CN1585035A - 用于高温气冷反应堆的气动吸收球停堆装置 - Google Patents

用于高温气冷反应堆的气动吸收球停堆装置 Download PDF

Info

Publication number
CN1585035A
CN1585035A CNA200410009169XA CN200410009169A CN1585035A CN 1585035 A CN1585035 A CN 1585035A CN A200410009169X A CNA200410009169X A CN A200410009169XA CN 200410009169 A CN200410009169 A CN 200410009169A CN 1585035 A CN1585035 A CN 1585035A
Authority
CN
China
Prior art keywords
ball
valve
storing tank
reactor
spring box
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CNA200410009169XA
Other languages
English (en)
Other versions
CN1246857C (zh
Inventor
周惠忠
黄志勇
刁兴中
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tsinghua University
Original Assignee
Tsinghua University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tsinghua University filed Critical Tsinghua University
Priority to CNB200410009169XA priority Critical patent/CN1246857C/zh
Publication of CN1585035A publication Critical patent/CN1585035A/zh
Application granted granted Critical
Publication of CN1246857C publication Critical patent/CN1246857C/zh
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E30/00Energy generation of nuclear origin
    • Y02E30/30Nuclear fission reactors

Landscapes

  • Structure Of Emergency Protection For Nuclear Reactors (AREA)

Abstract

用于高温气冷反应堆的气动吸收球停堆装置,属于核反应堆工程与安全技术领域。该装置主要包括反射层吸收球通道、贮球罐、阀头、与阀头相连的阀杆、弹簧箱、高压气罐、低压气罐以及设置在贮球罐和反射层吸收球通道之间的带有进气口的输球管。高压气罐通过管路和平衡截止阀与弹簧箱相连,并在平衡截止阀与弹簧箱之间设有落球截止阀;低压气罐通过提球截止阀和出气管与贮球罐相连。气动吸收球停堆装置是一种新的落球与提球装置,具有不需要电力驱动、可重复使用、运行稳定可靠、输球效率高等特点。本发明还可推广应用于形状规则的物料颗粒气动输送装置上。

Description

用于高温气冷反应堆的气动吸收球停堆装置
技术领域
本发明涉及一种高温气冷反应堆第二停堆装置,特别涉及一种气动吸收球停堆装置,属于核反应堆工程与安全技术领域。
背景技术
在高温气冷堆技术的发展历史上,已有几种形式的第二停堆装置得到试验或应用:在美国桃花谷(Peach Bottom)反应堆的上反射层内,设置了挂有吸收棒的安全保险丝,当温度超过设定值时,保险丝熔化,吸收棒落入堆芯。在美国圣·符伦堡(Fort St.Vrain)堆中,直径12.6mm的碳化硼吸收球可以通过圆柱型管道进入堆芯。在德国钍高温气冷球床堆(THTR-300)上试验了将直径只有燃料球若干分之一的碳化硼吸收球撒进堆芯的方法,吸收球穿进球床形成一定的分布,可以作为异常情况下(如地震)的停堆手段。以上几种停堆方式均将中子吸收材料直接投入到堆芯核燃料区,不便于中子吸收材料的分离、循环再利用。在中国第一座高温气冷实验堆(HTR-10)应用上的吸收球装置,使用电动机带动丝杠进行贮球罐阀头的开启与关闭,吸收球从贮球罐依靠重力下落,实现反应堆停堆,在反应堆再次启动之前,需要用罗茨风机产生气体流动压头携带吸收球回到贮球罐,上述过程中电动机和罗茨风机均需使用电力驱动,参见周惠忠等人发表的论文“HTR-10第二停堆系统的试验与调试”,(核动力工程,2002年2月,23(1):45~48.)。
高温气冷实验堆控制棒装置用于反应堆的启动、功率调节和停堆操作,由步进电动机驱动。这样就形成了吸收球停堆装置与控制棒装置的驱动原理类似,均需要电力驱动的设计结果。如果发生反应堆断电事故,控制棒装置再出现卡棒等机械故障,则无法实现控制棒装置或吸收球停堆装置的停堆功能,严重危及反应堆的安全。吸收球停堆装置采用气动原理,则不依赖于电力驱动,在事故工况下,能够可靠地完成反应堆停堆操作。
发明内容
本发明的目的是提供一种可重复使用、不需电力驱动、运行稳定可靠的应用于高温气冷反应堆的气动吸收球停堆装置。
本发明的目的是通过如下技术方案实现的:
一种用于高温气冷反应堆的气动吸收球停堆装置,该装置含有反射层吸收球通道、贮球罐、设置在贮球罐下部的阀头、与阀头相连的阀杆以及设置在贮球罐和反射层吸收球通道之间的带有进气口的输球管,所述的反射层吸收球通道、贮球罐、阀头和输球管设置在反应堆压力壳内部,其特征在于:该装置还包括与阀杆相连的弹簧箱、高压气罐和低压气罐,所述的高压气罐通过管路和平衡截止阀与弹簧箱相连,并在平衡截止阀与弹簧箱之间的旁路上设有落球截止阀;所述的低压气罐通过提球截止阀和出气管与贮球罐相连。
为了阀杆的传动方向,在所述的阀头与弹簧箱之间的阀杆上设置换向支撑杆。
本发明与现有的电力驱动吸收球停堆装置相比,具有以下优点及突出性效果:(1)本发明提供了一种不需电力驱动的气动吸收球停堆装置,从驱动原理上独立于需要电力驱动的控制棒装置,避免同时失效,可以为事故工况下的反应堆安全停堆提供更可靠的手段。(2)高压气罐、低压气罐、平衡截止阀、落球截止阀、提球截止阀等均位于反应堆压力壳的外部,便于现场维护检修。(3)当反应堆的控制棒装置失效时,落球传动机构能将含碳化硼的中子吸收球落入堆芯侧反射层相应的通道内,实现紧急停堆,其吸收球是投入侧反射层通道内而非堆芯;当反应堆再次临界之前,利用气动输送提球机构将吸收球输送回到位于堆顶的贮球罐内,从而实现顺利开堆;使得该装置具有可重复使用、运动部件少、整机运行稳定可靠、输球效率高等特点。
附图说明
图1为本发明提供的用于高温气冷反应堆的吸收球停堆装置的结构示意图。
具体实施方式
下面结合附图1对本发明的原理、结构作进一步的详细说明。
本发明所提供的是应用于高温气冷反应堆的气动吸收球停堆装置(如图1所示)。该装置主要包括反射层吸收球通道3、贮球罐5、设置在贮球罐下部的阀头4、与阀头相连的阀杆6、弹簧箱8、高压气罐9、低压气罐10以及设置在贮球罐和反射层吸收球通道之间的带有进气口1的输球管13;所述的反射层吸收球通道、贮球罐、阀头和输球管设置在反应堆压力壳2内部;所述的高压气罐9通过管路和平衡截止阀12与弹簧箱相连,并在平衡截止阀与弹簧箱之间的旁路上设有落球截止阀11;所述的低压气罐通过提球截止阀15和出气管14与贮球罐5相连。
本发明还在所述的阀头4与弹簧箱8之间的阀杆6上设置换向支撑杆7,这样可以使传动机构更加灵活。
在反应堆正常运行时,落球截止阀11关闭,平衡截止阀12打开,由于高压气罐9内的气体压力Pd高于反应堆压力壳2内的气体压力Po,弹簧箱8伸长,通过换向支撑杆7的转向,阀杆6将阀头4提起,使贮球罐5下部的端口关闭,吸收球保持在贮球罐5内部。
落球过程为:关闭平衡截止阀12,然后打开落球截止阀11,弹簧箱8内部的高压气体经过落球截止阀11及相应管路进入反应堆压力壳2,弹簧箱8因内部气压降低而回缩,经过换向支撑杆7的杠杆作用,阀杆6向下移动,阀头4下降,使贮球罐5下部的端口打开,贮存在贮球罐5中的数十万个小直径的吸收球依靠重力下落到反射层吸收球通道3之中,实现安全停堆。
提球过程为:落球截止阀11关闭、平衡截止阀12打开,高压气罐9内的高压气体充入弹簧箱8,弹簧箱8因内部气压升高而伸长,经过换向支撑杆7和阀杆6的杠杆作用,阀头4上提,把贮球罐5的下部端口关闭。提球截止阀15打开,反应堆压力壳2内部的高压气体经过进气口1,夹带着小直径的吸收球以一定的速度沿输球管13向上流动,进入贮球罐5,经过分离,吸收球落入贮球罐,气体沿出气管14流动,经提球截止阀15流入低压气罐10内。
根据高温气冷堆功率的不同,该装置可以布置一套或多套。

Claims (2)

1.一种用于高温气冷反应堆的气动吸收球停堆装置,该装置含有反射层吸收球通道(3)、贮球罐(5)、设置在贮球罐下部的阀头(4)、与阀头(4)相连的阀杆(6)以及设置在贮球罐和反射层吸收球通道之间的带有进气口(1)的输球管(13),所述的反射层吸收球通道(3)、贮球罐(5)、阀头(4)和输球管(13)设置在反应堆压力壳(2)内部,其特征在于:该装置还包括与阀杆相连的弹簧箱(8)、高压气罐(9)和低压气罐(10),所述的高压气罐(9)通过管路和平衡截止阀(12)与弹簧箱相连,并在平衡截止阀与弹簧箱之间的旁路上设有落球截止阀(11);所述的低压气罐(10)通过提球截止阀(15)和出气管(14)与贮球罐(5)相连。
2.按照权利要求1所述的反应堆的气动吸收球停堆装置,其特征在于:在所述的阀头(4)与弹簧箱(8)之间的阀杆上设置换向支撑杆(7)。
CNB200410009169XA 2004-06-03 2004-06-03 用于高温气冷反应堆的气动吸收球停堆装置 Expired - Lifetime CN1246857C (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNB200410009169XA CN1246857C (zh) 2004-06-03 2004-06-03 用于高温气冷反应堆的气动吸收球停堆装置

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNB200410009169XA CN1246857C (zh) 2004-06-03 2004-06-03 用于高温气冷反应堆的气动吸收球停堆装置

Publications (2)

Publication Number Publication Date
CN1585035A true CN1585035A (zh) 2005-02-23
CN1246857C CN1246857C (zh) 2006-03-22

Family

ID=34600226

Family Applications (1)

Application Number Title Priority Date Filing Date
CNB200410009169XA Expired - Lifetime CN1246857C (zh) 2004-06-03 2004-06-03 用于高温气冷反应堆的气动吸收球停堆装置

Country Status (1)

Country Link
CN (1) CN1246857C (zh)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101159172B (zh) * 2007-11-16 2010-07-14 清华大学 应用于高温气冷堆吸收球停堆系统的非能动安全驱动装置
CN101794632A (zh) * 2010-03-02 2010-08-04 清华大学 球床高温堆装料缓冲装置
CN101800087A (zh) * 2010-03-02 2010-08-11 清华大学 球床高温堆燃料元件多向分配器
CN102262907A (zh) * 2011-04-29 2011-11-30 清华大学 一种高温气冷堆吸收球气力输送供料器及输送系统
CN102507124A (zh) * 2011-10-27 2012-06-20 清华大学 一种检测球体元件落球强度的装置
CN103345948A (zh) * 2013-07-18 2013-10-09 中国科学院上海应用物理研究所 停堆系统
CN110487354A (zh) * 2019-08-28 2019-11-22 清华大学 导电容器中导电物料料位检测探头及测量装置
CN112397207A (zh) * 2020-11-20 2021-02-23 西安热工研究院有限公司 一种用于吸收球停堆系统功能验证的测试装置
CN114566297A (zh) * 2022-01-28 2022-05-31 清华大学 高温气冷堆吸收球落球装置

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101159172B (zh) * 2007-11-16 2010-07-14 清华大学 应用于高温气冷堆吸收球停堆系统的非能动安全驱动装置
CN101794632B (zh) * 2010-03-02 2012-02-08 清华大学 球床高温堆装料缓冲装置
CN101794632A (zh) * 2010-03-02 2010-08-04 清华大学 球床高温堆装料缓冲装置
CN101800087A (zh) * 2010-03-02 2010-08-11 清华大学 球床高温堆燃料元件多向分配器
CN102262907B (zh) * 2011-04-29 2013-07-10 清华大学 一种高温气冷堆吸收球气力输送供料器及输送系统
CN102262907A (zh) * 2011-04-29 2011-11-30 清华大学 一种高温气冷堆吸收球气力输送供料器及输送系统
CN102507124A (zh) * 2011-10-27 2012-06-20 清华大学 一种检测球体元件落球强度的装置
CN102507124B (zh) * 2011-10-27 2014-12-31 清华大学 一种检测球体元件落球强度的装置
CN103345948A (zh) * 2013-07-18 2013-10-09 中国科学院上海应用物理研究所 停堆系统
CN103345948B (zh) * 2013-07-18 2016-02-03 中国科学院上海应用物理研究所 熔盐冷却球床反应堆系统
CN110487354A (zh) * 2019-08-28 2019-11-22 清华大学 导电容器中导电物料料位检测探头及测量装置
CN112397207A (zh) * 2020-11-20 2021-02-23 西安热工研究院有限公司 一种用于吸收球停堆系统功能验证的测试装置
CN114566297A (zh) * 2022-01-28 2022-05-31 清华大学 高温气冷堆吸收球落球装置

Also Published As

Publication number Publication date
CN1246857C (zh) 2006-03-22

Similar Documents

Publication Publication Date Title
CN1246857C (zh) 用于高温气冷反应堆的气动吸收球停堆装置
CN207268376U (zh) 一种燃料电池车车载氢系统
CN112397207B (zh) 一种用于吸收球停堆系统功能验证的测试装置
CN102598147B (zh) 核裂变反应堆、透气式核裂变燃料模块、其方法以及透气式核裂变燃料模块系统
CN1447342A (zh) 应用于气冷反应堆的吸收球第二停堆系统
CN105702304A (zh) 一种反应堆控制棒驱动线综合性能试验验证装置
CN1327453C (zh) 球床高温气冷堆双径球碎球分选装置
US9805833B2 (en) Passively initiated depressurization valve for light water reactor
JP2009526218A (ja) ペブルベッド原子炉を備える原子力発電所
Steed Nuclear power: in Canada and beyond
Kukita et al. Summary of ROSA-IV LSTF first-phase test program—integral simulation of PWR small-break LOCAs and transients
CN214752963U (zh) 一种液力悬浮式反应堆停堆棒
Kawanishi et al. Experimental study on heat removal during cold leg small break LOCAs in PWRs
CN110322974B (zh) 一种燃料球可聚集分离的轻水堆
CN103307320A (zh) 一种非能动单向隔离阀、管道及球床高温气冷堆
Bittermann et al. Design aspects and pertaining development work for the KWU 200 MWth nuclear heating reactor
CN216311363U (zh) 放射性废气处理装置
CN202297647U (zh) 用于向2座高炉供风的拨风控制装置
Dymáčková et al. Helium recovery from guard vessel atmosphere of the ALLEGRO reactor
Park et al. Thermal-Hydraulic Validation Tests for SMART Pre-Project Engineering
Dastidar et al. Engineering development and safety back-up for nuclear power programme
Endiah et al. Analysis on the Role of RSG-GAS Pool Cooling System during Partial Loss of Heat Sink Accident
Wessman et al. HTGR plant safety design bases
Liu et al. Estimation of the depressurization process of Fukushima Daiichi NPP Unit 1
Kim et al. Analysis of the Steam Generator Tube Rupture Source Term for a PHWR

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant