CN1560393A - Connection structure of connection of floor beam and steel pipe concrece pole and construction method thereof - Google Patents

Connection structure of connection of floor beam and steel pipe concrece pole and construction method thereof Download PDF

Info

Publication number
CN1560393A
CN1560393A CNA2004100154523A CN200410015452A CN1560393A CN 1560393 A CN1560393 A CN 1560393A CN A2004100154523 A CNA2004100154523 A CN A2004100154523A CN 200410015452 A CN200410015452 A CN 200410015452A CN 1560393 A CN1560393 A CN 1560393A
Authority
CN
China
Prior art keywords
steel pipe
roof beam
concrete
steel
node
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CNA2004100154523A
Other languages
Chinese (zh)
Other versions
CN1314869C (en
Inventor
健 蔡
蔡健
陈庆军
杨春
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
South China University of Technology SCUT
Original Assignee
South China University of Technology SCUT
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by South China University of Technology SCUT filed Critical South China University of Technology SCUT
Priority to CNB2004100154523A priority Critical patent/CN1314869C/en
Publication of CN1560393A publication Critical patent/CN1560393A/en
Application granted granted Critical
Publication of CN1314869C publication Critical patent/CN1314869C/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

The invention discloses a joint structure at the connection part of steel pipe concrete pile and floor beam and the constructing method. The joint structure includes steel pipe concrete pile, floor beam and ring type concrete beam. The vertical component steel pile and the parallel component floor beam are connected at the joint, the steel pipe is drilled with a aperture at position correspondent to the joint on the floor, thus the beam lengthwise rib of the beam can pass through the steel pile directly; ring type concrete beams are arranged around the steel pipe in the joint area, the steel bar in the ring concrete beam includes ring type beam lengthwise rib which is concentric with the steel pipe concrete pile and radiate ring beam hooping in radius direction; a steel bar cage concentric with the steel pipe is arranged in the pile, which includes vertical pile connection lengthwise rib and parallel pile connection hooping, the anchor in the steel bar cage extension length is decided by the diameter of the steel bar.

Description

The node structure of steel core concrete column and building roof beam junction and job practices thereof
Technical field
The present invention relates to building structure, particularly the node structure and the job practices thereof of steel core concrete column and building roof beam junction.
Background technology
Steel core concrete column as a kind of combining structure that has steel work and both advantages of concrete structure concurrently in application in engineering more and more widely, but node as one of part of the emphasis in the structure, stressed and construct problem, be not well solved yet, become " bottleneck " problem that the restriction steel core concrete column is used.
Existing steel core concrete column and building roof beam can be divided into two types of post steel pipe conitnuous forms and building roof beam conitnuous forms at the joint construction of node area.
1. the node of post steel pipe conitnuous forms:
Its main thought is: keep steel core concrete column to connect along overall height, building roof beam is connected with it from the post side.This has caused node all comparatively complicated and difficult in design, construction.
Its basic force-transmission mechanism is: mainly adopted bracket, and reinforcing ring, the concrete ring beam is worn the straight-through reinforcing bar of steel pipe, and forms such as grappling formula ground tackle are carried out the moment of flexure transmission.Shearing passes through reinforcing ring, the bearing pin bracket, and structural forms such as annular shear reinforcement are transmitted, and bonding between node area concrete and steel pipe walls and frictional force are also brought into play certain effect.
This category node form exists such or such shortcoming in actual applications, and subject matter is summarized as follows:
1) simplification of node mechanical property and construction, economy can not be satisfactory to both parties: some node type, as the reinforcing ring type node, mechanical property is good, the integral rigidity of node is also high, but material usage is big, construction is complicated; Some node type, as the grappling gusset-type joint, simple structure, easy construction, also than the material saving, but its mechanical property is unsatisfactory; Anti-shear ring ring beam joint and for example, its construction and advantage economically are very outstanding, but the rigidity of its node is limited, and the service behaviour under the complex stress situation is poor;
2) influence architectural appearance and use: the structure of the node of cast-in-situ floor beam slab often has with architectural appearance and function of use and conflicts, and cause the layout of superstructure beam slab dumb, girder system complicated layout as the twin beams node, and single beam joint makes the width of building roof beam excessive, not only increase dead load but also cause waste of material, and influence the attractive in appearance of superstructure;
3) application of node is dumb: at present applied node all only is applicable to conventional situation in the engineering, comparatively special superstructure is arranged, and as nonopiate girder system, the absolute altitude of each beam and square one not highly, its application just has been subjected to certain restriction.
2. the node of building roof beam conitnuous forms
Its main thought is: keep the continuity of concrete floor system, each floor covers at the bottom of the beam face of beam column junction and beam and is connected with steel pipe column.
This category node has solved the connectivity problem of building roof beam and steel core concrete column, but still has following problem:
1) the post steel pipe is not communicated with the transmission capacity that has weakened its shaft pressuring load significantly in node area, though the ring beam of being furnished with circumferential reinforcement by setting can solve the axial bearing capacity problem, axial deformation is bigger than normal, and it is bigger to the stressed influence of structural entity;
2) the moment of flexure transmission of the joint face of post steel pipe at the bottom of beam face, beam and shearing transmission capacity are poor, and corresponding structure is handled the complexity of the consumption and the structure that have increased material again;
3) the centering difficulty of last lower prop in the construction;
4) steel pipe needs every layer of lifting, fixing, and construction is not easy when using in super highrise building.
Summary of the invention
The object of the present invention is to provide the node structure and the job practices thereof of a kind of steel core concrete column and building roof beam junction, its good economy performance, construction is convenient, power transmission is clear and definite, and steel pipe is at the node area opening.
The node structure of steel core concrete column of the present invention and building roof beam junction as shown in the figure, Fig. 1 (a) is its sectional drawing when girder system is the quadrature system, Fig. 1 (b) is its plan view when girder system is the quadrature system, and Fig. 1 (c) is its plan view when girder system is nonopiate system.This node structure comprises steel core concrete column (1), building roof beam (7) and annular concrete roof beam (8).The steel core concrete column of vertical member (1) joins at the node place with the building roof beam (7) of horizontal member, and steel pipe makes the vertical muscle (6) of beam of building roof beam (7) can directly pass through steel pipe column in the position perforate of the corresponding building roof beam of node area (7); Steel pipe in node area is outside equipped with annular concrete roof beam (8), and the reinforcing bar of annular concrete roof beam (8) lining comprises with the vertical muscle (2) of the concentric ring beam of steel core concrete column (1) annular and radially is actiniform ring beam stirrup (3); Be provided with and the steel pipe bar cage concentric in node area steel core concrete column (1), it comprises that the post connection lengthwise rib (4) of vertical placement and the post of horizontal positioned are connected stirrup (5), and the anchorage length that reinforcing cage extends in steel pipe is decided on the diameter of reinforcing bar.
Described steel pipe tapping is provided with gauze wire cloth, to prevent the outflow of node area concrete.
The present invention can realize by following technical measures: the continuous steel pipe column of multilayer makes the vertical muscle (6) of beam of building roof beam (7) run through steel pipe column smoothly at node area and building roof beam (7) junction opening, has guaranteed the continuity of steel pipe column and building roof beam (7) simultaneously.Building roof beam (7) duplicates to the internal force mode of node transmission and traditional reinforced concrete post node, and power transmission is direct, and mechanism is clear and definite.Because the steel pipe opening weakens the ultimate bearing capacity of joints decline that causes, outside the node area steel pipe, be provided with annular concrete roof beam (8) for fear of node area, node area retrained, guarantee the continuity of steel pipe axial bearing capacity by it; In order to make moment of flexure and smooth transmission shearing of steel pipe column, in the node area steel pipe, be provided with the continuity that reinforcing cage guarantees that the post moment of flexure is transmitted simultaneously.
The job practices flow chart of the node structure of steel core concrete column of the present invention and building roof beam junction as shown in Figure 2, construction sequence is as follows:
1. the steel pipe column of single or multiple lift is lifted the place, pillar location on construction plane;
2. reinforcing bar cage hoisting is arrived steel pipe interior nodes position, drive fixing with beam;
3. the cage of reinforcement of the annular concrete roof beam that will tie up on vacant lot (8) is placed into the template the inside of annular concrete roof beam (8);
4. the vertical muscle (6) of the beam of building roof beam (7) is passed node area, colligation beam stirrup (9) is provided with gauze wire cloth at the steel pipe tapping and prevents the outflow of node area concrete;
5. steel pipe column is carried out concrete pouring, concreting is to node area;
6. after the steel pipe column concrete setting, the casting beams concrete.
Outstanding advantage of the present invention and remarkable result are:
1. this node has well solved the be connected difficult problem of building roof beam with steel core concrete column, and node area beam column concrete is communicated with, and this makes the performance that rigidly connects of node be guaranteed, and stressing conditions and ordinary reinforced concrete structure are similar, and power transmission is clear and definite;
2. this node job practices is similar to ordinary reinforced concrete structure, except that the welding of steel pipe spreading, does not have the welding step of other steel work to carry out at the scene, and the welding job amount is little, and construction is convenient;
3. the steel pipe of serialization can disposable lifting multilayer, and the centering of the steel pipe up and down problem when having avoided dividing the construction of floor steel pipe realizes accurately location;
4. node can be connected with the building roof beam of any direction, the flexible arrangement of building roof beam, and construction function request is content with very little;
5. node has saved steel connecting elementss such as reinforcing ring, punching bracket, has reduced structural cost, has good economic benefit.
Description of drawings
Fig. 1 (a) is the sectional drawing of node structure when girder system is the quadrature system of steel core concrete column and building roof beam junction;
Fig. 1 (b) is the plan view of node structure when girder system is the quadrature system of steel core concrete column and building roof beam junction;
Fig. 1 (c) is the plan view of node structure when girder system is nonopiate system of steel core concrete column and building roof beam junction;
Fig. 2 is a job practices flow chart of the present invention.
Among the figure: the vertical muscle 3-ring beam stirrup 4-post connection lengthwise rib 5-post of 1-steel core concrete column 2-ring beam annular connects the vertical muscle 7-building roof beam 8-annular concrete roof beam 9-beam stirrup of stirrup 6-beam
The specific embodiment
Below in conjunction with accompanying drawing the present invention is further described.
The job practices flow chart of the node structure of steel core concrete column of the present invention and building roof beam junction as shown in Figure 2, construction sequence is as follows:
1. the steel pipe column of single or multiple lift is lifted the place, pillar location on construction plane;
2. reinforcing bar cage hoisting is arrived steel pipe interior nodes position, drive fixing with beam;
3. the cage of reinforcement of the annular concrete roof beam that will tie up on vacant lot (8) is placed into the template the inside of annular concrete roof beam (8);
4. the vertical muscle (6) of the beam of building roof beam (7) is passed node area, colligation beam stirrup (9) is provided with gauze wire cloth at the steel pipe tapping and prevents the outflow of node area concrete;
5. steel pipe column is carried out concrete pouring, concreting is to node area;
6. after the steel pipe column concrete setting, the casting beams concrete.
Can implement the present invention preferably with above-mentioned job practices.

