CN1837483A - Steel arch frame healing and dismounting device - Google Patents

Steel arch frame healing and dismounting device Download PDF

Info

Publication number
CN1837483A
CN1837483A CN 200610051028 CN200610051028A CN1837483A CN 1837483 A CN1837483 A CN 1837483A CN 200610051028 CN200610051028 CN 200610051028 CN 200610051028 A CN200610051028 A CN 200610051028A CN 1837483 A CN1837483 A CN 1837483A
Authority
CN
China
Prior art keywords
chord
jack
bow member
adjusting
adjusting rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN 200610051028
Other languages
Chinese (zh)
Other versions
CN100430555C (en
Inventor
张有德
何开智
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CHONGQING BIAOWANG MACHINERY EQUIPMENT CO., LTD.
Original Assignee
张有德
何开智
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 张有德, 何开智 filed Critical 张有德
Priority to CNB2006100510283A priority Critical patent/CN100430555C/en
Publication of CN1837483A publication Critical patent/CN1837483A/en
Application granted granted Critical
Publication of CN100430555C publication Critical patent/CN100430555C/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The invention relates to a steel arc support closing and detaching device, which comprises: an arc top, a jack, a adjusting rod, and a adjusting pad. Wherein, said arc top is formed by upper and lower string rods, upright rod, transverse rod, and middle rod. The inner sides of two ends of upper and lower string rods (1, 2) have connectors to connect bolt anchor plate (8); one end of upper and lower string rods have passive arc connectors (6) while another end are the adjusting ends (12); and their inner sides have side plates (14), jack pad (11), and adjusting pad baffle block (13); and one end of adjusting rod (9) is connected to the positive arc connector. The invention has simple operation, and the assembled steel support has large rigidity and better stability, while the mounting error and arc support internal force can be effectively adjusted.

Description

A kind of steel bow member closes up and unloads rack device
Technical field
The present invention relates to a kind of the construction and build the vault of the steel bow member that arch bridge uses, relate in particular to that a kind of bow member vault closes up and bow member unloads the method and apparatus of frame.
Background technology
The steel bow member is to have rack construction to build the indispensable supplementary structure of arch bridge, and steel bow member vault plays crucial effect as the closure segment of assembly unit bow member.Unsettled steel bow member mainly contains two kinds of forms in the prior art bridge arch ring cast-in-place construction: a kind of three slotted-angle shelving assembly unit steel bow members, a kind of tool thunder frame assembly unit steel bow member, these two kinds of forms all do not have the special-purpose device that closes up, can not adjust the internal force and the arch axis line of bow member when closing up, make arch axis line and design that certain error be arranged, influence the mechanical characteristic of bow member, do not have the good rack device that unloads simultaneously again, cause that bow member splits out difficulty, efficient is low, labour intensity is big, influence arch ring quality and construction speed.The prior art bow member unloads to set up and is equipped with adopt " sand tubes " more, and this simple in equipment can not be used for eliminating concrete shrinkage, creep and the internal force of elastic compression, be provided with and use not too convenient, can only be as the rack device that unloads of simple function.
Summary of the invention
The object of the present invention is to provide a kind of steel bow member to close up and unload rack device, vault as the steel bow member when arch bridge is built in construction can play regulating action, execute internal force and the arch axis line that horizontal force is regulated bow member at the upper and lower string of vault when closing up, stride footpath and landform to the requirement of arch ring to satisfy difference, bow member stressedly more is tending towards rationally, evenly, treat that bricklaying reaches when needing after certain intensity folding to remove bow member as unloading rack device, can adjust arch internal force and can split out the steel bow member easily and safely again.
The present invention includes vault sections, jack, adjusting rod, regulate backing plate, vault sections of the present invention is made of upper chord, lower chord, vertical rod, cross bar, web member, be frame construction, the outside is provided with joint connecting screw rod anchor plate in upper chord and the lower chord two ends, one end of upper chord and lower chord is provided with cloudy end circular arc joint, and the upper chord and the lower chord other end are the adjustable side, and its inboard is provided with side plate, jack pad, adjusting backing plate block; Adjusting rod one end of the present invention is an oedoeagus circular arc joint.
When the steel bow member closes up, the oedoeagus circular arc joint of the moon end circular arc joint of the upper and lower chord member of vault sections one side of the present invention and the upper and lower chord member of basic sections of steel bow member joins, bear the pressure that chord member produces, connect by joint connecting bolt (or studs) outward, connecting bolt bears pulling force, at opposite side is the adjustable side, regulates bow member alignment error and bow member internal force with jack by adjusting rod; The reusable connector connecting bolt connects: jack is placed in the chord member of chord member adjustable side between the chord member and side plate, to connect at the bottom of the jack on the jack pad that is provided with on the chord member, put into adjusting rod again, jack piston promotes adjusting rod and advances, in the moon end nose circle joint of the chord member of the basic sections of adjusting rod oedoeagus circular arc joint insertion steel bow member, pushing tow along with piston, the adjusting rod pressurized, form cavity between adjusting rod reach and the adjusting backing plate block, can insert between adjusting backing plate block and the adjusting rod regulating backing plate, regulate bow member alignment error and bow member internal force, use the joint connecting bolt at last, pass the connection anchor plate and connect, finish the bow member assembly unit of arch bridge arch ring.
Bow member is during bricklaying irritate to be built, and the total weight of supporting arch ring treats that bricklaying reaches dismountable bow member after certain intensity, the present invention land bow member can with adjust internal force and carry out simultaneously, eliminate concrete shrinkage, creep and the internal force of elastic compression.When unloading frame to jack applied thrust slowly, when the force value of jack reaches required thrust and keeps period of oil pressure, can eliminate the concrete influence of creeping, reach the purpose of adjusting arch thrust, because the jack application of force, connecting bolt is easy to unload, take out and regulate backing plate, make bow member and cast-in-place arch ring break away from arch striking, the easy removal of bow member.
The present invention is simple, and is easy to operate, and the steelframe rigidity of institute's assembly unit is big, and good stability can effectively be regulated arch ring alignment error and bow member internal force, can adjust arch internal force during unloading frame, improves the arch ring quality, and it is safe and efficient to unload frame.
Description of drawings
The present invention is further detailed explanation below in conjunction with accompanying drawing:
Accompanying drawing 1 is the structural representation of vault sections of the present invention;
Accompanying drawing 2 is structure side views of vault sections of the present invention;
Accompanying drawing 3 is cloudy end circular arc joint design schematic diagram;
Accompanying drawing 4 is that cloudy end circular arc joint design B is to view;
Accompanying drawing 5 is a upper and lower chord member adjustable side structural representation;
Accompanying drawing 6 is a upper and lower chord member adjustable side A-A sectional drawing;
Accompanying drawing 7 is an adjusting rod schematic diagram of the present invention;
Accompanying drawing 8 is vault sections and basic sections connection diagram;
Accompanying drawing 9 is regulated schematic diagram for vault;
Among each figure: 1 is upper chord, and 2 is lower chord, and 3 are vertical rod, 4 is cross bar, and 5 is web member, and 6 is the cloudy end of chord member circular arc joint, 7 is the anchor plate deep floor, 8 is joint connecting bolt anchor plate, and 9 is adjusting rod, and 10 is the backing plate deep floor, 11 is jack pad, 12 is the chord member adjustable side, and 13 for regulating the backing plate block, and 14 is side plate, 15 is the cloudy end of chord member circular arc tip side, 16 is gusset plate, and 17 is the side gusset plate, and 18 is basic sections, 19 is joint connecting bolt, nut, 20 is jack, and 21 for regulating backing plate, and 22 is basic sections.
The specific embodiment
Embodiment 1:
As Fig. 1, shown in Figure 2, vault sections of the present invention is by two upper chords 1, two lower chords 2, four cross bars 4, four vertical rods 3, eight web members 5 constitute, be frame construction, the outside is provided with joint connecting screw rod anchor plate 8 in upper chord 1 and lower chord 2 two ends, and joint connecting bolt anchor plate 8 has anchor plate deep floor 7, and an end of upper chord 1 and lower chord 2 is provided with cloudy end circular arc joint 6 for cloudy end circular arc tip side 15, the upper chord 1 and lower chord 2 other ends are adjustable side 12, as Fig. 3, shown in Figure 4, the moon end circular arc tip side 15 of upper chord 1 and lower chord 2 is provided with cloudy end circular arc joint 6, also has gusset plate 16 around it, reinforce side plate 17; As Fig. 5, shown in Figure 6,12 inboards, chord member adjustable side of upper chord 1 and lower chord 2 are provided with backing plate deep floor 10 that side plate 14, jack pad 11, jack pad 11 have, regulate backing plate block 13; As shown in Figure 7, adjusting rod 9 one ends of the present invention are oedoeagus circular arc joint.
When the steel bow member closes up, as Fig. 8, shown in Figure 9, on the moon end circular arc joint 6 of vault sections one side upper chord 1 of the present invention and lower chord 2 and the basic sections 18 of steel bow member, the oedoeagus circular arc joint of lower edge joins, outward by the joint connecting bolt, nut 19 passes the joint connecting bolt and plugs with molten metal solid plate 8 connections, at opposite side is adjustable side 12, with jack 20 place in the chord member adjustable side 12 its with the groove of side plate 14 formation among, 20 ends of jack, connect jack pad 11, put into adjusting rod 9 again, in the moon end circular arc joint of the chord member of the basic sections 22 of oedoeagus circular arc joint insertion steel bow member of adjusting rod 9, give jack 20 application of forces, 9 reaches of jack 20 piston pushing tow adjusting rods, adjust the bow member alignment error and execute horizontal force for basic sections 22 biographies, regulate bow member internal force, with adjusting rod 9 reaches, between adjusting rod 9 and adjusting backing plate block 13, form cavity, to regulate backing plate 21 and insert this cavity, when the force value of jack 20 reaches the jack required thrust, use the joint connecting bolt, nut 19 connects anchor plate 8 through joint the vault sections is connected with basic sections 22, finishes the assembly unit of steel bow member.
When bricklaying irritate finish building after, bricklaying reaches when needing arch striking after certain intensity, can to jack 20 slowly the application of force reach the purpose of adjusting arch thrust.Because the application of force of jack 20 makes adjusting backing plate 21 loosening, is easy to extract out and regulates backing plate 21 and unload lower contact connecting bolt, nut 19, it is convenient that bow member unloads frame, respond well.
Embodiment 2:
In this embodiment, upper chord 1 length is greater than lower chord 2, and the vault sections of present embodiment is the isosceles trapezoid frame construction, and all the other are identical with embodiment 1.

Claims (2)

1, a kind of steel bow member closes up and unloads rack device, comprise vault sections, jack, adjusting rod, regulate backing plate, described vault sections is made of upper chord, lower chord, vertical rod, cross bar, web member, be frame construction, it is characterized in that the outside is provided with joint connecting screw rod anchor fixed head (8) in the two ends of upper chord (1) and lower chord (2), one end of upper chord (1) and lower chord (2) is provided with cloudy end circular arc joint (6), other end inboard is provided with side plate (14), jack pad (11) is regulated backing plate block (13); Described adjusting rod (9) is characterized in that adjusting rod (9) one ends are oedoeagus circular arc joint.
2, close up according to the described a kind of steel bow member of claim 1 and unload rack device, it is characterized in that described vault sections upper chord (1) length greater than lower chord (2), is the isosceles trapezoid frame construction.
CNB2006100510283A 2006-04-28 2006-04-28 Steel arch frame healing and dismounting device Active CN100430555C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNB2006100510283A CN100430555C (en) 2006-04-28 2006-04-28 Steel arch frame healing and dismounting device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNB2006100510283A CN100430555C (en) 2006-04-28 2006-04-28 Steel arch frame healing and dismounting device

Publications (2)

Publication Number Publication Date
CN1837483A true CN1837483A (en) 2006-09-27
CN100430555C CN100430555C (en) 2008-11-05

Family

ID=37014981

Family Applications (1)

Application Number Title Priority Date Filing Date
CNB2006100510283A Active CN100430555C (en) 2006-04-28 2006-04-28 Steel arch frame healing and dismounting device

Country Status (1)

Country Link
CN (1) CN100430555C (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101255678B (en) * 2007-12-28 2010-08-11 贵州省桥梁工程总公司 Slippage bracket of drag bridge arch rib
CN102433839A (en) * 2011-10-15 2012-05-02 安徽华力建设集团有限公司 Wood truss support structure for arch cap formwork of rigid frame arch bridge and construction method of wood truss support structure
CN102704410A (en) * 2012-06-28 2012-10-03 中铁十三局集团第一工程有限公司 Closure mechanism for concrete-filled steel tube arch bride rib
CN105984795A (en) * 2016-07-25 2016-10-05 森赫电梯股份有限公司 Automatic pavement frame molded surface connecting device
CN113652947A (en) * 2021-09-27 2021-11-16 中交第二公路勘察设计研究院有限公司 Combined arch segment structure, bridge and construction method
CN114775437A (en) * 2022-05-05 2022-07-22 中铁大桥局集团第一工程有限公司 Rapid closure method for arch rib of deck type steel tube arch bridge

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2574176B2 (en) * 1988-02-12 1997-01-22 武田薬品工業株式会社 Yellow solid color
CN2895513Y (en) * 2006-04-28 2007-05-02 何开智 Steel arch-rack top

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101255678B (en) * 2007-12-28 2010-08-11 贵州省桥梁工程总公司 Slippage bracket of drag bridge arch rib
CN102433839A (en) * 2011-10-15 2012-05-02 安徽华力建设集团有限公司 Wood truss support structure for arch cap formwork of rigid frame arch bridge and construction method of wood truss support structure
CN102704410A (en) * 2012-06-28 2012-10-03 中铁十三局集团第一工程有限公司 Closure mechanism for concrete-filled steel tube arch bride rib
CN105984795A (en) * 2016-07-25 2016-10-05 森赫电梯股份有限公司 Automatic pavement frame molded surface connecting device
CN113652947A (en) * 2021-09-27 2021-11-16 中交第二公路勘察设计研究院有限公司 Combined arch segment structure, bridge and construction method
CN114775437A (en) * 2022-05-05 2022-07-22 中铁大桥局集团第一工程有限公司 Rapid closure method for arch rib of deck type steel tube arch bridge

Also Published As

Publication number Publication date
CN100430555C (en) 2008-11-05

Similar Documents

Publication Publication Date Title
CN1837483A (en) Steel arch frame healing and dismounting device
CN2895513Y (en) Steel arch-rack top
CN109594479A (en) A kind of parallel overpass center anticollision barrier of double width while construct mould bases and method
CN201943009U (en) Simple fast-dismounting type steel truss guide beam
CN216427858U (en) Linear adjusting template device for post-cast section of curved track beam
CN200967929Y (en) Regulating device for steel arch truss dome
KR100832100B1 (en) Temporal structure and temporal setting method for stress control of the pylon base
CN113502853B (en) Piping lane quick detach system
CN109944164A (en) Jack up hollow thin-walled high pier roller die system and its construction method
CN213358344U (en) Adjustable bracket for cast-in-situ beam
CN206279460U (en) A kind of running gear for Construction of continuous beam Hanging Basket
CN201195825Y (en) Type A hydraulic beam falling mechanism of segment suspend-assembly erecting machine of bridge span
CN2573678Y (en) Built-up variable cross-section concrete coated steel shuttering flat car
CN206448342U (en) Pipeline non-excavation rehabilitation pre-processes bracing members system
CN111945570A (en) Bridge erecting machine
CN219508805U (en) Steel structure node member
CN107190974B (en) Cable tower combined type inner sliding die construction method and inner platform frame used by same
CN217781759U (en) Truss for hoisting high-level water passing concrete slab convenient to erect
CN216786898U (en) Drainage box culvert pouring supporting structure
CN214573256U (en) Arch rib side turning opposite pulling erecting device
CN203866710U (en) Temporary cross arm structure of H-shaped tower column with internal force adjustable
CN108221705A (en) A kind of twin legged thin wall pier I-steel bolster and application method convenient for removing
CN111502254A (en) Hanging type formwork support-free frame for construction of beam system steel structure floor slab
JP7464914B2 (en) Precast floor slab installation jig and precast floor slab connection method
CN213389734U (en) Bridge erecting machine

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
EE01 Entry into force of recordation of patent licensing contract

Assignee: Qingdao Yuanzheng Steel Structure Co., Ltd.

Assignor: He Kaizhi|Zhang Youde

Contract record no.: 2011440020281

Denomination of invention: Steel arch frame healing and dismounting device

Granted publication date: 20081105

License type: Exclusive License

Open date: 20060927

Record date: 20110720

ASS Succession or assignment of patent right

Owner name: CHONGQING BIAOWANG MACHINERY AND EQUIPMENT CO., LT

Free format text: FORMER OWNER: ZHANG YOUDE

Effective date: 20130426

Free format text: FORMER OWNER: HE KAIZHI

Effective date: 20130426

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 551700 BIJIE, GUIZHOU PROVINCE TO: 404100 QIJIANG, CHONGQING

TR01 Transfer of patent right

Effective date of registration: 20130426

Address after: 404100 Qijiang County Industrial Park, Chongqing

Patentee after: CHONGQING BIAOWANG MACHINERY EQUIPMENT CO., LTD.

Address before: 551700 Bijie prison, Bijie, Guizhou

Patentee before: Zhang Youde

Patentee before: He Kaizhi

EC01 Cancellation of recordation of patent licensing contract

Assignee: Qingdao Yuanzheng Steel Structure Co., Ltd.

Assignor: He Kaizhi|Zhang Youde

Contract record no.: 2011440020281

Date of cancellation: 20130904

LICC Enforcement, change and cancellation of record of contracts on the licence for exploitation of a patent or utility model