CN1769630A - Tension reset method for twisted and tilted loft type wood tower - Google Patents

Tension reset method for twisted and tilted loft type wood tower Download PDF

Info

Publication number
CN1769630A
CN1769630A CN 200510095358 CN200510095358A CN1769630A CN 1769630 A CN1769630 A CN 1769630A CN 200510095358 CN200510095358 CN 200510095358 CN 200510095358 A CN200510095358 A CN 200510095358A CN 1769630 A CN1769630 A CN 1769630A
Authority
CN
China
Prior art keywords
tower
working platform
distortion
bracing frame
reset method
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN 200510095358
Other languages
Chinese (zh)
Other versions
CN100343462C (en
Inventor
袁建力
刘殿华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yangzhou University
Original Assignee
Yangzhou University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yangzhou University filed Critical Yangzhou University
Priority to CNB2005100953588A priority Critical patent/CN100343462C/en
Publication of CN1769630A publication Critical patent/CN1769630A/en
Application granted granted Critical
Publication of CN100343462C publication Critical patent/CN100343462C/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The invention discloses a restoring method of wood structural pavilion-like tower, which is characterized by the following: forcing the bulking tower with the inversed reset couple of buckling deforming direction; setting the typical reinforcer in the tower after the tower restores to the preset position; removing the couple. The invention is easy to deposit and adjust, which adapts construction rack as loaded working platform to save the cost of special loaded structure and assembly time limit for a project.

