CN1721155A - Movable production process for plate-type wall member - Google Patents

Movable production process for plate-type wall member Download PDF

Info

Publication number
CN1721155A
CN1721155A CN 200410026321 CN200410026321A CN1721155A CN 1721155 A CN1721155 A CN 1721155A CN 200410026321 CN200410026321 CN 200410026321 CN 200410026321 A CN200410026321 A CN 200410026321A CN 1721155 A CN1721155 A CN 1721155A
Authority
CN
China
Prior art keywords
room
boiler
fog room
fog
make
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN 200410026321
Other languages
Chinese (zh)
Other versions
CN100417502C (en
Inventor
姚谦峰
张萌
张�杰
Original Assignee
姚谦峰
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 姚谦峰 filed Critical 姚谦峰
Priority to CNB2004100263215A priority Critical patent/CN100417502C/en
Publication of CN1721155A publication Critical patent/CN1721155A/en
Application granted granted Critical
Publication of CN100417502C publication Critical patent/CN100417502C/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Devices For Post-Treatments, Processing, Supply, Discharge, And Other Processes (AREA)

Abstract

The present invention relates to wall body plate component production technique composed with concrete and filling block and comprises the building technique for assembly curing room and boiler room and preparation technique for wall body component. Use polyphenyl color steel sandwich plate to assemble and build curing room and boiler room with good heat preservation performance; use steam boiler to stacking steam protection for concrete wall component in curing room with temperature 60~80Deg, humidity more than 90% and curing time 6~8h. Compared with existing technique, this invention has particular advantages such as: it stands out prepare on field; the operation is simple; it is convenient to control and transport; production speed is quick; it makes good use of energy, etc.

Description

The portable production technology of board-like wall body construction
Affiliated technical field
Content of the present invention belongs to the production technical field of house architectural structure spare, relates to a kind of production technology of the ash wall body plate member of being made up of concrete and filling block.
Background technology
Along with developing rapidly of building industry and deepening continuously of housing industrialization process, the extensive mode of production shows deficiency in all many-sides in the tradition dwelling construction, thereby the prefabrication production technology of exploitation and the more advanced technology of development, economical rationality has been imperative.In the prior art, the Chinese invention patent publication number is that the patent application text of CN1222436A once disclosed the wall board production technology that a kind of name is called " manufacturing technique method of multi-ribbed composite wallboard ", through user's practical application, find that this invention also has following weak point: 1. fog room is built below ground in, at indoor retaining wall, heat-insulation layer and the interior wall of being equipped with, the making quantities is big, program is complicated, is not easy to field fabrication, and the production cycle is longer; 2. the control of curing temperature does not meet the material property characteristics, and curing time (24~36 hours) and production cycle are all long, can't satisfy the requirement of quick production; 3. the used bed die of this process is a plank, finds in actual application, and the scantling of being produced by wooden bed die lamination is inaccurate, occurs warping phenomenon easily, is out of shape bigger; 4. the complex structure of heat generator is difficult for realizing; 5. to live steam pipe pipe protection deficiency, can not make full use of the energy.
Summary of the invention
The objective of the invention is to the existing production technology in this area particularly the described manufacturing technique method of CN1222436A patent text make improvement, the portable production technology of a kind of cost board-like wall body construction low, easy to operate, easy to implement is provided, in order to realize prefabricated components production plantization, improve the quality of production and the efficient of member.
The technical solution that adopts is so for achieving the above object: the portable production technology of this board-like wall body construction comprises that mainly the construction technology of dismountable fog room and boiler room and wall body construction make two process portion, wherein
1, described fog room and boiler room construction technology carry out according to following operation: make thermal insulation layer on the fog room position in the operation place of handling ground earlier, then make the armored concrete cushion cap thereon, around cushion cap, make the fog room that has the gate then with polyphenyl chromatic steel sandwich plate assembling with excellent adiabatic capacity, make boiler room with the assembling of polyphenyl chromatic steel sandwich plate on the boiler room position in this external operation place, boiler room is installed in boiler room and is provided with water pump, fog room inner concrete cushion cap is communicated with the Boiler Steam port of export by jet chimney, on the fog room interior wall, be provided with respectively the hygrosensor and the hygrosensor that connect with boiler controlling device, the trickle shower nozzle that links to each other with the boiler room water pump and control for hygrosensor also is housed on the fog room inner roof wall;
2, described wall body construction manufacture craft is carried out according to following operation: after tabular component is made large form and placed the special-purpose place of structure manufacture, the steel plate bed die that the bottom is welded with channel-section steel places on the large form, make member therein after adding channel-section steel limit mould, after completing the member of large form and not maintenance is transported on the concrete bearing platform in the fog room, make polylith treat steam-cured member lamination placement, close the fog room gate after placing end, open steam boiler, provide heat to carry out lamination steam curing by jet chimney to the fog room inner member, curing temperature is controlled curve controlled at 60~80 ℃ according to the time, whole curing time is 6~8 hours, carry out humidity control according to the indoor humidity situation by the trickle shower nozzle during this time, it is remained on more than 90%, afterwards large form and member are transported by fog room together, slough and form the ash wall body plate member that completes after the template.
Compared with prior art, the advantage that the present invention has is: 1. adopt easy accessibility, be easy to transportation and reusable heat preservation maintenance structure, and outstanding field fabrication, simple to operate, speed of production is fast, efficient is high, saves investment; 2. template adopts steel plate and channel-section steel to make, and the scantling of making is accurate, distortion is less; 3. adopt the temperature and humidity automatic compensatory technique, carry out maintenance, guaranteed the quality of structure manufacture in strict accordance with the performance requirement of material in the member; 4. steam curing pipeline major part places in the fog room, can be incubated processing to the seldom section of tubing that exposes, and heat runs off seldom, and using energy source is abundant; 5. the scope of application is extensive, can be used for various board-like member of armored concrete and the armored concrete composite board type members that need maintenance.
Description of drawings
Fig. 1 is the work structuring of a specific embodiment of the present invention and the schematic diagram of the course of work.
Fig. 2 is the vertical view of work structuring part shown in Figure 1.
The specific embodiment
Referring to accompanying drawing, the specific operation process of production technology of the present invention can be illustrated by following examples.
At first the member production site is planned that comprise the planning of fog room 2, boiler room 3, construction material being stacked place, structure manufacture place and member finished product stacking place etc., wherein fog room 2 floor spaces are 3.5~5m * 6.5~7.5m; After planning is finished ground is carried out in place, fog room 2 place and handle (look the different skins that divide of foundation condition and do 3: 7 dirt), the thick polyphenyl plate of material of 10cm is laid as thermal insulation layer 9 in ground on the scene then, on styrofoam, make the thick armored concrete cushion cap 10 of 15cm again, be 12.6 channel-section steel at cushion cap 10 sides along the pre-buried model of fog room axis simultaneously, the channel-section steel groove upwards; Making height with 80mm * 80mm square steel is the cube shaped steel skeleton of 3.5~3.8m, be connected to pre-buried channel-section steel in the quadrangle of steel skeleton bottom and connect with bolt, adopt the thick polyphenyl chromatic steel sandwich plate of 10cm to safeguard then, be connected with screw rod between battenboard and the steel skeleton, fog room 2 ceilings also adopt and also adopt the thick polyphenyl chromatic steel sandwich plate of 10cm, the sideways polyphenyl color steel of fog room 2 a certain length adopts splicing, forms gate 13; On fog room 2 interior walls, be provided with the hygrosensor 14 and the hygrosensor 15 that can connect with the boiler room boiler controlling device, also be equipped with on these external fog room 2 inner roof walls and link to each other with boiler room water pump 16 and be the hygrosensor 15 trickle shower nozzles 17 of control unlatching automatically.Boiler room 3 can be built simultaneously or successively with fog room 2, earlier simple ground is carried out on ground, boiler room 3 place when constructing and handles, and makes boiler room 3 with the polyphenyl chromatic steel sandwich plate then; Boiler 11 and water pump 16 etc. are set in the boiler room 3, and wherein boiler 11 adopts one ton of oil-fired steam boiler, and the thermal efficiency of boiler 11 should per hour provide heat should be no less than 600,000 kilocalories more than 80%; Boiler 11 is that jet chimney 8 extend in the fog room in the cushion cap 10 to fog room 2 heat supplies by the 6cm steel pipe, and the exposed outdoor part of steel pipe will be incubated processing by wrapping up in modes such as applying the insulation material thing; Be provided with a plurality of steam vents to the side near pre-buried channel-section steel 20cm position in fog room 2 length, set-up mode is that both sides are respectively established seven, and every hole is separated by about one meter.In the practice of construction, fog room 2 can be built one or more, has a plurality ofly as fog room 2, and then boiler room 3 is built on the place between each fog room 2.
Large form 4 adopts the 1cm steel plate as bed die 6, and bed die 6 length and width are of a size of 2750~2800mm * 2600~2650mm, uses the 20a channel-section steel as limit mould 5; At 6 times welding of bed die 20a channel-section steel 7, the channel-section steel edge of a wing down, cut off along each four road of both direction in length and breadth and at infall, wherein in the middle of the distance of twice should be complementary with its heavy fork truck 12, be formed for making the no top cover cubic space that the base plate of board-like reinforced concrete member is strengthened.Fork-lift truck 12 adopts maximum lifting height to be not less than five ton forklifts of 3m.
The making place of wall body construction should be located at apart from fog room 2 nearby.With fork-lift truck 12 large form 4 is transported to earlier during making and made the place, place framework of steel reinforcement and filling block, casting concrete then therein; Build and finish the back and with fork-lift truck 12 large form 4 is reached and just finished the concrete wall member of building and be transported on the interior cushion cap 10 of fog room; The above-mentioned manufacturing process that circulates, in fog room 2, pack into two groups of nine layers of large forms 4 and member, every layer of 0.3m of nine layers of member be 2.7m altogether.After wall plate member make to finish and all is transported in the fog room 2, close fog room gate 13, quietly stop opening after 2 hours boiler and heat up, in 2~3 hours, make the maintenance indoor temperature rise to 60 ℃~more than 80 ℃; Continue constant temperature 2 hours, after this lower the temperature again, indoor/outdoor temperature-difference is not more than 20 ℃ when opening gate 13, requires humidity to remain on more than 90% in this process, can control by hygrosensor 15 and trickle shower nozzle 17 in the practical operation.Maintenance is opened gate 13 after finishing, and transports member and large form, and forming specification after the demoulding is the wall body construction of 2630mm * 2500mm * 200mm.Label 1 is a transporting equipment in the accompanying drawing.

Claims (1)

1, a kind of portable production technology of board-like wall body construction is characterized in that comprising the construction technology and the wall body construction manufacture craft of dismountable fog room (2) and boiler room (3), wherein
1.1 fog room (2) and boiler room (3) construction technology carry out according to following operation: on fog room (2) position in the operation place of handling ground, make thermal insulation layer (9) earlier, then make armored concrete cushion cap (10) thereon, make the fog room (2) that has gate (13) with the assembling of polyphenyl chromatic steel sandwich plate all around at cushion cap (10) then, make boiler room (3) with the assembling of polyphenyl chromatic steel sandwich plate on boiler room (3) position in this external operation place, boiler room (11) is installed in boiler room (3) and is provided with water pump (16), fog room (2) inner concrete cushion cap (10) is communicated with boiler (11) steam (vapor) outlet by jet chimney (8), on fog room (2) interior wall, be provided with respectively the hygrosensor (14) and the hygrosensor (15) that connect with boiler controlling device, on fog room (2) inner roof wall, be equipped with and link to each other with boiler room water pump (16) and be the trickle shower nozzle (17) that hygrosensor (15) is controlled;
1.2 the wall body construction manufacture craft is carried out according to following operation: after tabular component made large form (4) and place the special-purpose place of structure manufacture, the steel plate bed die (6) that the bottom is welded with channel-section steel (7) places on the large form (4), make member therein after adding channel-section steel limit mould (5), after completing the member of large form (4) and not maintenance is transported on the concrete bearing platform (10) in the fog room (2), make polylith treat steam-cured member lamination placement, close fog room gate (13) after placing end, open steam boiler (11), provide heat to carry out lamination steam curing by jet chimney (8) to fog room (2) inner member, curing temperature is controlled at 60~80 ℃, whole curing time is 6~8 hours, carry out humidity control according to the indoor humidity situation by trickle shower nozzle (17) during this time, it is remained on more than 90%, afterwards large form (4) and member are transported by fog room (2) together, slough and form the member that completes after the template.
CNB2004100263215A 2004-07-12 2004-07-12 Movable production process for plate-type wall member Expired - Fee Related CN100417502C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNB2004100263215A CN100417502C (en) 2004-07-12 2004-07-12 Movable production process for plate-type wall member

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNB2004100263215A CN100417502C (en) 2004-07-12 2004-07-12 Movable production process for plate-type wall member

Publications (2)

Publication Number Publication Date
CN1721155A true CN1721155A (en) 2006-01-18
CN100417502C CN100417502C (en) 2008-09-10

Family

ID=35911939

Family Applications (1)

Application Number Title Priority Date Filing Date
CNB2004100263215A Expired - Fee Related CN100417502C (en) 2004-07-12 2004-07-12 Movable production process for plate-type wall member

Country Status (1)

Country Link
CN (1) CN100417502C (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102241066A (en) * 2011-07-20 2011-11-16 上海城业管桩构件有限公司 Industrial production method for housing wall body module
CN102490250A (en) * 2011-12-09 2012-06-13 山东万斯达建筑科技有限公司 Concrete prefabricated part manufacturing device
CN104723447A (en) * 2015-04-21 2015-06-24 南通市恒达机械制造有限公司 Steam curing equipment for cement bricks
CN105668256A (en) * 2016-03-28 2016-06-15 北京星航机电装备有限公司 Curing house stacking car control system and control method of concrete prefabricated slab production line
CN107322775A (en) * 2017-08-08 2017-11-07 西安墙体材料研究设计院 A kind of reciprocating circulating maintenance device and maintaining process
CN111618917A (en) * 2019-03-20 2020-09-04 北新集团建材股份有限公司 Assembled wallboard production line
CN113001745A (en) * 2021-03-09 2021-06-22 安徽格构材料科技有限公司 Assembled wallboard flat die superposition production method

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102615707A (en) * 2011-01-27 2012-08-01 伊犁固锐特建材有限公司 Circular concrete pole production process and special steam curing kiln thereof

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1028786C (en) * 1991-11-09 1995-06-07 林得泉 Process for production of wall body material <<lattice board light structure>>
CN2257307Y (en) * 1996-06-11 1997-07-02 阜新市房产建筑构件厂 Concrete element hollow steel plate hot form platform
CN1093030C (en) * 1999-02-03 2002-10-23 西安建筑科技大学 Technological process of producing dense-rib composite wall board

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102241066A (en) * 2011-07-20 2011-11-16 上海城业管桩构件有限公司 Industrial production method for housing wall body module
CN102241066B (en) * 2011-07-20 2014-08-20 上海城业管桩构件有限公司 Industrial production method for housing wall body module
CN102490250A (en) * 2011-12-09 2012-06-13 山东万斯达建筑科技有限公司 Concrete prefabricated part manufacturing device
CN104723447A (en) * 2015-04-21 2015-06-24 南通市恒达机械制造有限公司 Steam curing equipment for cement bricks
CN105668256A (en) * 2016-03-28 2016-06-15 北京星航机电装备有限公司 Curing house stacking car control system and control method of concrete prefabricated slab production line
CN105668256B (en) * 2016-03-28 2019-02-22 北京星航机电装备有限公司 The curing room stacking vehicle control and control method of concrete prefabricated board assembly line
CN107322775A (en) * 2017-08-08 2017-11-07 西安墙体材料研究设计院 A kind of reciprocating circulating maintenance device and maintaining process
CN111618917A (en) * 2019-03-20 2020-09-04 北新集团建材股份有限公司 Assembled wallboard production line
CN113001745A (en) * 2021-03-09 2021-06-22 安徽格构材料科技有限公司 Assembled wallboard flat die superposition production method

Also Published As

Publication number Publication date
CN100417502C (en) 2008-09-10

Similar Documents

Publication Publication Date Title
CN204804044U (en) House with equipment of three -dimensional light steel frame structure composite sheet module
US5028357A (en) Lightweight cooling tower with cruciform columns
US8418411B2 (en) Integral, industrialized modular dwelling system
CN204826348U (en) Compound floor board of three -dimensional light steel frame structure
CN105863067A (en) Modular low-layer assembling type house system of special-shaped column steel structure
ES2969483T3 (en) Building construction procedure
US5155961A (en) Lightweight cooling tower with cruciform columns
CN100417502C (en) Movable production process for plate-type wall member
US4432171A (en) Building modules
CN104652610A (en) Corner splice joint structure for box-type module building
CN105525557B (en) Structural system and its construction method for indoor interim ice stadium ice face supporting conversion
CN105317109A (en) Three-dimensional net fixed house adopting overall pouring of foamed wall and construction method
CN203320695U (en) Integrated house
CN204804176U (en) Three -dimensional light steel frame structure composite wall panel of right angle type
CN108360682A (en) A kind of construction process of three-dimensional building module and three-dimensional building module
CN210562600U (en) Novel plate-shaped building system
CN110259237A (en) Assembling frame posture horizontal warehouse, prefabricated panel mold and horizontal warehouse method of construction
CN207172366U (en) Splicing prefabricated cover plate mold
CN106351466A (en) Housing assembled by light steel space framework structure composite plate module and construction method thereof
CN205063175U (en) Three -dimensional light steel frame structure composite wall panel of angle type that slits
CN115366232A (en) Curing mold for steamer type prefabricated concrete slabs
CN209975803U (en) Ecological composite wall structure
CN110117989B (en) Quick building method of energy-saving environment-friendly building block type detachable frame structure mobile building and mobile building thereof
CN209491943U (en) The concrete integrated wall plate addition method produces molding machine
CN109760178B (en) Method for manufacturing assembled integral floor slab

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20080910

Termination date: 20110712