CN1528988A CNA2003101019543A CN200310101954A CN1528988A CN 1528988 A CN1528988 A CN 1528988A CN A2003101019543 A CNA2003101019543 A CN A2003101019543A CN 200310101954 A CN200310101954 A CN 200310101954A CN 1528988 A CN1528988 A CN 1528988A
Authority
CN
China
Prior art keywords
reinforcing cage
reinforcement cage
pile
construction
gatherer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CNA2003101019543A
Other languages
English (en)
Other versions
CN1232705C (zh
Inventor
吴春林
滕延京
刘国安
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Cabr Foundation Engineering Co ltd
Original Assignee
Cabr Foundation Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Family has litigation
First worldwide family litigation filed litigation Critical https://patents.darts-ip.com/?family=34304232&utm_source=google_patent&utm_medium=platform_link&utm_campaign=public_patent_search&patent=CN1528988(A) "Global patent litigation dataset” by Darts-ip is licensed under a Creative Commons Attribution 4.0 International License.
Application filed by Cabr Foundation Engineering Co ltd filed Critical Cabr Foundation Engineering Co ltd
Priority to CN 200310101954 priority Critical patent/CN1232705C/zh
Publication of CN1528988A publication Critical patent/CN1528988A/zh
Application granted granted Critical
Publication of CN1232705C publication Critical patent/CN1232705C/zh
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

一种长螺旋钻孔泵送砼成桩后插钢筋笼施工工艺及钢筋笼导入装置,其施工工艺步骤为:先钻孔;然后向桩孔内灌满素砼;将制作好的钢筋笼与钢筋笼导入装置连接,吊至桩孔上;起动钢筋笼导入装置的振动锤,通过振动锤的激振力将钢筋笼送入素砼桩身内至设计标高;拔出钢筋导入装置,成桩。该装置的钢筋笼导入管贯穿钢筋笼、并与钢筋笼底部连接,钢筋笼导入管上端与振动锤连接。该发明不需泥浆或水泥浆护壁,噪音小、造价低、防止泥水污染;在地下水位较高、地基土砂层较厚时,不会出现穿不透及孔壁坍塌的问题,施工速度快,施工质量好,施工环节少,施工效率高。