Description

The tension reset method that pavilion-like wood pagoda is turned round, inclined and is out of shape
Technical field
The present invention relates to recovery technique method to wooden structure loft-style tower.
Background technology
Wood pagoda is under long-term wind action, and when particularly standing geological process, structure easily deforms, and the principal character of this distortion is torsional deformation in the plane and vertical inclination and distortion.After in a single day housing structure is distorted and tilts, make wooden construction produce out of joint, pressurized one side and produce splitting or deflection, and make sets of brackets on top of the columns loosening in tension one side.Along with the long term and the material ageing of environmental load, the intensity of member descends, rigidity is degenerated, and causes the distortion of structure and the progressively aggravation of tilting.The Ying County Shaka Pagoda that China is famous is typical pavilion-like wood pagoda, go through more than 900 year vicissitudes after, whole tilt to the north by east, second and third course northeastward horizontal torsion, the relative bottom total drift in top 445mm, wooden construction damage, come off serious.At present, the situation of this tower still continuing deterioration, is demanded strengthening by reparative method urgently.
Ancient tower belongs to precious cultural heritage, and its strengthening by reparative method work need be followed the historical relic's protection principle, and will guarantee to be perfectly safe.For preserving its historical information, general requirements adopts the whole repair mode of " frame does not fall ".Tall and big, the complex structure of the pavilion-like wood pagoda bodily form carries out " frame does not fall " integral error correcting and position to it and reinforces, and difficulty of construction is big, technical requirements is high.
Summary of the invention
The purpose of this invention is to provide a kind of tension reset method that historical relic's protection " restoring the old as the old " and structural strengthening " safe and reasonable " require, distortion is turned round, inclined to practical pavilion-like wood pagoda of taking into account.
The present invention's technical scheme is: the distortion tower body is applied the reset couple opposite with the torsional deformation direction, tower body is returned to the precalculated position after, typing is set in tower body inside adds solid, remove couple then.
The present invention can utilize construction bracket that wood pagoda repairs as working platform, is the structure of leading and causing tilting to producing torsional deformation, carries out " frame does not fall " by the mode of outside stretch-draw, inner support and resets and reinforce.Characteristics are safe and reliable, simple and feasible, economical rationality.At first, adopt pulling force directly will twist tower course rightabout and just draw, easy and simple to handle, be easy to control; Compare with traditional thrustor, do not need the bigger horizontal reacting force frame of rigidity, and the distance between weighted platform and the tower body is not subjected to the restriction of thrustor length, easy arrangement and adjustment.Secondly, make full use of construction bracket, can save the expense and the installation period of ad hoc loading structure as loading working platform.
When the few wood pagoda of the distortion number of plies is resetted reinforcing, under the situation of loading equipemtn and conditions permit, can once construct simultaneously to each layer.
When the distortion number of plies is more, for reducing total tricks of loading equipemtn and interlayer steel bracing frame, improve utilization rate of equipment and installations, should successively construct by top-down order.
The concrete steps of constructing that reset are:
1) reset below the crossbeam of wood pagoda floor of couple, between adjacent two bearing columns the steel bracing frame be set desiring to apply, described steel bracing frame is made up of the horizontal support body and the vertical support body that be arranged in parallel with crossbeam;
2) in the construction bracket of repairing wood pagoda, working platform is set, and the working platform position is reinforced;
3) between end node and the working platform tensioner is being set on every edge column of loading layer;
4) by tensioner the distortion tower body is applied the couple that resets, make it return to the precalculated position;
5) in the floor after resetting timber wedge is set and support member positions tower body;
6) remove tensioner, steel bracing frame, working platform.
In addition, the vertical support body lower end of the steel bracing frame in step 1) is provided with arrangement for adjusting height respectively.Not influencing under the prerequisite that floor distortion recovers, reliable assurance can be provided for the construction safety of tower body, and can be and change, repair the floor member that has damaged and provide support power.Above-mentioned arrangement for adjusting height is hydraulic jack or regulates bolt.
Above-mentioned steps 1) between steel bracing frame and tower layer crossbeam, soft bed course is set in,, also can the safety of ancient tower be provided safeguard simultaneously to avoid hindering the horizontal movement of superstructure when tension reset is constructed.
Above-mentioned steps 3) tensioner comprises steel wire cable, ess-strain controller, flower basket bolt securing member in, and fixing steel wire cable respectively on working platform and loading layer connects ess-strain controller and flower basket bolt securing member between two groups of reinforcing bar ropes.
Consider the elastic deformation of unloading back wooden construction, can not reach the recovery value of design, be loaded on the distortion recovery value and reach 105% o'clock of target recovery value, keep load, adopt timber wedge and support the body of the tower associated components is positioned for preventing the tower layer behind the removal pulling force.
Description of drawings
Fig. 1 is that wood pagoda facade of the present invention and construction bracket are arranged total figure.
Fig. 2 is the plan view of wood pagoda.
Fig. 3 is the installation and the couple schematic diagram that resets of tensioner.
Fig. 4 is the structural representation of steel bracing frame.
Specific embodiment
Specific design and construction sequence for octagonal wood pagoda are as follows:
(1) tower body detects and the strengthening member design: measure the torsional deflection value and the vertical deviant of floor, measure the dislocation and the deformation values of each member; The damage location of detection means and degree of injury are drafted the repairerment of damaged component and reinforce requiring (to damaging more serious member, should reinforcing or replace, to guarantee the safety in the construction) before tension reset; Determine that floor adopts timber wedge is fastening and support is located node and position when tension reset.
(2) loading scheme design: draft the target recovery value of floor tension reset, calculate total stretching force and Deformation control value, determine tensioner quantity and arrangement according to the design scheme that multilayer is constructed simultaneously or successively constructed; According to total stretching force and Deformation control value design hierarchical loading system.
(3) erection construction support is to the operation platform reinforcing design: in the construction bracket of repairing 1 working platform 2 is set, and according to the requirement that tensioner quantity, arrangement and pulling force are regulated the working platform position is reinforced, cable rope 3 is set in case of necessity.Working platform 2 should be convenient to technician's tension operation and measure observation.As shown in Figure 1, 2.
(4) the interlayer temporary steel support is set up meter:every group of steel bracing frame 4 is made up of horizontal support body 4-1 and two vertical support body 4-2 of be arrangeding in parallel with crossbeam 5; Connect hydraulic jack in the lower end of each vertical support body 4-2 respectively or regulate bolt 4-3, form Height Adjustable temporary steel support frame.As shown in Figure 4. exists
(5) install and debug steel bracing frame between temporary layer: between every group of steel support 4 and crossbeam 5, soft bed course 6 is set, as shown in Figure 4.Be symmetrical arranged four groups of steel bracing frames 4 altogether at same contorted strata, every group of steel bracing frame 4 is installed in respectively between adjacent two bearing columns 7, as shown in Figure 2.
(6) installation and debugging charger and Measurement and Control System: in this example, adopt two pairs of couples that reset at same contorted strata, four limits promptly selecting the tower body symmetry load the last end node place that the position is located at every edge column 7 as loading zone, and adopt steel clamping plate 8 to reinforce temporarily; Apply Horizontal Tension N by the charger that is connected on the construction bracket, form the couple that resets.
Every group of tensioner 9 is made up of steel wire cable, an ess-strain controller, a flower basket bolt securing member; The end of wire rope 9-1 is connected on the steel clamping plate 8 at last end node place of column 7, the other end links to each other with ess-strain controller 9-2, the other end of ess-strain controller 9-2 links to each other with flower basket bolt securing member 9-3, and the other end of flower basket bolt securing member 9-3 is connected with steel wire cable 9-4 on being fixed on working platform 2.As shown in Figure 3.
(7) reliability of inspection whole construction support, loading system and interlayer steel support system.
(8) press loading scheme classification load application, note observation tower body and deformation of members situation, the deformation tendency that will note observing damaged component and node especially while loading.
(9) strengthen stretching force gradually, be loaded on the distortion recovery value and reach 105% o'clock of target recovery value, keep load, adopt timber wedge and support tower body inside associated components is positioned.
(10) finish member location after, shed external force gradually.Note observing while unloading, the discovery situation should take appropriate measures.After unloading finishes, measure and the anti-back twist stability of check tower body.If tower body back twist value less than 10% of target recovery value, can be thought to reach the requirement that resets; Otherwise, should apply stretching force, further fastening timber wedge once more and strengthen support, until reaching the requirement that resets.
(11) turn round turning over position work and finish after, the node area and the damage member of wooden construction carried out strengthening by reparative method.The emphasis of damaged strengthening member is splitting position, end, can adopt the ground polymers fibre reinforced composites (Geopolymer-based FRP) of aging-resistant flame-proof better performances to twine hoop or impregnation process.If must change the member of damage or when node area reinforced in a big way, should utilize interlayer steel bracing frame to hold out against the force part, repair process safe to guarantee structure.
(12) remove interlayer steel bracing frame, remove tensioner, working platform.
(13) the fixed observer point is set in the tower body relevant position, the tracking observation with consolidation effect of resetting, is observed three times every year at least 2 years duration.

