CN1760475A - 建筑物筏板施工工艺及筏板 - Google Patents
建筑物筏板施工工艺及筏板 Download PDFInfo
- Publication number
- CN1760475A CN1760475A CN 200510095443 CN200510095443A CN1760475A CN 1760475 A CN1760475 A CN 1760475A CN 200510095443 CN200510095443 CN 200510095443 CN 200510095443 A CN200510095443 A CN 200510095443A CN 1760475 A CN1760475 A CN 1760475A
- Authority
- CN
- China
- Prior art keywords
- raft plate
- building
- concrete slab
- technique
- constructing
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Foundations (AREA)
Abstract
本发明公开了一种建筑物筏板施工工艺是:先挖掘基坑,再铺设垫层,捆扎钢筋,浇筑混凝土并形成混凝土板和基础梁,混凝土板的底面被制成朝向基坑底部拱形;建筑物筏板,由混凝土板、基础梁和垫层组成;本发明具有如下优点:本发明底板的下边缘为下凹的曲面,这与地下室和上部结构建造后,基底土重新受力压缩后的表面曲面相一致,因此受力比平板式筏板受力合理,板内内力小,地基土的承载力也能更好的发挥,整体沉降变小,整个建筑物的安全度更高,在相同条件下,采用本发明所述筏板,其厚度比平板式筏板大大减小,且筏板中的钢筋使用量也大大减小,能有效降低工程造价。
Description
技术领域
本发明涉及一种建筑物筏板施工工艺及筏板,尤其是建筑物地下室用建筑物筏板施工工艺及筏板。
背景技术
目前几乎所有埋置较深的建筑物地下室(2层以上)筏板均采用平板式。平板式筏板表面看起来构造简单、施工方便,但实际上平板式筏板不仅受力不合理,有一定的安全隐患,而且浪费材料。具体原因叙述如下:
建筑物基坑的开挖,实际上是一个对基底土体进行卸载的过程。因此在基坑的开挖过程中,基底土会发生隆起与回弹。当基坑较深时,隆起和回弹量比较可观,最终可能会形成一个倒扣的“锅底形”曲面。从理论上讲,如果保持基底土的曲面不变,当地下室和上部结构等荷载施加后,向上隆起的土体将被重新压缩,其性能仍然近似开挖前的状态。但是实际施工时为了施工的方便,在平整基坑底部时,往往将回弹土体也一并开挖,表面上基坑底呈一水平面,但是实际上当基底土重新承担上部荷载时,基底土将被压缩成下凹的锅底形曲面。此时当基础筏板为平板式时,则相当于筏板支撑于一个不平而且下凹的曲面上,建筑物的沉降不仅会加大,而且在筏板中的内力也会大幅度的增加,给建筑物的安全造成了一定的隐患。
另外实际上平板式筏板自身的受力也不合理,其承载模式并不是最理想的,事实上这也是目前高层建筑尤其是带有几层地下室的高层建筑物筏板动辄数米的原因之一。
发明内容
本发明提供一种能够充分优化混凝土材料和基底土体的受力性能、并能减少钢筋混凝土使用量的建筑物筏板施工工艺及筏板。
本发明采用如下技术方案:
本发明所述的建筑物筏板施工工艺是:先挖掘基坑,再铺设垫层,捆扎钢筋,浇筑混凝土并形成混凝土板和基础梁,混凝土板的底面被制成朝向基坑底部拱形。
本发明所述的建筑物筏板,由混凝土板、基础梁和垫层组成,基础梁位于混凝土板的两端或中间,在混凝土板和基础梁内有钢筋,混凝土板的底面形状为向下凸起的拱面。
与现有技术相比,本发明具有如下优点:
本发明底板的下边缘为下凹的曲面,这与地下室和上部结构建造后,基底土重新受力压缩后的表面曲面相一致,因此受力比平板式筏板受力合理,板内内力小,地基土的承载力也能更好的发挥,整体沉降变小,整个建筑物的安全度更高。另外就“锅底形”筏板自身的受力性能看,其剖面为拱形。众所周知,拱结构是以承受正压力为主,能充分利用混凝土良好的抗压性能。在相同条件下,采用本发明所述筏板,其厚度比平板式筏板大大减小,且筏板中的钢筋使用量也大大减小,能有效降低工程造价。综上,本发明不仅能减小建筑物的沉降,安全度提高,而且能降低工程的造价。
附图说明
图1是本发明施工工艺流程图。
图2是本发明实施例的结构剖视图。
具体实施方式
实施例1
发明所述的建筑物筏板施工工艺是:先挖掘基坑,再铺设垫层5,捆扎钢筋3,浇筑混凝土并形成混凝土板1和基础梁2,混凝土板1的底面被制成朝向基坑底部拱形,在本实施例中,底面呈拱形的混凝土板1的制备是采用在垫层5上铺设兼做模具的泡沫板且该泡沫板的顶面呈下凹拱形,为进一步提高筏板的防水性能,本实施例将混凝土板1和基础梁2进行整体一次性浇筑。
实施例2
本发明所述的建筑物筏板,由混凝土板1、基础梁2和垫层5组成,基础梁2位于混凝土板1的两端或中间,在混凝土板1和基础梁2内有钢筋3,混凝土板1的底面形状为向下凸起的拱面。
Claims (3)
1、一种建筑物筏板施工工艺,先挖掘基坑,再铺设垫层(5),捆扎钢筋(3),浇筑混凝土并形成混凝土板(1)和基础梁(2),其特征在于混凝土板(1)的底面被制成朝向基坑底部拱形。
2、根据权利要求1所述的建筑物筏板施工工艺,其特征在于底面呈拱形的混凝土板(1)的制备是采用在垫层(5)上铺设兼做模具的泡沫板且该泡沫板的顶面呈下凹拱形。