Claims (2)

1. the node structure of steel core concrete column and building roof beam junction, comprise steel core concrete column, building roof beam and annular concrete roof beam, it is characterized in that, the steel core concrete column of vertical member and the building roof beam of horizontal member are in the handing-over of node place, and steel pipe is in the perforate of the position of the corresponding building roof beam of node area; Steel pipe in node area is outside equipped with annular concrete roof beam, and the reinforcing bar in the annular concrete roof beam comprises with the vertical muscle of the concentric ring beam of steel core concrete column annular and radially is actiniform ring beam stirrup; Be provided with in the node area steel core concrete column and the steel pipe bar cage concentric, described reinforcing cage comprises that the post connection lengthwise rib of vertical placement and the post of horizontal positioned are connected stirrup; Described steel pipe tapping is provided with gauze wire cloth.
2. the job practices of the node structure of described steel core concrete column of claim 1 and building roof beam junction is characterized in that construction sequence is as follows:
(1) steel pipe column of single or multiple lift is lifted the place, pillar location on construction plane;
(2) reinforcing bar cage hoisting is arrived steel pipe interior nodes position, drive fixing with beam;
(3) cage of reinforcement of the annular concrete roof beam that will tie up on vacant lot is placed into the template the inside of annular concrete roof beam;
(4) the vertical muscle of the beam of building roof beam is passed node area, the colligation beam stirrup is provided with gauze wire cloth at the steel pipe tapping;
(5) steel pipe column is carried out concrete pouring, concreting is to node area;
(6) after the steel pipe column concrete setting, the casting beams concrete.
CNB2004100154523A 2004-02-25 2004-02-25 Connection structure of connection of floor beam and steel pipe concrece pole and construction method thereof Expired - Fee Related CN1314869C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNB2004100154523A CN1314869C (en) 2004-02-25 2004-02-25 Connection structure of connection of floor beam and steel pipe concrece pole and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNB2004100154523A CN1314869C (en) 2004-02-25 2004-02-25 Connection structure of connection of floor beam and steel pipe concrece pole and construction method thereof

Publications (2)

Publication Number Publication Date
CN1560393A true CN1560393A (en) 2005-01-05
CN1314869C CN1314869C (en) 2007-05-09

Family

ID=34440368

Family Applications (1)

Application Number Title Priority Date Filing Date
CNB2004100154523A Expired - Fee Related CN1314869C (en) 2004-02-25 2004-02-25 Connection structure of connection of floor beam and steel pipe concrece pole and construction method thereof

Country Status (1)

Country Link
CN (1) CN1314869C (en)

Cited By (19)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102127978A (en) * 2011-01-24 2011-07-20 姜志勇 House in light steel structure and construction method thereof
CN102296752A (en) * 2011-06-09 2011-12-28 北京工业大学 Galvanized welded steel wire mesh beam end structure and method for improving ductility of beam end bottom pressure zone
CN102352669A (en) * 2011-08-22 2012-02-15 李治轮 Combined multi-limb constraint stirrup
CN102352655A (en) * 2011-07-28 2012-02-15 华南理工大学 Multi-floor type rectangular steel pipe concrete column and floor system beam connecting node and manufacturing method thereof
CN102505846A (en) * 2011-11-21 2012-06-20 中国建筑第八工程局有限公司 Steel pipe column bearing table girder connection construction method
CN102587661A (en) * 2012-03-22 2012-07-18 广东中城建设集团有限公司 Method for constructing tall-section structural column of reinforced concrete frame
CN103397704A (en) * 2013-08-01 2013-11-20 香港华艺设计顾问(深圳)有限公司 Connected node of concrete filled steel tube combination column and reinforced concrete beams
CN103924681A (en) * 2014-04-14 2014-07-16 北京工业大学 Prestress connected precast concrete beam rectangular steel tube concrete column node
CN104695555A (en) * 2013-12-06 2015-06-10 中建四局第五建筑工程有限公司 Construction process for joint of large-section beam column of different concrete strength grades
CN104975653A (en) * 2015-06-18 2015-10-14 长安大学 Circular steel tube confined steel reinforced concrete post and reinforced concrete beam node structure
CN105239676A (en) * 2015-10-30 2016-01-13 华南理工大学 Reinforcement structure for frame beam column joint and construction method thereof
CN105604250A (en) * 2016-03-03 2016-05-25 中国建筑第五工程局有限公司 Prefabricated integral assembly type reinforcement frame for joint of concrete columns, beams and plates
CN106760206A (en) * 2016-12-15 2017-05-31 中国建筑第八工程局有限公司 Spigot-and-socket reinforcement cage structure and its construction method in steel pipe column
CN109826324A (en) * 2019-02-28 2019-05-31 清华大学 The transformational structure and conversion method of upper layer steel pipe column and lower layer's reinforced column
CN110185179A (en) * 2019-05-29 2019-08-30 兰州理工大学 Assembled hangs the building structure of superstructure Self-resetting and construction method
WO2019210537A1 (en) * 2018-05-02 2019-11-07 华南理工大学 Joint of concrete-filled steel tube column and annular steel plate concrete beam and construction method therefor
CN112922172A (en) * 2021-01-26 2021-06-08 石家庄铁道大学 Reinforced concrete beam joint structure of steel pipe concrete superposed column
CN113585466A (en) * 2021-07-26 2021-11-02 广州市城市规划勘测设计研究院 Steel pipe concrete beam column joint structure and construction method
CN116892245A (en) * 2023-06-05 2023-10-17 华南理工大学 Hidden ring beam joint of steel tube concrete superposed column and construction method thereof

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO1998036134A1 (en) * 1997-02-13 1998-08-20 Tanaka Steel Workshop Joint for steel structure, and combining structure using the same joints for steel structure
JPH10292486A (en) * 1997-02-13 1998-11-04 Tanaka Seisakusho:Kk Through diaphragm body and connecting structure for steel structure using it
FR2791977B1 (en) * 1999-04-08 2003-04-11 Rhodia Chimie Sa HALOGENATION IN THE META POSITION OF AN AROMATIC PRESENTING A PHENOL FUNCTION PROTECTED BY CONDENSATION WITH AN ACID
CN2390933Y (en) * 1999-06-04 2000-08-09 同济大学 Square steel pipe concrete beam and column jointing gusset
JP2003045612A (en) * 2001-07-30 2003-02-14 Sanee Denki Kk Minus ion generator
CN2701931Y (en) * 2004-02-25 2005-05-25 华南理工大学 Joint structure of concrete filled steel tubular column and floor beam

Cited By (26)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102127978A (en) * 2011-01-24 2011-07-20 姜志勇 House in light steel structure and construction method thereof
CN102296752A (en) * 2011-06-09 2011-12-28 北京工业大学 Galvanized welded steel wire mesh beam end structure and method for improving ductility of beam end bottom pressure zone
CN102296752B (en) * 2011-06-09 2013-04-10 北京工业大学 Galvanized welded steel wire mesh beam end structure and method for improving ductility of beam end bottom pressure zone
CN102352655A (en) * 2011-07-28 2012-02-15 华南理工大学 Multi-floor type rectangular steel pipe concrete column and floor system beam connecting node and manufacturing method thereof
CN102352669A (en) * 2011-08-22 2012-02-15 李治轮 Combined multi-limb constraint stirrup
CN102505846A (en) * 2011-11-21 2012-06-20 中国建筑第八工程局有限公司 Steel pipe column bearing table girder connection construction method
CN102505846B (en) * 2011-11-21 2013-10-30 中国建筑第八工程局有限公司 Steel pipe column bearing table girder connection construction method
CN102587661A (en) * 2012-03-22 2012-07-18 广东中城建设集团有限公司 Method for constructing tall-section structural column of reinforced concrete frame
CN102587661B (en) * 2012-03-22 2014-03-26 广东中城建设集团有限公司 Method for constructing tall-section structural column of reinforced concrete frame
CN103397704A (en) * 2013-08-01 2013-11-20 香港华艺设计顾问(深圳)有限公司 Connected node of concrete filled steel tube combination column and reinforced concrete beams
CN104695555A (en) * 2013-12-06 2015-06-10 中建四局第五建筑工程有限公司 Construction process for joint of large-section beam column of different concrete strength grades
CN103924681A (en) * 2014-04-14 2014-07-16 北京工业大学 Prestress connected precast concrete beam rectangular steel tube concrete column node
CN104975653A (en) * 2015-06-18 2015-10-14 长安大学 Circular steel tube confined steel reinforced concrete post and reinforced concrete beam node structure
CN105239676A (en) * 2015-10-30 2016-01-13 华南理工大学 Reinforcement structure for frame beam column joint and construction method thereof
CN105604250A (en) * 2016-03-03 2016-05-25 中国建筑第五工程局有限公司 Prefabricated integral assembly type reinforcement frame for joint of concrete columns, beams and plates
CN105604250B (en) * 2016-03-03 2017-03-15 中国建筑第五工程局有限公司 Concrete column, beam, plate junction are with prefabricated overall assembled reinforced frame
CN106760206A (en) * 2016-12-15 2017-05-31 中国建筑第八工程局有限公司 Spigot-and-socket reinforcement cage structure and its construction method in steel pipe column
CN106760206B (en) * 2016-12-15 2019-07-30 中国建筑第八工程局有限公司 Spigot-and-socket reinforcement cage structure and its construction method in steel pipe column
US11421414B2 (en) 2018-05-02 2022-08-23 South China University Of Technology Concrete-filled steel tubular column-steel plate concrete ring beam joint and construction method thereof
WO2019210537A1 (en) * 2018-05-02 2019-11-07 华南理工大学 Joint of concrete-filled steel tube column and annular steel plate concrete beam and construction method therefor
CN109826324A (en) * 2019-02-28 2019-05-31 清华大学 The transformational structure and conversion method of upper layer steel pipe column and lower layer's reinforced column
CN110185179A (en) * 2019-05-29 2019-08-30 兰州理工大学 Assembled hangs the building structure of superstructure Self-resetting and construction method
CN110185179B (en) * 2019-05-29 2020-11-20 兰州理工大学 Assembly type suspended floor self-resetting building structure and construction method
CN112922172A (en) * 2021-01-26 2021-06-08 石家庄铁道大学 Reinforced concrete beam joint structure of steel pipe concrete superposed column
CN113585466A (en) * 2021-07-26 2021-11-02 广州市城市规划勘测设计研究院 Steel pipe concrete beam column joint structure and construction method
CN116892245A (en) * 2023-06-05 2023-10-17 华南理工大学 Hidden ring beam joint of steel tube concrete superposed column and construction method thereof

Also Published As

Publication number Publication date
CN1314869C (en) 2007-05-09

Similar Documents

Publication Publication Date Title
CN1314869C (en) Connection structure of connection of floor beam and steel pipe concrece pole and construction method thereof
CN212404825U (en) Prefabricated plate joint structure with bottom die
CN102352655A (en) Multi-floor type rectangular steel pipe concrete column and floor system beam connecting node and manufacturing method thereof
CN111058543B (en) Connection structure of concrete slab and steel beam and installation method
CN212957167U (en) Precast concrete superimposed sheet with external detachable enhancement truss
CN2701931Y (en) Joint structure of concrete filled steel tubular column and floor beam
CN110331664A (en) Steel-concrete mixes Continuous Box Girder Bridge panel connector construction and its construction method
CN113860190B (en) Cantilever crane turnover-free beam rest bracket and installation method
CN110512800A (en) A kind of steel and concrete combined structure system and construction method
CN114482400A (en) Superposed beam connected with prefabricated vertical component
CN109098278A (en) The connecting structure and construction method of prefabricated beam column
CN216587255U (en) Steel-concrete combined rib prestressed concrete laminated slab
JP2001049622A (en) Bridge erecting apparatus and bridge erecting method
CN217027753U (en) Novel truss structure
CN217027742U (en) Superposed beam connected with prefabricated vertical component
CN216305078U (en) Detachable superimposed floor slab made of UHPC
CN217461113U (en) Laminated slab bottom plate with concave and convex plate ends and without ribs and mounting structure
CN1202325C (en) Unconnected steel pipe and concrete pillar planar node
CN213951909U (en) Tubular connecting piece suitable for steel-concrete composite structure
CN209873568U (en) Connecting structure of combination beam and concrete bridge deck
CN107542212A (en) A kind of Prefabricated porous plate being connected and attaching method thereof
CN210947410U (en) Prestressed recycled concrete hollow composite beam
CN2592739Y (en) Node zone column steel pipe disconnection type steel pipe concrete column-board node
CN105908705A (en) Prefabricated pretensioned prestressed underground continuous wall and construction method thereof
CN111648234A (en) Steel-concrete composite beam concrete bridge deck slab capable of being constructed quickly and hoisting system thereof

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
EE01 Entry into force of recordation of patent licensing contract

Assignee: Guangzhou Yufeng Holding Co., Ltd.

Assignor: South China University of Technology

Contract fulfillment period: 2007.6.28 to 2012.6.28 contract change

Contract record no.: 2009440000351

Denomination of invention: Connection structure of connection of floor beam and steel pipe concrece pole and construction method thereof

Granted publication date: 20070509

License type: Exclusive license

Record date: 2009.5.11

LIC Patent licence contract for exploitation submitted for record

Free format text: EXCLUSIVE LICENSE; TIME LIMIT OF IMPLEMENTING CONTACT: 2007.6.28 TO 2012.6.28; CHANGE OF CONTRACT

Name of requester: GUANGZHOU CITY YUFENG HOLDINGS CO., LTD.

Effective date: 20090511

C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20070509

Termination date: 20140225