Claims (6)

1, the pavilion-like wood pagoda tension reset method of distortion of turning round, incline is characterized in that the distortion tower body is applied the reset couple opposite with the torsional deformation direction, tower body is returned to the precalculated position after, typing is set in tower body inside adds solid, remove couple then.
2, the tension reset method of turning round, inclining and be out of shape according to the described pavilion-like wood pagoda of claim 1, the concrete steps of constructing that it is characterized in that resetting are:
1) reset below the crossbeam of wood pagoda floor of couple, between adjacent two bearing columns the steel bracing frame be set desiring to apply, described steel bracing frame is made up of the horizontal support body and the vertical support body that be arranged in parallel with crossbeam;
2) in the construction bracket of repairing wood pagoda, working platform is set, and the working platform position is reinforced;
3) between end node and the working platform tensioner is being set on every edge column of loading layer;
4) by tensioner the distortion tower body is applied the couple that resets, make it return to the precalculated position;
5) in the floor after resetting timber wedge is set and support member positions tower body;
6) remove tensioner, steel bracing frame, working platform.
3, the tension reset method of turning round, inclining and be out of shape according to the described pavilion-like wood pagoda of claim 2 is characterized in that the vertical support body lower end of the steel bracing frame in the step 1) is provided with arrangement for adjusting height respectively, and described arrangement for adjusting height is hydraulic jack or regulates bolt.
4, the tension reset method of turning round, inclining and be out of shape according to the described pavilion-like wood pagoda of claim 2 is characterized in that in the step 1), between steel bracing frame and tower layer crossbeam soft bed course is set.
5, the tension reset method of turning round, inclining and be out of shape according to the described pavilion-like wood pagoda of claim 2, it is characterized in that tensioner described in the step 3) comprises steel wire cable, ess-strain controller, flower basket bolt securing member, fixing one group of rope silk of reinforcing bar rope respectively on working platform and loading layer connects ess-strain controller and flower basket bolt securing member between two groups of reinforcing bar ropes.
6, according to the described pavilion-like wood pagoda of claim 1 turn round, the incline tension reset method of distortion, it is characterized in that being loaded on the distortion recovery value and reach 105% o'clock of target recovery value, keep load, adopt timber wedge and support the body of the tower associated components is positioned.
CNB2005100953588A 2005-11-08 2005-11-08 Tension reset method for twisted and tilted loft type wood tower Expired - Fee Related CN100343462C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNB2005100953588A CN100343462C (en) 2005-11-08 2005-11-08 Tension reset method for twisted and tilted loft type wood tower

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNB2005100953588A CN100343462C (en) 2005-11-08 2005-11-08 Tension reset method for twisted and tilted loft type wood tower

Publications (2)

Publication Number Publication Date
CN1769630A true CN1769630A (en) 2006-05-10
CN100343462C CN100343462C (en) 2007-10-17

Family

ID=36751142

Family Applications (1)

Application Number Title Priority Date Filing Date
CNB2005100953588A Expired - Fee Related CN100343462C (en) 2005-11-08 2005-11-08 Tension reset method for twisted and tilted loft type wood tower

Country Status (1)

