CN1584239B - Wall combining method - Google Patents

Wall combining method Download PDF

Info

Publication number
CN1584239B
CN1584239B CN 200410047979 CN200410047979A CN1584239B CN 1584239 B CN1584239 B CN 1584239B CN 200410047979 CN200410047979 CN 200410047979 CN 200410047979 A CN200410047979 A CN 200410047979A CN 1584239 B CN1584239 B CN 1584239B
Authority
CN
China
Prior art keywords
wallboard
connector
hole
screw mandrel
installing port
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 200410047979
Other languages
Chinese (zh)
Other versions
CN1584239A (en
Inventor
关范
李春普
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 200410047979 priority Critical patent/CN1584239B/en
Publication of CN1584239A publication Critical patent/CN1584239A/en
Application granted granted Critical
Publication of CN1584239B publication Critical patent/CN1584239B/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Load-Bearing And Curtain Walls (AREA)

Abstract

The present invention discloses a wall body combination method in building field. Said method includes the following steps: 1. making connecting component with connecting screw hole; 2. placing the connecting component in the interior of wall plate; 3. setting connecting hole on beam and column; 4. after the wall plate and beam and column and wall plate are mutually corresponded, making the connecting bolt inserted into the connecting screw hole and connecting hole; and 5. sealing fixing hole by using dinding agents of concrete, etc. Said invention has the advantages of quick construction speed, high integrated strength, high aseismic strength and no easily producing crack, etc.

