CN1565925A - Ballast water overflow displacement method for Cape of Good Hope type bulk cargo ship - Google Patents

Ballast water overflow displacement method for Cape of Good Hope type bulk cargo ship Download PDF

Info

Publication number
CN1565925A
CN1565925A CN 03129649 CN03129649A CN1565925A CN 1565925 A CN1565925 A CN 1565925A CN 03129649 CN03129649 CN 03129649 CN 03129649 A CN03129649 A CN 03129649A CN 1565925 A CN1565925 A CN 1565925A
Authority
CN
China
Prior art keywords
ballast
ballast water
flows
cargo hold
tank
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN 03129649
Other languages
Chinese (zh)
Other versions
CN100430291C (en
Inventor
陈强
陶颖
鲍彤
厉敏燕
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Xinye Marine & Engineering Design Co., Ltd.
Original Assignee
Shanghai Waigaoqiao Shipbuilding Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Waigaoqiao Shipbuilding Co Ltd filed Critical Shanghai Waigaoqiao Shipbuilding Co Ltd
Priority to CNB031296491A priority Critical patent/CN100430291C/en
Publication of CN1565925A publication Critical patent/CN1565925A/en
Application granted granted Critical
Publication of CN100430291C publication Critical patent/CN100430291C/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Physical Water Treatments (AREA)

Abstract

The invention relates to a ballast water overflow replacement method for Capesize bulk carrier which includes the following steps: a ballast pump pumps the seawater into the fore peak bottom or ballast well of No.6 cargo hold bottom via a ballast system, when the hydraulic pressure increases, the pumped seawater in the ballast well flows into the No.6 cargo hold, and the ballast water in the fore peak or the No.6 cargo hold flows into the overflow pipe, then flows into the No.1 ballast chamber or the No.6 ballast chamber, then flows into the sea via the ballast system or flows outboard via the outlet on the shipboard. The invention can prevent the ballast water from flowing onto the main deck and icing.

Description

Cape size bulk carrier ballast water overflow method of replacing
Technical field
The present invention relates to a kind of ballast water for ship method of replacing, relate in particular to a kind of cape size bulk carrier ballast water overflow method of replacing.
Background technology
Discover: many biological species can be survived in dissimilar ballast waters and accretion, even through after the route in several weeks.So external ballast water and sedimentary discharging might cause wherein harmful organism and germ to get involved the harborage area, thereby break the ecologic balance at this harbour.In order to prevent the pollution of the environment, many national requirements enter the boats and ships at this state harbour must take measures to limit the intervention of harmful organism and germ.International Maritime Organization's conference resolution A.868 (20) requires: ballast water is managed to reduce the propagation of harmful organism and germ etc. as far as possible.Wherein ballast water is replaced into most important measure.
Be the method that adopts the deck overflow to cape size bulk carrier ballast water overflow method of replacing at present, the ballast water of first Peak Tank and No. 6 cargo holds is replaced, and then other ballast tank is carried out the ballast water displacement by draining-water inlet method; Because adopting press over system is that ballast water is directly discharged outboard through the deck, when seasonal area carries out the ballast water displacement in the winter time, the icing phenomenon in deck just may appear.
Summary of the invention
The objective of the invention is to solve the problems of the technologies described above, a kind of cape size bulk carrier ballast water overflow method of replacing is provided, ballast water can not overflowed to outboard by the deck.
The objective of the invention is to realize by following steps:
With ballast pump seawater is thrown into first Peak Tank bottom by ballasting system or thrown the ballast well of No. 6 tank tops into from sea chest;
Hydraulic pressure constantly increases or throws into the ballast well of No. 6 tank tops bottom first Peak Tank, enters cargo hold No. 6, and No. 6 cargo hold hydraulic pressure constantly increases;
The ballast water of first Peak Tank or the ballast water of No. 6 cargo holds enter overflow pipe;
Flow to No. 1 ballast chamber or flow to ballast chamber No. 6;
Enter the sea or the discharge port by topside flows out outboard by ballasting system.
Compared with prior art, the invention has the beneficial effects as follows: avoided ballast water to flow directly to main deck and produced the phenomenon of freezing.
Description of drawings
Fig. 1 is the scheme drawing that first Peak Tank ballast water overflows to outboard;
Fig. 2 is the scheme drawing that the ballast water of No. 6 cargo holds overflows to outboard;
Wherein: ballasting system 1, first Peak Tank 2,3, No. 1 ballast chambers 4 of overflow pipe, 7, No. 6 ballast chambers 9 of 6, No. 6 cargo holds of ballast well, the discharge port 10 of topside.
The specific embodiment
Below in conjunction with the accompanying drawing and the specific embodiment the present invention is described in further detail:
As seen from Figure 1: throw seawater into first Peak Tank 2 bottoms from sea chest by ballasting system 1 with ballast pump, along with first Peak Tank 2 bottom hydraulic pressure constantly increase, the ballast water of first Peak Tank slowly enters overflow pipe 3, flows to ballast chamber 4 No. 1, enters the sea by ballasting system again.
As seen from Figure 2: the ballast well 6 of seawater being thrown into No. 6 tank tops from sea chest by ballasting system 1 with ballast pump, enter cargo hold 7 No. 6, because No. 6 cargo hold 7 bottom hydraulic pressure constantly increase, the ballast water of No. 6 cargo holds slowly enters overflow pipe 3, flow to ballast chamber 9 No. 6, the discharge port 10 by topside flows out outboard again.
The present invention puts in ballast chamber No. 1 with the overflow pipe of first Peak Tank, the overflow pipe of No. 6 cargo holds puts in ballast chamber No. 6, respectively the ballast water of first Peak Tank and No. 6 cargo holds is overflowed to outboard by No. 1 ballast chamber and No. 6 ballast chambers, produce the phenomenon of freezing thereby avoid ballast water to flow directly to main deck.

Claims (1)

1, a kind of cape size bulk carrier ballast water overflow method of replacing is characterized in that: realize by following steps:
With ballast pump seawater is thrown into first Peak Tank bottom by ballasting system or thrown the ballast well of No. 6 tank tops into from sea chest;
Hydraulic pressure constantly increases or throws into the ballast well of No. 6 tank tops bottom first Peak Tank, enters cargo hold No. 6, and No. 6 cargo hold hydraulic pressure constantly increases;
The ballast water of first Peak Tank or the ballast water of No. 6 cargo holds enter overflow pipe;
Flow to No. 1 ballast chamber or flow to ballast chamber No. 6;
Enter the sea or the discharge port by topside flows out outboard by ballasting system.
CNB031296491A 2003-07-02 2003-07-02 Ballast water overflow displacement method for Cape of Good Hope type bulk cargo ship Expired - Fee Related CN100430291C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNB031296491A CN100430291C (en) 2003-07-02 2003-07-02 Ballast water overflow displacement method for Cape of Good Hope type bulk cargo ship

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNB031296491A CN100430291C (en) 2003-07-02 2003-07-02 Ballast water overflow displacement method for Cape of Good Hope type bulk cargo ship

Publications (2)

Publication Number Publication Date
CN1565925A true CN1565925A (en) 2005-01-19
CN100430291C CN100430291C (en) 2008-11-05

Family

ID=34469388

Family Applications (1)

Application Number Title Priority Date Filing Date
CNB031296491A Expired - Fee Related CN100430291C (en) 2003-07-02 2003-07-02 Ballast water overflow displacement method for Cape of Good Hope type bulk cargo ship

Country Status (1)

Country Link
CN (1) CN100430291C (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102030077A (en) * 2010-11-30 2011-04-27 南通中远川崎船舶工程有限公司 Anti-sediment type large-size ship with new ballast tank separation
CN101432187B (en) * 2006-02-17 2012-02-29 沙特阿拉伯石油公司 Loop ballast exchange system for marine vessels
CN103395474A (en) * 2013-06-19 2013-11-20 大连船舶重工集团有限公司 Ballast tube of bulk cargo ship windstorm ballast tank on basis of sharing filter screen and drain well system
CN104015876A (en) * 2014-06-20 2014-09-03 南通欣通船舶与海洋工程设计有限公司 Semi-submersible type launching barge ballast tank watertight bulkhead opening and ventilating structure
CN105270567A (en) * 2015-11-12 2016-01-27 上海船舶研究设计院 Pipeline layout structure for ship ballasting system
CN106275305A (en) * 2016-08-25 2017-01-04 广船国际有限公司 A kind of ballast for cruising system, its control method and there are its boats and ships

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1263752A (en) * 1968-02-23 1972-02-16 Rheinstehl Nordseewerke G M B Apparatus for pumping out the liquid ballast of ships
US4289457A (en) * 1979-07-30 1981-09-15 Porter Carl W Combination sea valve and deballast pump
US4550751A (en) * 1981-10-28 1985-11-05 Misuzu Machineries & Engineering Ltd. Ballast exhaust pipe closing appliance for a ship
JP3038324B2 (en) * 1997-07-08 2000-05-08 ティーケイシッピングジャパン株式会社 Automatic ballast water replacement system
KR100325929B1 (en) * 2000-03-20 2002-02-27 김형벽ㅂ Apparatus for removal sediment in ballast tank of ship
JP2002331991A (en) * 2001-05-10 2002-11-19 Nkk Corp Method of exchanging ballast water in cargo hold

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101432187B (en) * 2006-02-17 2012-02-29 沙特阿拉伯石油公司 Loop ballast exchange system for marine vessels
CN102030077A (en) * 2010-11-30 2011-04-27 南通中远川崎船舶工程有限公司 Anti-sediment type large-size ship with new ballast tank separation
CN102030077B (en) * 2010-11-30 2013-04-03 南通中远川崎船舶工程有限公司 Anti-sediment type large-size ship with new ballast tank separation
CN103395474A (en) * 2013-06-19 2013-11-20 大连船舶重工集团有限公司 Ballast tube of bulk cargo ship windstorm ballast tank on basis of sharing filter screen and drain well system
CN103395474B (en) * 2013-06-19 2016-03-30 大连船舶重工集团有限公司 Bulge carrier storm ballast tank is based on the ballast tube of shared filter screen and drain well system
CN104015876A (en) * 2014-06-20 2014-09-03 南通欣通船舶与海洋工程设计有限公司 Semi-submersible type launching barge ballast tank watertight bulkhead opening and ventilating structure
CN105270567A (en) * 2015-11-12 2016-01-27 上海船舶研究设计院 Pipeline layout structure for ship ballasting system
CN106275305A (en) * 2016-08-25 2017-01-04 广船国际有限公司 A kind of ballast for cruising system, its control method and there are its boats and ships

Also Published As

Publication number Publication date
CN100430291C (en) 2008-11-05

Similar Documents

Publication Publication Date Title
CN1678491A (en) Ballast exchange system for marine vessels
CN102514693B (en) Method for loop ballast exchange system for marine vessels during navigation
CN1946607A (en) Vessel including automatic ballast system using tubes
CN102923292A (en) Marine organism pollution control and ballast water treatment combined system for ship
CA2510854A1 (en) Ballast system for boats
CN1565925A (en) Ballast water overflow displacement method for Cape of Good Hope type bulk cargo ship
CN105270567A (en) Pipeline layout structure for ship ballasting system
CN105015705A (en) Ballast-water-free ship and operating method thereof
CN104760665A (en) Energy saving system used for adjusting floating state of waterborne floating body and use method thereof
CN208378627U (en) The novel dilution method ballast water treatment system of ship
WO2004050466B1 (en) Ballast system for tension leg platform
CN109116006A (en) A kind of antifouling test device and test method based on water jet
CN203318637U (en) Ballast water processing system
KR20160101597A (en) Ballast Water Treatment System
CN202201129U (en) Novel sand resistant system of ballast tank of large oil tanker
CN110510271A (en) Underwater large-scale oil and water displacement storage Unloading Device and its operating method suitable for marine petroleum development
CN110015381A (en) Ballast water treatment barge and ballast water processing
CN209567056U (en) One kind being applied to the reflux of ship topside tank and removes silt device
CN207644565U (en) A kind of load-carring transport
CN107776827A (en) A kind of load-carring transport
CN107381718A (en) A kind of deep-sea suspended seawater desalination system of no breather pipe
CN216783759U (en) Double-layer bottom arrangement structure at machine position of trailing suction hopper dredger
KR101516160B1 (en) Settling tank sysem for ship
RU2434779C1 (en) All-purpose cargo-and-passenger pusher amphibious ship
CN105383676A (en) Cabin bilge water preprocess system for ship

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: SHANGHAI XINYE SHIP MARINE ENGINEERING DESIGN CO.,

Free format text: FORMER OWNER: SHANGHAI WAIGAOQIAO SHIPBUILDING CO., LTD.

Effective date: 20091002

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20091002

Address after: Shanghai city Pudong New Area Yinxiao Road No. 393 white housing Pudong Business Building Room 303

Patentee after: Shanghai Xinye Marine & Engineering Design Co., Ltd.

Address before: No. 3001, Pudong New Area Sea Road, Shanghai, China

Patentee before: Shanghai Waigaoqiao Shipbuilding Co., Ltd.

C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20081105

Termination date: 20130702