Country Link
CN (1) CN100343462C (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103291083A (en) * 2012-03-03 2013-09-11 兰州理工大学 Repair method for old wooden tower
CN103850445A (en) * 2014-03-12 2014-06-11 扬州大学 Reset reinforcing method for deformation of pavilion timer frame building
CN104234445A (en) * 2014-09-25 2014-12-24 扬州大学 Restoration-security multifunctional bracket of deformed wooden structure building
CN110158988A (en) * 2019-06-28 2019-08-23 中冶建工集团有限公司 A kind of building protection steel structure support and its quick method for dismounting
CN111236311A (en) * 2020-03-06 2020-06-05 华东建筑设计研究院有限公司 Construction platform and construction method for underground space development of dense existing building group
CN112144903A (en) * 2020-08-07 2020-12-29 北京国文琰园林古建筑工程有限公司 Correction method for displaced members of mountain surface golden columns and eaves columns integrally
CN113802593A (en) * 2021-09-28 2021-12-17 中国建筑第五工程局有限公司 Assembly type KSC plate brick moulding bed reinforcing system
CN114658248A (en) * 2022-02-25 2022-06-24 兰州理工大学 Method for correcting inclination of local layer of mortise and tenon double-drum tower structure

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1058250A (en) * 1991-07-06 1992-01-29 朱友山 Method of strengthening ancient buildings with pcestressed built-in rib reinfocement

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103291083A (en) * 2012-03-03 2013-09-11 兰州理工大学 Repair method for old wooden tower
CN103850445A (en) * 2014-03-12 2014-06-11 扬州大学 Reset reinforcing method for deformation of pavilion timer frame building
CN103850445B (en) * 2014-03-12 2015-11-25 扬州大学 The distortion reset reinforcement means of loft-style timber-framed building
CN104234445A (en) * 2014-09-25 2014-12-24 扬州大学 Restoration-security multifunctional bracket of deformed wooden structure building
CN104234445B (en) * 2014-09-25 2016-04-27 扬州大学 Reset-security the multiple bay of distortion timber-framed building
CN110158988A (en) * 2019-06-28 2019-08-23 中冶建工集团有限公司 A kind of building protection steel structure support and its quick method for dismounting
CN111236311A (en) * 2020-03-06 2020-06-05 华东建筑设计研究院有限公司 Construction platform and construction method for underground space development of dense existing building group
CN111236311B (en) * 2020-03-06 2024-04-09 华东建筑设计研究院有限公司 Construction platform and construction method for developing underground space of dense existing building group
CN112144903A (en) * 2020-08-07 2020-12-29 北京国文琰园林古建筑工程有限公司 Correction method for displaced members of mountain surface golden columns and eaves columns integrally
CN112144903B (en) * 2020-08-07 2021-11-23 北京国文琰园林古建筑工程有限公司 Correction method for displaced members of mountain surface golden columns and eaves columns integrally
CN113802593A (en) * 2021-09-28 2021-12-17 中国建筑第五工程局有限公司 Assembly type KSC plate brick moulding bed reinforcing system
CN114658248A (en) * 2022-02-25 2022-06-24 兰州理工大学 Method for correcting inclination of local layer of mortise and tenon double-drum tower structure
CN114658248B (en) * 2022-02-25 2024-02-02 兰州理工大学 Method for correcting inclination of local layer of mortise and tenon double-cylinder tower structure

Also Published As

Publication number Publication date
CN100343462C (en) 2007-10-17

Similar Documents

Publication Publication Date Title
CN100343462C (en) Tension reset method for twisted and tilted loft type wood tower
CN102877547B (en) Steel net rack installation method for integrally improving high-altitude moving and positioning
CN103850445B (en) The distortion reset reinforcement means of loft-style timber-framed building
CN103643800B (en) The erection & lift system of buckling-restrained bracing member and construction method thereof
CN103866986B (en) Long span variable cross-section bolted spherical node net shell mounting method
CN113241998B (en) Prestressed flexible photovoltaic fixing support
CN105888131A (en) Flexural yielding type energy dissipation truss
CN107461067A (en) A kind of efficient aluminium alloy timber structure buckling-restrained bracing member
CN104234445B (en) Reset-security the multiple bay of distortion timber-framed building
CN210713742U (en) Cantilever beam structure
CN111170171A (en) Core cylinder movable arm type tower crane installation climbing structure and method thereof
CN103993744A (en) Raising system for large-area net frame and installing method thereof
CN210917735U (en) Supporting jig frame structure for large-span prestressed inhaul cable structure
CN218780018U (en) Wooden frame deviation correcting device for high-rise ancient building
CN207143751U (en) Splice pier top block Support bracket in upstriker section
CN108104349B (en) Oblique compression bar truss beam chord beam combined structure and implementation method
CN111705931A (en) Construction method of large-span grid structure
CN206144182U (en) Reinforcing concrete structure
CN219012057U (en) Spliced ancient building wood column pier connection structure
CN1313923A (en) Scaffolding
CN208267511U (en) One kind can load-bearing anemometer tower
CN215561946U (en) Door opening type support for installing and adjusting pre-buried steel plate of arch support
CN217758771U (en) Rapid assembly moving platform for piling at breach
CN112609954B (en) Novel automatic climbing system in elevator shaft and construction method thereof
CN220336532U (en) Building wall reinforcing structure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20071017

Termination date: 20101108