3、一种用于实施权利要求1所述建筑物筏板施工工艺的建筑物筏板,由混凝土板(1)、基础梁(2)和垫层(5)组成,基础梁(2)位于混凝土板(1)的两端或中间,在混凝土板(1)和基础梁(2)内有钢筋(3),其特征在于混凝土板(1)的底面形状为向下凸起的拱面。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 200510095443 CN1760475A (zh) | 2005-11-16 | 2005-11-16 | 建筑物筏板施工工艺及筏板 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 200510095443 CN1760475A (zh) | 2005-11-16 | 2005-11-16 | 建筑物筏板施工工艺及筏板 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN1760475A true CN1760475A (zh) | 2006-04-19 |
Family
ID=36706686
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 200510095443 Pending CN1760475A (zh) | 2005-11-16 | 2005-11-16 | 建筑物筏板施工工艺及筏板 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN1760475A (zh) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101476324A (zh) * | 2009-01-20 | 2009-07-08 | 叶长青 | 筏板基础及其施工方法 |
CN102251532A (zh) * | 2011-04-20 | 2011-11-23 | 上海交通大学 | 底面为曲面基础优化施工方法 |
CN103074902A (zh) * | 2013-01-05 | 2013-05-01 | 华南理工大学 | 一种控制建筑沉降的复合板 |
-
2005
- 2005-11-16 CN CN 200510095443 patent/CN1760475A/zh active Pending
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101476324A (zh) * | 2009-01-20 | 2009-07-08 | 叶长青 | 筏板基础及其施工方法 |
CN102251532A (zh) * | 2011-04-20 | 2011-11-23 | 上海交通大学 | 底面为曲面基础优化施工方法 |
CN102251532B (zh) * | 2011-04-20 | 2012-11-28 | 上海交通大学 | 底面为曲面基础优化施工方法 |
CN103074902A (zh) * | 2013-01-05 | 2013-05-01 | 华南理工大学 | 一种控制建筑沉降的复合板 |
CN103074902B (zh) * | 2013-01-05 | 2015-04-22 | 华南理工大学 | 一种控制建筑沉降的复合板 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109778829B (zh) | 一种深厚软土刚柔性桩与格构墙组合复合地基 | |
CN101994325B (zh) | 一种加固基础及提高既有建筑刚性基础抗弯剪能力的方法 | |
CN1112484C (zh) | 施加预应力的地下连续墙 | |
CN101240548A (zh) | 二级垛式悬臂式l型挡墙及其实施方法 | |
Ma et al. | Key technical problems of extra-high concrete faced rock-fill dam | |
CN1594833A (zh) | 钢板—混凝土组合衬砌 | |
CN1760475A (zh) | 建筑物筏板施工工艺及筏板 | |
CN108797636A (zh) | 一种上字型挡土墙结构及其施工方法 | |
CN212335975U (zh) | 一种建筑复合地基桩顶预刺入式褥垫层 | |
CN205501982U (zh) | 一种斜坡软弱地基加固结构 | |
CN2830511Y (zh) | 锅底形筏板 | |
CN2672161Y (zh) | 一种具有独立坝踵块结构的混凝土坝 | |
CN210002431U (zh) | 山区栈道景观平台复合基础结构 | |
CN111676740B (zh) | 路堑地段无砟轨道抗上拱路基结构的施工及设计方法 | |
CN212611699U (zh) | 一种用于高速铁路加固结构、路基组件和路基系统 | |
CN211036890U (zh) | 狭窄河谷深厚淤泥质覆盖层超高面板坝窄趾板结构 | |
CN113897998B (zh) | 根须式加强基础结构及施工方法 | |
CN206800418U (zh) | 一种深埋排洪渠箱及综合管廊土拱减载结构 | |
CN100334313C (zh) | 高层建筑物移位的抗倾覆和抗震方法 | |
CN2856171Y (zh) | 纵向预应变桩 | |
CN218149492U (zh) | 一种超平耐磨型地坪结构 | |
RU2752890C1 (ru) | Ленточно-мембранный фундамент мелкого заложения | |
CN112064590B (zh) | 一种高地震区粘土心墙堆石坝的抗震结构及施工方法 | |
CN216787187U (zh) | 一种板索和锚杆结合的抗拔基础结构 | |
CN213867661U (zh) | 一种高地震区粘土心墙堆石坝的抗震结构 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C12 | Rejection of a patent application after its publication | ||
RJ01 | Rejection of invention patent application after publication |
Open date: 20060419 |