CN1696412A - Method for designing practical weir in broadband and coarse vacuum - Google Patents

Method for designing practical weir in broadband and coarse vacuum Download PDF

Info

Publication number
CN1696412A
CN1696412A CN 02146339 CN02146339A CN1696412A CN 1696412 A CN1696412 A CN 1696412A CN 02146339 CN02146339 CN 02146339 CN 02146339 A CN02146339 A CN 02146339A CN 1696412 A CN1696412 A CN 1696412A
Authority
CN
China
Prior art keywords
weir
max
coefficient
design
value
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN 02146339
Other languages
Chinese (zh)
Other versions
CN1277994C (en
Inventor
杨首龙
林琳
叶丽清
谢德瑞
翁玉华
周顺田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
FUJIAN PROVINCIAL INST OF WATER CONSERVANCY AND HYDRAULIC POWER PROSPECTING AND
Original Assignee
FUJIAN PROVINCIAL INST OF WATER CONSERVANCY AND HYDRAULIC POWER PROSPECTING AND
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by FUJIAN PROVINCIAL INST OF WATER CONSERVANCY AND HYDRAULIC POWER PROSPECTING AND filed Critical FUJIAN PROVINCIAL INST OF WATER CONSERVANCY AND HYDRAULIC POWER PROSPECTING AND
Priority to CN 02146339 priority Critical patent/CN1277994C/en
Publication of CN1696412A publication Critical patent/CN1696412A/en
Application granted granted Critical
Publication of CN1277994C publication Critical patent/CN1277994C/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Barrages (AREA)

Abstract

The present invention discloses a design method of broad base low-vacuum practial weir. Said invention includes system design mentality, weir surface curve design, flood carrying capacity calculation method, finite element stress check calculation and technical economic comparison of new weir type and WES weir. The most key of said design includes three factors of flood carrying capacity, weir surface pressure and volume of dam body, and its concrete design calculation method includes two portions of body type designand discharge coefficient definition.

Description

The method for designing of broadband low vacuum practical weir
Technical field
The present invention relates to the method for designing of flood discharge overfall dam, a kind of specifically design method of broad base low-vacuum practial weir.
Background technology
Practical weir is one of topmost building of Ba Gongzhong, has dash and sluicing double action concurrently, therefore, the safe and reasonable, also good hydraulic characteristic(s) will be arranged on requiring its structure.Broadband low vacuum practical weir belongs to Hydraulic and Hydro-Power Engineering dam flood-discharge new technology.Content relates to the most important building that Ba Gongzhong has dash and sluicing double action concurrently---the design of practical weir.
More than one since century, the hydraulic engineering expert of countries in the world has proposed a plurality of overflow weir bodily forms, wherein most representative is by the WES weir of CE, US Army water channel experiment station proposition and the Krieger one Ao Feicailuofu weir of former Soviet Union's proposition (being called for short gram weir difficult to understand), the former is extensively adopted by the U.S., Japan and the Western European countries, and among income China's " design of spillway standard " SL253-2000, the latter then is put into former Soviet Union's " hydraulic structure design specifications ".Restrain weir difficult to understand, it is the former Soviet Union's a kind of practical weir commonly used and that be put into its hydraulic structure design specifications, also be the weir type of China's 50~sixties through using always, the weir surface curve mainly is made up of five line segments, it is the upstream vertical section, the curved section of weir kept man of a noblewoman portion straightway, weir crest upstream and downstream face, abrupt slope straightway and anti-segmental arc are formed, and mainly tabling look-up by X/Hd and Y/Hd during design draws.AUS engineering water channel experiment station proposes standard weir type: the WES weir, extensively adopt in the U.S., Japan and the Western European countries, also be widely adopted in China the eighties, and income China's " design of spillway standard ", it is more small and exquisite that WES weir build restrains weir difficult to understand, and its weir surface curve depends on typing head Hd fully.The institute of Yangtze River Water section of China proposed the long I type practical weir that grinds in 1973,1981~nineteen eighty-two enriches the back and forms the weir surface curve similar to the WES weir, and only the power exponent with weir, downstream face changes 1.80 into by 1.85, and weir body mentality of designing is basic identical with the WES weir; Nanjing Shui Keyuan utilizes binary potential barrier Mathematical Modeling, find the axial ratio of an optimum, make that curve interior pressure distribution in weir crest upstream is comparatively even and negative pressure value is minimum, pressure distribution in the weir crest downstream curve is comparatively even and negative pressure value is minimum, weir crest downstream face curve and WES weir are very approaching, and this weir is called as the extremal practical weir; China Jiang Yu dragon, the medium people of Guo Zi are after the weir crest downstream curve of collecting domestic and international multiple weir type, and respective coordinate value is in addition average, and the curve that obtains a kind of match is called the resultant curve practical weir; It is a biquadratic equation that the airfoil type weir surface curve that proposes behind the airfoil type weir of the empty Advisory Board of U.S.'s boat (NACA) has been analyzed in the examination of China Hohai University, mainly is applicable to the face design of flood spillway weir, bank.
In sum, present practical weir all has the flood discharge capacity deficiency or flood discharge capacity does not also reach ideal range, the negative pressure value of weir face such as but can't bear at problem, and improving the flood discharge capacity of dam, the cavitation resistive property that strengthens dam facing, the engineering quantity etc. that reduces overfall dam is the important technology difficult problem that present Ba Gongjie waits to capture.
Show from the interrelated data retrieval that comprises Chinese patent, at present the relevant report of still not having the application example of broadband low vacuum practical weir both at home and abroad and not finding flood discharge capacity higher under equal hydraulics as yet.
Summary of the invention
In order to overcome present practical weir flood discharge capacity deficiency, problem such as dam facing vacuum band is unreasonable the invention provides a kind of design method of broad base low-vacuum practial weir.
The technical solution adopted for the present invention to solve the technical problems is: the present invention includes general design idea, the design of weir surface curve, flood discharge capacity computational methods, finite Element Stress are checked calculating and new weir type and WES weir Technological Economy and are relatively waited part.The design most critical of weir type three key elements, i.e. discharge capacity, weir surface pressure and dam body volume arranged.And these three key elements are mutual restriction to each other.Feature of the present invention is: broadband low vacuum practical weir, and the specific design computational methods are divided two parts, and the one, the build design, the 2nd, discharge coefficient is determined.The build design mainly is to determine oval major and minor axis length A, B and power curve COEFFICIENT K.
Head ellipse ( x a H max ) 2 + ( 1 - Y b H max ) 2 = 1
Power curve y=CX 1.85
By known maximum weir head H MaxWith permission weir face max vacuum force value ha, obtain coefficient k by following formula, C.
( 1 ) - - - K = - 0.88 ha H max + 0.5
C = K H max 0.85 = K · H max - 0.85
2. obtain coefficient a value according to the K value by following formula
a=0.1984-0.2571ogk
3. obtain coefficient b value according to the K value by following formula
b=0.2502-0.1804k
4. transverse length A=aH Max
Ellipse short shaft length B=bH Max
5. by m = 0.5250 - 0.03922 ln ( P H ) Obtain the integrated flow rate coefficient.
The wide zone of described band shape: the maximum operating head polishing H of weir face MaxWith the ratio of weir face vacuum belt length L be H Max/ L=0.77~1.11; High dam H Max/ L gets big value, and weir gets the small value.
Described height of dam is at the high dam of 70~130m, and weir face head ellipse long axis length can be determined by following formula
A=(0.1984-0.25701ogk)H max
Minor axis length: B=(0.2502-0.1804k) H Max
Weir face equation Y=CX 1.85
Coefficient K = 0.5 - 0.88 ha H max Ha is for allowing negative pressure value (m water column)
Coefficient C=KH -0.85 Max
Integrated flow rate coefficient (counting the side direction effect of contraction)
m = 0.5252 - 0.03922 ln ( P H )
P is that height of weir (m) H is weir head (m)
Above formula application conditions:
P/H=4.6~20.0
Storehouse, overfall dam water inlet face width degree B The storehouseWith water inlet overflow clear span B OnlyRatio
B The storehouse/ B Only=3.0~5.0
Flood discharge capacity has than quantum jump
Big discharge coefficient M can reach 0.5261~0.5465, and big by 5~7.8% than the WES weir, more antivacuum gram weir difficult to understand is big by 4.4~7.2%.
The invention has the beneficial effects as follows: the weir surface pressure presents the wider nothing harm low pressure in zone and distributes, and promptly so-called low pressure broadband distributes; The peak suction value of weir face is controlled in the safe range of standard permission; This weir type has bigger flood discharge capacity, its discharge coefficient international WES weir maximum at present can improve 5.0~7.8%, gram one antivacuum weir difficult to understand than the former Soviet Union improves 4.4~7.2%, can reach 0.5261~0.5465, reservoir level can reduce by 0.36~0.92m, and its effect is by improving WES weir type or improving the gate pier head type and improve 10 times that flood discharge capacity tells on.Moreover, the broadband low vacuum practical weir bodily form is small and exquisite, and the basal area of weir body can reduce 6.8% than the WES weir, is a kind of new weir type that good economic benefit and application prospect are arranged.At present, this new technology has been successfully applied to the weir face design of the major works dam of Fujian Province's key project dam design and height of dam 128m, and is respond well.Therefore, weir of the present invention body has big flood discharge capacity, and the harmfulness negative pressure does not take place the weir face, and engineering quantity is few, characteristics such as reduced investment.
Description of drawings
The present invention is described in more detail below in conjunction with drawings and Examples.
Fig. 1 is a broadband of the present invention low vacuum practical weir cross section view.
Fig. 2 is a terminal layout of the present invention.
Fig. 3 is an overfall dam sectional drawing of the present invention.
Fig. 4 is an overfall dam plan view of the present invention.
Dam body slime flux face weir crest upstream curve 1 among the figure, weir, weir crest downstream surface curve 2 (by weir crest to abrupt slope section initial point), weir surface curve 3 is anti-segmental arc (initial point is an abrupt slope section end), gate pier 4, gate 5.
The specific embodiment
Embodiment 1:
Overfall dam weir crest curve (1) is designed to as shown in Figure 1:
( X 2.912 ) 2 + ( 1 - Y 1.579 ) 2 = 1
Weir, weir crest downstream surface curve is 2 to be designed to:
Y=0.0803X 1.85
Weir surface curve 3 is radius 20m, and central angle is 83 ° a circular arc;
Gate pier 4 is a long 30m, thick 2.5m cuboid, and two is the column of radius 1.25m;
Gate 5 is the camber steel gate of a radius 16m.

Claims (3)

1. design method of broad base low-vacuum practial weir, it is characterized in that: broadband low vacuum practical weir specific design computational methods are divided two parts, and the one, the build design, the 2nd, discharge coefficient is determined; The build design mainly is to determine oval major and minor axis length A, B and power curve COEFFICIENT K;
Head ellipse ( X aH max ) 2 + ( 1 - Y b H max ) 2 = 1
Power curve y=CX 1.85
By known maximum weir head H MaxWith permission weir face max vacuum force value ha, obtain coefficient k by following formula, C;
K = - 0.88 ha H max + 0.5
C = K H max 0.85 = K · H max - 0.85
2. obtain coefficient a value according to the K value by following formula
a=0.1984-0.257logk
3. obtain coefficient b value according to the K value by following formula
b=0.2502-0.1804k
4. transverse length A=aH Max
Ellipse short shaft length B=bH Max
5. by m = 0.5250 - 0.039221 n ( P H ) Obtain the integrated flow rate coefficient.
2. the method for designing of broadband according to claim 1 low vacuum practical weir is characterized in that: the wide zone of described band shape is: the maximum operating head polishing H of weir face MaxShould be H with the ratio of weir face vacuum strip length L Max/ L=0.77~1.11; High dam H Max/ L gets big value, and weir gets the small value.
3. the method for designing of broadband according to claim 1 low vacuum practical weir is characterized in that: described height of dam is at the high dam of 70~130m, and weir face head ellipse long axis length can be determined by following formula
A=(0.1984-0.2570logk)H max
Minor axis length: B=(0.2502-0.1804k) H Max
Weir face equation Y=CX 1.85
Coefficient K = 0.5 - 0.88 ha H max Ha is for allowing negative pressure value (m water column)
Coefficient C=KH -0.85 Max
Integrated flow rate coefficient (counting the side direction effect of contraction)
m = 0.5252 - 0.039221 n ( P H )
P is that height of weir (m) H is weir head (m)
Described formula application conditions:
P/H=4.6~20.0
Storehouse, overfall dam water inlet face width degree B The storehouseWith water inlet overflow clear span B OnlyRatio
B The storehouse/ B Only=3.0~5.0
Flood discharge capacity has than quantum jump
Big discharge coefficient M can reach 0.5261~0.5465, and big by 5~7.8% than the WES weir, more antivacuum gram weir difficult to understand is big by 4.4~7.2%.
CN 02146339 2002-10-24 2002-10-24 Method for designing practical weir in broadband and coarse vacuum Expired - Fee Related CN1277994C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 02146339 CN1277994C (en) 2002-10-24 2002-10-24 Method for designing practical weir in broadband and coarse vacuum

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 02146339 CN1277994C (en) 2002-10-24 2002-10-24 Method for designing practical weir in broadband and coarse vacuum

Publications (2)

Publication Number Publication Date
CN1696412A true CN1696412A (en) 2005-11-16
CN1277994C CN1277994C (en) 2006-10-04

Family

ID=35349290

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 02146339 Expired - Fee Related CN1277994C (en) 2002-10-24 2002-10-24 Method for designing practical weir in broadband and coarse vacuum

Country Status (1)

Country Link
CN (1) CN1277994C (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105821815A (en) * 2016-04-01 2016-08-03 山东省水利科学研究院 Protective device for overflowing bucket

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105821815A (en) * 2016-04-01 2016-08-03 山东省水利科学研究院 Protective device for overflowing bucket
CN105821815B (en) * 2016-04-01 2017-07-14 山东省水利科学研究院 A kind of protector for excessively stream bucket lip

Also Published As

Publication number Publication date
CN1277994C (en) 2006-10-04

Similar Documents

Publication Publication Date Title
CN2832899Y (en) Energy dissipation structure for mud-rock flow]
CN103498452B (en) The slit structure of high steep Narrow Valleys outlet structure escape works
CN107022987B (en) High dam overflow surface jet control structure
CN203188185U (en) United energy dissipation structure under ultralow Froude number
CN204282308U (en) A kind of lattice guest gabion composite material dam adapting to deep covering layer
CN1277994C (en) Method for designing practical weir in broadband and coarse vacuum
CN101408022B (en) Water gate dipper type shunting energy dissipating rushing-proof technology
Jun et al. Flood control strategies for the river basin enlightened by the 2020 upper Yangtze River floods
CN212865890U (en) Soft soil foundation treatment structure
CN204982814U (en) Power that disappears structure in low water head dam low reaches riverbed
CN113094799B (en) Comprehensive control method for deformation of ultra-high core wall rock-fill dam
CN104727266B (en) It is applicable to the rubble flow sediment transport control method of broad valley type debris flow valley
Ouamane et al. Improvement of labyrinth weirs shape
CN103382717B (en) The ladder energy dissipating method of preposition aeration pond aeration and energy dissipater
CN115995498A (en) Solar cell and solar cell string
CN212335924U (en) Environment-friendly river course water conservancy diversion canal
CN209836954U (en) Composite structure for energy dissipation of surface hole outlet of arch dam
CN213267769U (en) Be applied to side direction and intake many pipelines of inverted siphon water inlet combination vortex device that disappears
CN108547268B (en) Tail water channel structure for overburden foundation
CN211111303U (en) Composite construction system for large-scale and special-shaped artificial wetland
CN207193875U (en) A kind of debris flow drainage groove for increasing resistance based on section
CN201459691U (en) Spillway with warped surface bottom board
CN211435201U (en) Curve desilting basin
CN2795298Y (en) Large rigidity underground continuou wall
CN210262774U (en) Chute with novel terminal energy dissipation facility

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C19 Lapse of patent right due to non-payment of the annual fee
CF01 Termination of patent right due to non-payment of annual fee