CN1515780A - Method for deblocking blocked pipe for extracting mirabilite ore deposit by using water soluble method and its equipment - Google Patents

Method for deblocking blocked pipe for extracting mirabilite ore deposit by using water soluble method and its equipment Download PDF

Info

Publication number
CN1515780A
CN1515780A CNA031247733A CN03124773A CN1515780A CN 1515780 A CN1515780 A CN 1515780A CN A031247733 A CNA031247733 A CN A031247733A CN 03124773 A CN03124773 A CN 03124773A CN 1515780 A CN1515780 A CN 1515780A
Authority
CN
China
Prior art keywords
water
pipe
well
plugging
well casing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CNA031247733A
Other languages
Chinese (zh)
Other versions
CN1295420C (en
Inventor
戢良鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Bluestar Chonfar Engineering and Technology Co Ltd
Original Assignee
China Bluestar Changsha Design and Research Institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Bluestar Changsha Design and Research Institute filed Critical China Bluestar Changsha Design and Research Institute
Priority to CNB031247733A priority Critical patent/CN1295420C/en
Publication of CN1515780A publication Critical patent/CN1515780A/en
Application granted granted Critical
Publication of CN1295420C publication Critical patent/CN1295420C/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Abstract

The present invention discloses a plugged pipe plugging-removing method for extracting miribilite mine. It includes the following steps: makking water with 25-50 deg.C be passed through water injection pipe positioned in the central position of well pipe and directly reached to the upper portion of well-plugging material, and be injected into well pipe, dissolving and scouring sodium sulfate decahydrate crystal body, discharging the dissolved bittern from gap between water injection pipe and well pipe and from wellhead, and progressively downward placing the water injection pipe with the dissolution and discharge of the crystal body until the crystal body is completely dissolved and discharged out. The plugging-removing equipment includes pressure-bearing soft pipe, water-feeding short connector and water-injection hard pipe.

Description

A kind of solution mining saltcake ore deposit plugging method for removing blockage and equipment
Technical field
The present invention relates to a kind of solution mining saltcake ore deposit plugging method for removing blockage and equipment.
Background technology
Drilling solution mining saltcake ore deposit is by injecting water as solvent, with the saltcake mineral dissolution, generates aqueous sodium persulfate solution and extraction ground.The concentration of aqueous sodium persulfate solution is relevant with its temperature.At a certain temperature, when temperature descended, the sodium sulphate in the aqueous sodium persulfate solution very easily crystallization watchman's clapper went out, and generated the sal glauberi crystal.If do not improve temperature, this sal glauberi crystal will stop up well casing gradually and cause stopping production in very short time.In addition, to contain silt particle more when ore bed, or contain the more top board of silt particle and collapse, and the drilling well sediment outflow is untimely, also can cause the silt particle plugging.
When plugging took place, general method for removing blockage was to utilize rig to drill obstruction in the well casing of center at present, or comes de-plugging with the tractor hoist drifting.There is following defective in these two kinds of methods: (1) must arrive the scene by heavy rig, drilling rod or the tractor hoist of carrying, and installs; (2) job site necessary dynamic (electricity or diesel-driven generator) and water supply; (3) time-consuming, take a lot of work, the cost height.
Summary of the invention
The objective of the invention is to overcome the above-mentioned defective that existing method for removing blockage exists, provide a kind of easy and simple to handle, cost is low, efficient is high, need not the solution mining saltcake ore deposit plugging method for removing blockage and the equipment thereof of power.
Technical scheme of the present invention is: utilize the physicochemical properties of stifled well thing (sal glauberi crystal) itself, with temperature 25-50 ℃ water (even more preferably 35-45 ℃ hot water, the more preferably hot water about 40 ℃.The temperature of water is low excessively, and sal glauberi dissolution of crystals speed is too slow, can reduce de-plugging efficient; The temperature of water improves, and can accelerate the dissolution velocity of sal glauberi crystal, but too high, the dissolution velocity of sal glauberi crystal reduces on the contrary, and because energy consumption increases, it is worthwhile also to may not be certain.Can utilize the cooling water of processing factory to do de-plugging hot water.), inject in the well casing by the water filling hard tube that places well casing centre and through stifled well thing top, dissolve and wash away crystalline solid, and return out well head from the gap of water filling hard tube and well casing (being equivalent to a small-sized individual well convection current).The water filling hard tube is along with crystalline solid dissolving and discharge and transfer gradually, till thoroughly dissolving, discharging the crystalline solid in the well casing.The water that injects should have suitable pressure, and the pressure size can be advisable from the discharge well head of the gap between water filling hard tube and the center well casing to guarantee the bittern (injection water) after the dissolving; Well is dark more, and the pressure of water should be big more.The water filling hard tube preferably selects for use seamless steel pipe to make, and connects with box cupling.
The present invention has following advantage: (1) does not need heavy equipment, is not having under the situation of power, still can carry out de-plugging work; (2) easy and simple to handle, cost low (hard tube used of de-plugging can be multiplexing, so prime cost is de-plugging personnel's a wage), used equipment and instrument are simple; (3) the de-plugging time lacks, and does not damage the production pipe string (comparing with the rig de-plugging) of down-hole.
Description of drawings
Accompanying drawing is present device and operating principle schematic diagram.
1 pressure-bearing flexible pipe; 2 water inlet short circuits; 3 water filling hard tubes; 4 the dissolving after bittern or contain sand water; 5 obstructions; 6 molten chamber and bittern
The specific embodiment
Below in conjunction with accompanying drawing one embodiment of the present of invention are illustrated.
The water injection equipment that present embodiment adopts is made of pressure-bearing flexible pipe 1, water inlet short circuit 2 and the water filling hard tube 3 made of seamless steel pipe, and pressure-bearing flexible pipe 1 is connected on the bypass of water short circuit 2 in succession, and water inlet short circuit 2 is positioned at the upper end of water filling hard tube 3, and connects with screw.
The concrete operations step of de-plugging is as follows:
(1) when finding that well casing stops up, (finds more early well more, easy more solution), lay down wellhead assembly;
(2) install derrick (derrick of available rig, also available easy tripod or portal frame); Water filling hard tube 3 is hung on derrick;
(3) water filling hard tube 3 is inserted in the well casing that needs de-plugging and through stifled well thing 5 tops;
(4) connect water filling hard tube 3 and water inlet short circuit 2;
(5) open gate valve, about 40 ℃ hot water are injected well by pressure-bearing flexible pipe 1, water inlet short circuit 2 and water filling hard tube 3, dissolve and wash away crystallization obstruction 5, the bittern 4 after the dissolving is discharged well head from the gap between water injection pipe 3 and the well casing.The bittern 4 of discharging temporarily leaves in the crystallizing pond, or uses pumped back processing factory.
(5) after the center well casing is removed obstruction, continue fill cycle, to remove the obstruction between center well casing and the sleeve pipe.

Claims (4)

1, a kind of solution mining saltcake ore deposit plugging method for removing blockage, it is characterized in that, temperature 25-50 ℃ and water with suitable pressure are injected in the well casing by the water injection pipe that places well casing centre and through stifled well thing top, dissolve and wash away the sal glauberi crystalline solid, bittern after the dissolving relies on the pressure that injects water to discharge well head from the gap between water injection pipe and the well casing, water injection pipe is along with crystalline solid dissolving and discharge and transfer gradually, till thoroughly dissolving, discharging the crystalline solid in the well casing.
2, exploitation saltcake ore deposit plugging method for removing blockage according to claim 1 is characterized in that, the temperature of the water in the described injection well casing is 35-45 ℃.
3, exploitation saltcake ore deposit plugging method for removing blockage according to claim 2 is characterized in that, the temperature of the water in the described injection well casing is 40 ℃.
4, a kind of solution mining saltcake ore deposit plugging de-plugging equipment is characterized in that, this equipment is made of pressure-bearing flexible pipe, water inlet short circuit and water filling hard tube, and the pressure-bearing flexible pipe is connected on the bypass of water short circuit into, and the water inlet short circuit is positioned at the upper end of water filling hard tube, and connects with screw.
CNB031247733A 2003-08-28 2003-08-28 Method for deblocking blocked pipe for extracting mirabilite ore deposit by using water soluble method and its equipment Expired - Fee Related CN1295420C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNB031247733A CN1295420C (en) 2003-08-28 2003-08-28 Method for deblocking blocked pipe for extracting mirabilite ore deposit by using water soluble method and its equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNB031247733A CN1295420C (en) 2003-08-28 2003-08-28 Method for deblocking blocked pipe for extracting mirabilite ore deposit by using water soluble method and its equipment

Publications (2)

Publication Number Publication Date
CN1515780A true CN1515780A (en) 2004-07-28
CN1295420C CN1295420C (en) 2007-01-17

Family

ID=34239558

Family Applications (1)

Application Number Title Priority Date Filing Date
CNB031247733A Expired - Fee Related CN1295420C (en) 2003-08-28 2003-08-28 Method for deblocking blocked pipe for extracting mirabilite ore deposit by using water soluble method and its equipment

