CN1544759A - Rolling dam equipment - Google Patents

Rolling dam equipment Download PDF

Info

Publication number
CN1544759A
CN1544759A CNA2004100331405A CN200410033140A CN1544759A CN 1544759 A CN1544759 A CN 1544759A CN A2004100331405 A CNA2004100331405 A CN A2004100331405A CN 200410033140 A CN200410033140 A CN 200410033140A CN 1544759 A CN1544759 A CN 1544759A
Authority
CN
China
Prior art keywords
brake lining
centimetres
rod
lock
lock frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CNA2004100331405A
Other languages
Chinese (zh)
Inventor
党海愚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CNA2004100331405A priority Critical patent/CN1544759A/en
Publication of CN1544759A publication Critical patent/CN1544759A/en
Pending legal-status Critical Current

Links

Landscapes

  • Revetment (AREA)

Abstract

The invention provides a roll dam device with respect to 'compound silting beach dam engineering technique', and the device is composed of wood rod triangular gate frame, wood rod parallel-serial gate piece and plastic piece parallel-serial apron, where there is a sand outlet in the isolating part of the gate frame.

Description

Overflow dam equipment
The application is dividing an application of " composite type siltbeach dam body engineering technology ", and original applying number is 02131470.5, and the applying date is on October 16th, 2002.
Technical field
The present invention relates to irrigation and water conservancy, reclamation, water and soil conservation and agriculture environmental protection system, particularly a kind of overflow dam equipment that matches with composite type siltbeach dam body engineering technology and use.
Background technology
The flood retention overflow dam of ground, original Yu Tan dam engineering is that cement grouts structure, utilizes certain elevation, and flood is poured in the lattice weir by the igniting flood port gate.Its defective is that structure ossifys, can not flexible Application; Cost is huge, is difficult to popularize; The strictness or the absolute limitations of gathering materials on the spot and being subjected to the different landforms condition, construction area can not be expanded; The all fronts that are difficult to adapt to after newly staying the riverbed limit narrow are brushed rule down, and the raising of the logical big vast ability of restriction forces and must raise the elevation of flood dam downstream, enlarges the design width in riverbed; Particularly cause the extensively efficient utilization of irrigation and water conservancy projects and loss water and soil and effective three of irrigation to separate disconnection.
Summary of the invention
The objective of the invention is for overcoming above defective, a kind of overflow dam equipment that is provided, this equipment is made up of lock frame, brake lining and three essential parts of automatic sedimentation protection-apron.
One, the making of equipment
The lock frame utilizes the triangle fixation principle, can adopt the rod strap-on structure.Long 4 meters of balance bar, 8 centimetres of top diameters, long 2 meters of the lock leg that is connected with the balance bar termination, long 1.5 meters of another root, 7 centimetres of top diameters.It is chevron shaped that the lock leg is isosceles, twists with bifilar No. 8 iron wires and be tied to the big first side of balance bar, and lock leg top interior angle is 50 degree.Lock frame rod is answered pitch prill bubble face.
The brake lining utilization principle of holding court from behind a screen adopts the rod and the string of 6 centimetres of top diameters, and concentric reducer is alternately arranged.Each perforating is 1 at the two ends of rod, penetrates in the eyelet with No. 8 iron wires, and of iron wire is stubborn dead with rod, and the other end grows more than 1 meter, and fixing at random with lock frame leg, the brake lining width can increase and decrease as required.Brake lining length is that the size of two lock frame spacings adds 30 centimetres, is generally 2.3 meters.
Protection-apron adopts sheet and string structure, and material has waste and old sole, skin scraper-trough conveyer, rubber tire tire.And the string method is, with mould line and to draw eye some, the cutting perforating around sole.With the sole made with length arrangement, wherein the center line of delegation just in time aim at adjacent two row to and seam, with iron wire knockout and string.The area of every group of protection-apron can be 3 * 2 meters.When adopting skin scraper-trough conveyer and rubber tire tire, utilize original length and width, each line width is not insisted on identity with as far as possible, but should be consistent with the width of delegation.Also can adopt cross to arrange and string.
Two, the assembling of equipment
During on-the-spot the installation, the lock frame is installed in the riverbed in the abutment pier in igniting flood port downstream and the place ahead, shark's fin main body termination, rectangular with igniting flood port.Lock frame spacing is advisable with 1 meter.The microcephaly of balance bar is placed to stream side, trench digging is imbedded in the groundbed, and the gradient of ditch is preferably 1: 0.12 of balance bar length, and promptly lock leg one end covers 5 centimetres of balancing poles, balance bar microcephaly one end covers balance bar more than 53 centimetres, gives covering earlier below its soil layer and presses a nylon sandy soil bag.Lock leg top is fixing rod completely.
The lock frame that sand removing hole is stayed apart from the igniting flood port downstream abutment pier and 2 meters of shark's fin main body is the position at interval, is lower than 40 centimetres on igniting flood port sand setting weir, and length generally accounts for below 3% of overflow dam sluicing section length, and looks its degree of depth of the motor-driven adjusting of coarse sand number and length.The sand removing hole bottom is established rod and is gone here and there the bank sill.
Each group brake lining is fixed on the lock frame leg, the brake lining elevation of sluicing section is that sand setting height of weir journey adds igniting flood port standard water inlet elevation, wherein desilting height of weir journey is 30 centimetres, igniting flood port standard water inlet elevation is the predetermined elevation of 20 years one chance riverbed floods, that is cross weir sluicing section elevation deducts the difference more than 10 centimetres, be generally about in the of 60 centimetres, promptly the design altitude of brake lining remains on about in the of 90 centimetres.Abutment pier need be built in the overflow dam both sides, the alternative abutment pier of the abutment pier of igniting flood port and shark's fin main body wherein, and another abutment pier can be increased the brake lining elevation of two lock frame spacings.
With each the group protection-apron again continued access get up, be fixed on lock frame leg and the brake lining.The protection-apron width is determined with last with 4 times of the maximum sluicing elevation of overflow dam, drop is sluiced change the plane following current in protection-apron, generally reaches more than 3 meters.
The specific embodiment
Realizing by the following method at application flexibly of this overflow dam equipment variation performance:
1, utilizes irrigated farmland, permanent current water source method.Promptly omit sand removing hole, compress the elevation of brake lining, the brake lining face is covered the new nylon cloth of the long width of cloth, the lower edge of nylon cloth and the right and left are pressed nylon sandy soil bag along covering, and prevent not jljl circle seepage and generation erosion.
2, utilize flooding irrigation farmland method.The brake lining of the equipment of being about to is divided into two-layer up and down, the design altitude of compression lower floor brake lining as regulating brake lining, is looked the standard water requirement and the riverbed flood elevation on lattice weir with the anti-top of the trellis that is hung on of upper strata brake lining, put down the part or all of brake lining on upper strata at random, and be connected with the lower floor brake lining.Can implicate the rod of lock top of the trellis during operation.
This flooding irrigation method is applicable to also that wasteland and cultivated land are staggered to be interted district's soil silt newly developed and overflows enforcement in flakes with the thickening of cultivated land soil layer, accomplishes that the soil is newly-increased, reclamation thickening and plantation extra earning three be unified; This method is that farmland water conservancy works that the hills area, mountain area has been implemented composite type siltbeach dam are carried out " the fast filling method of having one's face covered with " basic ancillary facility is provided, and omits pouring head works and subsystem channel.
3, the urgent job practices of retaining sand bar.The wall bank materialization combination cross weir that is about to keep off the totally-enclosed overflow of sand bar replaces with overflow dam equipment, after treating that silt is flat, dismounting equipment, the section that will deposit makes up building stones wall bank abutment pier and sluicing section, can omit the earthwork construction procedures of cross weir substantially, particularly satisfy the needs of urgent construction.

