CN1737269A CN 200510099774 CN200510099774A CN1737269A CN 1737269 A CN1737269 A CN 1737269A CN 200510099774 CN200510099774 CN 200510099774 CN 200510099774 A CN200510099774 A CN 200510099774A CN 1737269 A CN1737269 A CN 1737269A
Authority
CN
China
Prior art keywords
cement
spray
pile
spraying
soil
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN 200510099774
Other languages
Chinese (zh)
Inventor
江焕杰
沙祥林
Original Assignee
GUANGZHOU TIANCHENG BUILDING TECHNIQUE CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by GUANGZHOU TIANCHENG BUILDING TECHNIQUE CO Ltd filed Critical GUANGZHOU TIANCHENG BUILDING TECHNIQUE CO Ltd
Priority to CN 200510099774 priority Critical patent/CN1737269A/en
Publication of CN1737269A publication Critical patent/CN1737269A/en
Pending legal-status Critical Current

Links

Images

Abstract

This invention relates to a spraying and stirring pile method, which belongs to civil engineering field, characterized in that the construction depth can reach to 35m, the cement consumption is small (10-20wt% of the earth), the diameter can be fixed (can be 50-100cm), and can penetrate standard penetration value N<=40 soil layer. The method designs, selects and manufactures the construction equipment as follows: the fixed mount beyond the length of the mount, gunite device, power unit with big twisting moment, the agitator (accompanying diagram2), cut-in screw blade; the method also designs the method of computing the processing parameter, characterized in that it uses the fixed number of leaves, the blade angle, the rotary rate and the water-cement ratio to make sure the cement paste pressure flow and the hoisting speed. The method will be mainly used in the following field: 1, industry and civil architecture foundation process; 2, railway and highway foundation process; 3, harbor, sluice, yard, oil can foundation process.

Description

Technique for spraying and stirring pile
Technical field:
Civil engineering
Background technology:
What at present method for processing foundation formed cement-soil has jet grounting and a deep mixing method.
Jet grounting: the big cement paste of working pressure (jet pressure is often greater than 20mp) the cutting soil body, injection flow is big, can have enormous impact to mix effect to the bigger cobble of diameter, gravelly soil.Handle the degree of depth at present and can reach more than the 30m, cement consumption is big.But owing to do not adopt stirring-head, the cement soil body diameter that forms in the soft or hard different soil does not wait.
The cement-soil paddling process: use fixedly stirring-head, cement paste water filling is under low pressure gone into the soil body and is stirred cement-soil fixed diameter after stirring.But, meet that underground rubble diameter is big slightly, plant roots and stems is difficult for passing.Construction depth has only 18m at present, forms the cement-soil quality and is difficult for guaranteeing (domestic a plurality of urban construction authorities' style of writing careful usefulness of indication or forbidding); At least need four to stir two sprays in the construction, speed is slower.
Summary of the invention:
The present invention is the novel construction method that is different from jet grounting and deep mixing method.
One, this worker method adopts: 1. high pulling torque power (4 T-MAbove moment of torsion); 2. bigger cement paste pressure (2~7mp); 3. organize stirring piece (7 groups~10 groups) more; 4. be provided with special spray and stir device, and 20 °~35 ° of 2 of cut-in type screw blades (accompanying drawing 2) incision lift angles are set in the end; 5. the high fixedly pile frame of 40m is set.
This worker method: 1. cement stirs, quality is good; 2. moment of torsion is big, and spray pressure is big, and has added the cut-in type screw blade, can pass and mould soil layer firmly; 3. spray pressure significantly improves than deep mixing method, can handle the degree of depth and reach 35m; 4. only need one on the other, speed is fast; 5. cement-soil fixed diameter; 6. cement consumption higher pressure injection slip casting method reduces significantly, and near the deep mixing method cement consumption, cost is low.
Two, this worker method process parameters design
1, predetermined major parameter calculates hoisting velocity
Pile body diameter d (m), number of blade ∑ Z, the wide h of blade (m), blade and shaft angle β (°), shaft speed of gyration (rev/min).Technological parameter N (cohesive soil is got 20, get 15) for sandy soil.Cut-in type flight lift angle θ (°).Device speed of gyration n is stirred in spray.
V = h cos &beta;&Sigma;Z + 2 &times; d &times; tg&theta; N n &times; 2
2, by hoisting velocity checking computations whitewashing amount
Q = VF &gamma;a w ( 1 + a c ) &gamma; d
γ in the formula d, γ-be respectively cement paste and soil severe (kN/min);
Q-whitewashing amount (m 3/ min);
Sectional area (the m of F-agitation pile 2);
a w--cement mixed ratio; (according to design commonly used fetch earth heavy by 10%~20%)
a c--the cement paste water/binder ratio.(water/binder ratio can select 0.6~1.0 for use)
3, whether double calculation whitewashing amount and hoisting velocity are coordinated, and determine suitable mouth spray diameter according to whitewashing amount and hoisting velocity.Spray pressure is used 2~7mp always, and it is big to make the stake diameter, can select big pressure for use when soil layer is hard.The mouth spray diameter can be 0.5~1.0cm (it is big that the diameter I produces pressure).
4, calculate whitewashing amount and spray and stir the device hoisting velocity and can not universal time coordinated can adjust to give and decide parameter, until reaching calculation requirement.
Three, this worker method technological process: (with reference to accompanying drawing 1)
1, preparation slurries;
2, pile-forming machine perching;
3, sink to design elevation (subsidence velocity must not greater than the design hoisting velocity) by design subsidence velocity rotation;
4, press at the uniform velocity rotary lifting of design hoisting velocity, and simultaneously by design pressure and flow whitewashing.
Description of drawings:
Accompanying drawing 1 is the process equipment schematic block diagram.
Accompanying drawing 2 stirs the design structure of device for the spray of this worker method.The quantity of blade and determine that by design the cut-in type flight is 2 wherein with the shaft angle, its lift angle (θ) to the mark value of passing through N greatly N 〉=15 soil layers should get and be not more than 30 °; Should get 30 °~45 ° for the less soil layer N of the mark value of passing through<15; The construction depth scope there be should considering by the maximum mark value of passing through soil layer in the soil layer of different soil.
Equipment material and section should carry out bending resistance, shearing resistance and reverse checking computations.
The mouth spray diameter should be determined according to design parameters.
The specific embodiment:
Select to adopt present existing production product; Slush pump, pile frame, stake machine running mechanism and high pulling torque power-equipment.Design and produce spray and stir device (seeing accompanying drawing 2).To different soil diameter designing and calculating parameters of construction technology, carry out test pile after, drop into formally construction.

Claims (1)

  1. The technique for spraying and stirring pile claim.At present civil engineering groundwork handle adopt cement earth pile the slip casting method of injection and deep mixing method arranged.
    Spraying slip casting method is that construction length is big with water under high pressure mud (more than the normal 20mp) cutting soil, but the stake footpath is different in different soil, and cement consumption is big; Deep mixing method is fixing stirring vane, injects cement paste and forms cement earth pile, and its footpath can be fixed, and cement consumption is little, but construction length little (less than 18m), construction quality is difficult for guaranteeing.
    The feature of technique for spraying and stirring pile be with fixing spray stir device (Fig. 2) with slip casing by pressure (2~7mp), construction length can reach 35m, fixed diameter, cement consumption little (soil weighs 10%~20%) speed of application is fast, cost low (near deep-mixed pile).
    Dependent claims:
    1, the equipment of worker's method configuration and spray are stirred the device mode and are made: 3 T-MMore than twist power; 2~10mp spray pump; Fixing pile frame; The making (Fig. 2) that device is stirred in spray.
    2, the design of worker's method construction parameter: (two stir a spray), subsidence velocity, whitewashing hoisting velocity, pumping pressure, flow, the number of blade one on the other.
CN 200510099774 2005-09-07 2005-09-07 Technique for spraying and stirring pile Pending CN1737269A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200510099774 CN1737269A (en) 2005-09-07 2005-09-07 Technique for spraying and stirring pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200510099774 CN1737269A (en) 2005-09-07 2005-09-07 Technique for spraying and stirring pile

Publications (1)

Publication Number Publication Date
CN1737269A true CN1737269A (en) 2006-02-22

Family

ID=36080192

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200510099774 Pending CN1737269A (en) 2005-09-07 2005-09-07 Technique for spraying and stirring pile

Country Status (1)

Country Link
CN (1) CN1737269A (en)

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102011400A (en) * 2010-11-09 2011-04-13 上海强劲地基工程股份有限公司 Sand added cement-soil stirring pile construction equipment and method
CN102689362A (en) * 2012-04-09 2012-09-26 河南省煤炭科学研究院有限公司 Concrete wet type injection system
CN104032733A (en) * 2013-03-06 2014-09-10 上海城地建设股份有限公司 Cement soil mixing pile device capable of switching up and down to spray slurry and construction method
CN104563124A (en) * 2013-10-29 2015-04-29 上海城地建设股份有限公司 Cement-soil mixing pile device capable of vertically converting for spraying slurry and operation method of cement-soil mixing pile device
CN104674797A (en) * 2013-11-27 2015-06-03 上海城地建设股份有限公司 Construction method for five-shaft cement mixing pile without squeezing soil
CN104674798A (en) * 2013-11-27 2015-06-03 上海城地建设股份有限公司 Construction method for non-replacement and up-and-down convertible spouting five-shaft cement mixing pile
CN105908717A (en) * 2016-06-12 2016-08-31 江苏昌鑫基础工程有限公司 Large-torque jet-grouting mixing pile construction device
CN105908747A (en) * 2016-06-12 2016-08-31 江苏昌鑫基础工程有限公司 Drilling and pile arranging assembly of large-torque jet-grouting mixing pile construction device
CN105926608A (en) * 2016-06-12 2016-09-07 江苏昌鑫基础工程有限公司 PLC-controlled large-torque rotary jetting stirring pile construction device
WO2017127955A1 (en) * 2016-01-30 2017-08-03 周兆弟 Drill rod assembly of pile driver
CN108951638A (en) * 2018-08-31 2018-12-07 汪长仁 A kind of stake syringe of automatic air exhausting
CN112281827A (en) * 2020-11-03 2021-01-29 秦皇岛市大地卓越岩土工程有限公司 High-pressure air-disturbed cement-soil mixing pile construction process

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102011400A (en) * 2010-11-09 2011-04-13 上海强劲地基工程股份有限公司 Sand added cement-soil stirring pile construction equipment and method
CN102689362A (en) * 2012-04-09 2012-09-26 河南省煤炭科学研究院有限公司 Concrete wet type injection system
CN104032733A (en) * 2013-03-06 2014-09-10 上海城地建设股份有限公司 Cement soil mixing pile device capable of switching up and down to spray slurry and construction method
CN104032733B (en) * 2013-03-06 2018-12-28 上海城地建设股份有限公司 A kind of cement-soil mixing pile device that can convert whitewashing up and down
CN104563124A (en) * 2013-10-29 2015-04-29 上海城地建设股份有限公司 Cement-soil mixing pile device capable of vertically converting for spraying slurry and operation method of cement-soil mixing pile device
CN104674797A (en) * 2013-11-27 2015-06-03 上海城地建设股份有限公司 Construction method for five-shaft cement mixing pile without squeezing soil
CN104674798A (en) * 2013-11-27 2015-06-03 上海城地建设股份有限公司 Construction method for non-replacement and up-and-down convertible spouting five-shaft cement mixing pile
WO2017127955A1 (en) * 2016-01-30 2017-08-03 周兆弟 Drill rod assembly of pile driver
CN105926608A (en) * 2016-06-12 2016-09-07 江苏昌鑫基础工程有限公司 PLC-controlled large-torque rotary jetting stirring pile construction device
CN105908747A (en) * 2016-06-12 2016-08-31 江苏昌鑫基础工程有限公司 Drilling and pile arranging assembly of large-torque jet-grouting mixing pile construction device
CN105908717A (en) * 2016-06-12 2016-08-31 江苏昌鑫基础工程有限公司 Large-torque jet-grouting mixing pile construction device
CN108951638A (en) * 2018-08-31 2018-12-07 汪长仁 A kind of stake syringe of automatic air exhausting
CN112281827A (en) * 2020-11-03 2021-01-29 秦皇岛市大地卓越岩土工程有限公司 High-pressure air-disturbed cement-soil mixing pile construction process

Similar Documents

Publication Publication Date Title
CN1737269A (en) Technique for spraying and stirring pile
CN103074892B (en) A kind of two, four, six axle interchangeable cement-soil mixing pile device and construction methods thereof
CN102535450A (en) Five-axis cement-soil mixing pile device and construction method
CN104929115A (en) Single-shaft cemented soil stirring pile machine capable of working in lower clearance mode and construction method of single-shaft cemented soil stirring pile machine
CN202430710U (en) Five-axis concrete mixing pile device
CN102943468A (en) Multi-axial mixing pile device capable of reducing soil extrusion and application thereof
CN101538855A (en) Method for treating three-layer soft foundation by using I-shaped mixing pile
CN203256735U (en) Multi-shaft mixing pile device capable of reducing soil-squeezing effect
CN101967822B (en) Construction mechanical device and construction method for fast consolidation of tidal marsh mud
CN211922602U (en) Drilling tool for composite stirring cement stirring pile
CN102561332A (en) Continuous variable-diameter cement-soil mixed pile forming method
CN210087232U (en) Double-stirring drill bit
CN102330426A (en) Transversely rotating type deep mixing pile machine
CN202175945U (en) Construction mechanical device for fast consolidation of tidal marsh mud
CN101514550A (en) Method using belled mixing piles for treating double-layer soft foundation
CN110004924A (en) A kind of Double shaft stirring drill bit with elimination soil body cementation
CN100374657C (en) Construction method employing threaded stirring shaft to decrease ambient foundation deformation
CN206034417U (en) A integrated system is split in high extrusion of deep soft base drilling cream thick liquid
CN212835345U (en) Cutting grouting stirring device
CN210049229U (en) Double-shaft stirring drill bit with function of eliminating soil body bonding
CN204875766U (en) Unipolar cement mixing method machine that can low clearance operation
CN1900430A (en) Multiple head small diameter long screw drilling wall forming machine
CN210637029U (en) Electric-drive ultra-deep cement mixing pile machine
CN100363562C (en) Preventing plate with spreading and deep layer rotating spraying mixture head with diffusion preventing plate and guniting mouth
CN100425555C (en) Pipeline sludge solidification treatment method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: JIANG HUANJIE; APPLICANT

Free format text: FORMER OWNER: GUANGZHOU CITY TIANCHENG CONSTRUCTURE TECHNOLOGICAL CO.,LTD.

Effective date: 20080321

C41 Transfer of patent application or patent right or utility model
TA01 Transfer of patent application right

Effective date of registration: 20080321

Address after: No. 68 Guangdong Province Post encoding Shiling Town, Huadu District of Guangzhou Furong Road: 510850

Applicant after: Jiang Wan Jie

Co-applicant after: Sha Xianglin

Address before: No. 68 Guangdong Province Post encoding Shiling Town, Huadu District of Guangzhou Furong Road: 510850

Applicant before: Guangzhou Tiancheng Building Technique Co., Ltd.

C02 Deemed withdrawal of patent application after publication (patent law 2001)