Country Status (1)

Country Link
CN (1) CN1295420C (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101260801B (en) * 2008-04-24 2011-06-15 化工部长沙设计研究院 Well drilling hot melt separate zone production technology for oil-containing low infiltration native sulphur deposit
CN101298835B (en) * 2007-04-30 2012-03-21 北京海能海特石油科技发展有限公司 Controllable acid distributing tube and controllable acid distributing method
CN102434141A (en) * 2011-09-16 2012-05-02 化工部长沙设计研究院 Method for mining sylvite in underground carnallite ore
CN101598009B (en) * 2009-07-01 2012-08-08 邛崃市鸿丰钾矿肥有限责任公司 Crystallization prevention control device for high temperature brine
CN114482896A (en) * 2020-10-23 2022-05-13 中国石油化工股份有限公司 Optimization method of plugging removal method for oil-water well

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4290650A (en) * 1979-08-03 1981-09-22 Ppg Industries Canada Ltd. Subterranean cavity chimney development for connecting solution mined cavities
US4368922A (en) * 1980-12-02 1983-01-18 W. R. Grace & Co. Method for solution mining of complex carbonaceous materials
US5351759A (en) * 1992-10-22 1994-10-04 Shell Oil Company Slag-cement displacement by direct fluid contact
CN1069732C (en) * 1999-05-15 2001-08-15 洪泽县化工(集团)总公司 Mirabilite exploiting water-dissolution process with two wells communicated by horizontal hole

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101298835B (en) * 2007-04-30 2012-03-21 北京海能海特石油科技发展有限公司 Controllable acid distributing tube and controllable acid distributing method
CN101260801B (en) * 2008-04-24 2011-06-15 化工部长沙设计研究院 Well drilling hot melt separate zone production technology for oil-containing low infiltration native sulphur deposit
CN101598009B (en) * 2009-07-01 2012-08-08 邛崃市鸿丰钾矿肥有限责任公司 Crystallization prevention control device for high temperature brine
CN102434141A (en) * 2011-09-16 2012-05-02 化工部长沙设计研究院 Method for mining sylvite in underground carnallite ore
CN102434141B (en) * 2011-09-16 2014-02-26 中水电海外投资有限责任公司 Method for mining sylvite in underground carnallite ore
CN114482896A (en) * 2020-10-23 2022-05-13 中国石油化工股份有限公司 Optimization method of plugging removal method for oil-water well

Also Published As

Publication number Publication date
CN1295420C (en) 2007-01-17

Similar Documents

Publication Publication Date Title
CN105255466B (en) Oil well slow de-plugging agent and method for removing blockage
CN105003220B (en) Coiled tubing Horizontal Well Drilling grinds pumped type composite bridge plug technique
AU2014295717B2 (en) Anchoring and anti-blocking drill rod for coal mine floor
CN100516457C (en) Chemical pulse compound unplugging method
US20140262268A1 (en) Drilling and Completion Applications of Magnetorheological Fluid Barrier Pills
CN101781982A (en) Short-injection water injection well acidation injectivity process
CN106894783B (en) The method of continuous tubing drill milling tamper
CN104481580A (en) Method and device for repairing downhole coal-bed gas extraction drilled hole
CN111140200A (en) Positive-negative coupling pulse chemical physical blockage removal system and blockage removal method
EP1719841A1 (en) Method and equipment for constructing micropiles in soil
CN1295420C (en) Method for deblocking blocked pipe for extracting mirabilite ore deposit by using water soluble method and its equipment
CN202228029U (en) Sand bailer for down-hole operation of oil field
CN105443101A (en) Compression type double-sealing and single-clamping subsection fracturing process pipe column and fracturing method thereof
CN105756591A (en) Coal bed methane well completion method
CN112360368A (en) Oil well water plugging method
CN103527078A (en) Hole forming technology and device for bored pile construction through down-the-hole hammer
CN204402406U (en) A kind of down-hole coal bed mash gas pumping drilling prosthetic device
CN110984891A (en) Horizontal well downhole throttling process pipe column and method
CN103790529A (en) Coalbed methane drainage extraction and backwashing device and method
CN115711100A (en) Method for finishing shaft treatment by using pointed bit milling cone
CN102278092B (en) Biological enzyme blocking removal process for blocking of inorganic scaling contained in strata
CN206385542U (en) A kind of pile tube draws a core apparatus
CN209742854U (en) Oil extraction device
CN104481494A (en) Method for repairing rock brine wells
CN104653128B (en) A kind of process that ash is dragged for for coal bed gas horizontal well

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20070117

Termination date: 20100828