Claims (8)

1, a kind of overflow dam equipment is characterized in that this equipment by rod triangle lock frame, rod and go here and there brake lining and sheet and the protection-apron of going here and there and form, stays sand removing hole on the lock frame, as required assembly and disassembly.
2, rod triangle lock frame according to claim 1 is characterized in that with bifilar No. 8 iron wires two rod lock legs being the chevron shaped big first side that is tied to balance bar of twisting of isosceles, and lock leg top interior angle is 50 degree; Wherein, long 4 meters of balance bar, 8 centimetres of top diameters, long 2 meters of the lock leg that is connected with the balance bar termination, long 1.5 meters of another root, 7 centimetres of top diameters; Lock frame rod is wanted pitch prill bubble face.
3, the rod according to claim 1 and the brake lining of going here and there is characterized in that the perforating of rod two ends, and concentric reducer is alternately arranged, and penetrate in the eyelet with No. 8 iron wires, and one stubborn dead with rod, and the iron wire of other end grows below 1 meter, in order to fixing at random with the lock frame; 7 centimetres of rod top diameters, length are that the size of two lock frame spacings adds 30 centimetres, are generally 2.3 meters; The brake lining width can increase and decrease at random.
4, the sheet according to claim 1 and the protection-apron of going here and there is characterized in that it can being waste and old plastic sole, skin scraper-trough conveyer or rubber tire tire; With mould line and picture eye around sole, cutting perforating; With sole with length arrangement, wherein the center line of delegation just in time to live adjacent two row to and seam, with iron wire knockout and string; When adopting skin scraper-trough conveyer or rubber tire tire, utilize original length and width, each line width is not insisted on identity with as far as possible, but same line width should be consistent; Also can adopt the also string method of cross arrangement; The area of every group of protection-apron can be 3 * 2 meters.
5, assembling according to claim 1 is characterized in that the lock frame being installed to the abutment pier in engineering igniting flood port downstream, lattice weir and giving of the place ahead, shark's fin main body termination stayed in the riverbed, and lock frame and igniting flood port are rectangular; Lock frame spacing is advisable with 1 meter, the microcephaly of balance bar is placed to stream side, trench digging is imbedded in the groundbed, the gradient of ditch is preferably 1: 0.12 of balance bar length, be that lock leg one end covers 5 centimetres of balance bars, microcephaly's one end of balance bar covers balance bar more than 53 centimetres, gives covering earlier below the soil layer and presses a nylon sandy soil bag; Lock frame apart from 2 meters of shark's fin main body stays sediment ejection opening in the position at interval, and the sediment ejection opening bottom is established rod and gone here and there the bank sill; Sand removing hole is lower than 40 centimetres of igniting flood ports, and length generally accounts for below 3% of overflow dam sluicing section length, and looks its degree of depth of the motor-driven adjusting of coarse sand number and length; The lock top of the trellis bundlees fixedly rod completely.
It is characterized in that each group brake lining is fixed on the lock frame leg; The brake lining elevation is that sand setting height of weir journey adds igniting flood port standard water inlet elevation, wherein, the elevation on sand setting weir is 30 centimetres, igniting flood port standard water inlet elevation is the 20 years one predetermined elevations of chance riverbed flood, that is the elevation of cross weir sluicing section deducts difference more than 10 centimetres in the lattice weir, be generally about in the of 60 centimetres, the design altitude of section brake lining of promptly sluicing remains on about in the of 90 centimetres, abutment pier will be built in the both sides of overflow dam sluicing section, the alternative abutment pier of the abutment pier of igniting flood port and shark's fin main body wherein, the abutment pier of opposite side can be increased the brake lining elevation of two overhead spacings.
It is characterized in that each the retable film and the protection-apron continued access again of going here and there are fixed on lock frame leg and the brake lining; The protection-apron width is determined with last with 4 times of the maximum sluicing elevation of overflow dam, is generally reached more than 3 meters.
6, a kind of claim 1 overflow dam equipment utilizes irrigated farmland, permanent current water source method, it is characterized in that omitting sand removing hole, the brake lining elevation of compression sluicing section, with the long width of cloth nylon cloth of the facial covering of brake lining, the lower edge of nylon cloth and the right and left are pressed nylon sandy soil bag along covering completely.
7, a kind of claim 1 overflow dam equipment utilizes flooding irrigation farmland method, it is characterized in that being divided into the brake lining of overflow dam two-layer up and down, the design altitude of compression lower floor brake lining, with the anti-lock top of the trellis that is hung on of upper strata brake lining as regulating brake lining, standard water requirement and riverbed flood elevation according to lattice weir crops, put down the part or all of brake lining on upper strata at random, and be connected with the lower floor brake lining; Can implicate the fixedly rod of lock top of the trellis during operation.
It is characterized in that this flooding irrigation farmland method can be incorporated in the staggered sharp in flakes flood of newly developed and the old improvement in soil that interts the district of wasteland and cultivated land and become silted up and overflow, accomplish the newly-increased exploitation in soil, soil thickening and three unifications of plantation extra earning; It is characterized in that providing the complete sets of basic equipment facility, and omit pouring channel and subsystem channel by the improvement soil implementation " the fast filling method of having one's face covered with " of being developed of hills area, mountain area.
8, a kind of urgent job practices of retaining sand bar of claim 1 overflow dam equipment, it is characterized in that retaining sand bar with the totally-enclosed overflow of overflow dam equipment replacement that does not have abutment pier, wait to deposit up to standard after, remove overflow dam equipment, the section that will deposit makes up building stones wall bank sluicing section and abutment pier, to omit the earthwork construction procedures on sandy soil weir.
CNA2004100331405A 2002-10-16 2002-10-16 Rolling dam equipment Pending CN1544759A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNA2004100331405A CN1544759A (en) 2002-10-16 2002-10-16 Rolling dam equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNA2004100331405A CN1544759A (en) 2002-10-16 2002-10-16 Rolling dam equipment

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
CN 02131470 Division CN1200172C (en) 2002-10-16 2002-10-16 Composite type siltbeach dam body engineering technology

Publications (1)

Publication Number Publication Date
CN1544759A true CN1544759A (en) 2004-11-10

Family

ID=34352232

Family Applications (1)

Application Number Title Priority Date Filing Date
CNA2004100331405A Pending CN1544759A (en) 2002-10-16 2002-10-16 Rolling dam equipment

Country Status (1)

Country Link
CN (1) CN1544759A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101824809A (en) * 2010-04-22 2010-09-08 重庆交通大学 Large-gradient gravel river bank protective structure and river washout-resistant controlling method thereof
CN103774606A (en) * 2014-02-26 2014-05-07 党海愚 Composite silting dam field engineering technology

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101824809A (en) * 2010-04-22 2010-09-08 重庆交通大学 Large-gradient gravel river bank protective structure and river washout-resistant controlling method thereof
CN103774606A (en) * 2014-02-26 2014-05-07 党海愚 Composite silting dam field engineering technology

Similar Documents

Publication Publication Date Title
CN105862885B (en) Soil slope reinforcing method
CN201048512Y (en) River, ditch lotus and fish pond, water-storing dam fish-cultivating and lotus-root-planting protecting device
CN103898870A (en) Gabion box ecological gabion river channel slope protection construction method
CN211080099U (en) Ecological river bank protection
CN108677871A (en) A kind of construction method of assembled grass planting concrete precast block and its ecological revetment
CN206667420U (en) Sponge city high-effective penetrating type greenery patches constructs
CN111501664A (en) Ecological sea wall slope protection structure and construction method thereof
CN110952578A (en) Slope protection structure for dealing with water and soil loss
CN108330912B (en) Catchment sponge slope protection structure
CN108385617B (en) Cotton stalk fiber soil slope reinforcement system and construction method thereof
CN206428602U (en) Prevent mud from blocking the roadbed both sides shallow seated groundwater connectivity structure with soil erosion
CN210797432U (en) Water conservancy river course bank protection
CN206581137U (en) A kind of drainage system device for Highway in Loess Area bridge
CN108755895A (en) A kind of counter-slope formula is shut off filtration system and its construction method
CN104818734B (en) Control completely decomposed granite side slope damage by water waterproof and water drainage system and construction method thereof
CN1544759A (en) Rolling dam equipment
CN215926014U (en) Dykes and dams slope protection structure for design based on hydraulic and hydroelectric engineering
CN106609510A (en) A flexible slope protection device
CN211395412U (en) Crossing dyke culvert pipe export protects step structure
CN210122706U (en) Check dam structure of hydraulic and hydroelectric engineering
CN212064807U (en) Rocky desertification area soil and water loss treatment system
Grimshaw et al. Vetiver grass—its use for slope and structure stabilisation under tropical and semi tropical conditions
CN1200172C (en) Composite type siltbeach dam body engineering technology
CN219653642U (en) Subsurface flow type ecological slope protection
Woodson Stabilization of the Middle Rio Grande in New Mexico

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication