CN1648347A - 利用可变式潮流控制闸清理航道泥沙的方法 - Google Patents

利用可变式潮流控制闸清理航道泥沙的方法 Download PDF

Info

Publication number
CN1648347A
CN1648347A CN 200510013195 CN200510013195A CN1648347A CN 1648347 A CN1648347 A CN 1648347A CN 200510013195 CN200510013195 CN 200510013195 CN 200510013195 A CN200510013195 A CN 200510013195A CN 1648347 A CN1648347 A CN 1648347A
Authority
CN
China
Prior art keywords
control gate
dike
leading
double
gate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN 200510013195
Other languages
English (en)
Other versions
CN100365213C (zh
Inventor
林步东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CNB2005100131954A priority Critical patent/CN100365213C/zh
Publication of CN1648347A publication Critical patent/CN1648347A/zh
Application granted granted Critical
Publication of CN100365213C publication Critical patent/CN100365213C/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Barrages (AREA)

Abstract

本发明公开了一种利用可变式潮流控制闸清理航道泥沙的方法,包括如下步骤:在河道河口或在河口潮流区窄处的任意位置设置可变式潮流控制闸,可变式潮流控制闸横跨河道两岸;在可变式潮流控制闸的向海一侧设置有双导堤,双导堤之间的距离至少为200米,足夠让远洋轮船双向行驶,双导堤的长度至少是从可变式潮流控制闸起延伸至水深等深线-15米,双导堤的高度为在涨潮时与海平面齐平;在海水退潮时,开启与双导堤连接处的可变式潮流控制闸的闸门,将其他闸门关闭,强大的水流夹带泥从双导堤内流出海;在海水涨潮时,关闭与双导堤连接处的可变式潮流控制闸的闸门,将其他闸门打开,本发明可将河流水流的力量集中,起到束水攻沙清理航道的效果。

Description

利用可变式潮流控制闸清理航道泥沙的方法
技术领域
本发明涉及河流淤泥治理领域,特别是涉及一种利用闸门清理航道泥沙的方法。
背景技术
许多大江大河每年都从上游带来极为大量的泥沙,这些泥沙到了河口,由于河道宽度增加,河流的流速大幅下降,同时,在大海潮流的影响下出现往复流,泥沙就会停止前进,在河口处沉淀下来,逐渐形成一段浅水地带,这些浅水区域,被称为拦门沙。拦门沙成为船只进入内河道的障碍。
以上海港口为例,在建港初期,由于来往贸易船只的吨位较小,长江河口处的拦门沙尚不会造成碍航现象,但随着远洋轮的吨位的增大,而拦门沙造成的河底距水平面仅约6-7米,万吨轮只能在涨潮时才能乘潮入港。
现代的远洋轮的吨位逐渐加大,海港及航道的水深最小也要达到15米,才能满足近代远洋轮的吃水要求。为了增加航道的深度,各国政府每年都要花费大量的人力、物力和财力疏通航道。
可变式潮流控制闸Programmable TidaL Current Control Gate简称PTCCG,在中国专利申请号为03130361.7,发明名称为:“一种防洪及泄洪的方法”,公开了利用PTCCG进行防洪及泄洪的方法。
发明内容
本发明的目的是提供一种利用可变式潮流控制闸清理航道泥沙的方法。
本发明的技术方案概述如下:
一种利用可变式潮流控制闸清理航道泥沙的方法,其特征是包括如下步骤:
(1)在河道河口或在河口潮流区窄处的任意位置设置可变式潮流控制闸,所述可变式潮流控制闸横跨所述河道两岸;
(2)在所述可变式潮流控制闸的向海一侧设置有双导堤,所述双导堤之间的距离至少为200米,足夠让远洋轮船双向行驶,所述双导堤的长度至少是从可变式潮流控制闸
起延伸至水深等深线-15米,所述双导堤的高度为在涨潮时与海平面齐平,也可以高于海平面或略低于海平面;
(3)在海水退潮时,开启与双导堤连接处的可变式潮流控制闸的闸门,将其他闸门关闭,强大的水流夹带泥从双导堤内流出海;在海水涨潮时,关闭与双导堤连接处的可变式潮流控制闸的闸门,将其他闸门打开。
本发明的优点是:
利用本发明可将河流的水流的力量集中,起到束水攻沙清理航道的效果。
附图说明
图1为可变式潮流控制闸与双导堤建设示意图。
具体实施方式
下面结合附图对本发明作进一步的说明。
在河道河口或在河口潮流区窄处的任意位置设置可变式潮流控制闸1(PTCCG),PTCCG横跨所述河道两岸;
在PTCCG的向海一侧与PTCCG连接设置有双导堤2,双导堤之间的距离至少为200米,足夠让远洋轮船双向行驶,双导堤的长度至少是从可变式潮流控制闸起延伸至水深等深线-15米,双导堤的高度要求在涨潮时与海平面齐平,也可以高于海平面或略低于海平面;
在海水退潮时,开启与双导堤连接处的PTCCG的闸门,将其他闸门关闭,利用PTCCG的巨型丁坝效应,将河道里的水流全部被强行束在双导堤中不断地流动,强大的水流夹带泥沙从双导堤内轻易地流出海,起到束水攻沙的效果;在海水涨潮时,关闭与双导堤连接处的可变式潮流控制闸的闸门,将其他闸门打开,则双导堤中的水流将停顿,不会逆流,其目的是已被带至双导堤下游的泥沙,不会因为涨潮而再被推回至上游。
在可变式潮流控制闸与双导堤建成后开始运作初期,我们可以采用一些常规的措施将双导堤内的泥土挖松,以增加水流的挟沙能力,增快束水攻沙的速度,在完成将双导堤内航挖深至15米,停止挖松。

Claims (1)

1.一种利用可变式潮流控制闸清理航道泥沙的方法,其特征是包括如下步骤:
(1)在河道河口或在河口潮流区窄处的任意位置设置可变式潮流控制闸,所述可变式潮流控制闸横跨所述河道两岸;
(2)在所述可变式潮流控制闸的向海一侧设置有双导堤,所述双导堤之间的距离至少为200米,足夠让远洋轮船双向行驶,所述双导堤的长度至少是从所述可变式潮流控制闸起延伸至水深等深线-15米,所述双导堤的高度为在涨潮时与海平面齐平;
(3)在海水退潮时,开启与双导堤连接处的可变式潮流控制闸的闸门,将其他闸门关闭,强大的水流夹带泥从双导堤内流出海;在海水涨潮时,关闭与双导堤连接处的可变式潮流控制闸的闸门,将其他闸门打开。
CNB2005100131954A 2005-02-18 2005-02-18 利用可变式潮流控制闸清理航道泥沙的方法 Active CN100365213C (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNB2005100131954A CN100365213C (zh) 2005-02-18 2005-02-18 利用可变式潮流控制闸清理航道泥沙的方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNB2005100131954A CN100365213C (zh) 2005-02-18 2005-02-18 利用可变式潮流控制闸清理航道泥沙的方法

Publications (2)

Publication Number Publication Date
CN1648347A true CN1648347A (zh) 2005-08-03
CN100365213C CN100365213C (zh) 2008-01-30

Family

ID=34875613

Family Applications (1)

Application Number Title Priority Date Filing Date
CNB2005100131954A Active CN100365213C (zh) 2005-02-18 2005-02-18 利用可变式潮流控制闸清理航道泥沙的方法

Country Status (1)

Country Link
CN (1) CN100365213C (zh)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2008031317A1 (fr) * 2006-09-08 2008-03-20 Jingcheng Lin Procédé permettant d'augmenter le débit des rivières des villes et de contrôler la pollution
CN101424078B (zh) * 2007-05-16 2011-07-20 马兴华 利用“双向束水效应”形成的海峡形深水潮汐通道
CN105019396A (zh) * 2014-04-23 2015-11-04 栾加友 一种入海航道采用格网拦沙治理新方法
CN107992640A (zh) * 2017-09-30 2018-05-04 上海河口海岸科学研究中心 入海口深水航道沿程月度最小疏浚量确定方法
CN108729407A (zh) * 2017-04-17 2018-11-02 吴彦民 河流双槽硬化河床互换停流清沙装置
CN109267536A (zh) * 2018-11-16 2019-01-25 彭国洪 一种库尾消落区的航道治理
CN109356097A (zh) * 2018-11-29 2019-02-19 中国电建集团成都勘测设计研究院有限公司 用于沟水处理的排水隧洞进口结构
CN111576343A (zh) * 2018-06-06 2020-08-25 黄斌夫 填海防洪法
CN112627100A (zh) * 2020-12-23 2021-04-09 珠江水利委员会珠江水利科学研究院 一种水闸导流冲淤结构及方法

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1068615A (zh) * 1992-03-29 1993-02-03 胡小华 单向潮水冲排河道污染的方法
US20030132170A1 (en) * 2002-01-16 2003-07-17 Wu-Hsiung Wu River pollution management method

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2008031317A1 (fr) * 2006-09-08 2008-03-20 Jingcheng Lin Procédé permettant d'augmenter le débit des rivières des villes et de contrôler la pollution
CN101424078B (zh) * 2007-05-16 2011-07-20 马兴华 利用“双向束水效应”形成的海峡形深水潮汐通道
CN105019396A (zh) * 2014-04-23 2015-11-04 栾加友 一种入海航道采用格网拦沙治理新方法
CN108729407A (zh) * 2017-04-17 2018-11-02 吴彦民 河流双槽硬化河床互换停流清沙装置
CN107992640A (zh) * 2017-09-30 2018-05-04 上海河口海岸科学研究中心 入海口深水航道沿程月度最小疏浚量确定方法
CN107992640B (zh) * 2017-09-30 2020-12-08 上海河口海岸科学研究中心 入海口深水航道沿程月度最小疏浚量确定方法
CN111576343A (zh) * 2018-06-06 2020-08-25 黄斌夫 填海防洪法
CN109267536A (zh) * 2018-11-16 2019-01-25 彭国洪 一种库尾消落区的航道治理
CN109356097A (zh) * 2018-11-29 2019-02-19 中国电建集团成都勘测设计研究院有限公司 用于沟水处理的排水隧洞进口结构
CN109356097B (zh) * 2018-11-29 2023-09-19 中国电建集团成都勘测设计研究院有限公司 用于沟水处理的排水隧洞进口结构
CN112627100A (zh) * 2020-12-23 2021-04-09 珠江水利委员会珠江水利科学研究院 一种水闸导流冲淤结构及方法

Also Published As

Publication number Publication date
CN100365213C (zh) 2008-01-30

Similar Documents

Publication Publication Date Title
CN1648347A (zh) 利用可变式潮流控制闸清理航道泥沙的方法
Bruun et al. Natural by-passing of sand at coastal inlets
Bruun Stability of tidal inlets
Bruun et al. Stability of coastal inlets
CN103938591A (zh) 一种减少多沙河流水库淤积的方法
CN103938578A (zh) 一种多沙河流水库的减淤系统
CN109356080A (zh) 一种创造生态湿地促进环抱式港池或港湾水体交换的方法
CN1318702C (zh) 河床与海床泥沙截留、促淤积防冲刷的装置
CN105089020A (zh) 一种水库的减淤方法
CN100347377C (zh) 一种模袋排帘及其江河崩岸防治方法
WO2021140559A1 (ja) 自然の力で繰返す、(津波・高潮・河川)災害阻止する方法
CN2654699Y (zh) 气动冲淤装置
CN105089006A (zh) 一种水库的减淤系统
CN2758332Y (zh) 河道扰沙清淤器
CN203904907U (zh) 一种水库的减淤系统
CN206887877U (zh) 一种能有效清除淤泥的人工水库结构
Mikhailova Many-year variations in river delta structures
CN114837120B (zh) 一种兼具引水和纳潮冲淤功能的双闸调控系统及其调控方法
Purohit et al. Current Deflecting Wall: A Promising Structure for Minimising Siltation in Semi-Enclosed Docks
Hickson Columbia River ship channel improvement and maintenance
Bruun et al. Natural by-passing of sand at coastal inlets
CN2208593Y (zh) 用于疏浚航道与整治害河的水力挖河船
Kirby Optimized harbor basins
Parchure Structural methods to reduce navigation channel shoaling
Parchure et al. Potential methods for reducing shoaling in harbors and navigation channels

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant