CN1789563A - 预应力后张法灌浆质量控制系统 - Google Patents

预应力后张法灌浆质量控制系统 Download PDF

Info

Publication number
CN1789563A
CN1789563A CN 200410104083 CN200410104083A CN1789563A CN 1789563 A CN1789563 A CN 1789563A CN 200410104083 CN200410104083 CN 200410104083 CN 200410104083 A CN200410104083 A CN 200410104083A CN 1789563 A CN1789563 A CN 1789563A
Authority
CN
China
Prior art keywords
grouting
pressure
proportion
grouting quality
control system
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN 200410104083
Other languages
English (en)
Inventor
刘其伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 200410104083 priority Critical patent/CN1789563A/zh
Publication of CN1789563A publication Critical patent/CN1789563A/zh
Pending legal-status Critical Current

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

在目前预应力构件后张法施工中,工人大多凭经验施工,没有相关的仪器控制灌浆过程。本发明的目的是主要通过灌浆压力和出浆浓度(比重)指标来监控灌浆施工,使规范要求的灌浆稳压强度、时间以及出浆浓度有准确的控制,从而保证灌浆质量。

Description

预应力后张法灌浆质量控制系统
本发明涉及到土木工程行业中预应力构件后张法施工,是一种控制灌浆质量的设备。
《公路桥涵施工技术规范》JTJ 041-89第11.9.7条:“压浆应使用活塞式压浆泵,不得使用压缩空气。压浆的最大压力一般宜为0.5~0.7MPa;当输浆管道较长或采用一次压浆时,应适当加大压力。梁体竖向预应力钢材孔道的压浆最大压力可控制在0.3~0.4MPa。每个孔道压浆至最大压力后,应有一定的稳压时间。压浆应达到孔道另一端饱满和出浆,并应达到排气孔排出与规定稠度相同的水泥浆为止。”针对规范的要求,在实际施工中有些指标不易控制。比如,规范要求“当输浆管道较长或采用一次压浆时,应适当加大压力”,此要求没有量的标准,在实际施工中没有积累丰富的经验就难以控制。另外,规范又要求“压浆应达到孔道另一端饱满和出浆,并应达到排气孔排出与规定稠度相同的水泥浆为止”,这一项要求需要以量的控制才能保证灌浆的质量。
在后张预应力混凝土桥梁中,在预应力筋张拉到设计吨位后孔道必须灌浆,将孔道填充密实。一般认为,灌浆有如下作用:(1)作为空隙填料,将预应力孔道填实;(2)作为粘结料,将预应力筋与混凝土粘结起来使其成为有机整体,同时,当桥上有荷载时,预应力筋上的受力更均匀地传递给混凝土结构;(3)防止钢筋锈蚀,灌浆作为防止预应力筋锈蚀的最后一道屏障,在保证桥梁的整体安全方面起着极为重要的作用。如果灌浆不密实,就会留有孔隙,孔隙中滞留的水份将使预应力筋锈蚀。因此,灌浆是否能够有效地发挥作用,取决于两个方面:一是组成灌浆混合料的物理、化学特性;另一个方面则是施工时灌浆的注人方法以及对施工质量的控制。在实际施工中,工人大多凭经验施工,没有相关的仪器控制很难保证施工的质量。从现有已经损坏的预应力桥梁分析看,灌浆质量不过关是引起结构破坏的罪魁祸首。特别是施工中压浆不足,水泥不能充满整个孔道,使得水泥浆没有把预应力筋完全包裹,部分预应力筋裸露在空气中产生锈蚀。另外预应力孔道中有无法排除的水分直接与预应力筋接触而造成锈蚀。由于稀浆混合料注入后没有一项切实可行的事后无损检测方法,因而控制灌浆过程是保证施工质量的唯一手段。
在目前施工中,工人大多凭经验施工,没有相关的仪器控制灌浆过程。本发明的目的是主要通过压力和浓度(比重)传感器来监控灌浆施工,使规范要求的灌浆稳压强度、时间以及出浆浓度有准确的控制,从而保证灌浆质量。
如图(1)所示为本发明的工作功能结构图。
在预应力后张法孔道压浆过程中,把本发明的压力传感器和比重传感器放置在出浆口。灰浆流过压力和比重传感器时,传感器把压力和比重信号传递到控制系统处理中心进行处理。当压力值超出规范所规定的范围时,控制系统给出不同的报警信号以提示施工人员进行相应的施工操作。当出浆浓度合格时,报警器报警以提示施工人员进行相应的施工操作。同时本发明还能够显示灌浆瞬时压力和出浆浓度。
图(2)所不为本发明的工作电路结构图。
本发明主要组成为:压力传感器[1]、比重传感器[2]、信号处理电路[3]、A/D转换装置[4]、单片机[5]、掉电保护存储器[6]、键盘[7]、报警器[8]、比重LCD数码管[9]、压力LCD数码管[10]。
本发明在预应力后张法灌浆过程中的灰浆压力和浓度是这样进行检测和控制的:当混凝土灰浆流经压力传感器[1]和比重传感器[2]时产生压力和浓度电量信号,此电量信号经过信号处理电路[3]进行运放等一系列处理,然后输送到A/D转换装置[4]对信号进行模数转换,接着转换后的数字信号被输送到单片机MCU[5]进行处理。由单片机[5]对压力LCD数码管[10]和比重LCD数码管[9]进行控制,进而通过压力LCD数码管[10]显示流经压力传感器[1]的灰浆瞬时压力,通过比重LCD数码管[9]显示流经比重传感器[2]的灰浆瞬时浓度。由单片机[5]控制报警器[8]进行预先设置的报警极限进行报警。报警器报警的内容为:低于最小灌浆压力报警,高于最大灌浆压力报警,出浆合格浓度报警。根据实际情况,报警范围可能需要进行调整,为此系统内增加一个掉电保护存储器[6]和薄膜键盘[7]:通过薄膜键盘[7]进行改写报警极限值以及实现其他功能操作,在掉电保护存储器[6]内存放报警值。
图(1)和图(2)也是本发明的一实施例。图(2)中元器件[1]到[10]是向不同的厂家购买的,然后通过电路设计、单片机编程以及最终的调试而发明预应力后张法灌浆质量控制系统。
从结构的使用的角度看,安全是放在第一位。在桥梁结构中,预应力结构的使用比较普遍。近年来,全国各地出现的一些桥梁垮塌事件在社会上造成了恶劣的影响。这些桥梁的垮塌不仅有设计的原因,而且施工上也存在着严重的质量问题,因此从控制施工质量入手,保证人民生命财产的安全显得尤为重要。本发明能够按照施工规范控制灌浆施工过程中的灰浆压力和比重技术指标,避免了人为因素对施工质量的影响,能够有效的提高灌浆的密实度,从而保证了结构的正常使用和耐久性能,进而产生广泛的社会经济效益。

Claims (2)

1、本发明涉及到土木工程行业中预应力构件后张法施工,是一种控制灌浆质量的设备:预应力后张法灌浆质量控制系统。
在预应力构件后张法灌浆过程中,通过监控灌浆过程中的灰浆压力和出浆比重来达到控制灌浆质量的目的。本发明的主要组成以及电路结构图为附图(2)所示:压力传感器[1]、比重传感器[2]、信号处理电路[3]、A/D转换装置[4]、单片机[5]、掉电保护存储器[6]、键盘[7]、报警器[8]、比重LCD数码管[9]、压力LCD数码管[10]。
2、按照权利要求1所述的预应力后张法灌浆质量控制系统,其特征在于在预应力构件后张法施工中通过控制和监测灌浆压力和出浆浓度(比重),使《公路桥涵施工技术规范》要求的灌浆稳压强度、时间以及出浆浓度有准确的控制,从而保证灌浆质量。
CN 200410104083 2004-12-15 2004-12-15 预应力后张法灌浆质量控制系统 Pending CN1789563A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200410104083 CN1789563A (zh) 2004-12-15 2004-12-15 预应力后张法灌浆质量控制系统

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200410104083 CN1789563A (zh) 2004-12-15 2004-12-15 预应力后张法灌浆质量控制系统

Publications (1)

Publication Number Publication Date
CN1789563A true CN1789563A (zh) 2006-06-21

Family

ID=36787662

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200410104083 Pending CN1789563A (zh) 2004-12-15 2004-12-15 预应力后张法灌浆质量控制系统

Country Status (1)

Country Link
CN (1) CN1789563A (zh)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103485268A (zh) * 2013-10-01 2014-01-01 曾胜 一种公路信息化智能注浆系统

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103485268A (zh) * 2013-10-01 2014-01-01 曾胜 一种公路信息化智能注浆系统
CN103485268B (zh) * 2013-10-01 2015-07-22 曾胜 一种公路信息化智能注浆系统

Similar Documents

Publication Publication Date Title
CN109858179B (zh) 钢筋砼受弯梁抗剪承载力计算方法
Dhouibi et al. The application of electrochemical impedance spectroscopy to determine the long-term effectiveness of corrosion inhibitors for steel in concrete
CN112095596B (zh) 基于云平台的边坡预应力锚杆智能化监测预警系统及方法
Gupta et al. Laboratory investigation and modeling of concrete pavements containing AOD steel slag
CN101694101B (zh) 预应力锚索锚固状态综合检测方法
CN1789563A (zh) 预应力后张法灌浆质量控制系统
KR20110125015A (ko) 강섬유 보강에 의한 순환골재 콘크리트 조성물
Marlay Hardened concrete properties and durability assessment of high volume fly ash concrete
Hartt et al. Corrosion Forecasting and Failure Projection of Post-Tensioned Tendons in Deficient Cementitious Grout
Dasar et al. Recovery In Mix Potential And Polarization Resistance Of Steel Bar In Cement Hardened Matrix During Early Age Of 6 Months-Sea-Water Mixed Mortar And Cracked Concrete
CN114720039A (zh) 一种测量精轧螺纹钢锚下有效预应力的方法
Koteš et al. Influence of reinforcement corrosion on moment and shear resistance in time of RC bridge girder
Koteng Concrete use for sustainable development
Thomas The effects of air content, water-cement ratio, and aggregate type on the flexural fatigue strength of plain concrete
CN209784063U (zh) 预应力钢筋应力状态分析仪
Yunusa The importance of concrete mix design (Quality control measure)
Rao et al. An experimental study on flexural strength and corrosion properties of reinforced concrete beams
Desnerck et al. Assessment of reinforced concrete half-joint structures: dealing with deterioration
Mostofinejad et al. Enhancing concrete durability with polymer impregnation: A comparative study of corrosion and freeze-thaw resistance
Dhir et al. PFA concrete: influence of simulated in situ curing on elasto-plastic load response
CN208921014U (zh) 一种预制混凝土构件收光面保护层厚度检测工具
Fagbohum et al. Determining the Effect of Water Quality On The Strength Of Concrete Using Water Samples from Ureje River, Ado-Ekiti, Ekiti State, Nigeria.
Da Silva Effect of concrete strength on axial load response of circular columns
Becker Investigation of Concrete Pumping Effects on Air-Entrained Concrete
Trivedi et al. A Review on corrosion of steel reinforced in cement concrete

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication