CN1818696A - 合成全工况试验装置双向阀单注入试验工作时序 - Google Patents

合成全工况试验装置双向阀单注入试验工作时序 Download PDF

Info

Publication number
CN1818696A
CN1818696A CN 200610064920 CN200610064920A CN1818696A CN 1818696 A CN1818696 A CN 1818696A CN 200610064920 CN200610064920 CN 200610064920 CN 200610064920 A CN200610064920 A CN 200610064920A CN 1818696 A CN1818696 A CN 1818696A
Authority
CN
China
Prior art keywords
valve
voltage
test
trigger
synthetic
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN 200610064920
Other languages
English (en)
Other versions
CN100429522C (zh
Inventor
汤广福
赵贺
朱家骝
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
China Electric Power Research Institute Co Ltd CEPRI
Original Assignee
China Electric Power Research Institute Co Ltd CEPRI
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Electric Power Research Institute Co Ltd CEPRI filed Critical China Electric Power Research Institute Co Ltd CEPRI
Priority to CNB2006100649205A priority Critical patent/CN100429522C/zh
Publication of CN1818696A publication Critical patent/CN1818696A/zh
Application granted granted Critical
Publication of CN100429522C publication Critical patent/CN100429522C/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Testing Of Individual Semiconductor Devices (AREA)

Abstract

一种合成全工况试验装置双向阀单注入试验工作时序,双向高压晶闸管阀运行试验的同步电压选择为大电流源输入电压,在不同运行方式和试验模式下的工作时序由同步信号确定;在双向串联高压晶闸管阀单注入电压试验模式下,主要由辅助阀和试品阀在工频周期内交替工作实现;试品阀和辅助阀工作时序如下:1、Vin为负,取负向同步电压,触发试品正向阀;2、Vin为正,取正向同步电压,触发辅助阀。在双向高压串联晶闸管阀单注入电压电流合成试验模式下,各个辅助阀和试品阀工作时序分为两个阶段:大电流阶段和高电源阶段。本发明所采用的同步信号具有通用性,工作时序满足双向高压串联晶闸管阀的运行试验要求。

Description

合成全工况试验装置双向阀单注入试验工作时序
技术领域
本发明涉及电力系统及电力电子系统当中对晶闸管阀进行合成全工况试验的技术,尤其是一种合成全工况试验装置双向阀单注入试验工作时序。
背景技术
随着电力电子技术在电力系统中应用的逐步推广,基于晶闸管串联均压技术的高压阀成为各种大功率电力电子装置的核心部件。例如静止无功补充装置(SVC)、晶闸管控制串联补偿器(TCSC)、高压直流输电技术(HVDC)等。而运行试验是关系到提高各种高压串联晶闸管阀设计和制造水平,提高其可靠性的重要试验手段。目前国际上普遍采用合成试验方法来进行晶闸管阀的运行试验。其基本思想是采用两套电源系统分别为晶闸管阀提供大电流和高电压强度,从而大大降低了电源容量。
合成全工况试验装置的运行方式有双向高压晶闸管阀单注入、双向高压晶闸管阀双注入、单向高压晶闸管阀单注入、单向高压晶闸管阀双注入四种运行方式,而每一种运行方式下,又存在着电压、电流和电压电流合成三种试验模式。在各种运行方式和试验模式之间,其工作时序存在一定的差异。
目前国内外尚未见到类似的有关合成试验装置同步与工作时序方面的技术专利。
发明内容
为了解决上述问题,本发明的目的是提供一种合成全工况试验装置双向阀单注入试验工作时序。
本发明解决其技术问题所采取的技术方案是:
本申请主要阐述双向高压晶闸管阀单注入合成试验同步与工作时序,其电压试验模式时,主要由V1阀和试品阀在工频周期内交替工作实现;而在电压电流合成试验模式下,分为一个工频周期的电压试验阶段和三个工频周期的电流试验阶段。
一种合成全工况试验装置双向阀单注入试验工作时序,针对双向高压晶闸管阀在单注入合成试验方式的工作时序进行设计:双向高压晶闸管阀运行试验的同步电压选择为大电流源输入电压,在不同运行方式和试验模式下的工作时序由同步信号确定;
在双向串联高压晶闸管阀单注入电压试验模式下,主要由辅助阀V1和试品阀VT在工频周期内交替工作实现;试品阀VT和辅助阀V1工作时序如下所述,双向晶闸管阀单注入电压试验模式下的同步处理与仿真波形分别如图1和2所示:
1、Vin为负,取负向同步电压,触发试品正向阀VT1
2、Vin为正,取正向同步电压,触发辅助阀V1
在双向高压串联晶闸管阀单注入电压电流合成试验模式下,分为一个工频周期的电压试验阶段和三个工频周期的电流试验阶段;各个辅助阀和试品阀工作时序和过程如下所述,其同步信号处理示意及试品阀上电压电流波形如图3和图4所示:
第一阶段:大电流阶段
1、Vin为负,取负向同步电压,触发VT反向阀,计数一次;
2、Vin为正,取正向同步电压,触发VT正向阀,计数一次;
3、如此往复,直至正向阀触发计数达到3次;
第二阶段:高电压阶段
4、在一个负向同步电压以内,触发试品VT正向阀;
5、Vin为正,取正向同步电压,触发V1阀;
6、回到大电流阶段,如此往复,完成这个合成试验的周期性触发与熄灭试验。
由于采用了上述的技术方案,本发明所具有的有益效果是:所采用的同步信号具有通用性,所设计的工作时序满足双向高压串联晶闸管阀的运行试验要求,对试验装置装置较为有利。
附图说明
图1是本发明的合成全工况试验装置双向阀单注入试验工作时序的双向高压串联晶闸管阀单注入电压试验模式同步信号处理示意图;
图2是本发明的合成全工况试验装置双向阀单注入试验工作时序的双向高压串联晶闸管阀单注入电压试验模式试品阀和辅助阀电压电流仿真波形;
图3本发明的合成全工况试验装置双向阀单注入试验工作时序的双向高压晶闸管阀单注入电压电流合成试验模式同步信号处理示意图;
图4是本发明的合成全工况试验装置双向阀单注入试验工作时序的双向高压串联晶闸管阀单注入电压电流合成试验模式试品阀电压电流波形。
具体实施方式
下面结合附图和实施例对本发明进一步说明。
在双向串联高压晶闸管阀单注入电压试验模式下,试品阀VT和辅助阀V1工作时序如下所述,双向晶闸管阀单注入电压试验模式下的同步处理与仿真波形分别如图1和2所示。
1、Vin为负,取负向同步电压,触发试品正向阀VT1
2、Vin为正,取正向同步电压,触发辅助阀V1
双向高压串联晶闸管阀单注入电压电流合成试验模式下,各个辅助阀和试品阀工作时序和过程如下所述,其同步信号处理示意及试品阀上电压电流波形如图3和图4所示。
第一阶段:大电流阶段
7、Vin为负,取负向同步电压,触发VT反向阀,计数一次;
8、Vin为正,取正向同步电压,触发VT正向阀,计数一次;
9、如此往复,直至正向阀触发计数达到3次;
第二阶段:高电压阶段
10、在一个负向同步电压以内,触发试品VT正向阀;
11、Vin为正,取正向同步电压,触发V1阀;
回到大电流阶段,如此往复,完成这个合成试验的周期性触发与熄灭试验。

Claims (1)

1、一种合成全工况试验装置双向阀单注入试验工作时序,针对双向高压晶闸管阀在单注入合成试验方式的工作时序进行设计,其特征是:双向高压晶闸管阀运行试验的同步电压选择为大电流源输入电压,在不同运行方式和试验模式下的工作时序由同步信号确定;
在双向串联高压晶闸管阀单注入电压试验模式下,主要由辅助阀V1和试品阀VT在工频周期内交替工作实现;试品阀VT和辅助阀V1工作时序如下所述:
1)Vin为负,取负向同步电压,触发试品正向阀VT1
2)Vin为正,取正向同步电压,触发辅助阀V1
在双向高压串联晶闸管阀单注入电压电流合成试验模式下,分为一个工频周期的电压试验阶段和三个工频周期的电流试验阶段;各个辅助阀和试品阀工作时序和过程如下所述:
第一阶段:大电流阶段
1)Vin为负,取负向同步电压,触发VT反向阀,计数一次;
2)Vin为正,取正向同步电压,触发VT正向阀,计数一次;
3)如此往复,直至正向阀触发计数达到3次;
第二阶段:高电压阶段
1)在一个负向同步电压以内,触发试品VT正向阀;
2)Vin为正,取正向同步电压,触发V1阀;
回到大电流阶段,如此往复,完成这个合成试验的周期性触发与熄灭试验。
CNB2006100649205A 2006-03-17 2006-03-17 合成全工况试验装置双向阀单注入试验控制方法 Active CN100429522C (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNB2006100649205A CN100429522C (zh) 2006-03-17 2006-03-17 合成全工况试验装置双向阀单注入试验控制方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNB2006100649205A CN100429522C (zh) 2006-03-17 2006-03-17 合成全工况试验装置双向阀单注入试验控制方法

Publications (2)

Publication Number Publication Date
CN1818696A true CN1818696A (zh) 2006-08-16
CN100429522C CN100429522C (zh) 2008-10-29

Family

ID=36918789

Family Applications (1)

Application Number Title Priority Date Filing Date
CNB2006100649205A Active CN100429522C (zh) 2006-03-17 2006-03-17 合成全工况试验装置双向阀单注入试验控制方法

Country Status (1)

Country Link
CN (1) CN100429522C (zh)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101187690B (zh) * 2007-11-28 2010-06-02 中国电力科学研究院 直流换流阀恢复期间瞬时正向电压试验的方法
CN101753001B (zh) * 2009-12-23 2012-02-29 中国电力科学研究院 一种半导体阀触发时序的同步切换方法
CN102692542A (zh) * 2012-05-04 2012-09-26 中电普瑞电力工程有限公司 一种短路电流试验装置中辅助阀的触发方法

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1461088A (zh) * 2003-06-12 2003-12-10 清华大学 用于链式静止同步补偿器直流电压平衡控制的双向变换器
CN1306677C (zh) * 2003-07-25 2007-03-21 清华大学 链式静止同步补偿器的分层分布式监测系统

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101187690B (zh) * 2007-11-28 2010-06-02 中国电力科学研究院 直流换流阀恢复期间瞬时正向电压试验的方法
CN101753001B (zh) * 2009-12-23 2012-02-29 中国电力科学研究院 一种半导体阀触发时序的同步切换方法
CN102692542A (zh) * 2012-05-04 2012-09-26 中电普瑞电力工程有限公司 一种短路电流试验装置中辅助阀的触发方法

Also Published As

Publication number Publication date
CN100429522C (zh) 2008-10-29

Similar Documents

Publication Publication Date Title
CN106838432B (zh) 一种电控单体泵电磁阀驱动电路及其控制方法
CN102922270B (zh) 电气端子排自动拧螺丝机
CN1818696A (zh) 合成全工况试验装置双向阀单注入试验工作时序
CN204249268U (zh) 一种对模内塑胶件自动取出装置
CN101539061A (zh) 一种基于工控机的内燃机电控开发系统
CN101393242B (zh) 高压直流输电换流阀单注入试验方法
CN1869728A (zh) 电源设备老化试验方法及装置
CN203390799U (zh) 一种机油泵泵体夹具
CN101162252B (zh) 高压直流输电换流阀三注入试验方法
CN203602243U (zh) 双动力液压抓料机
CN204905982U (zh) 商用车双电压混合电源系统
CN1818697A (zh) 高压串联晶闸管阀单注入合成试验方法
CN1258880C (zh) 薄栅氧化层的低功耗自恢复的电平移位栅电压控制电路
CN101028826A (zh) 一种混挂车列自动计量参数切换方法
CN1818813A (zh) 便携式汽车发动机电子模拟装置
CN1848093A (zh) 基本输入输出系统中高级配置和电源接口模块的调试方法
CN1786728A (zh) 一种测试ups控制单元的方法和装置
CN202789374U (zh) 一种注射泵
CN200962522Y (zh) 片上系统芯片供电装置
CN102486526B (zh) 一种高压直流输电换流阀最小触发角运行试验方法
CN2765396Y (zh) 实现逻辑电压转换的装置
CN204241928U (zh) 油门控制系统逻辑信号转换模块
CN204145137U (zh) 电机支架
CN218016985U (zh) 一种可注射螺丝胶和锁附螺丝的设备
CN1207502C (zh) 流体系统数字化的脉冲数字流传动、控制方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
EE01 Entry into force of recordation of patent licensing contract

Assignee: China-EPRI Electric Power Engineering Co., Ltd.

Assignor: China Electric Power Research Institute

Contract record no.: 2011990000573

Denomination of invention: Two-way valve working sequence with single pouring of synthetic work condition experimental device

Granted publication date: 20081029

License type: Exclusive License

Open date: 20060816

Record date: 20110708

ASS Succession or assignment of patent right

Owner name: STATE ELECTRIC NET CROP.

Effective date: 20130225

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20130225

Address after: 100085 Beijing city Haidian District Qinghe small Camp Road No. 15

Patentee after: China Electric Power Research Institute

Patentee after: State Grid Corporation of China

Address before: 100085 Beijing city Haidian District Qinghe small Camp Road No. 15

Patentee before: China Electric Power Research Institute