Description

A kind of wall body combination method
Technical field
The present invention is to provide the body of wall construction method of building field, specifically a kind of wall body combination method.
Background technology
Before the inventive method proposes, when using wallboard wall constructed, some blocks of wallboards to be interconnected usually, be connected with beam column simultaneously.Employed method is, sticks with glue material and fill between wallboard, and the curing by adhesive material is with dry, makes wallboard obtain being formed by connecting body of wall into integral body.Because used sticky matter exists the different of the drying shrinkage and the coefficient of expansion joint face of wallboard is come off or ftracture, cause body of wall the crack to occur, bulk strength is reduced, lowered performances such as antidetonation, support, this has become wallboard and has connected and the disadvantage of constructing.
Summary of the invention
The objective of the invention is to propose a kind of wall body combination method in order to overcome the shortcoming of existing panel assembly method.Its summary of the invention is:
Construction sequence is:
1, make connector, be provided with connecting hole in connector one side, make connecting bolt and be provided with the connecting bolt latch segment in the centre position of connector, be connected with the connection screw mandrel in the bilateral symmetry of connector, the screw thread that connects screw mandrel is reverse each other;
2, described connector layout is arranged in the making mould of wallboard, and embeds the installing port module in its both sides, fluid concrete, curing and demolding is taken off the installing port module, forms installing port, constitutes the wallboard with connector; Or on the wallboard of installing port inboard, get connector in advance and inlay mouth, and connector is embedded in inlays in the mouth, the direction in the connecting filament hole of connector is towards the outside;
3, constitute connecting hole in the punching of beam column sidepiece preposition, the connection screw mandrel that is located at the connecting bolt on the wallboard is inserted in the connecting hole that is located on the beam column, realizes being located by connecting;
4, will need two wallboard sidepieces connecting relative, the connecting filament hole is aimed at the connection screw mandrel two ends of connecting bolt, the rotational lock instrument blocks the connecting bolt latch segment and is rotated, effect by screw thread enters in the connecting filament hole connection screw mandrel, two wallboards are close to, can make that by the connector in the wallboard wallboard connects continuously, form integral wall;
5, on the side between wallboard and beam column and wallboard and the wallboard, smear cementing agent, use the concrete enclosing installing port simultaneously.
Because method of the present invention can be carried out being connected with fixing of wallboard by connector, with stick with glue material adhesive compare have that speed of application is fast, bulk strength is high, antidetonation and be difficult for producing the advantage in crack.
Description of drawings
Fig. 1 is a wallboard connector structure chart of the present invention
Fig. 2 is provided with figure for connector of the present invention in wallboard
Fig. 3 is wallboard of the present invention and beam column connection status figure
Fig. 4 is wallboard of the present invention and panel assembly state diagram
Among Fig. 1,1 is connector, is provided with connecting filament hole 1A in a side of connector.2 is connecting bolt, is provided with connecting bolt latch segment 2A in position intermediate, is connected with in its bilateral symmetry to connect screw mandrel 2B.
Among Fig. 2,3 is wallboard, is provided with connector 3A at the sidepiece of wallboard, is provided with connector 1 in connector, and the direction of connecting filament hole 1A toward the outer side.
Among Fig. 3,4 is beam column, is provided with connecting hole 4A at the sidepiece of beam column, is located at connection screw mandrel 1B on the wallboard and inserts and realize in the connecting hole 4A being connected of wallboard and beam column.
Among Fig. 4, wallboard A and B are adjacent wall board, and its structure is identical.Be respectively equipped with connector A1 and B1 in wallboard A, B, the connection screw mandrel 2B by connecting bolt 2 is connected with screwing of the connector connecting filament hole A1A, the B1A that are located at wallboard A, B is connected A, B wallboard.
The specific embodiment
Wall body combination method, construction sequence is:
1, make connector, be provided with connecting hole 1A in connector one side, make connecting bolt 2 and be provided with connecting bolt latch segment 2A in the centre position of connector, be connected with in the bilateral symmetry of connector and connect screw mandrel 2B, the screw thread that connects screw mandrel is reverse each other;
2, described connector layout is arranged in the making mould of wallboard, and embeds the installing port module in its both sides, fluid concrete, curing and demolding is taken off the installing port module, forms installing port 3A, constitutes the wallboard with connector; Or on the wallboard of installing port inboard, get connector in advance and inlay mouth, and connector is embedded in inlays in the mouth, the direction of the connecting filament hole 1A of connector 1 is towards the outside;
3, constitute connecting hole 4A in the punching of beam column sidepiece preposition, the connection screw mandrel 2B that is located at the connecting bolt 2 on the wallboard 3 is inserted in the connecting hole 4A that is located on the beam column, realizes being located by connecting;
4, will need two wallboard sidepieces connecting relative, connecting filament hole 1A is aimed at the connection screw mandrel 2B two ends of connecting bolt 2, the rotational lock instrument blocks connecting bolt latch segment 2A and is rotated, effect by screw thread enters in the connecting filament hole connection screw mandrel 2B, two wallboards are close to, can make that by the connector in the wallboard wallboard connects continuously, form integral wall;
5, on the side between wallboard and beam column and wallboard and the wallboard, smear cementing agent, use the concrete enclosing installing port simultaneously.
Described connector is made connector 1 with metal sheet or metal bar by carrying to cut with mode crooked and welding; Make the connecting bolt blank with metal bar by the mode of cutting or punching press, and form connecting bolt latch segment 2A; Make connection screw mandrel 2B by modes such as hitch or turning.
The described connector that is provided with in wallboard is connector to be arranged be arranged in the making mould of wallboard that the casting cement concrete forms installing port.
Described is to get connecting hole with Churn drill precalculated position on beam column in that connecting hole is set on the beam column.
It is by connector adjacent two blocks of wallboards to be interconnected that described body of wall is connected, and is connected with beam column simultaneously, realizes the entire combination of body of wall.
It is to seal with cementing agent or the concrete installing port with wallboard and connector position that the sealing of described connector is handled, and makes wall leveling.
The connecting bolt latch segment of connecting bolt of the present invention also can be solenoid structure, be fixed on the connector and connect screw mandrel, by the rotation screwed pipe and with is connected screw mandrel and interacts and realize between the wallboard and wallboard is connected with locking between the beam column with making up and fixes.
Being connected of the wallboard that method by as above and step can realize different structure is in order to wall constructed.

Claims (1)

1. wall body combination method, it is characterized in that: construction sequence is:
1), makes connector, be provided with connecting hole (1A) in connector one side, make connecting bolt (2) and be provided with connecting bolt latch segment (2A) in the centre position of connector, be connected with in the bilateral symmetry of connector and connect screw mandrel (2B), the screw thread that connects screw mandrel is reverse each other;
2), described connector arranged be arranged in the making mould of wallboard, and embed the installing port module in its both sides, fluid concrete, curing and demolding is taken off the installing port module, forms installing port (3A), constitutes the wallboard with connector; Or on the wallboard of installing port inboard, get connector in advance and inlay mouth, and connector is embedded in inlays in the mouth, the direction in the connecting filament hole (1A) of connector (1) is towards the outside;
3), constitute connecting hole (4A) in beam column sidepiece preposition punching, the connection screw mandrel (2B) that is located at the connecting bolt (2) on the wallboard (3) is inserted in the connecting hole (4A) that is located on the beam column, realizes being located by connecting;
4), will need two wallboard sidepieces connecting relative, connecting filament hole (1A) is aimed at connection screw mandrel (2B) two ends of connecting bolt (2), the rotational lock instrument blocks connecting bolt latch segment (2A) and is rotated, effect by screw thread enters in the connecting filament hole connection screw mandrel (2B), two wallboards are close to, can make that by the connector in the wallboard wallboard connects continuously, form integral wall;
5), on the side between wallboard and beam column and wallboard and the wallboard, smear cementing agent, use the concrete enclosing installing port simultaneously.
CN 200410047979 2004-06-14 2004-06-14 Wall combining method Expired - Fee Related CN1584239B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200410047979 CN1584239B (en) 2004-06-14 2004-06-14 Wall combining method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200410047979 CN1584239B (en) 2004-06-14 2004-06-14 Wall combining method

Publications (2)

Publication Number Publication Date
CN1584239A CN1584239A (en) 2005-02-23
CN1584239B true CN1584239B (en) 2010-06-16

Family

ID=34602047

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200410047979 Expired - Fee Related CN1584239B (en) 2004-06-14 2004-06-14 Wall combining method

Country Status (1)

Country Link
CN (1) CN1584239B (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101063318B (en) * 2007-05-31 2010-12-08 杭州恒达钢结构实业有限公司 Construction steel structure glue-joint technique
CN104594533B (en) * 2015-01-23 2017-06-20 沈阳建筑大学 Adjustable masonry filler wall and frame column flexible connecting structure
CN106149924B (en) * 2015-04-10 2019-02-22 北新集团建材股份有限公司 The connection structure and connection method of a kind of wall panel assemblies connector, wallboard
CN110939206B (en) * 2019-12-31 2021-03-16 河南城建学院 Assembled building connecting component

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1095785C (en) * 1996-05-24 2002-12-11 布隆福斯国际股份有限公司 Device for ships, independent of principle propulsion system, serving either as passive rudder or as active manoeuvring element
CN1236044C (en) * 2003-02-20 2006-01-11 曾和平 Honeyed hedgehog fungus wine and its production process

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1095785C (en) * 1996-05-24 2002-12-11 布隆福斯国际股份有限公司 Device for ships, independent of principle propulsion system, serving either as passive rudder or as active manoeuvring element
CN1236044C (en) * 2003-02-20 2006-01-11 曾和平 Honeyed hedgehog fungus wine and its production process

Also Published As

Publication number Publication date
CN1584239A (en) 2005-02-23

Similar Documents

Publication Publication Date Title
CN106193336B (en) Connecting structure and its construction method with H-type slotted wall structure precast shear wall
CA2272729A1 (en) Insulating connectors used to retain forms during the manufacture of composite wall structures
US7152378B2 (en) Panel forming system and components
CN1584239B (en) Wall combining method
JP3272839B2 (en) Jig for joining
CN216587140U (en) Assembled wall structure
CN111236499A (en) Prefabricated superposed component and production method thereof, prefabricated superposed wall and construction method thereof
CN201169883Y (en) Back hanging type building exterior wall heat insulation decoration board
CN112144652A (en) Prefabricated part construction process
JP2018178365A (en) Reinforcement joint coupler
CN201474110U (en) Heat insulation system in compound heat insulation keel
CN211286083U (en) Prefabricated coincide component and prefabricated coincide outer wall of integrated heat preservation template
CN214144208U (en) Outer wall insulation board repairing structure, outer wall insulation board comprising same and building
CN106592872A (en) Steel bar mechanical connecting structure and installation method
CN2721756Y (en) Wall board with connector
US20030145765A1 (en) Lightweight concrete with increased strength and method for producing the same
CN108104501B (en) CFRP (carbon fiber reinforced plastics) -based reinforced concrete reinforcing method
CN211597359U (en) Prefabricated sandwich wallboard
CN115538645B (en) Integrated precast concrete wallboard for heat preservation and decoration
CN220814378U (en) High-strength prefabricated component for assembled machine room
CN216041912U (en) Assembled building wallboard crack anti-damage device
TWI356116B (en)
CN215759964U (en) Prefabricated cement wallboard for assembly type structure
CN113700176B (en) Segmental prestress assembling method for prefabricated partition wall board with holes
CN213805911U (en) Prestress auxiliary fastener for connecting inner partition plate seams

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20100616

Termination date: 20110614