CN1818217A - Waterstone-polishing grounding brick with imitated granite and machining method thereof - Google Patents

Waterstone-polishing grounding brick with imitated granite and machining method thereof Download PDF

Info

Publication number
CN1818217A
CN1818217A CN 200610033299 CN200610033299A CN1818217A CN 1818217 A CN1818217 A CN 1818217A CN 200610033299 CN200610033299 CN 200610033299 CN 200610033299 A CN200610033299 A CN 200610033299A CN 1818217 A CN1818217 A CN 1818217A
Authority
CN
China
Prior art keywords
surface layer
polishing
waterstone
brick
grounding
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN 200610033299
Other languages
Chinese (zh)
Inventor
卢应祺
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 200610033299 priority Critical patent/CN1818217A/en
Publication of CN1818217A publication Critical patent/CN1818217A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Road Paving Structures (AREA)

Abstract

A pavement brick comprises top layer and bottom layer. The bottom layer is composed by 15-35 wt% cement, 15-35 wt% sand and 30-50 wt% stone particles. The top layer is composed by 15-35 wt% white cement, 30-50 wt% stone particles, 15-35 wt% sand and 0.5-5% brightener. At production, first blend the materials of the top and bottom layer separately. Pave the bottom layer material into the mold then to the top the top layer material. Take off the mold after 24-48 hours then leave it for 20 to 30 days. Finally polish the surface.

Description

A kind of waterstone-polishing grounding brick with imitated granite and processing method thereof
Technical field
The present invention relates to a kind of floor tile, refer in particular to a kind of waterstone-polishing grounding brick with imitated granite that is used for the sidewalk, the invention still further relates to the processing method of this floor tile.
Background technology
The sidewalk on highway both sides is emphasis of urban municipal construction, should guarantee pedestrian's walking safety, and is attractive in appearance again, durable, can play the effect of beautifying urban environment.At present, widely usedly change, be to adopt slag to make coloredly, exists intensity low, the deficiency of not wear-resisting, easy fracture damage.
Summary of the invention
A kind of waterstone-polishing grounding brick with imitated granite that the purpose of this invention is to provide a kind of intensity height, wear-resisting, long service life.
Further purpose of the present invention provides the processing method of the simple above-mentioned floor tile of a kind of technology.
Last purpose of the present invention is achieved in that a kind of waterstone-polishing grounding brick with imitated granite, is to be made of bottom and the surface layer that covers bottom surface, and wherein said bottom is to be made of cement 15~35%, sand 15~35% and chicken girt 30~50%; Surface layer is made up of white cement 15~35%, chicken girt 30~50%, sand 15~35% and brightener 0.5~5%; Above-mentioned percentage is weight percentage.
Back of the present invention one purpose is achieved in that a kind of processing method of waterstone-polishing grounding brick with imitated granite, comprises the steps: that (1) adds bottom batching, surface layer batching respectively in an amount of water and mixes in proportion; (2) lay underlying material earlier at mold bottom, then at underlying material top paved surface layered material; The demoulding after (3) 24~48 hours, and maintenance 20 to 30 days; (4) surface layer is carried out grinding process promptly.
Floor tile of the present invention has following advantage:
(1) than present widely used slag floor tile intensity height, average rupture strength C fReach 5.65MPa.
(2) abrasion resistance is good: mill hole length is less than 21.2mm.
(3) water absorption rate is less than 5.0%.
Description of drawings
Below in conjunction with in the accompanying drawing and embodiment the present invention is described in further detail, but do not constitute any limitation of the invention.
Fig. 1 is the structural representation of floor tile of the present invention.
The specific embodiment
Consult shown in Figure 1ly, waterstone-polishing grounding brick with imitated granite of the present invention is to be made of bottom and the surface layer 2 that covers bottom 1 surface, and bottom 1 is by percentage by weight: cement 15~35%, husky 15~35% and chicken girt 30~50% constitute; Surface layer 2 is by percentage by weight: white cement 15~35%, chicken girt 30~50%, husky 15~35% and brightener 0.5~5% form.
The processing method of waterstone-polishing grounding brick with imitated granite of the present invention comprises the steps: that (1) adds bottom batching, surface layer batching respectively in an amount of water and mixes in proportion; (2) lay underlying material earlier at mold bottom, then at underlying material top paved surface layered material; The demoulding after (3) 24~48 hours, and maintenance 20 to 30 days; (4) surface layer is carried out grinding process promptly.
Embodiment 1
Bottom raw material proportioning: 140 kilograms of cement, husky 140 kilograms, chicken girt 120 kg
Surface layer raw material proportioning: 35 kilograms of white cements, 30 kilograms of chicken girts, 35 kilograms in sand, 0.5 kilogram of brightener
Processing method: above-mentioned bottom, surface layer raw material and an amount of water are mixed, then the bottom raw material is laid in the metal die of 40 * 40 * 5cm, and mechanical pudding, laying depth is about 4cm, lays the surface layer raw material then on the bottom raw material, floating after the mechanical pudding, the about 1cm of thickness, the demoulding after 48 hours, maintenance is after 25 days, to smooth smooth getting final product, warehouse-in is packed in the check back with levigator polishing surface course.
Embodiment 2
Bottom raw material proportioning: 60 kilograms of cement, 140 kilograms in sand, 200 kilograms of chicken girts
Surface layer raw material proportioning: 15 kilograms of white cements, 50 kilograms of chicken girts, 35 kilograms in sand, 5 kilograms of brighteners
Processing method: above-mentioned bottom, surface layer raw material and an amount of water are mixed, then the bottom raw material is laid in the metal die of 40 * 40 * 5cm, and mechanical pudding, laying depth is about 4cm, lays the surface layer raw material then on the bottom raw material, floating after the mechanical pudding, the about 1cm of thickness, the demoulding after 24 hours, maintenance is after 20 days, to smooth smooth getting final product, warehouse-in is packed in the check back with levigator polishing surface course.
Embodiment 3
Bottom raw material proportioning: 200 kilograms of cement, 200 kilograms in sand, 300 kilograms of chicken girts
Surface layer raw material proportioning: 50 kilograms of white cements, 75 kilograms of chicken girts, 50 kilograms in sand, 2 kilograms of brighteners
Processing method: above-mentioned bottom, surface layer raw material and an amount of water are mixed, then the bottom raw material is laid in the metal die of 40 * 40 * 5cm, and mechanical pudding, laying depth is about 4cm, lays the surface layer raw material then on the bottom raw material, floating after the mechanical pudding, the about 1cm of thickness, the demoulding after 48 hours, maintenance is after 30 days, to smooth smooth getting final product, warehouse-in is packed in the check back with levigator polishing surface course.
Above-mentioned floor tile detects by JC/T446-2000 " rigid pavement commentaries on classics ", and the result is as follows:
Rupture strength C f: average 5.65MPa
Monolithic minimum value 5.35MPa
Abrasion resistance: mill hole length 21.2mm
Water absorption rate: 5.0%.