Description

长螺旋钻孔泵送砼成桩后插钢筋笼施工工艺及钢筋笼导入装置
技术领域
本发明涉及一种建筑工程桩基施工工艺及设备,特别是一种灌注桩施工工艺及施工设备。
背景技术
现有的灌注桩有振动沉管灌注桩、泥浆护壁灌注桩、螺旋钻孔无砂砼灌注桩。
一、振动沉管灌注桩施工工艺为:
1.启动振动锤,将桩管沉至设计深度;
2.在桩管内下放钢筋笼至设计标高;
3.向桩管内投放砼料;
4.拔管成桩。
其缺点是当地基土层含有较厚的砂层时,振动沉管无法穿过砂层;且振动锤功率较大,并位于桩管顶部,施工时有较大的噪音,在市区内施工存在较大困难;另外振动沉管灌注桩易产生缩颈现象。
二、泥浆护壁灌注桩施工工艺为:
1.旋挖钻机(或正反循环钻机)通过泥浆护壁钻孔至设计深度;
2.在泥浆护壁的桩孔内下放钢筋笼;
3.下放水下砼灌注导管至一定深度;
4.灌注水下砼。
其缺点是由于采用泥浆护壁,泥浆排放量大,易造成施工场地泥浆污染;另外施工效率低,且施工费用高。
三、螺旋钻孔无砂砼灌注桩施工工艺:
1.长螺旋钻机旋转钻进(将桩孔内的土体带出)至设计标高;
2.通过桩管向钻头端注水泥浆边拔桩管;
3.在水泥浆护壁的桩孔内下放钢筋笼(水泥补浆管绑扎在钢筋笼上随钢筋笼下放至设计标高);
4.向桩孔内倒入碎石;
5.通过绑扎在钢筋笼上的水泥补浆管再次补浆,将桩底和桩身的杂质排出桩身。
其缺点是由于采用水泥浆护壁及水泥浆再次补浆,水泥浆排放量大,会造成水泥浆污染及施工场地桩间土挖运困难;桩头砼强度低、易破坏;施工费用高。
发明内容
本发明的目的是提供一种长螺旋钻孔泵送砼成桩后插钢筋笼灌注桩的施工工艺及设备,解决灌注桩泥浆或水泥浆护壁造成泥水污染的问题,并解决施工噪音大、造价高的问题,还解决在地下水较高、地基土中含砂层较厚时,容易产生缩颈,施工速度速度慢、施工质量不能保证的问题。
本发明长螺旋钻孔泵送砼成孔后插钢筋笼施工工艺的施工步骤如下:
a、钻孔;
b、向桩孔内灌满素砼;
c、将制作好的钢筋笼与钢筋笼导入装置连接,吊至桩孔上;
d、起动钢筋笼导入装置的振动锤,通过振动锤的激振力将钢筋笼送入素砼桩身内至设计标高;
e、拔出钢筋导入装置,成桩。
上述a步骤中,钻孔的方式是采用液压钻机或螺旋钻机取土成孔。
上述c步骤中,钢筋笼导入装置与钢筋笼是分步起吊后组装。
上述c步骤中,钢筋笼导入装置与钢筋笼是组装连接后再一同起吊。
这种钢筋笼导入装置的钢筋笼导入管贯穿钢筋笼、并与钢筋笼底部连接,钢筋笼导入管上端与振动锤连接。
上述钢筋笼导入管上端固定有夹头,夹头与振动锤下方的夹具配合相连。
上述钢筋笼导入管的导入头是圆管形或圆锥形。
本发明的有益效果:利用长螺旋钻机成孔,通过砼输送泵边压砼边拔管直至成桩,不需泥浆或水泥浆护壁,噪音小、造价低、防止泥水污染;在地下水位较高、地基土砂层较厚时,不会出现穿不透及孔壁坍塌的问题,施工速度快、施工质量好;施工无泥浆或水泥浆的污染,施工造价较低;螺旋钻钻孔泵压砼成素砼桩,振动锤通过钢筋笼导入管下放钢筋笼至设计标高;施工环节少,施工效率高。
附图说明
图1是本发明施工工艺的a步骤示意图;
图2是本发明施工工艺的b步骤示意图;
图3是本发明施工工艺的c步骤示意图;
图4是本发明施工工艺的d步骤示意图;
图5是本发明施工工艺的e步骤示意图;
图6是本发明钢筋笼导入装置实施例的结构示意图。
具体实施方式
实施例一如图1-5所示,
图1是步骤a,长螺旋钻机成孔至设计标高;
图2是步骤b,边拔钻,边泵入砼,成素砼桩;
图3是步骤c,钢筋笼就位,吊至桩孔上;
图4是步骤d,起动钢筋笼导入装置的振动锤,将钢筋笼送至设计标高;
图5是步骤e,拔出钢筋导入管成桩。
这种长螺旋钻孔泵送砼成桩后插钢筋笼的施工工艺,是采用长螺旋钻机6成孔,通过弯管7向孔内泵送砼,形成素砼桩8;将制作好的钢筋笼1与钢筋笼导入管2相连接并吊起,移至已成桩的桩孔内;起吊振动锤3至笼顶,通过振动锤下的夹具4夹住钢筋笼导入管上端的夹头5;起动振动锤通过钢筋笼导入管将钢筋笼送入桩身素砼内至设计标高,拔出钢筋导入装置,即可成桩。
图6是与该施工工艺配套的钢筋笼导入装置的实施例,钢筋笼导入管2贯穿钢筋笼1、并与钢筋笼底部连接,钢筋笼导入管上端与振动锤3连接。为更好地工作,上述钢筋笼导入管上端固定有凸物状的夹头5,夹头与振动锤下方的夹具4配合相连。钢筋笼导入管的导入头可以是圆管形或圆锥形。
实施例二,将制作好的钢筋笼与钢筋笼导入管分步起吊后连接。

