CN1585342A - Frame facility visual method for network gating system - Google Patents

Frame facility visual method for network gating system Download PDF

Info

Publication number
CN1585342A
CN1585342A CN 200410027448 CN200410027448A CN1585342A CN 1585342 A CN1585342 A CN 1585342A CN 200410027448 CN200410027448 CN 200410027448 CN 200410027448 A CN200410027448 A CN 200410027448A CN 1585342 A CN1585342 A CN 1585342A
Authority
CN
China
Prior art keywords
information
frame
veneer
execution
chassis equipment
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN 200410027448
Other languages
Chinese (zh)
Other versions
CN1299470C (en
Inventor
徐后强
林树旺
张红
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Bai Lisong
Original Assignee
ZTE Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZTE Corp filed Critical ZTE Corp
Priority to CNB2004100274489A priority Critical patent/CN1299470C/en
Publication of CN1585342A publication Critical patent/CN1585342A/en
Application granted granted Critical
Publication of CN1299470C publication Critical patent/CN1299470C/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Data Exchanges In Wide-Area Networks (AREA)

Abstract

The method includes following steps: the basic information about all parts of rack equipment is saved; the rack formatted display information is inquired; deciding if the rack has visualized, if not, then generates in turn the displaying objects of rack, machine frame, on-board and interface; if it has already formatted, then checking the information type that waits to be checked, deciding if the information type is machine frame or on-board, and modifying its state information, displaying the renewed object on the graph.

Description

A kind of chassis equipment visualization method of network management system
Technical field
The present invention relates to the graph visualization method of basic physical equipment---chassis equipment visualization method, especially code division multiple access communication chassis equipment in the telecommunication network management system.
Background technology
In field of telecommunications, many equipment such as switch, base station equipment etc. all are to realize its function by the frame that all kinds difference, size differ as carrier.Frame generally is made of several dissimilar machine frames, and the several trough position is arranged in the machine frame.Can insert dissimilar veneers in these groove positions, also be furnished with several ports on some important veneer, these ports can couple together relevant equipment by line and form a complete functive.Dispose the machine frame of variety classes, different numbers in each frame, and identical machine frame is inserted with the veneer of variety classes, different numbers, its function of finishing is inequality.How managing effectively and controlling these frame information is major issues that telecom network management system need solve, and functions such as the physical configuration in the telecom network management system, alarm management and diagnostic test have proposed solution for this reason.
The factor of two aspects is depended on the basis that can Telecommunication network equipment move well: the first, and whether information configuration such as the machine frame on the chassis equipment, veneer, port get reasonable.The second, whether foreground (frame hardware system) running status is normally monitored and is safeguarded.Physical configuration function in the telecom network management system for the user chassis equipment is carried out reasonable disposition and management provides possibility, and functions such as alarm management and diagnostic test for the user whether the running status on foreground are normally monitored and solid foundation has been established in maintenance.The network management system of some telecommunications manufacturers is carried out reasonable disposition and monitoring and is safeguarded the normal operating condition on foreground chassis equipment by the capable mode of input command.Advantage be simple to operate, overhead is little, be more suitable for expert's level personnel and use; Shortcoming is that visual degree is low, the Operation and Maintenance inconvenience of getting up, and the operation and maintenance personnel are required height.Therefore, press for and overcome the above problems.
Summary of the invention
At the existing the demand of existing network management system, the invention provides a kind of chassis equipment visualization method of network management system, the information graphic of chassis equipment is visual, and then can be configured, monitor and safeguard the frame hardware system easily.
Another goal of the invention of the present invention is to realize versatility when chassis equipment is visual, satisfies the visual requirement of chassis equipment of a great variety in the telecom network management system, that differ greatly.
For achieving the above object, the method for the present invention's proposition mainly may further comprise the steps:
(1) Back ground Information of basic information about all parts is stored;
(2) the frame display message of interrogate formatization;
(3) judge whether frame visual: if do not have visual, execution in step (4) then; If frame is visual, execution in step (7) then;
(4) according to the frame type, the Back ground Information of coupling chassis equipment generates the frame display object;
(5) check the machine frame key element, the Back ground Information of coupling chassis equipment generates machine frame and default veneer in this frame;
(6) check the veneer key element, show veneer and port object (po), execution in step (11) again;
(7) check information type to be shown;
(8) judge whether this information type is machine frame: if, execution in step (9) then; If not, execution in step (10);
(9) revise the state information of machine frame or veneer, and on figure the update displayed object, be back to step (8) subsequently and continue to judge;
(10) judge whether this information type is veneer: if, execution in step (9) then; If not, execution in step (11);
(11) finish working procedure, return results.
In addition, the present invention is also further by the following technical solutions:
In the above-mentioned steps (1), the Back ground Information of basic information about all parts is classified according to standing part and change part, and the change partial content adopts outer carrier to store, as modes such as xml file or databases.
With respect to existing method, the present invention is with the chassis equipment graph visualization, based on this frame figure chassis equipment is carried out reasonable disposition, monitoring and safeguards the normal operating condition on foreground, operate more directly perceived, more convenient and quicker, and the operation and maintenance personnel are required to reduce; In addition, because the Back ground Information of basic information about all parts, the information stores of especially change part is carrier externally, for different chassis equipment parts, only need revise corresponding information in the outer carrier, and need not to revise system program, realize the visual versatility problem of various chassis equipments, more help the expansion, multiplexing of network management system, reduced the network management system exploitation and safeguard in the cost expenditure.
Description of drawings
Fig. 1 is chassis equipment information static visual configuration flow figure of the present invention;
Fig. 2 is chassis equipment information dynamic and visual configuration flow figure of the present invention;
Fig. 3 is that the present invention monitors and safeguard front stage operation status visualization flow chart;
Fig. 4 is that chassis equipment visible process figure is realized on backstage of the present invention.
Specific embodiment
With reference to the accompanying drawings and in conjunction with static state, dynamic-configuration and the monitor procedure of chassis equipment the present invention is done detailed explanation.
Before carrying out the chassis equipment configuration, must collect the visual required Back ground Information of chassis equipment (as kind, the composition of frame, the distribution of the size of machine frame, veneer slot etc.), the Back ground Information of basic information about all parts is classified according to standing part and change part, will change partial content and adopt outer carrier such as modes such as xml file, database to store.When visual (the generating frame figure) of chassis equipment, the chassis equipment information that is stored in outer carrier can be called in internal memory, and basic information about all parts will be presented on the frame figure, all needs Dynamic matching outer carrier institute canned data, to realize general visual.
As shown in Figure 1, be network management system mid frame facility information static visual configuration flow figure of the present invention.According to the function that the foreground will be finished, step 101 is determined the information that chassis equipment need dispose; Step 106 generates frame figure (the concrete generation step of frame figure will illustrated below in conjunction with Fig. 4); Step 102 is by frame visualization model---frame figure configure chassis facility information, and as facility informations such as machine frame, veneer and connection status, step 103 writes background data base with the data that produce in the layoutprocedure; After the information configuration that all chassis equipments need dispose was finished, step 104 was acted on behalf of the data sync of back-end data library storage to the foreground, and step 105 is finished by the foreground agency and activated preceding station information.
Fig. 2 has described chassis equipment information dynamic and visual configuration flow.The flow process of dynamic-configuration chassis equipment information is: step 201 backstage sends to the foreground agency and obtains the foreground information request, the foreground agent processes should be asked, the information that has activated to foreground queries, step 202 backstage is finished and is resolved the foreground active information, generate frame figure, the information that display foreground has activated (comprising frame, machine frame, veneer and port connection status etc.), and the data message that the foreground has been activated by step 203 writes in the background data base.After the foreground is activated, sometimes (as function additions and deletions etc.) carry out corresponding modify according to some needs, as delete annexation between veneer, configured port etc., then need by configuration foreground, backstage active information, step 204 is revised foreground active information by frame figure, and step 205 writes background data base with amended data again; The data that step 206 is revised this background data base send the foreground agency to, according to the consideration of factors such as the reliability of system and efficient, instrument manual operation that can provide by the backstage or backstage timing automatic are finished the data message that will revise and are sent the foreground agency to; Step 207 foreground proxy resolution is handled the back and is revised corresponding foreground active information, finally finishes the modification of backstage to preceding station information, realizes the configuration of chassis equipment information dynamic and visual.
See also Fig. 3, for monitoring and safeguard front stage operation status visualization flow chart.When ANOMALOUS VARIATIONS has taken place in the foreground running status, undesired as the veneer operation, will produce alarm, and issue the foreground agency; Step 301 foreground agency issues the backstage with warning information, after resolve on step 302 backstage, generate frame figure, and on frame figure, show this warning information, as on frame figure, showing veneer according to alarm code and alarm level etc. or on veneer, producing mode display alarm such as flicker with different colors, variation has taken place in prompting front stage operation state, needs to handle; Step 303, when safeguarding the front stage operation state, the backstage changes the front stage operation state information by frame figure, as masterslave switchover of veneer etc.; Step 304 backstage will change the request of front stage operation state information and issue the foreground agency; Step 305 foreground proxy resolution is handled the back and is revised the front stage operation state, and replys and whether operate success message to the backstage; Step 306 backstage is judged this message: as success, and step 307 running state information that display foreground has changed on frame figure; As unsuccessful, then directly finish, and return results.
Fig. 4 has described the backstage and has realized chassis equipment general visual flow process.Below in conjunction with this flow process the chassis equipment visualization process among Fig. 1, Fig. 2, Fig. 3 (promptly generating the process of frame figure) is done to describe in detail.Step 401, from background data base or the formative frame display message of foreground agents query, during the static configuration chassis equipment, this frame display message is from the back-end data library inquiry, and during the dynamic-configuration chassis equipment, the frame display message is then from the foreground agents query; Step 402 checks whether frame is visual: if do not have, then execution in step 404 is by the frame key element, and the frame default information that has existed in the coupling internal memory generates the frame display object; Step 405 is still checked the machine frame key element then, and the machine frame that has existed in the coupling internal memory is formed information, generates machine frame and default veneer in this frame; Step 406 reexamines the veneer key element, shows veneer and port object (po); Step 407 is checked connection state information, and step 408 judges whether there is connection between the veneer: if exist, execution in step 409 is provided with the connection status of port on the veneer of correspondence, be back to step 408 subsequently; If do not exist, then directly finish return results.If judge that in step 402 frame is visual, then execution in step 403 is checked information type to be shown, later step 410 judges whether this information type is machine frame: if, then execution in step 412 is revised the state information of machine frame or veneer, and on figure the update displayed object, be back to step 410 subsequently; If not, execution in step 411 continues to judge whether this information type is veneer: if, then execution in step 412 is revised the state information of machine frame or veneer, this modification is according to revising its state from background data base or the formative frame display message of foreground agents query, revise machine frame for inserting the state in frame or the veneer insertion machine frame, be back to step 410 subsequently; If not, then step 413 judges whether it is port again: if execution in step 414 is revised the connection status of port, is back to step 413 subsequently; If not, then direct termination routine, return results.Through these a series of processes, finally finish the frame visualization process---generate frame figure.
What this was worth particularly pointing out be, step 407,408 among above-mentioned Fig. 4,409 and step 413,414 be not steps necessary, only in some occasion when chassis equipment is carried out static state or dynamic-configuration, need to show the port connection status of veneer, then need above step, and in the monitoring maintenance process, need not the display port state, then above step can be omitted.
In addition, the present invention proposes network management system classifies it when forming the visualized graphs of chassis equipment according to standing part and change part, to change partial content adopts outer carrier such as modes such as xml file, database to store, concrete which kind of mode that adopts is stored the change partial information, according to the situation decision of reality; As long as can dynamically load the change partial information, go the usefulness of match information when supplying to generate frame figure to be shown, this does not break away from the scope of the present invention all without prejudice to creation spirit of the present invention.
In a word, the present invention carries out the chassis equipment graph visualization reasonable disposition, monitoring and safeguards the normal operating condition on foreground chassis equipment based on this frame figure, operates more directly perceived, more convenient and quicker, and the operation and maintenance personnel are required to reduce; In addition, because the Back ground Information of basic information about all parts, the information stores of especially change part is carrier externally, for different chassis equipments, only need revise corresponding information in the outer carrier, and need not to revise system program, realize the visual versatility problem of various chassis equipments, more help the expansion, multiplexing of network management system, reduced the network management system exploitation and safeguard in the cost expenditure.

Claims (10)

1, a kind of chassis equipment visualization method of network management system is characterized in that, this method may further comprise the steps:
(1) Back ground Information of basic information about all parts is stored;
(2) the frame display message of interrogate formatization;
(3) judge whether frame visual: if do not have visual, execution in step (4) then; If frame is visual, execution in step (7) then;
(4) according to the frame type, the Back ground Information of coupling chassis equipment generates the frame display object;
(5) check the machine frame key element, the Back ground Information of coupling chassis equipment generates machine frame and default veneer in this frame;
(6) check the veneer key element, show veneer and port object (po), execution in step (11);
(7) check information type to be shown;
(8) judge whether this information type is machine frame: if, execution in step (9) then; If not, execution in step (10);
(9) revise the state information of machine frame or veneer, and on figure the update displayed object, be back to step (8) subsequently and continue to judge;
(10) judge whether this information type is veneer: if, execution in step (9) then; If not, execution in step (11) then;
(11) finish working procedure, return results.
2, the chassis equipment visualization method of network management system as claimed in claim 1, it is characterized in that, in the step (1), the Back ground Information of basic information about all parts is classified according to standing part and change part, and the change partial content adopts outer carrier to store.
3, the chassis equipment visualization method of network management system as claimed in claim 2 is characterized in that, the change partial content adopts xml file or database mode to store.
4, the chassis equipment visualization method of network management system as claimed in claim 1 is characterized in that, in the step (2), during the static configuration chassis equipment, the frame display message is from the back-end data library inquiry.
5, the chassis equipment visualization method of network management system as claimed in claim 4, it is characterized in that, after the step (11), by frame figure configure chassis facility information, the data that produce in the layoutprocedure are write background data base, and the data sync of back-end data library storage acted on behalf of to the foreground, and then the foreground agency activate before station information.
6, the chassis equipment visualization method of network management system as claimed in claim 1 is characterized in that, in the step (2), during the dynamic-configuration chassis equipment, the frame display message is from the foreground agents query.
7, as the chassis equipment visualization method of claim 4 or 6 described network management systems, it is characterized in that behind demonstration veneer and the port object (po), also further having following steps before the termination routine in the step (6):
A) check connection state information, execution in step (b) again;
B) judge whether there is connection between the veneer: connect execution in step (c) if exist; If do not have connection, then execution in step (11);
C) connection status of port is set on the veneer of correspondence, is back to step (b) subsequently.
8, as the chassis equipment visualization method of claim 4 or 6 described network management systems, it is characterized in that, in the step (10), is not after the veneer if judge this information type, also further has following steps:
A) judge whether port of this information type: if, execution in step b); If not, execution in step (11) then;
B) connection status of modification port is back to step a) subsequently.
9, the chassis equipment visualization method of network management system as claimed in claim 6, it is characterized in that, after the step (11), the data message that the foreground has been activated writes in the background data base, revise foreground active information by frame figure, more amended data are write background data base, the data that this background data base is revised send the foreground agency to, the foreground proxy resolution is handled the active information that the foreground correspondence is revised in the back, realizes the configuration of chassis equipment information dynamic and visual.
10, the chassis equipment visualization method of network management system as claimed in claim 1, it is characterized in that, revise the state information of machine frame or veneer in the step (9), be to revise its state, revise machine frame for inserting frame or revising veneer for inserting the state in the machine frame according to the format frame display message of inquiry.
CNB2004100274489A 2004-06-01 2004-06-01 Frame facility visual method for network gating system Expired - Fee Related CN1299470C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNB2004100274489A CN1299470C (en) 2004-06-01 2004-06-01 Frame facility visual method for network gating system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNB2004100274489A CN1299470C (en) 2004-06-01 2004-06-01 Frame facility visual method for network gating system

Publications (2)

Publication Number Publication Date
CN1585342A true CN1585342A (en) 2005-02-23
CN1299470C CN1299470C (en) 2007-02-07

Family

ID=34601344

Family Applications (1)

Application Number Title Priority Date Filing Date
CNB2004100274489A Expired - Fee Related CN1299470C (en) 2004-06-01 2004-06-01 Frame facility visual method for network gating system

Country Status (1)

Country Link
CN (1) CN1299470C (en)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101860452A (en) * 2010-05-21 2010-10-13 中兴通讯股份有限公司 Network element management method and system
CN101232398B (en) * 2008-02-28 2011-05-11 中兴通讯股份有限公司 Network managing system of frame picture common sharing and application thereof
CN101594183B (en) * 2009-06-29 2011-12-07 中兴通讯股份有限公司 Detection device and detection method for working states of slot positions of machine cabinet
CN101795208B (en) * 2010-01-21 2013-12-04 中兴通讯股份有限公司 Method and system for synchronizing display information on rack diagram
CN103856967A (en) * 2014-03-05 2014-06-11 浪潮通信信息系统有限公司 Visualized configuration method for equipment panel in NIS system
CN103916279A (en) * 2014-04-14 2014-07-09 华为技术有限公司 Method and device for displaying logical connection of electronic frames
CN106301901A (en) * 2016-08-09 2017-01-04 北京北信源软件股份有限公司 A kind of strategy distribution for terminal unit performs and update method
WO2017219832A1 (en) * 2016-06-24 2017-12-28 中兴通讯股份有限公司 Rack diagram display and processing method and apparatus, display system, and storage medium
CN108429630A (en) * 2017-02-15 2018-08-21 广东国盾量子科技有限公司 A kind of simulated panel map generalization method and apparatus of quantum devices
CN111507861A (en) * 2020-04-07 2020-08-07 南京海兴电网技术有限公司 Power utilization data processing and visualization method and system

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6285967B1 (en) * 1998-10-22 2001-09-04 Dell Usa, L.P. Troubleshooting computer systems during manufacturing using state and attribute information
US20030036983A1 (en) * 2001-08-14 2003-02-20 Hougen Jerome L. Method for inventory and layout management of a facility
US6577498B1 (en) * 2001-11-26 2003-06-10 Sun Microsystems, Inc. Fully integrated computer racking system
US20040083017A1 (en) * 2002-10-18 2004-04-29 Terrence Brown Process and method for a dynamic rack creator and editor

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101232398B (en) * 2008-02-28 2011-05-11 中兴通讯股份有限公司 Network managing system of frame picture common sharing and application thereof
CN101594183B (en) * 2009-06-29 2011-12-07 中兴通讯股份有限公司 Detection device and detection method for working states of slot positions of machine cabinet
CN101795208B (en) * 2010-01-21 2013-12-04 中兴通讯股份有限公司 Method and system for synchronizing display information on rack diagram
CN101860452B (en) * 2010-05-21 2015-06-10 中兴通讯股份有限公司 Network element management method and system
CN101860452A (en) * 2010-05-21 2010-10-13 中兴通讯股份有限公司 Network element management method and system
CN103856967A (en) * 2014-03-05 2014-06-11 浪潮通信信息系统有限公司 Visualized configuration method for equipment panel in NIS system
CN103916279A (en) * 2014-04-14 2014-07-09 华为技术有限公司 Method and device for displaying logical connection of electronic frames
CN103916279B (en) * 2014-04-14 2017-06-27 华为技术有限公司 The method and device of display electronics frame logic connection
WO2017219832A1 (en) * 2016-06-24 2017-12-28 中兴通讯股份有限公司 Rack diagram display and processing method and apparatus, display system, and storage medium
CN107547219A (en) * 2016-06-24 2018-01-05 南京中兴软件有限责任公司 The display of frame picture, processing method and processing device, display system
CN106301901A (en) * 2016-08-09 2017-01-04 北京北信源软件股份有限公司 A kind of strategy distribution for terminal unit performs and update method
CN108429630A (en) * 2017-02-15 2018-08-21 广东国盾量子科技有限公司 A kind of simulated panel map generalization method and apparatus of quantum devices
CN111507861A (en) * 2020-04-07 2020-08-07 南京海兴电网技术有限公司 Power utilization data processing and visualization method and system

Also Published As

Publication number Publication date
CN1299470C (en) 2007-02-07

Similar Documents

Publication Publication Date Title
CN1299470C (en) Frame facility visual method for network gating system
US6738775B2 (en) Database communication system and method for communicating with a database
US7644093B2 (en) Partially embedded database and an embedded database manager for a control system
US6163801A (en) Dynamic communication between computer processes
US6253257B1 (en) Software Interface for dynamic API mapping
US6272500B1 (en) Object-oriented device management system and method
US7856496B2 (en) Information gathering tool for systems administration
US7925002B2 (en) Administering multiple target ACD systems
CN1459061A (en) Automatic data update
US20050193386A1 (en) Intelligent patch checker
CN1122233C (en) Method and apparatus for supporting dynamic run-time object definition in a relational detabase management system
US6941309B2 (en) Object integrated management system
CN111897643B (en) Thread pool configuration system, method, device and storage medium
CN101582071A (en) System and method for updating data
CN1080080C (en) Switching system data inheritance method and system
CN111240737A (en) Dynamic service parameter configuration method based on Redis
CN1261875C (en) Data establishing system for display device and control method
CN1623295A (en) Method for recognizing electronic appliance in multiple control system
CN1152338C (en) Parallel distributed-data base processing method and device
US6604112B1 (en) Method and system for managing an AIX UNIX server using an SNMP interface
US6711573B2 (en) Method and apparatus for application execution of distributed database service updates
CN1333311C (en) System and method for automatically processing data esp. in field of prodn. assembly, service or maintenance
CN1110934C (en) Assigned control component of V5.2 interface between digital exchange and access network
CN112732516A (en) Equipment monitoring method and system
CN1276347C (en) Operation state structured display method of structured software system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20171204

Address after: 065000 Langfang City, Hebei province Guangyang District Xinhua Road Fifth Street Plaza No. E103

Patentee after: Bai Lisong

Address before: 518057 Nanshan District, Guangdong high tech Industrial Park, science and Technology Industrial Park, ZTE building, block A, layer 6, layer

Patentee before: ZTE Corporation

TR01 Transfer of patent right
CB03 Change of inventor or designer information

Inventor after: Bai Lisong

Inventor before: Xu Houqiang

Inventor before: Lin Shuwang

Inventor before: Zhang Hong

CB03 Change of inventor or designer information
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20070207

Termination date: 20180601

CF01 Termination of patent right due to non-payment of annual fee