Summary of the invention
The invention provides a kind of many analysis of version system that is used in an Advanced Planning and Scheduling, in order to record and the tracking that this Advanced Planning and Scheduling execution result is provided, so that carry out the computing of historical data, and then continued to carry out this Advanced Planning and Scheduling importing analysis of related results.
The invention provides a kind of many analysis of version system that is used in an Advanced Planning and Scheduling, in order to the comparison and analysis of this Advanced Planning and Scheduling planning with execution result to be provided, so that the designer is carried out the adjustment of modeling parameters according to circumstances, or the change of management process, make this Advanced Planning and Scheduling plan convergence execution result gradually.
The invention provides a kind of many analysis of version system that is used in an Advanced Planning and Scheduling, compare,, and then differentiate responsibility rapidly so that Rapid identification causes the special event of planning change in order to input and the output data of respectively planning version to be provided.
In order to achieve the above object, the invention provides an a kind of Advanced Planning and Scheduling (Advanced Planning ﹠amp that is used in; Scheduling, the system of analysis of version more than an APS), this many analysis of version system comprise one and select interface, an edition data receiver module and an edition data analysis module.This selects the interface, in order to providing a plurality of modeling parameters options in order to selecting a modeling parameters, and a plurality of edition data option, select for subsequent analysis with a convenient user.This edition data receiver module, select chosen this modeling parameters and a chosen edition data option in the interface in order to receive according to this, take out the tables of data of a plurality of different editions, and the tables of data of each version comprises a start context in order to the instruction time of difference successively.This edition data analysis module in order to according to chosen this modeling parameters, is analyzed the tables of data of these a plurality of different editions that this edition data receiver module taken out.Wherein, this edition data analysis module can start a corresponding pre-setting analysis/determining program according to this chosen modeling parameters, and according to a predefined analysis/judgment principle in this analysis/determining program, do a mathematical operation for this modeling parameters in these a plurality of different editions tables of data, in view of the above with the difference of the tables of data of monitoring these a plurality of different editions, and produce a corresponding analysis result, when this analysis/determining program judges that this analysis result has been violated this analysis/judgment principle, then initiatively export a warning message and warn this user.
The present invention also provides a kind of method of analysis of version more than that is used in an Advanced Planning and Scheduling, and this Advanced Planning and Scheduling comprises one and selects the interface, and this many analysis of version method comprises the following step:
(A) provide a plurality of modeling parameters options in order to selecting a modeling parameters by this selection interface, and a plurality of edition data option, select for subsequent analysis with a convenient user;
(B) receive according to chosen this modeling parameters and a chosen edition data option in this selection interface, the tables of data of taking out a plurality of different editions, and the tables of data of each version comprises a start context in order to the instruction time of difference successively;
(C) start a corresponding pre-setting analysis/determining program according to this chosen modeling parameters, and according to predefined at least one analysis/judgment principle in this analysis/determining program, do a mathematical operation for this modeling parameters in these a plurality of different editions tables of data, in view of the above with the difference of the tables of data of monitoring these a plurality of different editions, and produce a corresponding analysis result; And
(D) when this analysis/determining program judges that this analysis result has been violated this analysis/judgment principle, then initiatively export a warning message and warn this user.
Therefore, can monitor the difference of the tables of data of different editions by this edition data analysis module of the present invention, can write down and follow the trail of this Advanced Planning and Scheduling execution result,, and then be continued to carry out this Advanced Planning and Scheduling importing analysis of related results so that carry out the computing of historical data.Moreover, also provide this Advanced Planning and Scheduling to utilize the comparison and analysis of planning and execution result, so that the designer is carried out the adjustment of modeling parameters according to circumstances, or the change of management process, make this Advanced Planning and Scheduling plan convergence execution result gradually.Except the above, a kind of many analysis of version system that is used in an Advanced Planning and Scheduling provided by the present invention can provide input and the output data of respectively planning version to compare, so that Rapid identification causes the special event of planning change, and then differentiates responsibility rapidly.
Can be further understood by the following detailed description and accompanying drawings about the advantages and spirit of the present invention.
Embodiment
See also Fig. 1, Fig. 1 is used in an Advanced Planning and Scheduling (AdvancedPlanning ﹠amp for the present invention; Scheduling, APS) calcspar of 21 the system of analysis of version more than one 20.The invention provides a system of analysis of version more than one 20 that is used in an Advanced Planning and Scheduling 21.In an embodiment, many analysis of version of the present invention system 20 is used in the Advanced Planning and Scheduling 21, and Advanced Planning and Scheduling 21 comprises a plurality of modeling parameters (not shown)s.These a plurality of modeling parameters are in order to setting up the model of Advanced Planning and Scheduling 21, via analyzing the effect that can improve Advanced Planning and Scheduling 21 with these a plurality of modeling parameters of monitoring, and the difference between the planning face of dwindling and the execution face.
Many analysis of version of the present invention system 20 comprises one and selects interface 30, an edition data receiver module 22 and an edition data analysis module 24.
Select interface 30 in order to a plurality of modeling parameters options 35 and a plurality of edition data option 39 to be provided, select for subsequent analysis with a convenient user.In an embodiment, modeling parameters option 35 for example comprises material procurement lead time (Vendor lead-time), order and finishes the lead time (Productlead-time), single execution time of worker ... or the like modeling parameters, modeling parameters option 35 is selected a modeling parameters (not shown) for subsequent analysis in order to this user to be provided from a plurality of modeling parameters options 35.
Edition data receiver module 22 is in order to select chosen this modeling parameters and a chosen edition data option in the interface 30, the tables of data (not shown) of taking out a plurality of different editions in order to receive foundation.And the tables of data of each version comprises a start context in order to the instruction time of difference successively.
Edition data analysis module 24 is in order to according to selecting this chosen modeling parameters in the interface 30, analyzes the tables of data of these a plurality of different editions that edition data receiver module 22 taken out.Edition data analysis module 24 can start a corresponding pre-setting analysis/determining program 23 according to this chosen modeling parameters, and according to predefined at least one analysis/judgment principle in the analysis/determining program 23, do a mathematical operation for this modeling parameters in these a plurality of different editions tables of data, in view of the above with the difference of the tables of data of monitoring these a plurality of different editions, and produce a corresponding analysis result.When analysis/determining program 23 judges that these analysis results have been violated this analysis/judgment principle, then initiatively export a warning message and warn this user.
Many analysis of version system 20 also comprise an APS edition data storehouse 26 in order to the tables of data that writes down these a plurality of different editions and an ERP transaction data base 28 in order to write down a plurality of ERP tables of data.Each tables of data comprises this modeling parameters of being planned out by Advanced Planning and Scheduling 21, and has according to time order and function different start contexts is arranged.Each ERP tables of data system record is corresponding to the actual execution result of these a plurality of tables of data.According to selecting selected this edition data option that goes out in the interface 30, edition data receiver module 22 can take out and these a plurality of tables of data from APS edition data storehouse 26, and from the tables of data corresponding a plurality of ERP tables of data of ERP transaction data base 28 taking-ups with these a plurality of taking-ups.
In an embodiment, the procurement staff of enterprise carries out the former material buying of a certain item number according to the scheduling of APS planning, the procurement staff is with purchase order (Purchasing Order, PO) issue the former material supplier of upstream, wherein in this PO, state clearly by the APS system according to modeling parameters--a Date Required of material procurement lead time Td planning, the supplier replys a scheduled delivery date according to regulation, and the procurement staff writes down an actual delivery date of the former material that this PO purchased after receiving goods.In present embodiment, this Date Required by APS according to modeling parameters--the operational model of material procurement lead time Td, by APS systems organization computing gained, and PO issuing date, this Date Required, material procurement lead time Td and this start context deposited in the tables of data in APS edition data storehouse 26.This scheduled delivery date and this actual delivery date, system was based on the execution result of this PO, so this scheduled delivery date and this actual delivery date deposit in the ERP tables of data of ERP transaction data base 28.
See also Fig. 1 and Fig. 2, Fig. 2 is a synoptic diagram of selecting interface 30 of many analysis of version system 20 of Fig. 1.In present embodiment, select interface 30 to comprise a modeling parameters option 35 and an edition data option 39.Modeling parameters option 35 comprises a modeling parameters name field 46, in order to this modeling parameters title of selecting desire to analyze, one computing parameter setting field 48 is in order to setting required computing parameter, and an analysis/judgment principle input field 50 is judged for analysis/determining program 23 in order to import this analysis/judgment principle.
In the embodiment of Fig. 2, this modeling parameters name of desire analysis is called material procurement lead time Td in modeling parameters name field 46.Its computing parameter then comprises material procurement lead time Td, an estimated time Te and an actual delivery time T r.Material procurement lead time Td is the time difference at the issuing date of the Date Required of this former material and this PO, material procurement lead time Td can estimate an initial value in advance by the user, or by the APS system through after a while simulation and adjustment and the present up-to-date numerical value of output.Estimated time Te is the difference of this actual delivery date and this scheduled delivery date, and actual delivery time T r is the time difference at this actual delivery date and this PO issuing date.
Analysis/judgment principle input field 50 input analysis/judgment principles comprise following:
A. actual delivery time T r mean value and material procurement lead time Td mean value error were expressed as more than or equal to 2 days:
(formula 1)
B. actual delivery time T r mean value and estimated time Te mean value error were expressed as more than or equal to 3 days:
(formula 2)
Edition data option 39 is in order to the stroke count of the edition data of selection desire analysis, its system of selection can be divided into doing to choose or do with the time with number of times to be chosen, for example the operator can select, with in a plurality of tables of data in APS edition data storehouse 26 and in a plurality of ERP tables of data of ERP transaction data base 28, the target of 3 nearest related datas for analyzing.Perhaps selecting with all the nearest 60 days related datas in the ERP tables of data that reaches ERP transaction data base 28 in the APS edition data table in APS edition data storehouse 26 is the target of analysis.