Claims (7)

1、一种长螺旋钻孔泵送砼成孔后插钢筋笼施工工艺,其特征是施工步骤如下:
a、钻孔;
b、向桩孔内灌满素砼;
c、将制作好的钢筋笼与钢筋笼导入装置连接,吊至桩孔上;
d、起动钢筋笼导入装置的振动锤,通过振动锤的激振力将钢筋笼送入素砼桩身内至设计标高;
e、拔出钢筋导入装置,成桩。
2、根据权利要求1所述的长螺旋钻孔泵送砼成孔后插钢筋笼施工工艺,其特征在于:所述a步骤中,钻孔的方式是采用液压钻机或螺旋钻机取土成孔。
3、根据权利要求1所述的长螺旋钻孔泵送砼成孔后插钢筋笼施工工艺,其特征在于:所述c步骤中,钢筋笼导入装置与钢筋笼是分步起吊后组装。
4、根据权利要求1所述的长螺旋钻孔泵送砼成孔后插钢筋笼施工工艺,其特征在于:所述c步骤中,钢筋笼导入装置与钢筋笼是组装连接后再一同起吊。
5、一种钢筋笼导入装置,其特征在于:该装置的钢筋笼导入管贯穿钢筋笼、并与钢筋笼底部连接,钢筋笼导入管上端与振动锤连接。
6、根据权利要求5所述的长螺旋钻孔泵送砼后插钢筋笼灌注桩施工设备,其特点在于:所述钢筋笼导入管上端固定有夹头,夹头与振动锤下方的夹具配合相连。
7、根据权利要求5所述的长螺旋钻孔泵送砼后插钢筋笼灌注桩施工设备,其特征在于:所述钢筋笼导入管的导入头是圆管形或圆锥形。
CN 200310101954 2003-10-20 2003-10-20 长螺旋钻孔泵送砼成桩后插钢筋笼施工工艺及钢筋笼导入装置 Expired - Lifetime CN1232705C (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200310101954 CN1232705C (zh) 2003-10-20 2003-10-20 长螺旋钻孔泵送砼成桩后插钢筋笼施工工艺及钢筋笼导入装置

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200310101954 CN1232705C (zh) 2003-10-20 2003-10-20 长螺旋钻孔泵送砼成桩后插钢筋笼施工工艺及钢筋笼导入装置

Publications (2)

Publication Number Publication Date
CN1528988A true CN1528988A (zh) 2004-09-15
CN1232705C CN1232705C (zh) 2005-12-21

Family

ID=34304232

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200310101954 Expired - Lifetime CN1232705C (zh) 2003-10-20 2003-10-20 长螺旋钻孔泵送砼成桩后插钢筋笼施工工艺及钢筋笼导入装置

Country Status (1)

Country Link
CN (1) CN1232705C (zh)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1320214C (zh) * 2004-12-29 2007-06-06 雷玉华 长螺旋压灌混凝土插芯组合桩及其施工方法
CN103174139A (zh) * 2013-04-16 2013-06-26 合肥建工集团有限公司 引孔沉桩穿越砂砾层施工技术
CN105421342A (zh) * 2015-11-04 2016-03-23 上海十三冶建设有限公司 长螺旋钻孔压灌桩的钢筋笼送入方法

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1320214C (zh) * 2004-12-29 2007-06-06 雷玉华 长螺旋压灌混凝土插芯组合桩及其施工方法
CN103174139A (zh) * 2013-04-16 2013-06-26 合肥建工集团有限公司 引孔沉桩穿越砂砾层施工技术
CN105421342A (zh) * 2015-11-04 2016-03-23 上海十三冶建设有限公司 长螺旋钻孔压灌桩的钢筋笼送入方法

Also Published As

Publication number Publication date
CN1232705C (zh) 2005-12-21

Similar Documents

Publication Publication Date Title
CN105780763B (zh) 中孔振动套管护壁长螺旋钻孔压灌桩的施工方法
CN110924383A (zh) 一种基于增强纤维和偏高岭土的加压灌注桩的施工方法
CN1896383A (zh) 一种预钻孔嵌岩钢管混凝土组合桩及其施工方法
CN102011399B (zh) 一种基于phc桩的多重高喷扩底桩施工方法
CN1710215A (zh) 侧向孔中挤土地基处理方法及水平挤扩装置
CN101644053A (zh) 一种增强软弱土层锚杆/锚索抗拔和抗拉能力的方法
CN105569560A (zh) 全套管式长螺旋钻孔桩机及利用该桩机施工的方法
CN1219945C (zh) 高喷插芯组合桩
CN101054799A (zh) 长螺旋钻孔压灌桩后注浆处理施工方法及其后置注浆装置
CN1488818A (zh) 一种套盘桩和成桩方法和挤扩装置、沉桩机和用途
CN1206419C (zh) 一种嵌岩组合桩及其施工方法
CN1232705C (zh) 长螺旋钻孔泵送砼成桩后插钢筋笼施工工艺及钢筋笼导入装置
CN1182301C (zh) 一种建筑基础用的成孔预制注浆桩的施工方法
CN108468334A (zh) 砂砾地层干挖粘土护壁成孔灌注桩施工装置
CN1827924A (zh) 静压置换地基处理法及其多用途压管
CN1320214C (zh) 长螺旋压灌混凝土插芯组合桩及其施工方法
CN215367226U (zh) 一种中掘后注浆根固增强的引扩孔扩体桩
CN1024029C (zh) 地下构筑物的施工方法及其专用墙底成槽机
CN1544764A (zh) 沉管灌注桩施工工艺及其桩端承载力加强器
CN1117906C (zh) 混凝土桩的施工方法及其施工设备
CN1279247C (zh) 多层组合钢管嵌岩桩施工方法
CN2177046Y (zh) 静压灌浆装置
CN1245558C (zh) 管桩施工方法
CN1119232A (zh) 后灌浆桩复合地基及其施工方法
CN1676763A (zh) 钻孔夯扩水泥土挤密桩施工方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
EE01 Entry into force of recordation of patent licensing contract

Application publication date: 20040915

Assignee: Beijing Geotechnical Engineering Association

Assignor: CABR FOUNDATION ENGINEERING Co.,Ltd.

Contract record no.: 2015990000888

Denomination of invention: Ling auger drilling pumping concrete pile-forming after-inserted reinforcement cage construction process and reinforcement cage guiding device

Granted publication date: 20051221

License type: Exclusive License

Record date: 20151026

LICC Enforcement, change and cancellation of record of contracts on the licence for exploitation of a patent or utility model
EC01 Cancellation of recordation of patent licensing contract
EC01 Cancellation of recordation of patent licensing contract

Assignee: Beijing Geotechnical Engineering Association

Assignor: CABR FOUNDATION ENGINEERING Co.,Ltd.

Contract record no.: 2015990000888

Date of cancellation: 20201120

EE01 Entry into force of recordation of patent licensing contract
EE01 Entry into force of recordation of patent licensing contract

Application publication date: 20040915

Assignee: Beijing Geotechnical Engineering Association

Assignor: CABR FOUNDATION ENGINEERING Co.,Ltd.

Contract record no.: X2020990000619

Denomination of invention: Construction technology of inserting reinforcement cage after long auger drilling and pumping concrete pile and reinforcement cage leading in device

Granted publication date: 20051221

License type: Exclusive License

Record date: 20201120

CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20051221