CN1566749A - Method of fluidizing wind at high pressure using steam to replace air - Google Patents

Method of fluidizing wind at high pressure using steam to replace air Download PDF

Info

Publication number
CN1566749A
CN1566749A CN 03129174 CN03129174A CN1566749A CN 1566749 A CN1566749 A CN 1566749A CN 03129174 CN03129174 CN 03129174 CN 03129174 A CN03129174 A CN 03129174A CN 1566749 A CN1566749 A CN 1566749A
Authority
CN
China
Prior art keywords
steam
boiler
material returning
returning device
air
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN 03129174
Other languages
Chinese (zh)
Other versions
CN1313766C (en
Inventor
肖峰
陈干锦
倪晓晖
邵国桢
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Boiler Works Co Ltd
Original Assignee
Shanghai Boiler Works Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Boiler Works Co Ltd filed Critical Shanghai Boiler Works Co Ltd
Priority to CNB031291740A priority Critical patent/CN1313766C/en
Publication of CN1566749A publication Critical patent/CN1566749A/en
Application granted granted Critical
Publication of CN1313766C publication Critical patent/CN1313766C/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Fluidized-Bed Combustion And Resonant Combustion (AREA)

Abstract

The invention relates to a method of implementing high pressure fluidization blast using steam in place of air, characterized in that: steam is used for high pressure fluidization blast in normal running of a boiler. The method includes: connecting a turbine exhaust or intermediate extraction with a stock recycler using a steam conduit; starting high pressure fluidization blower and fluidizing recycle material in the stock recycler using air when the boiler begins to start; opening stop valve of the turbine steam conduit, fluidizing recycle material in the stock recycler using steam, shutting down the high pressure fluidization blower and closing the stop valve when the temperature of recycle material in the stock recycler is above 300 Celsius degree, the fluidization steam vapor source pressure parameter is greater than 60Kpa, and the superheat degree is larger than 30 Celsius degree; starting the high pressure fluidization blower, fluidizing recycle material in the stock recycler using air, and closing the stop valve on steam turbine when the temperature of the stock recycler is under 300 Celsius degree in blow off process of the boiler. Advantages of the invention consist in that coking of the stock recycler or other high temperature zones can be prevented or abated and boiler operation reliability can be improved by using steam for replacing high pressure fluidization blast. At the same time, circulating fluid bed boiler desulfurizer utilization rate can be improved, Nox discharge concentration can be reduced, and power plant running cost can be saved by utilizing steam fluidization.

Description

Replace air to carry out the method for hp fluid air with steam
Technical field
The present invention relates to a kind ofly replace air to carry out the method for hp fluid air, be used for the fluidisation of CFBB material returning device, belong to CFBB fluidization technique field with steam.
Background technology
From the eighties in 20th century, CFBB is in China's develop rapidly, and up to the present, the above CFBB of 130t/h grade just has good hundreds of platform in moving or be in installation and design.Along with reaching its maturity of burning in circulating fluid bed boiler technology, the capacitance grade of boiler also constantly increases, the single reheat CFBB will also have dropped into commercial operation in the middle of the 135MW band the end of the year 2002, the schedule that the research of 200MW, 300MW and above CFBB, exploitation also enter each big R﹠D institution and boiler maker man facts have proved that this novel " cleaning " coal combustion technology of recirculating fluidized bed has plurality of advantages such as coal adaptability is wide, load range of boiler is big, pollutant discharge amount is low.But situation from actual motion, CFBB is when using the fuel of the after-flame poor-performing that catches fire, because the optimum temperature of boiler operatiopn is mostly in 850-900 ℃ scope, fuel is disposable can not to burn fully by fire box, a part carbon granules at furnace outlet along with flue gas enters cyclone separator at a high speed, carbonaceous particles is at a high speed rotation and contact the generation after-burning with air in the flue gas in cyclone separator, this after-burning enters material returning device along with material is separated, because material returning device comes fluidisation with air, this after-burning makes the temperature of material returning device raise and coking along with material and aggravation more after material returning device high pressure fluidization air contacts.This is for the easier generation of the low fuel of ash fusion point.Particularly present most of CFBB adopts high-temperature heat insulation formula cyclone separator, and time grey temperature of discovery material returning device in service is than furnace outlet height, and some will exceed 50-100 ℃, thereby material returning device blast cap scaling loss and phenomenon of coking take place.In addition, since feed back fluidized wind pressure head height, blower fan power consumption height, high-head fluidisation fan noise is big, the air channel serious vibration, some power plant even discovery have influenced the operation of boiler owing to the vibration in hp fluid air road causes material returning device air compartment and whole material returning device vibration damage.
Summary of the invention
The objective of the invention is to invent a kind of material returning device be difficult for coking, blast cap be difficult for scaling loss and have improve desulfurizing function replace air to carry out the method for hp fluid air with steam.
For realizing above purpose, technical scheme of the present invention provides and a kind ofly replaces air to carry out the method for hp fluid air with steam, it is characterized in that, in servicely carries out hp fluid air with steam in that boiler is normal, and its method comprises:
(1) with jet chimney turbine discharge or other vapour source are connected with material returning device;
(2) when boiler begins to start, open the hp fluid air machine, come recycle stock in the fluidisation material returning device with air;
(3) about the temperature of boiler heating recycle stock in the material returning device is greater than 300 ℃, the fluidization steam vapor of steam turbine or other steam source parameter meet pressure greater than 60Kpa (g), the degree of superheat is greater than after more than 30 ℃, open the stop valve on the steam-turbine lead, use steam to come the interior recycle stock of fluidisation material returning device, and close hp fluid air machine and stop valve.
(4) in the boiler shutdown process, when material returning device temperature during, open the hp fluid air machine less than 300 ℃, come recycle stock in the fluidisation material returning device with air, and close the stop valve of steam turbine or other steam source.
Use the required system of this method to comprise boiler furnace, cyclone separator, material returning device, blast cap and steam jet, wind and vaporium, afterbody convection pass, hp fluid air machine, stop valve, its characteristics are, connect material returning device and steam turbine or other steam source by jet chimney, on the jet chimney between material returning device and the steam turbine, be equipped with stop valve.
Principle according to Dual-Phrase Distribution of Gas olid, when the gas by fixed bed or gas flow are increased to weight that gas or gas just equal particle to the drag force of particle and deduct buoyancy, particle is in a kind of plan suspended state, particle changes a kind of running status that is similar to fluid into, this moment, fixed-bed conversion was initial fluidized state, and at this moment Zui Xiao wind speed is grain fluidized critical fludization velocity Vlj.It is as follows to calculate and test the empirical equation that draws the critical fluidising air velocity Vlj of calculating according to theory:
Vlj=0.0882Ar 0.528(v y/D dl) m/s
In the formula: Ar = g D dl 3 / v y 2 * ( γ g - γ y ) / γ y -Archimedes criterion
v yThe dynamic viscosity coefficient of-gas (vapour) body, m 2/ s
γ gThe true specific gravity of-solid particle, kg/m 3
γ yThe proportion of-bed temperature the therapeutic method to keep the adverse qi flowing downward (vapour) body, kg/m 3
D DlThe average diameter of-solid particle, m
G-acceleration of gravity is generally got 9.81m/s 2
Influence gas or gas depend on gas or gas to grain fluidized critical speed proportion and dynamic viscosity coefficient as can be seen according to above formula, the proportion of gas or gas is big more, grain fluidized critical fludization velocity is more little, also with regard to the easy more goods fluid that makes, the big more needed critical fludization velocity of dynamic viscosity is more little.According to the physical characteristic of air and steam as can be seen, for steam, when steam pressure is not very big, can be used as perfect gas under the not too low situation of temperature handles, for parts such as boiler hearth of circulating fluidized bed air distribution plate, material returning device, fluidized bed slag cooler and external heat exchangers, steam all can be used as perfect gas and handles.Under uniform pressure and temperature, the proportion of steam is littler than air, and the viscosity ratio air is big, therefore with the effect of steam fluidisation granule materials substantially and air be equal to.Find through computational analysis: under the identical situation of other condition, it is littler than the mass flow of air to reach the required steam mass flow of identical fluidizing velocity.Draw from theory analysis that to use steam to replace air to come the fluidisation material be fully feasible.
Advantage of the present invention is:
1. can prevent the material returning device coking effectively;
Because logical steam replaces air in the material returning device, fuel is disposable can not to burn fully by fire box, a part carbon granules at furnace outlet along with flue gas enters cyclone separator at a high speed, carbonaceous particles is at a high speed rotation and contact the generation after-burning with air in the flue gas in cyclone separator, this after-burning enters material returning device along with material is separated, can avoid further burning, steam heat absorption simultaneously can reduce back grey temperature, prevents coking.
2. steam substitutes hp fluid air, and material returning device regional water vapour concentration is increased, and CaO is activated, and increases the desulfuration efficiency of lime stone;
The desulfurizing agent of desulphurization in circulating fluidized bed boiler generally adopts lime stone CaCO at present 3, dolomite CaCO 3.MgCO 3, under the situation for identical Ca/S mol ratio, Ca (OH) 2Desulfuration efficiency than lime stone CaCO 3, dolomite CaCO 3.MgCO 3Much higher, this is to become Ca (OH) owing to work as the CaO aquation 2The time, its specific area will increase, and void size distributes better, as Ca (OH) 2Being heated to resolve in the process that CaO emits water vapour forms the space again, has increased the specific area of CaO, has strengthened the activity of CaO, and the utilization rate of lime stone is improved.In addition, according to the desulphurization mechanism of CaO, CaCO 3Its molal volume had dwindled 45% when particle was transformed into the CaO particle, thereby made former CaCO 3Interior natural space has enlarged many, and this helps mushy CaO and SO 2React and generate CaSO 4But CaO becomes CaSO 4Its molal volume of course of reaction can increase about 180%, therefore, will generate the fine and close CaSO of one deck on the surface of CaO in the reaction beginning 4Thin layer has hindered SO 2Further be diffused into the CaO internal granular layer and react, use the steam fluidisation can make CaSO 4Break with the steam generation hydration reaction, expose new CaO surface, improve the desulfurization utilization rate of calcium.
Secondly, substitute the high pressure fluidization air, the vapour content in the flue gas is increased, play the effect of in-furnace calcium spraying back-end ductwork humidification desulfurization, make tiny CaO particle fly out behind the cyclone separator, at afterbody convection pass low-temperature space and H with steam 2The O reaction generates Ca (OH) 2With the SO in the flue gas 2Has very high reaction speed after meeting with SO 2Absorb, improve the utilization rate of calcium and further reduce SO 2Concentration of emission.Under similarity condition, obtain same desulfuration efficiency, the consumption that utilizes vapor stream fossil lime stone is than the low 20-30% of air fluidisation.The experience of boiler actual motion shows that along with reducing of Ca/S mol ratio, the concentration of emission of NOx also decreases.
3. operation maintenance is simple, and steam pressure is easy to regulate;
In Design of CFB Boiler; smooth and prevent burner hearth flue gas anti-channeling for the ease of the material returning device returning charge; the required pressure head of feedback air is more much higher than a blast head; need to be equipped with special fluidisation blower fan; and in order to increase the reliability of system; usually also need be equipped with standby fan, make system layout, safeguard complicatedly, investment increases.If use steam to replace this part fluidization air, the pressure of steam can arbitrarily be adjusted according to the variation in operating condition and the coal, does not also need to be equipped with standby fan, and system equipment is simple and reliable, and is easy to operate.
4. avoid the vibrations and the noise of pipeline and hp fluid air machine, improve power plant's running environment.
Description of drawings
Fig. 1 is the circulating fluidized bed boiler systems schematic diagram.
The specific embodiment
Because the producing steam of boiler own, to generator for electricity generation, so steam can come from turbine discharge or intermediate extraction to steam by steam turbine, also can be from boiler itself or other source generating means.
Present embodiment is an example with the 150MW of Shanghai Furnace Factory Co., Ltd band resuperheat CFBB, and steam is provided by turbine discharge or intermediate extraction:
As shown in Figure 1, be the circulating fluidized bed boiler systems schematic diagram, by boiler 1, cyclone separator 2, material returning device 3, blast cap and steam jet 4, wind and vaporium 5, afterbody convection pass 6, stop valve 7, steam turbine 8, hp fluid air machine 9, stop valve 10 is formed, cyclone separator 2 connects the upper end of boiler 1, the upper end of cyclone separator 2 connects afterbody convection pass 6, the lower end of cyclone separator 2 connects material returning device 3, material returning device 3 connects the lower end of boiler 1, material returning device is equipped with blast cap and steam jet 4 for 3 li, the lower end of material returning device 3 connects steam turbine 8 with jet chimney, on the jet chimney between material returning device 3 and the steam turbine 8, load onto stop valve 7, connect hp fluid air machine 9 with air duct, on the air duct of material returning device 3 and hp fluid air machine 9, load onto stop valve 10.
The method that replaces air to carry out hp fluid air with steam is:
(1) when boiler 1 begins to start, open hp fluid air machine 9, come recycle stock in the fluidisation material returning device 3 with air;
(2) in boiler 1 is warmed up to material returning device 3 temperature of recycle stock greater than about 300 ℃, the fluidization steam vapor vapour source parameter of steam turbine 8 meets pressure greater than 60Kpa (g), the degree of superheat is greater than after more than 30 ℃, open the stop valve 7 on steam turbine 8 jet chimneys, use steam comes the recycle stock in the fluidisation material returning device 3, and closes hp fluid air machine 9 and stop valve 10.
(3) in boiler 1 furnace shutting down process, when material returning device 3 temperature during, open hp fluid air machine 9 less than 300 ℃, come recycle stock in the fluidisation material returning device 3 with air, and close the stop valve 7 on the steam turbine 8.
Fuel burns in the burner hearth of boiler 1, flue gas enters cyclone separator 2 at a high speed, separating the back flue gas is discharged by afterbody convection pass 6, a large amount of materials and a part of unburnt carbonaceous particles high speed rotation and reinforcement in cyclone separator mix with air in the flue gas after-burning take place, this after-burning enters material returning device 3 along with material is separated, the low-pressure steam that is provided by steam turbine enters material returning device 3, by blast cap and steam jet 4 ejections recycle stock is carried out fluidisation.
Shared 2 material returning devices of the 150MW of Shanghai Furnace Factory Co., Ltd band resuperheat CFBB, the bed surface of each material returning device is long-pending to be 4.96m 2, fluidizing velocity is 0.6-0.8m/s during according to design and operation, and the fluidization steam vapor quantity of steam calculates by 1.0m/s, and required fluidization steam vapor is 35712m 3/ h designs back 870 ℃ of grey temperature, pressure 34.0KPa, and absolute pressure is 0.1353MPa, and under this situation, steam is by desirable gas treatment, and the specific volume of steam is: 3.9m 3/ kg, therefore required material returning device fluidization steam vapor amount is 9157kg/h.
According to the vapour source of conveniently choosing in the source of boiler or power plant's steam turbine steam, existing is 150-200 ℃ by the inlet vapor source temperature, and the steam enthalpy is considered by 2800-3000kJ/kg.If the vapour source is from beyond the steam generator system, boiler efficiency will increase.If from boiler self steam, the heat loss due to exhaust gas of boiler will increase.Calculate according to heating power, boiler substitutes under the situation of high pressure fluidization air at steam of no use, the exhaust smoke level of boiler is: 635424kg/h, the weight quota of water vapour is 4.042% in the flue gas, the weight of water vapour is in the flue gas: 25684kg/h, the heat loss of water vapour is 0.97% by high calorific power in the fuel.If boiler utilizes steam to replace the material returning device hp fluid air, the weight quota of water vapour is 5.4% in the boiler smoke at this moment, and the heat loss of water vapour is 1.32% by high calorific power in the fuel, will make the heat loss due to exhaust gas of boiler increase 0.3-0.4%.Calculate by heat loss, boiler per hour thermal losses is about 1620kw, if unit calculates by 35% generating efficiency, then power consumption is 567kw/h, remains basically stable with the power consumption of hp fluid air machine.
From computational analysis as can be seen, the steam fluidisation makes the flue gas water vapour content be increased to 5.4% from 4.04%, therefore as long as the humidity of coal is moderate, the content of tail flue gas steam can obviously not increase, can not cause empty preheater cold end corrosion and to have a strong impact on, simultaneously after the steam fluidisation because the raising of limestone desulfurization efficient, SO 2Discharging reduce, empty preheater cold end corrosion situation is improved greatly.

Claims (3)

1. one kind replaces air to carry out the method for hp fluid air with steam, it is characterized in that, in servicely carries out hp fluid air with steam in that boiler is normal, and its method comprises:
(1) with jet chimney turbine discharge or intermediate extraction (8) are connected with material returning device (3);
(2) when beginning to start, open hp fluid air machine (9) at boiler (1), come the interior recycle stock of fluidisation material returning device (3) with air;
(3) in boiler (1) is warmed up to material returning device (3) temperature of recycle stock greater than 300 ℃ about, the fluidization steam vapor vapour source parameter of turbine discharge or intermediate extraction (8) meets pressure greater than 60Kpa (g), the degree of superheat is greater than after more than 30 ℃, open the stop valve (7) on steam turbine (8) jet chimney, use steam to come the interior recycle stock of fluidisation material returning device (3), and close hp fluid air machine (9) and stop valve (10).
(4) in boiler (1) furnace shutting down process, when material returning device (3) temperature during, open hp fluid air machine (9) less than 300 ℃, come recycle stock in the fluidisation material returning device (3) with air, and close the stop valve (7) on the steam turbine (8).
2. use the required system of this method to comprise boiler (1), cyclone separator (2), material returning device (3), steam jet (4), wind and vaporium (5), afterbody convection pass (6), hp fluid air machine (9), stop valve (10), it is characterized in that, connect material returning device (3) and steam turbine (8) by jet chimney, on the jet chimney between material returning device (3) and the steam turbine (8), be equipped with stop valve (7).
3. according to claim 1 and 2ly replace air to carry out the method and system of hp fluid air, it is characterized in that described steam can come from turbine discharge or intermediate extraction with steam, also can be from boiler itself or other vapour source generating means.
CNB031291740A 2003-06-11 2003-06-11 Method of fluidizing wind at high pressure using steam to replace air Expired - Lifetime CN1313766C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNB031291740A CN1313766C (en) 2003-06-11 2003-06-11 Method of fluidizing wind at high pressure using steam to replace air

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNB031291740A CN1313766C (en) 2003-06-11 2003-06-11 Method of fluidizing wind at high pressure using steam to replace air

Publications (2)

Publication Number Publication Date
CN1566749A true CN1566749A (en) 2005-01-19
CN1313766C CN1313766C (en) 2007-05-02

Family

ID=34469228

Family Applications (1)

Application Number Title Priority Date Filing Date
CNB031291740A Expired - Lifetime CN1313766C (en) 2003-06-11 2003-06-11 Method of fluidizing wind at high pressure using steam to replace air

Country Status (1)

Country Link
CN (1) CN1313766C (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102128447A (en) * 2011-04-21 2011-07-20 张全胜 Steam heating method of bed materials of fluidized bed boiler
CN101021318B (en) * 2006-02-16 2011-12-07 山东兖矿国际焦化有限公司 New technique for solving the problem of middle-and small-size circulating fluidized bed boiler coking
CN102798122A (en) * 2012-08-24 2012-11-28 上海锅炉厂有限公司 Feeding back device of circulating fluidized bed boiler
CN102997271A (en) * 2012-12-19 2013-03-27 上海艾能电力工程有限公司 Method and system for avoiding slagging of circulating fluid bed boiler furnace
CN106224944A (en) * 2016-08-31 2016-12-14 哈尔滨锅炉厂有限责任公司 Improve desulfurization efficiency of circulating fluidized bed boiler device and the method for desulfuration efficiency
US9651244B2 (en) 2011-02-04 2017-05-16 Amec Foster Wheeler Energia Oy Method of operating an oxycombustion circulating fluidized bed boiler
CN107806634A (en) * 2017-12-07 2018-03-16 济南海耀新能源设备有限公司 A kind of novel fluidization technique
US10011794B2 (en) 2013-04-24 2018-07-03 Ihi Corporation Fluidized bed system and method for operating fluidized bed furnace
CN112920850A (en) * 2021-01-26 2021-06-08 哈尔滨锅炉厂有限责任公司 Material returning device for biomass fluidized bed gasification furnace

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2014110881A1 (en) * 2013-01-18 2014-07-24 北京神雾环境能源科技集团股份有限公司 Pellet fuel boiler equipped with regenerative rotating commutating heater

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1029689C (en) * 1992-01-23 1995-09-06 浙江大学 Circulation fluidized-bed gas-steam combine producing process and device
US5666801A (en) * 1995-09-01 1997-09-16 Rohrer; John W. Combined cycle power plant with integrated CFB devolatilizer and CFB boiler
JP3554518B2 (en) * 2000-02-21 2004-08-18 株式会社タクマ High temperature and high pressure circulating fluidized bed boiler using waste as fuel.
CN1173015C (en) * 2002-05-12 2004-10-27 郑州永泰能源新设备有限公司 Fluidized bed water gas production method equipped with auxiliary bed reactor and installation thereof

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101021318B (en) * 2006-02-16 2011-12-07 山东兖矿国际焦化有限公司 New technique for solving the problem of middle-and small-size circulating fluidized bed boiler coking
US9651244B2 (en) 2011-02-04 2017-05-16 Amec Foster Wheeler Energia Oy Method of operating an oxycombustion circulating fluidized bed boiler
CN102128447A (en) * 2011-04-21 2011-07-20 张全胜 Steam heating method of bed materials of fluidized bed boiler
CN102128447B (en) * 2011-04-21 2012-10-10 张全胜 Steam heating method of bed materials of fluidized bed boiler
CN102798122A (en) * 2012-08-24 2012-11-28 上海锅炉厂有限公司 Feeding back device of circulating fluidized bed boiler
CN102997271A (en) * 2012-12-19 2013-03-27 上海艾能电力工程有限公司 Method and system for avoiding slagging of circulating fluid bed boiler furnace
US10011794B2 (en) 2013-04-24 2018-07-03 Ihi Corporation Fluidized bed system and method for operating fluidized bed furnace
CN106224944A (en) * 2016-08-31 2016-12-14 哈尔滨锅炉厂有限责任公司 Improve desulfurization efficiency of circulating fluidized bed boiler device and the method for desulfuration efficiency
CN107806634A (en) * 2017-12-07 2018-03-16 济南海耀新能源设备有限公司 A kind of novel fluidization technique
CN112920850A (en) * 2021-01-26 2021-06-08 哈尔滨锅炉厂有限责任公司 Material returning device for biomass fluidized bed gasification furnace

Also Published As

Publication number Publication date
CN1313766C (en) 2007-05-02

Similar Documents

Publication Publication Date Title
Liu et al. Experimental tests on co-firing coal and biomass waste fuels in a fluidised bed under oxy-fuel combustion
CN102537975B (en) Circulating fluidized bed garbage incineration boiler and pollution control system with same
CN1959208A (en) Boiler system of circulating fluid bed burning in oxygen enrichment
CN101311628A (en) Circulating fluid bed boiler flue calcium injection and desulfurization process
CN102083947A (en) Mild gasification combined-cycle powerplant
CN1313766C (en) Method of fluidizing wind at high pressure using steam to replace air
CN2937851Y (en) Biomass energy fuel boiler
WO1999023431A1 (en) Fluidized bed gasification combustion furnace
CN101037193A (en) Technology and device for producing yellow Phosphorus by electric oven process
CN203671593U (en) Internal and external cooperated pollutant removing device for boiler of flow state reconstructed circulating fluidized bed
GB2049134A (en) Fluidized bed fuel burning
CN100441952C (en) Composite circulating fluidized bed system for high performance clean burning of urban domestic garbage
CN104990072A (en) Efficient and low NOx emission fluidized bed boiler
CN204756912U (en) Fluidized bed boiler that high -efficient low NOx discharged
CN2747467Y (en) Fluidised sealed material return device
CN111102563A (en) Clean power generation method by blending and burning coal slime based on low-position coal slime feeding mode
CN1312431C (en) Sealed fluid back-feeder
CN111102566A (en) Clean power generation method by blending and burning coal slime in large circulating fluidized bed boiler
CN111102564A (en) Clean power generation method for mixed-burning coal slime based on bed temperature and bed pressure control
CN111102565A (en) Method for controlling emission of pollutants generated by mixed combustion of coal slime
CN111878800A (en) Combustion method for micro-flow layer combustion boiler
KR100686441B1 (en) Temperature Control apparatus and Control method at the combustor exit in a circulating fluidized bed combustion system
CN216744317U (en) Circulating fluidized bed boiler that heat utilization efficiency is high
Chowdhury Emission control alternatives for electric utility power plants
CN1199713C (en) Flue gas desulfuring method and its device for density current fluidised bed

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term

Granted publication date: 20070502

CX01 Expiry of patent term