CN1587607A - Process for producing cement railing - Google Patents
Process for producing cement railing Download PDFInfo
- Publication number
- CN1587607A CN1587607A CN 200410058328 CN200410058328A CN1587607A CN 1587607 A CN1587607 A CN 1587607A CN 200410058328 CN200410058328 CN 200410058328 CN 200410058328 A CN200410058328 A CN 200410058328A CN 1587607 A CN1587607 A CN 1587607A
- Authority
- CN
- China
- Prior art keywords
- cement
- framework
- decoration
- kilogram
- guard bar
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Landscapes
- Manufacturing Of Tubular Articles Or Embedded Moulded Articles (AREA)
- Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)
Abstract
The invention relates to a manufacturing engineering of the cement guardrail which is composed of frame and decorating device. Decorating device is fixed between two frames, decorating device is fixed between two frames, decorating device is fixed on first frame. Its characteristic is that it is manufactured on the following manufacturing engineering: choose some iron pipe and cut it into fixed length to get the section-iron-pipe, then fix the pipe on the lathe, while in its corresponding parallel place should fix an shaped strike-off board; prepare some open sane cement paste, then coil and wrap several layers of glassfiber with open sand cement paste on the section-iron-pipe to get shaped rough blank; wrap fine sand cement paste on the rough blank through rolling to get shaped fine blank; put the blank on a shelf in an all closed room, keep wet through 3 to 7 days, then it will get solidificated into structural device, colour the device to get the decorative one; then compose the decorative one and the frame with hole into the cement guardrail whose manufacturing cost is low, model is convenient, unique, novel, sturdy and duable, long-lived, and through which can make out beautiful and penetrating guardrails.
Description
Technical field
The present invention relates to a kind of manufacturing process of Cement guard bar, relate to a kind of method durable, that moulding arbitrarily can be played the enclosure wall fence of decoration function of making specifically.
Background technology
At present, along with the fast development of national economy and the raising day by day of living standards of the people, the construction business of China is also more and more prosperous, the construction of luxurious house, villa, gardens, biotope, office, universities and colleges, private residence, the construction of scenic spot, park, riverside, artificial lake, traffic route and overpass is seen everywhere.Thereupon, be used to the to demarcate demand of various enclosure walls, guardrail, railing of usefulness is also increasing.Yet, enclosure wall, guardrail and railing that being mostly of the existing usefulness that is used to demarcate formed for the raw material manufacturing by brick, stone and cement, sand, though they are solid firmly, yet transparent performance is poor, can only play the effect of isolation, lacks artistry and aesthetic feeling; Also have plenty of by enclosure wall, guardrail and railing wooden or that bamboo product forms for the raw material manufacturing, though they have artistry and aesthetic feeling, solid firm poor performance, with the passing of time the burn into phenomenon that comes off, wrecks happens occasionally.For this reason, at present some also having occurred is guardrail and the railing that raw material is made by metal, as iron skill guardrail or railing etc., the artistic performance of this guardrail and railing is strong, but year falls lacquer, oxidation for a long time, loses phenomenon such as part and happen occasionally, and other is as copper skill guardrail and railing etc., its cost costliness, year is also wanted oxidation and rusting for a long time, also will bear and stolen the danger of losing part, is difficult for popularizing.So the manufacturing process of existing body of wall fence needs further improvement.
Summary of the invention
The object of the present invention is to provide a kind of durable, with low cost, moulding is random, can play the manufacturing process of the Cement guard bar of decoration function, to overcome the deficiencies in the prior art.
The object of the present invention is achieved like this, Cement guard bar is made up of framework and decoration, it is between framework (1) and framework (2) decoration (6) to be installed, between framework (2) and the framework (3) decoration (5) is installed, decoration (4) is installed on the framework (3), it is characterized in that it is by following technology manufacturing:
1. select iron pipe, be cut into fixed length, get the iron leg pipe, standby,
2. the iron leg pipe is installed on the lathe, the typing scraper plate is installed at the corresponding parallel place of iron leg pipe,
3. prepare the coarse sand cement paste,
4. with the glass fiber of coiling wrapped multiple band coarse sand cement paste on the iron leg pipe, coarse sand cement paste and glass fiber are made the typing crude green body by the typing scraper plate in winding process, standby,
5. with crude green body surface fine sand slurry on the scroll again, make the thin base of typing, standby,
6. the thin base of will finalizing the design is inserted on the totally enclosed indoor shelf, and covers Polypropylence Sheet and preserved moisture 3-7 days, is solidified into the section bar parts, and is standby,
7. the section bar parts are painted, get decoration,
8. decoration is assembled into Cement guard bar with framework with holes.
Its diameter of described iron pipe is 2cm-3cm.
Described coarse sand cement paste, it is to be mixed by the following weight proportion raw material,
Cement 1-2 kilogram, coarse sand 1-2 kilogram, 1 kilogram in water.
Described cement, its specification are 52.5 sulphate aluminium cement.
Its granularity of described coarse sand is 0.2-0.5mm.
Described fine sand slurry, it is to be mixed by the following weight proportion raw material,
Sulphate aluminium cement 1-2 kilogram, land plaster 0.1-0.3 kilogram,
Short early strength admixture 50 grams, fine sand 1-2 kilogram, 1 kilogram in the water of coagulating.
Its granularity of described fine sand is 0.1-0.3mm.
The present invention compared with prior art, its raw material sources are extensive, and are cheap for manufacturing cost, utilize its moulding arbitrarily, unique, novel, use it sturdy and durable, the life-span is long, its life-span was 50 years, the guardrail of producing by it is attractive in appearance, penetrating.
Description of drawings
Accompanying drawing is looked the broken section structural representation for the utility model master.
Among the figure: 1, framework, 2, framework, 3, framework, 4, decoration, 5, decoration, 6, decoration, 7, the iron leg pipe, 8, cement layer, 9, glass layer.
The specific embodiment
The present invention is further described below in conjunction with drawings and Examples:
Referring to accompanying drawing, accompanying drawing is that the master of embodiment of the invention product looks the broken section structural representation.This product is the random length product, omit a segment length among the figure, it is made up of entire product framework and decoration, Cement guard bar is between framework 1 and framework 2 decoration 6 to be installed, between framework 2 and the framework 3 decoration 5 is installed, decoration 4 is installed on the framework 3, and it is by following technology manufacturing for this product:
1. selecting diameter is that the iron pipe of 2.5cm is cut into 80cm, 25cm, several sections pipes of 20cm, iron leg pipe 7 is standby,
2. iron leg pipe 7 is installed on the lathe, the typing scraper plate is installed at iron leg pipe 7 corresponding parallel places,
3. prepare the coarse sand cement paste, selecting specification is 2 kilograms of 52.5 sulphate aluminium cements, and granularity is 2 kilograms of the coarse sands of 0.5mm, adds 1 kilogram of mixing of water, makes the coarse sand cement paste.
4. with the glass fiber of wrapped multiple band coarse sand cement paste on the iron leg pipe 7, coarse sand cement paste and glass fiber are made the typing crude green body by the typing scraper plate in winding process, standby,
5. be 52.5 2 kilograms of sulphate aluminium cements, 0.3 kilogram of land plaster with specification, add short early strength admixture 50 grams that coagulate, granularity is 2 kilograms of the fine sands of 0.2mm, add 1 kilogram of mixing of water and make fine sand slurry,, make the thin base of typing crude green body surface fine sand slurry on the scroll again, standby
6. the thin base of will finalizing the design is inserted on the totally enclosed indoor shelf, and covers Polypropylence Sheet and preserved moisture 6 days, is solidified into the section bar parts, and is standby,
7. the section bar parts bottle green, get bottle-green decoration 4,
Take above-mentioned process to prepare the long decoration 4 of a plurality of 20cm, long decoration 5 and the long decoration 6 of a plurality of 80cm of a plurality of 25cm equally,
Described decoration 4, decoration 5 or decoration 6 be shaped as cucurbit shape, vase-like, ring shape or other rotary body shape.Among the present embodiment figure cucurbit shape and vase-like.
8. decoration is assembled into the Cement guard bar that has cucurbit and vase shape with framework with holes.
Claims (7)
1, a kind of manufacturing process of Cement guard bar, Cement guard bar is made up of framework and decoration, it is between framework (1) and framework (2) decoration (6) to be installed, between framework (2) and the framework (3) decoration (5) is installed, decoration (4) is installed on the framework (3), it is characterized in that it is by following technology manufacturing:
1. select iron pipe, be cut into fixed length, get the iron leg pipe, standby,
2. the iron leg pipe is installed on the lathe, the typing scraper plate is installed at the corresponding parallel place of iron leg pipe,
3. prepare the coarse sand cement paste,
4. with the glass fiber of coiling wrapped multiple band coarse sand cement paste on the iron leg pipe, coarse sand cement paste and glass fiber are made the typing crude green body by the typing scraper plate in winding process, standby,
5. with crude green body surface fine sand slurry on the scroll again, make the thin base of typing, standby,
6. the thin base of will finalizing the design is inserted on the totally enclosed indoor shelf, and covers Polypropylence Sheet and preserved moisture 3-7 days, is solidified into the section bar parts, and is standby,
7. the section bar parts are painted, get decoration,
8. decoration is assembled into Cement guard bar with framework with holes.
2, the manufacturing process of Cement guard bar according to claim 1 is characterized in that its diameter of described iron pipe is 2cm-3cm.
3, the manufacturing process of Cement guard bar according to claim 1 is characterized in that described coarse sand cement paste, and it is to be mixed by the following weight proportion raw material:
Cement 1-2 kilogram, coarse sand 1-2 kilogram, 1 kilogram in water.
4, the manufacturing process of Cement guard bar according to claim 3 is characterized in that described cement, and its specification is 52.5 sulphate aluminium cement.
5, the manufacturing process of Cement guard bar according to claim 4 is characterized in that its granularity of described coarse sand is 0.2-0.5mm.
6, the manufacturing process of Cement guard bar according to claim 1 is characterized in that described fine sand slurry, and it is to be mixed by the following weight proportion raw material,
Sulphate aluminium cement 1-2 kilogram, land plaster 0.1-0.3 kilogram,
Short early strength admixture 50 grams, fine sand 1-2 kilogram, 1 kilogram in the water of coagulating.
7, the manufacturing process of Cement guard bar according to claim 6 is characterized in that its granularity of described fine sand is 0.1-0.3mm.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNB2004100583285A CN1327098C (en) | 2004-08-12 | 2004-08-12 | Process for producing cement railing |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNB2004100583285A CN1327098C (en) | 2004-08-12 | 2004-08-12 | Process for producing cement railing |
Publications (2)
Publication Number | Publication Date |
---|---|
CN1587607A true CN1587607A (en) | 2005-03-02 |
CN1327098C CN1327098C (en) | 2007-07-18 |
Family
ID=34603342
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CNB2004100583285A Expired - Fee Related CN1327098C (en) | 2004-08-12 | 2004-08-12 | Process for producing cement railing |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN1327098C (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113932841A (en) * | 2021-10-09 | 2022-01-14 | 深圳大学 | Embedded sensor protection device and manufacturing method |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2316397Y (en) * | 1997-12-30 | 1999-04-28 | 王世玉 | Bottle-shaped fence vertical post |
-
2004
- 2004-08-12 CN CNB2004100583285A patent/CN1327098C/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113932841A (en) * | 2021-10-09 | 2022-01-14 | 深圳大学 | Embedded sensor protection device and manufacturing method |
CN113932841B (en) * | 2021-10-09 | 2022-09-06 | 深圳大学 | Embedded sensor protection device and manufacturing method |
Also Published As
Publication number | Publication date |
---|---|
CN1327098C (en) | 2007-07-18 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN1314868C (en) | Build up type bamboo house and its manufacturing method | |
CN2801928Y (en) | Hollow building block decoration brick with color relief | |
CN203669267U (en) | Novel plasterboard | |
CN113816702A (en) | Stone-like light-transmitting nano cement and preparation method thereof | |
CN1587607A (en) | Process for producing cement railing | |
CN105198325A (en) | Formula of finish material adopting travertinus dry powder | |
CN2793184Y (en) | External thermal-insulative board of external wall | |
CN204505970U (en) | Light noise-reducing synthetic quartz plate | |
CN202455932U (en) | Combined flower bed | |
CN2861347Y (en) | Composite structure board | |
CN1822460A (en) | Processing method for assembling non-metal box transforming station case | |
CN201214848Y (en) | Steel mesh enhanced high strength baffle wall ribbon board | |
CN2734913Y (en) | Cement guard bar | |
CN202596023U (en) | Vertical wood-plastic hollow wall plate | |
CN1037902C (en) | Decorative relief sculpture products imitating ancient and European styles and its manufacture | |
CN2878054Y (en) | Inorganic wood grain-like plate | |
CN104652918A (en) | Manufacturing process of cement glass fiber perspective wall | |
CN203441031U (en) | Heat-preserving sound-insulation decorative partition board | |
CN112376707A (en) | Foamed aluminum assembled wallboard | |
CN210798121U (en) | Wall body decorative panel with good sound insulation performance | |
CN208088735U (en) | A kind of steel composite decorating board of corrosion resistance | |
KR200242862Y1 (en) | a block | |
CN202925821U (en) | Artificial mushroom stone decorative sheet | |
CN2504370Y (en) | Composite-reinforced shaped stones | |
CN200999450Y (en) | Decorating section bar |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C17 | Cessation of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20070718 Termination date: 20110812 |