim shutoff, and install the rubber sealing collar at the periphery of steel plate; B, outside the pond, pool wall is holed; C, in the hole, install communicating pipe, remove interim shutoff steel plate at last again.
The present invention is when carrying out the water tank connection pipe transformation, need not the water body in the pond is drained, only need to send the diver in the pond, pool wall to be carried out interim shutoff under water, outside the pond metope that blocks is holed then, install communicating pipe in the hole then, the other end of communicating pipe links to each other with the turnover well, the last steel plate of interim shutoff of removing again, low, the short construction period of whole construction method cost can not produce pollution to water body, can not influence the pond view yet.
Description of drawings:
Fig. 1 is the structural representation of one embodiment of the invention
Fig. 2 is the generalized section of pool wall of the present invention
The specific embodiment:
The invention will be further described below in conjunction with drawings and Examples.
A kind of method for rebuilding pond communication pipe of the present invention, its difference with the prior art is: the step of described method for rebuilding pond communication pipe is as follows: a, at pond external reinforcement pool wall, in the pond, interim shutoff steel plate 1 is installed on pool wall under water then and carries out interim shutoff, and install rubber sealing collar 3 at the periphery of steel plate; B, outside the pond, pool wall is holed; C, in the hole, install communicating pipe 2, remove interim shutoff steel plate at last again.What adopted in pond described in a step is steel concrete pool wall, and pond external reinforcement pool wall is meant in the needs both sides, hole (being the pond outer wall) that hole steel concrete counterfort is set that the reinforcing bar in the steel concrete counterfort of both sides anchors in the pool wall; The pond is for containing the unsettled pond in pond or bottom of water in it, steel plate refers to stainless-steel sheet or general steel plate.Be meant installation communicating pipe described in the c step and will be installed in communicating pipe in the steel concrete counterfort of both sides (steel concrete counterfort and pool wall of pool are close to), and in steel concrete counterfort pre-buried wall bushing hermetic seal, adopt cast iron pipe or other metal pipe materials communicating pipe.
Embodiment 1
The floating rapid line track of one magnetic needs to pass through between two ecoscape ponds, the communicating pipe of prior pool has been cut off, therefore must reconstruct water tank connection pipe, outside the pool wall of the north and south in two ponds, reinforce at first respectively, send diver's dive in the pond, the pool wall of reinforcing to be carried out interim shutoff then with interim shutoff steel plate and rubber sealing collar, what adopt here is stainless steel plate, the thickness of steel plate is 10mm, then outside the pond, the north and south pool wall is holed, in the hole, install communicating pipe, communicating pipe is a cast iron pipe, caliber is 600mm, at last the steel plate and the rubber sealing collar of interim shutoff are removed, finished the communicating pipe improvement project in two ponds.Whole construction period is shorter, and cost is not high yet, and construction has kept the ecoscape in pond simultaneously again to water nonpollution.
Claims (4)
1. method for rebuilding pond communication pipe, it is characterized in that: the step of described method for rebuilding pond communication pipe is as follows: a, at pond external reinforcement pool wall, in the pond, interim shutoff steel plate is installed on pool wall under water then and carries out interim shutoff, and install the rubber sealing collar at the periphery of interim shutoff steel plate; B, outside the pond, pool wall is holed; C, in the hole, install communicating pipe, remove interim shutoff steel plate at last again.
2. a kind of method for rebuilding pond communication pipe according to claim 1 is characterized in that: the pond described in a step is for containing the unsettled pond in pond or bottom of water in it.
3. a kind of method for rebuilding pond communication pipe according to claim 1 is characterized in that: the interim shutoff steel plate described in a step refers to stainless-steel sheet or general steel plate.
4. a kind of method for rebuilding pond communication pipe according to claim 1 is characterized in that: the communicating pipe described in the c step is cast iron pipe or other metal pipe materials.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2006100256526A CN1837554B (en) | 2006-04-12 | 2006-04-12 | Method for rebuilding pond communication pipe |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2006100256526A CN1837554B (en) | 2006-04-12 | 2006-04-12 | Method for rebuilding pond communication pipe |
Publications (2)
Publication Number | Publication Date |
---|---|
CN1837554A CN1837554A (en) | 2006-09-27 |
CN1837554B true CN1837554B (en) | 2010-08-18 |
Family
ID=37015051
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2006100256526A Active CN1837554B (en) | 2006-04-12 | 2006-04-12 | Method for rebuilding pond communication pipe |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN1837554B (en) |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101634194B (en) * | 2009-08-04 | 2012-07-04 | 重庆钢铁(集团)有限责任公司 | Construction method for resisting leakage between liquid pipeline and concrete tank |
CN110847294B (en) * | 2019-11-26 | 2021-02-02 | 中冶建工集团有限公司 | Construction method for converting water supply of pool |
CN112538893B (en) * | 2020-10-27 | 2024-05-03 | 上海市政工程设计研究总院(集团)有限公司 | Structure of current pool side wall opening hole penetrating pipe |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE29716994U1 (en) * | 1997-09-23 | 1997-11-13 | Teichform Gmbh | Artificial garden pond |
CN2639441Y (en) * | 2003-09-03 | 2004-09-08 | 王斐力 | Circulation water pool for swimming |
-
2006
- 2006-04-12 CN CN2006100256526A patent/CN1837554B/en active Active
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE29716994U1 (en) * | 1997-09-23 | 1997-11-13 | Teichform Gmbh | Artificial garden pond |
CN2639441Y (en) * | 2003-09-03 | 2004-09-08 | 王斐力 | Circulation water pool for swimming |
Also Published As
Publication number | Publication date |
---|---|
CN1837554A (en) | 2006-09-27 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102011410A (en) | Prefabricated prestressed underground continuous wall and construction method thereof | |
CN1837554B (en) | Method for rebuilding pond communication pipe | |
CN102444285A (en) | Method for manufacturing reinforced concrete basement external wall | |
CN204267915U (en) | Strengthen the two rubber sealing reinforced concrete sewer pipe of jacking construction corrosion protection | |
CN104499494B (en) | Double-wall corrugated steel cofferdam | |
CN204004780U (en) | Can peg graft concrete drain tile and the socket steel ring for this waste pipe | |
CN109183851B (en) | Underwater installation method of shell type immersed tube | |
CN204959781U (en) | Dewatering well plugging device | |
CN204898831U (en) | Novel plastic check well | |
CN104089103A (en) | Circulating water pipe lined with glass steel pipe and glass steel pipe lined method thereof | |
CN201028170Y (en) | Steel faucet prestressed steel cylinder concrete top pipe | |
CN201196300Y (en) | Prefabricated cylindrical reinforcing steel frame concrete pipe gallery | |
CN210049281U (en) | Combined immersed tube for submarine tunnel | |
CN204385753U (en) | A kind of double-wall corrugated steel cofferdam | |
CN201526467U (en) | Shaft with sealing function | |
CN111827355A (en) | Immersed tube tunnel and construction method | |
CN101311598B (en) | Steel cylinder strengthened steel faucet prestressed concrete ceiling coil | |
CN201028171Y (en) | Steel cylinder reinforced steel faucet prestressed longitudinal rib concrete top pipe | |
CN101311601B (en) | Steel cylinder strengthened steel faucet longitudinal reinforced concrete ceiling pipe | |
CN111379252A (en) | Diaphragm wall construction method | |
CN215669411U (en) | Ocean engineering platform anticorrosion shell structure | |
CN214423530U (en) | Pouring structure of precast concrete inspection well and precast concrete inspection well | |
CN219828166U (en) | F-shaped steel bearing type reinforced concrete jacking pipe | |
CN209066387U (en) | A kind of U-shaped sluice gate side wall template reinforcing device in seawater pond | |
CN204491679U (en) | A kind of ater-casting exterior wall plugging structure with elastic waterstop bar |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C56 | Change in the name or address of the patentee |
Owner name: SHANGHAI MUNICIPAL ENGINEERING DESIGN INSTITUTE (G Free format text: FORMER NAME: SHANGHAI MUNICIPAL ENGINEERING DESIGN INSTITUTE |
|
CP03 | Change of name, title or address |
Address after: 200092 Shanghai, Zhongshan, North Road, No. two, No. 901, No. Patentee after: Shanghai Municipal Engineering Design Institute (Group) Co., Ltd. Address before: 200092 No. two, 901 North Road, Shanghai, Zhongshan Patentee before: Shanghai Municipal Engineering Design Institute |