Claims (2)

1. waterstone-polishing grounding brick with imitated granite is to be made of bottom (1) and the surface layer (2) that covers bottom (1) surface, it is characterized in that described bottom be by cement 15~35%, husky 15~35% and chicken girt 30~50% constitute; Surface layer is made up of white cement 15~35%, chicken girt 30~50%, sand 15~35% and brightener 0.5~5%; Above-mentioned percentage is weight percentage.
2. the processing method of the described waterstone-polishing grounding brick with imitated granite of claim 1 is characterized in that comprising the steps: that (1) adds bottom batching, surface layer batching respectively in an amount of water and mixes in proportion; (2) lay underlying material earlier at mold bottom, then at underlying material top paved surface layered material; The demoulding after (3) 24~48 hours, and maintenance 20 to 30 days; (4) surface layer is carried out grinding process promptly.
CN 200610033299 2006-01-24 2006-01-24 Waterstone-polishing grounding brick with imitated granite and machining method thereof Pending CN1818217A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200610033299 CN1818217A (en) 2006-01-24 2006-01-24 Waterstone-polishing grounding brick with imitated granite and machining method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200610033299 CN1818217A (en) 2006-01-24 2006-01-24 Waterstone-polishing grounding brick with imitated granite and machining method thereof

Publications (1)

Publication Number Publication Date
CN1818217A true CN1818217A (en) 2006-08-16

Family

ID=36918392

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200610033299 Pending CN1818217A (en) 2006-01-24 2006-01-24 Waterstone-polishing grounding brick with imitated granite and machining method thereof

Country Status (1)

Country Link
CN (1) CN1818217A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101234879B (en) * 2007-01-30 2010-06-16 广州市坚基环保数码彩砖有限公司 Magic color surface encaustic brick and preparation method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101234879B (en) * 2007-01-30 2010-06-16 广州市坚基环保数码彩砖有限公司 Magic color surface encaustic brick and preparation method

Similar Documents

Publication Publication Date Title
CN1123546C (en) Building material and its producing method
CN1231427C (en) Metal rubber concrete and its preparing process
CN102433819A (en) Semi-flexible structure permeable street and pavement method thereof
CN104803636B (en) Process for regeneration of ore leftovers
CN104291752B (en) A kind of artificial stone and production method thereof with natural gloss
CN1745218A (en) Composite shaped block
KR101012968B1 (en) Non-slip panel by using bottom ash aggregate and method of manufact- uring for the same
KR102372063B1 (en) Method of manufacturing permeable block and the permeable block thereby
CN1818217A (en) Waterstone-polishing grounding brick with imitated granite and machining method thereof
JPH0532444A (en) Water-permeable block for pavement
CN201314052Y (en) Concrete inspection well cover for landscape type simulation stone surface layer
CN1598151A (en) Road surface structure of rolled press polymer modified cement concrete and its constructure method
CN204826468U (en) Environment -friendly perron
KR20060105944A (en) Method for making a multi-layer pavement with crushed concrete block
CN104878672A (en) Stone-planted cement concrete bridge deck paving structure and method
CN1884696A (en) Simple road building method
CN211848691U (en) Clear water concrete sidewalk
Ovchinnikov et al. Composite materials based on polysturctural integration of heterogeneous materials
Sadek et al. UTILIZATION OF SOLID WASTES IN CEMENT BRICKS FOR AN ENVIRONMENTAL BENEFICIAL.
CN2871620Y (en) Permeable concrete tiles on pavement
CN1170036C (en) Road bed without reflected cracks on asphalt pavement and its building method
CN201485770U (en) Antiskid concrete modular brick
KR20060101703A (en) The construction method of the playground floor for children
CN221053077U (en) Prefabricated multi-level millstone ground
GB2495591A (en) Stone Paving construction having a hydraulically bound mixture in the base layer

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication