CN1787134A - Tech. for impregnating varnish of half packed 10KV grade high voltage coil - Google Patents

Tech. for impregnating varnish of half packed 10KV grade high voltage coil Download PDF

Info

Publication number
CN1787134A
CN1787134A CN 200510123021 CN200510123021A CN1787134A CN 1787134 A CN1787134 A CN 1787134A CN 200510123021 CN200510123021 CN 200510123021 CN 200510123021 A CN200510123021 A CN 200510123021A CN 1787134 A CN1787134 A CN 1787134A
Authority
CN
China
Prior art keywords
button
open
pressurization
close
impregnating
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN 200510123021
Other languages
Chinese (zh)
Other versions
CN1787134B (en
Inventor
孙海峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Electric Equipment Group Jiangsu Co Ltd
Original Assignee
China Electric Equipment Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Electric Equipment Group Co Ltd filed Critical China Electric Equipment Group Co Ltd
Priority to CN 200510123021 priority Critical patent/CN1787134B/en
Publication of CN1787134A publication Critical patent/CN1787134A/en
Application granted granted Critical
Publication of CN1787134B publication Critical patent/CN1787134B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Application Of Or Painting With Fluid Materials (AREA)

Abstract

The invention is a process for dip-painting a semi-enveloped 10KV-level high voltage coil and comprising the steps of: taking off the cover of a dip-painting tank, stably and vertically lifting the qualified coil into a lining tank, and putting on and fastening the cover; vacuumizing to 100 Pa below; transporting the dipping paint from a storage tank into the dip-painting tank; as vacuumizing to 600 Pa, closing the vacuumizing button; as pressurizing to 0.55 MPa, closing the pressurizing button; closing the vacuumizing button; as pressurizing to 0.55 MPa, closing the pressurizing button; closing the vacuumizing button; as pressurizing to 0.55 MPa, closing the pressurizing button; depressurizing to 0.2 MPa; opening and closing the paint transporting value; pushing the coil into an oven and waiting until curing. The advantages: it can fill solvent-free insulating dipping paint in the SCRB10 semi- enveloped high voltage coil, so as to achieve the effect of low local discharge, even no local discharge.

Description

Partly seal 10KV level high-tension coil paint-dipping process
Technical field
What the present invention relates to is a kind of solvent-free insulated impregnating varnish to be full of the half-packaging high-voltage coil internal voids, reduce coil inside office high-volume to reach, even reach no office and put the SGRB10 of requirement (a kind of national standard model of transformer) and partly seal the extraordinary paint-dipping process of 10KV level high-tension coil, belong to the high pressure multi-layer cylinder formula coil paint-dipping process technology neighborhood of transformer.
Background technology
At present, the high pressure disc coil of SG10 dry-type transformer all adopts vacuum pressure impregnation technology, and concrete processing step is specific as follows:
1, opens the dipping lacquer cover, qualified coil is steadily vertically hung in the lining jar.Cover and fastening dipping lacquer cover; 2, opening vacuum pump vacuumizes impregnating vessel; 3, close vacuum pump during for 600pa when vacuum degree, and kept this state about 30 minutes; 4, open defeated lacquer valve, the solvent-free paint in the storage paint can is transported in the impregnating vessel,, close defeated lacquer valve when the solvent-free paint height exceeds coil 50mm~100mm; 5, opening vacuum pump vacuumizes impregnating vessel; 6, close vacuum pump during for 600pa when vacuum degree, and kept this state 30 minutes; 7, impregnating vessel is pressurizeed (dry compressed air), when being forced into 0.5Mpa, close vacuum pump, and kept this state 30 minutes; 8, impregnating vessel is carried out the pressure release first time, when making the pressure of impregnating vessel reduce to 0.2Mpa, stop pressure release,, the solvent-free paint in the impregnating vessel is got back in the storage paint can by the pressure of 0.2Mpa; 9, in the lining jar of impregnating vessel coil is dripped lacquer, the time is 30 minutes; 10, impregnating vessel is carried out complete pressure release, open the dipping lacquer cover, will soak the pallet that good coil hung out and gently put into coil vertically, stably, wait for and solidifying.The high pressure disc coil of SGB10 dry-type transformer is a cake formula structure, and the sensible solvent-free insulated impregnating varnish of above process implementing is easy to infiltrate through coil inside, the coil inside space is filled up, thereby reduced partial discharge, even reach no office and put requirement.Yet because SGRB10 partly seals 10KV level high-tension coil structure is the multi-layer cylinder formula, the number of plies of coil is more, and use filling insulating material between layer and the layer, cause interlayer comparatively closely and with less air gap, if the paint-dipping process of SGRB10 half-packaging high-voltage coil is pressed the vacuum pressure impregnation technology of SGB10 dry-type transformer and is carried out, will cause solvent-free insulated impregnating varnish can not fill up the air gap of SGRB10 half-packaging high-voltage coil inside (by test, impregnating varnish fill up approximately coil 1/3), make the office of transformer put increase (be about national standard hundreds of times).
Summary of the invention
The objective of the invention is to defective at above-mentioned existence, propose a kind of SGRB10 and partly seal the extraordinary paint-dipping process of 10KV level high-tension coil, can make solvent-free insulated impregnating varnish be full of SGRB10 half-packaging high-voltage coil inside, put even do not have the effect that office puts to reach low innings.
Technical solution of the present invention: SGRB10 partly seals the extraordinary paint-dipping process of 10KV level high-tension coil, vacuum pouring technology and open type SG10 transformer vacuum pressure impregnation technology in conjunction with epoxy SC transformer coil, vacuumize and pressurized treatments by circulation, make solvent-free insulated impregnating varnish be full of SGRB10 and partly seal 10KV level high-tension coil, its processing step branch
1, opens the dipping lacquer cover, qualified coil is steadily vertically hung in the lining jar.Cover and fastening dipping lacquer cover;
2, open the button of finding time, impregnating vessel is vacuumized, be evacuated to below the 100Pa, and keep vacuum degree at 100Pa and waited for the 100Pa vacuum 2 hours;
3, beat in defeated lacquer valve, the impregnating varnish in the storage tank is transported in the impregnating vessel.Transport to 200~300mm place, coil top when impregnating varnish, close defeated lacquer valve, notice that the defeated lacquer time must remain between 55~65 minutes;
4, open the button of finding time, impregnating vessel is vacuumized, close the button of finding time when being evacuated to 600Pa, and kept the 600Pa vacuum 0.5 hour;
5, pressurization 1.: open the pressurization button, impregnating vessel is pressurizeed.When being forced into 0.55MPa, close the pressurization button, and kept this state 2 hours;
6, open the button of finding time, impregnating vessel is vacuumized, close the button of finding time when being evacuated to 600Pa, and kept the 600Pa vacuum 30 minutes;
7, pressurization 2.: open the pressurization button, impregnating vessel is pressurizeed.When being forced into 0.55MPa, close the pressurization button, and kept this state 1 hour;
8, open the button of finding time, impregnating vessel is vacuumized, close the button of finding time when being evacuated to 600Pa, and kept the 600Pa vacuum 30 minutes;
9, pressurization 3.: open the pressurization button, impregnating vessel is pressurizeed.When being forced into 0.55MPa, close the pressurization button, and kept this state 1 hour;
10, open the button of finding time, impregnating vessel is vacuumized, close the button of finding time when being evacuated to 600Pa, and kept the 600Pa vacuum 30 minutes;
11, pressurization 4.: open the pressurization button, impregnating vessel is pressurizeed.When being forced into 0.55MPa, close the pressurization button, and kept this state 1 hour;
12, open the pressure release button, the pressure in the impregnating vessel is let out to 0.2MPa, close the pressure release button.
13, open defeated lacquer valve, impregnating varnish is got back in the storage paint can fully, close defeated lacquer valve;
14, open the dipping lacquer cover, coil is steadily vertically hung on the pallet of baking oven flat car, and push baking oven, wait for and solidifying.
Advantage of the present invention: can make solvent-free insulated impregnating varnish be full of SGRB10 half-packaging high-voltage coil inside, put even do not have the effect that office puts to reach low innings.
Embodiment
Embodiment 1
1, opens the dipping lacquer cover, qualified coil is steadily vertically hung in the lining jar, cover and fastening dipping lacquer cover;
2, open the button of finding time, impregnating vessel is vacuumized, be evacuated to 100Pa, and keep vacuum degree 100Pa 2 hours;
3, open defeated lacquer valve, the impregnating varnish in the storage tank is transported in the impregnating vessel, transport to 300mm place, coil top, close defeated lacquer valve, notice that the defeated lacquer time must remain between 65 minutes when impregnating varnish;
4, open the button of finding time, impregnating vessel is vacuumized, close the button of finding time when being evacuated to 600Pa, and kept the 600Pa vacuum 0.5 hour;
5, pressurization 1.: open the pressurization button, impregnating vessel is pressurizeed, close the pressurization button when being forced into 0.55MPa, and keeping this state 2 hours;
6, open the button of finding time, impregnating vessel is vacuumized, close the button of finding time when being evacuated to 600Pa, and kept the 600Pa vacuum 30 minutes;
7, pressurization 2.: open the pressurization button, impregnating vessel is pressurizeed, close the pressurization button when being forced into 0.55MPa, and keeping this state 1 hour;
8, open the button of finding time, impregnating vessel is vacuumized, close the button of finding time when being evacuated to 600Pa, and kept the 600Pa vacuum 30 minutes;
9, pressurization 3.: open the pressurization button, impregnating vessel is pressurizeed, close the pressurization button when being forced into 0.55MPa, and keeping this state 1 hour;
10, open the button of finding time, impregnating vessel is vacuumized, close the button of finding time when being evacuated to 600Pa, and kept the 600Pa vacuum 30 minutes;
11, pressurization 4.: open the pressurization button, impregnating vessel is pressurizeed, close the pressurization button when being forced into 0.55MPa, and keeping this state 1 hour;
12, open the pressure release button, the pressure in the impregnating vessel is let out to 0.2MPa, close the pressure release button;
13, open defeated lacquer valve, impregnating varnish is got back in the storage paint can fully, close defeated lacquer valve;
14, open the dipping lacquer cover, coil is steadily vertically hung on the pallet of baking oven flat car, and push baking oven, wait for and solidifying.
Embodiment 2
1, opens the dipping lacquer cover, qualified coil is steadily vertically hung in the lining jar, cover and fastening dipping lacquer cover;
2, open the button of finding time, impregnating vessel is vacuumized, be evacuated to 100Pa, and keep vacuum degree at 100Pa2 hour;
3, open defeated lacquer valve, the impregnating varnish in the storage tank is transported in the impregnating vessel, transport to 200mm place, coil top, close defeated lacquer valve, notice that the defeated lacquer time must remain between 55 minutes when impregnating varnish;
4, open the button of finding time, impregnating vessel is vacuumized, close the button of finding time when being evacuated to 600Pa, and kept the 600Pa vacuum 0.5 hour;
5, pressurization 1.: open the pressurization button, impregnating vessel is pressurizeed, close the pressurization button when being forced into 0.55MPa, and keeping this state 2 hours;
6, open the button of finding time, impregnating vessel is vacuumized, close the button of finding time when being evacuated to 600Pa, and kept the 600Pa vacuum 30 minutes;
7, pressurization 2.: open the pressurization button, impregnating vessel is pressurizeed, close the pressurization button when being forced into 0.55MPa, and keeping this state 1 hour;
8, open the button of finding time, impregnating vessel is vacuumized, close the button of finding time when being evacuated to 600Pa, and kept the 600Pa vacuum 30 minutes;
9, pressurization 3.: open the pressurization button, impregnating vessel is pressurizeed, close the pressurization button when being forced into 0.55MPa, and keeping this state 1 hour;
10, open the button of finding time, impregnating vessel is vacuumized, close the button of finding time when being evacuated to 600Pa, and kept the 600Pa vacuum 30 minutes;
11, pressurization 4.: open the pressurization button, impregnating vessel is pressurizeed, close the pressurization button when being forced into 0.55MPa, and keeping this state 1 hour;
12, open the pressure release button, the pressure in the impregnating vessel is let out to 0.2MPa, close the pressure release button;
13, open defeated lacquer valve, impregnating varnish is got back in the storage paint can fully, close defeated lacquer valve;
14, open the dipping lacquer cover, coil is steadily vertically hung on the pallet of baking oven flat car, and push baking oven, wait for and solidifying.
According to result of the test, press the SG10 paint-dipping process, dipping SGRB10 partly seals 10KV level high-tension coil, the transformer partial discharge test is 520PC, partly seal 10KV level high-tension coil special warfare dipping lacquer by SGRB10, the transformer partial discharge test is 10PC, the standard that satisfied country plays a game and puts.

Claims (1)

1, partly seals 10KV level high-tension coil paint-dipping process, it is characterized in that its processing step branch
(1), open the dipping lacquer cover, qualified coil is steadily vertically hung in the lining jar, cover and fastening dipping lacquer cover;
(2), open the button of finding time, impregnating vessel is vacuumized, be evacuated to below the 100Pa, and keep vacuum degree at 100Pa and waited for 100Pa 2 hours;
(3), beat in defeated lacquer valve, the impregnating varnish in the storage tank is transported in the impregnating vessel, transport to 200~300mm place, coil top when impregnating varnish, close defeated lacquer valve, fail the lacquer time between 55~65 minutes;
(4), open the button of finding time, impregnating vessel is vacuumized, close the button of finding time when being evacuated to 600Pa, and kept the 600Pa vacuum 0.5 hour;
(5), pressurization 1.: open the pressurization button, impregnating vessel is pressurizeed, close the pressurization button when being forced into 0.55MPa, and keeping this state 2 hours;
(6), open the button of finding time, impregnating vessel is vacuumized, close the button of finding time when being evacuated to 600Pa, and kept the 600Pa vacuum 30 minutes;
(7), pressurization 2.: open the pressurization button, impregnating vessel is pressurizeed, close the pressurization button when being forced into 0.55MPa, and keeping this state 1 hour;
(8), open the button of finding time, impregnating vessel is vacuumized, close the button of finding time when being evacuated to 600Pa, and kept the 600Pa vacuum 30 minutes;
(9), pressurization 3.: open the pressurization button, impregnating vessel is pressurizeed, close the pressurization button when being forced into 0.55MPa, and keeping this state 1 hour;
(10), open the button of finding time, impregnating vessel is vacuumized, close the button of finding time when being evacuated to 600Pa, and kept the 600Pa vacuum 30 minutes;
(11), pressurization 4.: open the pressurization button, impregnating vessel is pressurizeed, close the pressurization button when being forced into 0.55MPa, and keeping this state 1 hour;
(12), open the pressure release button, the pressure in the impregnating vessel is let out to 0.2MPa, close the pressure release button;
(13), open defeated lacquer valve, impregnating varnish is got back in the storage paint can fully, close defeated lacquer valve;
(14), open the dipping lacquer cover, coil is steadily vertically hung on the pallet of baking oven flat car, and pushes baking oven, wait for to solidify.
CN 200510123021 2005-12-13 2005-12-13 Technique for impregnating varnish of half packed 10KV grade high voltage coil Expired - Fee Related CN1787134B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200510123021 CN1787134B (en) 2005-12-13 2005-12-13 Technique for impregnating varnish of half packed 10KV grade high voltage coil

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200510123021 CN1787134B (en) 2005-12-13 2005-12-13 Technique for impregnating varnish of half packed 10KV grade high voltage coil

Publications (2)

Publication Number Publication Date
CN1787134A true CN1787134A (en) 2006-06-14
CN1787134B CN1787134B (en) 2010-05-12

Family

ID=36784548

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200510123021 Expired - Fee Related CN1787134B (en) 2005-12-13 2005-12-13 Technique for impregnating varnish of half packed 10KV grade high voltage coil

Country Status (1)

Country Link
CN (1) CN1787134B (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101051563B (en) * 2007-01-31 2010-04-07 刘磊 Lacquer dipping process for electric product
CN102088228A (en) * 2011-01-26 2011-06-08 刘磊 Manufacture method of waterproof motor coil
CN101409149B (en) * 2008-07-19 2011-07-20 王立诚 Paint-dipping drying technique for dry-type three-phase combined transformer
CN102592806A (en) * 2011-12-22 2012-07-18 江苏宏安变压器有限公司 Amorphous alloy dry-type transformer coil insulating structure and method of removing local discharge signal noise
CN103464333A (en) * 2013-08-30 2013-12-25 无锡晶磊电子有限公司 Multifunctional paint dipping device
CN105788838A (en) * 2016-05-18 2016-07-20 无锡晶磊电子有限公司 Insulating paint impregnating device of transformer

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1255825C (en) * 2001-11-20 2006-05-10 上海电器科学研究所 Vacuum continuous dipping insulation process
CN1218334C (en) * 2001-12-13 2005-09-07 上海电器科学研究所 Vacuum pressure impregnaing insulation process
CN2567749Y (en) * 2002-08-06 2003-08-20 顾家华 Testing device for impregnating varnish vacuum performance

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101051563B (en) * 2007-01-31 2010-04-07 刘磊 Lacquer dipping process for electric product
CN101409149B (en) * 2008-07-19 2011-07-20 王立诚 Paint-dipping drying technique for dry-type three-phase combined transformer
CN102088228A (en) * 2011-01-26 2011-06-08 刘磊 Manufacture method of waterproof motor coil
CN102592806A (en) * 2011-12-22 2012-07-18 江苏宏安变压器有限公司 Amorphous alloy dry-type transformer coil insulating structure and method of removing local discharge signal noise
CN103464333A (en) * 2013-08-30 2013-12-25 无锡晶磊电子有限公司 Multifunctional paint dipping device
CN105788838A (en) * 2016-05-18 2016-07-20 无锡晶磊电子有限公司 Insulating paint impregnating device of transformer
CN105788838B (en) * 2016-05-18 2017-12-05 无锡晶磊电子有限公司 A kind of transformer impregnated insulating paint device

Also Published As

Publication number Publication date
CN1787134B (en) 2010-05-12

Similar Documents

Publication Publication Date Title
CN1787134A (en) Tech. for impregnating varnish of half packed 10KV grade high voltage coil
CN101064456A (en) Anti-explosion vacuum pressure varnished insulation apparatus and its technical method
CN101086921A (en) A vacuum pressure dipping technology and its application device
CN107369511B (en) A kind of sintering process of neodymium iron boron
CN102497069A (en) Vacuum pressure impregnating insulating method
CN101086922A (en) A vacuum balance method of vacuum pressure dipping technology and its device
CN1862724A (en) Semi-packed 10KV stage high-voltage coil impregnating varnish technique
CN1091537C (en) Permanent magnet for ultrahigh vacuum application and method for mfg. same
CN106881237A (en) Vacuum hydraulic immersion system and dipping method
CN115073174B (en) Compact high-entropy rare earth niobate high-temperature ceramic material, preparation method and application
JPH09102443A (en) Method of filling with electrolytic solution
CN112622383A (en) Asymmetric three-layer structure all-polymer dielectric composite material and preparation method thereof
CN101521111A (en) Novel immersion painting process for transformer coil
CN101931174B (en) Method for realizing changing accessories of large transformer without discharging oil by utilizing oil conservator to conserve oil
CN101145445A (en) Transformer coil paint-dipping process
CN1176476C (en) Method and device for supplying magnetic powder, and magnet mfg. method
US10011534B2 (en) Process for forming carbon composite materials
CN1168631C (en) Method and apparatus for filling materials
CN100338249C (en) Method for preparing magnesium base hydrogen-storage material using hydrogenation combustion method and its magnesium base hydrogen-storage material
CN113903551A (en) SF (sulfur hexafluoride)6Structure and method for vacuumizing box edge of gas-insulated transformer
CN111362704A (en) High-thermal-conductivity silicon nitride ceramic and preparation method thereof
CN1933066A (en) Half-packaging high-voltage coil end sealing technology process
CN113035467A (en) Resin fiber insulation basin for SF6 high-voltage switch equipment and manufacturing method thereof
KR100382950B1 (en) Method of charging electrolyte and charging device used in this method
CN1487543A (en) Sol-gel enclosed treatment process for electronic element and device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: CHINA ELECTRIC EQUIPMENT(JIANGSU) CO., LTD

Free format text: FORMER OWNER: ZHONGDIAN ELECTRIC GROUP CO., LTD.

Effective date: 20100726

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 211100 NO.88, SHENGTAI ROAD, JIANGNING ECONOMIC AND TECHNOLOGICAL DEVELOPMENT ZONE, NANJING CITY, JIANGSU PROVINCE TO: 212200 ZHONGDIAN STREET, YANGZHONG CITY, JIANGSU PROVINCE

TR01 Transfer of patent right

Effective date of registration: 20100726

Address after: 212200 CLP Road, Yangzhong, Jiangsu

Patentee after: CEEG (Jiangsu) Co., Ltd.

Address before: 211100 No. 88 Sheng Sheng Road, Jiangning economic and Technological Development Zone, Nanjing, Jiangsu, China

Patentee before: Zhongdian Electric Group Co., Ltd.

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20100512

Termination date: 20191213

CF01 Termination of patent right due to non-payment of annual fee