CN1829019B - Switchboard and manufacturing method thereof - Google Patents
Switchboard and manufacturing method thereof Download PDFInfo
- Publication number
- CN1829019B CN1829019B CN2005100939453A CN200510093945A CN1829019B CN 1829019 B CN1829019 B CN 1829019B CN 2005100939453 A CN2005100939453 A CN 2005100939453A CN 200510093945 A CN200510093945 A CN 200510093945A CN 1829019 B CN1829019 B CN 1829019B
- Authority
- CN
- China
- Prior art keywords
- vertical bus
- installation frame
- mentioned
- casing
- distribution board
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Patch Boards (AREA)
- Installation Of Bus-Bars (AREA)
Abstract
This invention is a distribution board comprising:Level busbars (4) for supplying power to case (2) that forms distribution board frame, vertical busbars (7) connected with the level busbars (4) and distribute the power to every functional unit (3) and vertical busbars packaging (5) formed by fixedly mounting a plurality of vertical busbars supports to preserve the vertical busbars (7). Encasing and fixing the vertical busbars packaging (5) inside the case (2) will obtain the distribution board that can do vertical busbars packaging outside the distribution board and advance packaging efficiency of vertical busbars.
Description
Technical field
The present invention relates to the distribution board and the manufacturing approach thereof of arranged perpendicular bus in casing.
Background technology
Figure 13 is a general principal view of representing the major part of distribution board in the past.Figure 14 is the cutaway view of the C-C line of Figure 13.Figure 13 is the figure expression is removed the functional unit 3 of its face side with vertical bus cover 11 after.In the casing 12 of distribution board, each functional unit 3 supply capability in order to pack into to vertical direction are configured in vertical direction with bus (vertical bus).When being fixed on vertical bus 7 assemblings in the casing 12, after installing and fixing a plurality of vertical bus supports 6 respectively on the installation frame 13 as the framework that constitutes casing 12, vertical bus is fixed on this each vertical bus support 6.In addition, distribution board of the same race is disclosed in patent documentation 1.
[patent documentation 1] Japanese Patent Laid is opened the 2001-69617 communique
In distribution board in the past, the installation frame 13 of vertical bus support 6 has been installed, for shared, vertical bus support 6 directly is assembled on the casing with the body structure member, then, vertical bus is installed on the casing.Therefore,, just can not carry out the assembling of vertical bus 7, make the operating efficiency variation if the casing of installing is not carried out.Owing in casing, assemble, occur in the operation of carrying out in the narrow space and operation property is poor again.
Summary of the invention
The present invention makes in order to address the above problem, and its purpose is, improves the assembling operation efficient of vertical bus.
Distribution board of the present invention has the horizontal bus 4 of supply capability in the casing 2 of the framework of formation dish and is connected with it and to the vertical bus 7 of each functional unit 3 electrical power distribution; The a plurality of vertical bus supports 6 that keep above-mentioned vertical bus 7 are fixed on the vertical bus assembly 5 that forms on the interior installation frame 8, make to above-mentioned casing 2 and pack into and fixing state.
Again; Above-mentioned vertical bus assembly 5; The upper end of the length direction of installation frame 8 in above-mentioned is fixed on the above-mentioned outer installation frame 9, and with the lower end of the length direction of above-mentioned interior installation frame 8 through movably descend to above-below direction installation frame 10 be fixed on above-mentioned outside on the installation frame 2a.
Again; The manufacturing approach of distribution board of the present invention; Horizontal bus 4 with supply capability in the casing 2 of the framework that constitutes distribution board be connected with it and to the vertical bus 7 of each functional unit 3 electrical power distribution; In a plurality of vertical bus supports 6 that will keep above-mentioned vertical bus 7 are fixed on the installation frame 8 and after constituting vertical bus assembly 5, make to above-mentioned casing 2 pack into above-mentioned vertical bus assembly 5 and fixing state.
In addition; Above-mentioned vertical bus assembly 5; The upper end of the length direction of installation frame 8 in above-mentioned is fixed on the above-mentioned outer installation frame 9, with the lower end of the length direction of above-mentioned interior installation frame 8 through movably descend to above-below direction installation frame 10 be fixed on above-mentioned outside on the installation frame 2a.
Adopt distribution board of the present invention and manufacturing approach thereof; Need be in the space of the casing of distribution board and can outside distribution board, the vertical bus assembly be assembled; Because the vertical bus assembly after will assembling is packed in the casing of the framework that constitutes distribution board, so can improve the assembling of vertical bus, the operating efficiency of packing into.Again and since the casing of vertical bus assembling physical efficiency and distribution board have or not irrespectively, carry out the assembling of vertical bus, so can make, year put and realize the high efficiency of assembling operation.
Description of drawings
Fig. 1 is the front view of the distribution board of expression example 1 of the present invention.
Fig. 2 is the cutaway view along the A-A line of Fig. 1.
Fig. 3 is the cutaway view along the B-B line of Fig. 1.
Fig. 4 is the exploded perspective view that expression is used for the vertical bus assembly of example 1.
Fig. 5 is the amplifier section stereogram of Fig. 4.
Fig. 6 is the exploded perspective view of the vertical bus assembly form of to casing in installing of expression after with assembling among Fig. 4.
Fig. 7 is the stereogram that expression is installed on the vertical bus assembly state in the casing.
Fig. 8 dissects the partial sectional view of state afterwards with the top of vertical bus assembly and casing with the D-D line in the presentation graphs 7 on the axis direction of vertical bus assembly.
Fig. 9 dissects the partial sectional view of state afterwards with the bottom of vertical bus assembly and casing with the E-E line in the presentation graphs 7 on the axis direction of vertical bus assembly.
Figure 10 is the partial sectional view that in the presentation graphs 7 pars intermedia of vertical bus assembly and casing is dissectd the back state with the F-F line pair and the section of the orthogonal axe of vertical bus assembly.
Figure 11 is with the front view after the vertical bus connection of horizontal bus and Fig. 7.
Figure 12 is the general profile chart of the distribution board of expression example 2.
Figure 13 is a general principal view of representing the major part of distribution board in the past.
Figure 14 is the cutaway view of the C-C line of Figure 13.
Embodiment
[example 1]
Fig. 1 is the front view of the distribution board of expression example 1 of the present invention.Fig. 2 is the cutaway view along the A-A line of Fig. 1.Fig. 3 is the cutaway view along the B-B line of Fig. 1.Among the figure, the casing 2 that distribution board 1 has the framework that constitutes distribution board carries a plurality of functional units 3 in the front and rear part of distribution board with installation.Again, distribution board 1 is for the horizontal bus 4 of back upper lateral part in the distribution board that is provided in supply power electric power and each functional unit 3 supply capability of front and rear part, has the vertical bus 7 of the zigzag of the electric conducting material that is provided in the distribution board central portion and uses copper aluminium etc.
For vertical bus 7, the vertical bus assembly 5 that is constituted on the installation frame 8 in a plurality of vertical bus supports 6 that keep vertical bus 7 are fixed on is packed into and is being fixed to the outer installation frame 2a of casing 2.Vertical bus assembly 5 utilizes vertical bus cover 11 and each functional unit 3 to isolate.Functional unit 3 utilizes the contact 3a that is arranged on its rear portion to be connected with vertical bus 7, accepts the supply of electric power, and on vertical bus cover 11, is provided with the square hole 11a that contact 3a passes through.
The vertical bus 7 of 3 phases is kept and with the vertical bus support 6 of required arranged spaced, utilize screw 6f to be installed in the metallic of 2 relative コ fonts of mutual direction on the installation frame 8 (with reference to Fig. 4, Fig. 5).Do like this, be assembled into vertical bus assembly 5.On interior installation frame 8, be provided with the screw (mounting part) of preparation and can different mechanical strengths change the interval that a plurality of vertical bus supports 6 are arranged easily according to the specification of every kind of distribution board with predetermined distance.Therefore, can make and carry by every kind of specification and put vertical bus assembly 5.In addition; Can vertical bus 7, vertical bus support 6 and interior installation frame 8 be made 1 assembly, promptly can not rely on casing 2 and make with the place beyond the casing 2, time in addition vertical bus assembly 5 being assembled through modularization.
Fig. 6 is an exploded perspective view of representing the vertical bus assembly 5 after the assembling among Fig. 4 is installed to form on the casing 2, and Fig. 7 is the stereogram that expression is installed on vertical bus assembly 5 state of casing 2.Fig. 8 dissects the partial sectional view of state afterwards with the top of vertical bus assembly 5 and casing 2 with the D-D line in the presentation graphs 7 on the axis direction of vertical bus assembly 5.Fig. 9 dissects the partial sectional view of state afterwards with the bottom of vertical bus assembly 5 and casing 2 with the E-E line in the presentation graphs 7 on the axis direction of vertical bus assembly 5.Figure 10 is the partial sectional view that in the presentation graphs 7 pars intermedia of vertical bus assembly 5 and casing 2 is dissectd the back state with the F-F line pair and the section of the orthogonal axe of vertical bus assembly 5.Figure 11 is with the front view after vertical bus 7 connections of horizontal bus 4 and Fig. 7.In addition, the wave among Fig. 8, Fig. 9 is because the cutting plane of vertical bus assembly 5 forms different, that represent easily in order to distinguish to some extent with the member of looking sideways to the direction of vertical bus assembly 5.
As shown in the figure, the vertical bus assembly 5 after the assembling is configured in the central authorities of the casing 2 of the state of laying across in advance.On casing 2, the central authorities in both sides are respectively equipped with the outer installation frame 2a of a part that constitutes casing 2.In addition, the outer installation frame 9 (with reference to Fig. 7, Fig. 8) of the section コ font of the part of formation casing 2 is fixed between the upper end of two outer installation frame 2a.The bottom of installation frame 2a outside two, the following installation frame 10 of section コ font (with reference to Fig. 7, Fig. 9), outside two, being configured between the installation frame 2a can be to the fixing selectively state in the position of above-below direction.
In addition; Following installation frame 10; Between the installation frame 2a, above-below direction is selected its position movably outside two, utilizes outer installation frame 9 to be mounted to the state (with reference to Fig. 7, Fig. 9) that sandwiches from upper and lower with following installation frame (scaffold) 10 vertical bus assembly 5.The lower end of vertical bus assembly 5 is carried in the left and right directions central authorities of the following installation frame 10 of section コ font and to be put at the upside of installation frame 10 down.And the outstanding flat installation sheet 23 (with reference to Fig. 5) from the lower ends downward side of the interior installation frame 8 of vertical bus assembly 5 makes up with the two sides of following installation frame 10, and with on the fastening two sides that are fixed on down installation frame 10 of bolt 22 (with reference to Fig. 9).Thus, the lower end of vertical bus assembly 5 is fixed on down on the installation frame 10, and following installation frame 10 is screwed on the outer installation frame 2a of the left and right sides.
That is to say that the lower end of vertical bus assembly 5 is installed in and can on the following installation frame 10 that above-below direction moves, be fixed on the outer installation frame 2a through this time installation frame 10.Like this, the outer installation frame 9 through will being installed in casing 2,2a, down on the installation frame 10, also reduce the operation in narrow space, can improve operation property by the vertical bus assembly 5 after the modularization.
Dispose vertical bus cover 11 in the front face side of vertical bus assembly 5 and back side, and on the outer installation frame 2a with multi-disc installation frame 8 and part of formation casing 2 vertical direction is fixed on screw in.In addition, in Figure 11, represent vertical bus cover 11 with chain-dotted line.Vertical bus cover 11 except will accepting square hole 11a that the contact 3a of the functional unit 3 that electric power supplies with inserts from vertical bus 7, can cover functional unit 3 and vertical bus 7.Through making such structure, when for example in functional unit 3, having an accident etc., also can reduce this accident impact vertical bus 7 and other functional unit 3.
[example 2]
Figure 12 is the general profile chart of the distribution board of expression example 2.In the explanation of example 1, the situation that vertical bus 7 is made zigzag is described, even but be shaped as flat vertical bus 7, also can play and the equal effect of above-mentioned situation.
Again; In the explanation of example 1; Utilization is described from the example that the front side and the rear side pushing supporting of vertical bus 7 becomes the state of sandwiching by vertical bus support 6 that a plurality of part constituted; Even but vertical bus 7 is bearing in the state of the vertical bus support 6 that is provided with the hole that connects vertical bus 7 in advance with connecting, also can play and the equal effect of above-mentioned situation.
Claims (3)
1. distribution board; Have: in the casing (2) of the framework that constitutes distribution board the horizontal bus (4) of supply capability be connected with it and to the vertical bus (7) of each functional unit (3) electrical power distribution; It is characterized in that; Keeping a plurality of vertical bus supports (6) of above-mentioned vertical bus (7) to be fixed on interior installation frame (8) goes up and constitutes vertical bus assembly (5); This vertical bus assembly (5) above-mentioned casing (2) and fixing of packing into; The upper end of the length direction of the above-mentioned interior installation frame (8) in the above-mentioned vertical bus assembly (5) is fixed on the outer installation frame (9) of a part that constitutes above-mentioned casing (2), and the lower end of the length direction of above-mentioned interior installation frame (8) is fixed on the above-mentioned outer installation frame (2a) through the following installation frame (10) of the position changeable of above-below direction.
2. distribution board as claimed in claim 1 is characterized in that, on the installation frame in above-mentioned (8), is provided with the mounting part to the preparation of a plurality of above-mentioned vertical bus supports (6), can a plurality of above-mentioned vertical bus supports (6) be installed by required spacing.
3. the manufacturing approach of a distribution board; This distribution board has: in the casing (2) of the framework that constitutes distribution board the horizontal bus (4) of supply capability be connected with it and to the vertical bus (7) of each functional unit (3) electrical power distribution; It is characterized in that; Be fixed on that interior installation frame (8) is gone up and after constituting vertical bus assembly (5) at a plurality of vertical bus supports (6) that will keep above-mentioned vertical bus (7); In above-mentioned casing (2), pack into above-mentioned vertical bus assembly (5) and fixedly the time; Above-mentioned vertical bus assembly (5) is fixed on the upper end of the length direction of installation frame (8) in above-mentioned on the outer installation frame (9) of a part that constitutes above-mentioned casing (2), and the lower end of length direction that will above-mentioned interior installation frame (8) is fixed on the above-mentioned outer installation frame (2a) through the following installation frame (10) of the position changeable of above-below direction.
Applications Claiming Priority (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2005054155A JP4726513B2 (en) | 2005-02-28 | 2005-02-28 | Switchboard and manufacturing method thereof |
JP2005054155 | 2005-02-28 | ||
JP2005-054155 | 2005-02-28 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN1829019A CN1829019A (en) | 2006-09-06 |
CN1829019B true CN1829019B (en) | 2012-02-29 |
Family
ID=36947214
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2005100939453A Expired - Fee Related CN1829019B (en) | 2005-02-28 | 2005-08-26 | Switchboard and manufacturing method thereof |
Country Status (2)
Country | Link |
---|---|
JP (1) | JP4726513B2 (en) |
CN (1) | CN1829019B (en) |
Families Citing this family (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101271370B1 (en) | 2012-02-24 | 2013-06-07 | (주)도스코 | A switchboard production system |
JP6217117B2 (en) * | 2013-04-09 | 2017-10-25 | 富士電機株式会社 | switchboard |
DE102013114105A1 (en) | 2013-12-16 | 2015-06-18 | Eaton Industries Austria Gmbh | Frame for a control cabinet with swiveling holders for distribution busbars as well as production processes for a control cabinet |
EP3151350A4 (en) * | 2014-05-29 | 2017-12-27 | Mitsubishi Electric Corporation | Bus line structure and distribution board using same |
JP2016046841A (en) * | 2014-08-20 | 2016-04-04 | 株式会社日立製作所 | Switch gear, switch gear group or assembly method for switch gear |
JP6407452B2 (en) * | 2015-11-30 | 2018-10-17 | 三菱電機株式会社 | DC distribution board and migration device |
JP6529672B2 (en) * | 2016-06-17 | 2019-06-12 | 三菱電機株式会社 | Switchboard assembly equipment and switchboard assembly method |
Family Cites Families (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS6192105A (en) * | 1984-10-09 | 1986-05-10 | 三菱電機株式会社 | Control center |
JPS6233603A (en) * | 1985-08-07 | 1987-02-13 | 三井建設株式会社 | Extrusion molding method of inorganic product |
JPH034085Y2 (en) * | 1985-08-15 | 1991-02-01 | ||
JPH11341614A (en) * | 1998-05-22 | 1999-12-10 | Mitsubishi Electric Corp | Bus unit and switchboard using it |
JP4301614B2 (en) * | 1998-12-14 | 2009-07-22 | 東芝Itコントロールシステム株式会社 | Closed switchboard busbar device |
JP2003134615A (en) * | 2001-10-19 | 2003-05-09 | Terasaki Electric Co Ltd | Low voltage distribution equipment |
-
2005
- 2005-02-28 JP JP2005054155A patent/JP4726513B2/en not_active Expired - Fee Related
- 2005-08-26 CN CN2005100939453A patent/CN1829019B/en not_active Expired - Fee Related
Non-Patent Citations (1)
Title |
---|
JP平11-341614A 1999.12.10 |
Also Published As
Publication number | Publication date |
---|---|
JP2006246547A (en) | 2006-09-14 |
CN1829019A (en) | 2006-09-06 |
JP4726513B2 (en) | 2011-07-20 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN100508316C (en) | Electrical junction box | |
AT513127B1 (en) | Electric energy storage | |
CN1829019B (en) | Switchboard and manufacturing method thereof | |
CN104051962A (en) | Electrical enclosure with improved mechanical arrangement | |
CN202406401U (en) | Outdoor cabinet having assembled structure | |
CN102257888A (en) | Electrical pack with separate control and power modules | |
US20020064976A1 (en) | Electrical junction box for a vehicle | |
CN214046404U (en) | Converter main control frame and converter | |
JP3130741U (en) | Connector and distribution board | |
CN214176174U (en) | Battery box for accommodating module | |
CN213691853U (en) | Grounding assembly of load switch | |
CN210468687U (en) | Low-voltage T-shaped connecting box | |
CN102231499B (en) | Distribution box | |
CN112492830A (en) | Main control frame of frequency converter | |
JP4301614B2 (en) | Closed switchboard busbar device | |
KR102169001B1 (en) | Battery module and battery package with the same | |
CN202009178U (en) | Section box | |
CN2411605Y (en) | Assemblied distribution cubicle frame | |
KR102679648B1 (en) | Multi fuse module | |
CN221176530U (en) | Battery module mounting structure reliable and convenient to connect | |
CN213424838U (en) | Capacitor module | |
CN216793934U (en) | Busbar support, busbar support assembly, battery pack and vehicle | |
CN219303877U (en) | Energy storage module | |
CN214450236U (en) | Battery module installation beam assembly, battery module installation structure and vehicle | |
CN218054868U (en) | Electric component support and electric assembly for lithium battery power battery pack |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20120229 Termination date: 20190826 |
|
CF01 | Termination of patent right due to non-payment of annual fee |