See also Fig. 3, Fig. 3 is that edition data analysis module 24 these performed mathematical operations of Fig. 1 illustrate synoptic diagram.Option according to selection interface 30 shown in Figure 3, edition data receiver module 22 from APS edition data storehouse 26 and in the ERP transaction data base 28, take out nearest 3 data Table As 1, A2, A3, and 3 ERP MSDS E1, E2, E3 that correspond respectively to tables of data A1, A2, A3.
Each self-contained PO issuing date, Date Required, material procurement lead time Td and start context among tables of data A1, A2, the A3.ERP tables of data E1, E2, E3 be each self-contained scheduled delivery date and actual delivery date corresponding to tables of data A1, A2, A3 then, and by the APS system from row operation and deposit the estimated time Te and the actual delivery time T r of ERP tables of data in.
Edition data analysis module 24 comes the computing parameter among analytical data A1, A2, A3 and ERP MSDS E1, E2, the E3 according to selecting specified analysis/judgment principle in the interface 30.In the embodiment of Fig. 3, the computing of edition data analysis module 24 execution formulas 1 and formula 2, its analysis result is:
And
Edition data analysis module 24 these analysis results of judgement have been violated this analysis/judgment principle, therefore initiatively export on warning message to a display screen (display panel) and warn this user, remind this user that APS and/or supplier are adjusted, to dwindle the difference between planning face and the execution face.
Therefore, can monitor the difference of the tables of data of different editions by edition data analysis module 24 of the present invention, can write down and follow the trail of Advanced Planning and Scheduling 21 execution results,, and then be continued to carry out Advanced Planning and Scheduling 21 importing analysiss of related results so that carry out the computing of historical data.Moreover, more provide Advanced Planning and Scheduling 21 to utilize the comparison and analysis of planning and execution result, so that the designer is carried out the adjustment of modeling parameters according to circumstances, or the change of management process, make Advanced Planning and Scheduling 21 plan convergence execution result gradually.
Except the above, a kind of many analysis of version system 20 that is used in an Advanced Planning and Scheduling 21 provided by the present invention can provide input and the output data of respectively planning version to compare, so that Rapid identification causes the special event (for example dull and rush season) of planning change, and then differentiates responsibility rapidly.
See also Fig. 4, Fig. 4 is many analysis of version method step process flow diagram of many analysis of version system 20 shown in Figure 1.The present invention also provides a kind of method of analysis of version more than that is used in an Advanced Planning and Scheduling 21.Advanced Planning and Scheduling 21 comprises one and selects interface 30.Below utilize the embodiment Advanced Planning and Scheduling 21 of Figure 1 and Figure 2 and select interface 30 that many analysis of version method of the present invention is described.The method of analysis of version more than that the present invention is used in Advanced Planning and Scheduling 21 comprises the following step:
Step S50: by selecting interface 30 to provide a plurality of modeling parameters options 35 in order to selecting a modeling parameters, and a plurality of edition data option 39, select for subsequent analysis with a convenient user;
Step S52: receive according to chosen this modeling parameters and a chosen edition data option in the selection interface 30, the tables of data of taking out a plurality of different editions, and the tables of data of each version comprises a start context in order to the instruction time of difference successively;
Step S54: start a corresponding pre-setting analysis/determining program 23 according to this chosen modeling parameters, and according to predefined at least one analysis/judgment principle in the analysis/determining program 23, do a mathematical operation for this modeling parameters in these a plurality of different editions tables of data, in view of the above with the difference of the tables of data of monitoring these a plurality of different editions, and produce a corresponding analysis result; And
Step S56: when analysis/determining program 23 judges that these analysis results have been violated this analysis/judgment principle, then initiatively export a warning message and warn this user.
Manual type compared to prior art is analyzed Advanced Planning and Scheduling 21, the present invention utilizes many analysis of version method, in order to the record and the tracking of Advanced Planning and Scheduling 21 execution results to be provided, so that carry out the computing of historical data, and then continued to carry out Advanced Planning and Scheduling 21 importing analysiss of related results.Moreover, more provide Advanced Planning and Scheduling 21 to utilize the comparison and analysis of planning and execution result, so that the designer is carried out the adjustment of modeling parameters according to circumstances, or the change of management process, make Advanced Planning and Scheduling 21 plan convergence execution result gradually.Except the above, the invention provides input and the output data of respectively planning version and compare, so that Rapid identification causes the special event of planning change, and then differentiate responsibility rapidly.
By the above detailed description of preferred embodiments, hope can be known description feature of the present invention and spirit more, and is not to come category of the present invention is limited with the above-mentioned preferred embodiment that is disclosed.On the contrary, its objective is that hope can contain in the category of claim of being arranged in of various changes and tool equality institute of the present invention desire application.