CN1509938A - Piling vessel with pile rotating unit - Google Patents

Piling vessel with pile rotating unit Download PDF

Info

Publication number
CN1509938A
CN1509938A CNA021576882A CN02157688A CN1509938A CN 1509938 A CN1509938 A CN 1509938A CN A021576882 A CNA021576882 A CN A021576882A CN 02157688 A CN02157688 A CN 02157688A CN 1509938 A CN1509938 A CN 1509938A
Authority
CN
China
Prior art keywords
pile
frame
driving
stake device
hull
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CNA021576882A
Other languages
Chinese (zh)
Inventor
奇 郑
郑奇
钟林贵
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CNA021576882A priority Critical patent/CN1509938A/en
Publication of CN1509938A publication Critical patent/CN1509938A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Abstract

A pile driving ship features that a pile orientating apparatus, a pile storage mechanism and a pile hoist are installed on it for increasing its productivity by 70% or more.

Description

A kind of pile-driving barge with commentaries on classics stake device
Technical field:
The invention belongs to the technical field of shipbuilding, specifically a kind of pile-driving barge with commentaries on classics stake device especially relates to the commentaries on classics stake device of setting up on pile-driving barge.
Background technology:
Pile-driving barge is one of main preparation of construction of water project, and the production efficiency of pile-driving barge is to the whole construction cycle decisive role of engineering.The described a kind of amplitude variation type pile-driving barge of the 13 piece of chapter 1 of port engineering construction handbook the 3rd joint (as No. 2, harbor work's stake, mountain, harbor work ocean number, this is the name of vessel of two pile-driving barges of Shanghai Port Titanium Engineering Company).Its formation is hull, pile driving frame, amplitude oil cylinder, anchor capstan, hangs a winch, its weak point, and one, every dozen one pile pile-driving barge will be refuted the side to 100 meters-300 meters apart from the pile sinking work area pile transport voluntarily by strand anchor mode and be reached stake, backhauls then.Because the reinforced concrete pile slenderness ratio is 80-100, need use pile driving frame to push up three groups of suspension hooks simultaneously, on reinforced concrete pile, detain five nodes with shackle and steel rope, the ability handling, very bothersome.Its two, get the stake be horizontality, three suspension hooks that utilize the pile driving frame top again transfer stake to erectility by horizontality lentamente through lifting separately.So in a piling cyclic process, the service working time sum of getting stake, pile transport and commentaries on classics stake has a strong impact on the raising of pile-driving barge capacity rating much larger than the pile sinking work-hours.No. 2 pile-driving barges of stake once piling normally circulated about 70 minutes, about 20 minutes of piling work-hours (advancing Longkou, location and pile sinking), account for 30% of the cycle time of once driving piles, and get stake, pile transport and commentaries on classics stake service working time with about 50 minutes, account for 70% of the cycle time of once driving piles.No. 12 pile-driving barges of the 3rd navigational matters Engineering Bureau are because design of Hydraulic System is comparatively reasonable, so capacity rating is higher than No. 2, stake, but stake-man's process flow is the same substantially, and the ratio of No. 12 pile-driving barge piling work-hourses of the 3rd navigational matters Engineering Bureau and service working time is about 0.8: 1.In a word, existing pile-driving barge service working time proportion is excessive, and this is to influence the major cause that the pile-driving barge capacity rating improves.
Summary of the invention:
The objective of the invention is to overcome deficiency of the prior art, a kind of pile-driving barge that improves piling efficient is provided.
Technical scheme of the present invention is achieved in that a kind of pile-driving barge that changes the stake device that has, it mainly comprises hull, be contained in power system and the amplitude variation type pile driving frame that is contained on the hull in the hull, it is characterized in that: a commentaries on classics stake device is housed on hull, deposits a support and hang a loop wheel machine.
The present invention compares with pile-driving barge commonly used at present, avoided every dozen one pile just to need to refute the other back work that reaches stake to 100 meters-300 meters apart from the pile sinking work area pile transport voluntarily by strand anchor mode, also saved utilize the pile driving frame top three suspension hooks through lifting separately, the very bothersome control step that stake is transferred lentamente to erectility by horizontality, what the present invention had not only reduced pile-driving barge moves number indicating a ship's order of departure number, also having shortened changes the stake time, thereby improved the work efficiency of pile-driving barge greatly, through initial estimate, the capacity rating of pile-driving barge has improved more than 70%, and cost only increases 10%-15%; The relative assembly of setting up is simple in structure, be easy to install and make, easy to use, simplified the step of pile-driving barge back work, especially in today of construction market keen competition, over-water construction unit thirsts for having an easy construction, the pile-driving barge of high efficiency, and the present invention can be used as a kind of comparatively desirable replenishing.
Description of drawings:
Fig. 1 is the scheme drawing of one embodiment of the invention
Fig. 2 is a kind of running condition scheme drawing of Fig. 1
Fig. 3 is the another kind of running condition scheme drawing of Fig. 1
Several the handlings that Fig. 4 refutes stake for the present invention are to the scheme drawing of depositing a support
Fig. 5 is the scheme drawing that a loop wheel machine hangs a pile holder pile frame that hangs among the present invention
The specific embodiment:
The invention will be further described below in conjunction with drawings and Examples.
A kind of pile-driving barge with commentaries on classics stake device, it mainly comprises hull 11, be contained in power system and the amplitude variation type pile driving frame 8 that is contained on the hull in the hull, it is different from prior art and is: being equipped with on hull 11 changes stake device 12, deposit a support 7 and hang a loop wheel machine 1, implement transfer stake device 12 two external slideway framves 6 are arranged, an inner slide frame 5 and a holder pile frame 2, inner slide frame 5 is between two external slideway framves 6, holder pile frame 2 is placed on above the inner slide frame 5, near the front end place one supporting leg 4 is arranged at holder pile frame 2 back sides, this supporting leg 4 rests on the chute surface of inner slide frame 5, there is a crossbeam 3 at holder pile frame 2 back sides near rear end, this crossbeam 3 rests on the chute surface of external slideway frame 6, be prior art about pile-driving barge and the pile driving frame that is arranged on the pile-driving barge, pile-driving barge of the present invention is to increase by three equipment on pile-driving barge basis commonly used at present, below these three equipment is described.
1. hang two of loop wheel machines, hang a loop wheel machine and comprise winch, cable wire, pulley, door frame, jib and corresponding mechanical drive and the electrical control gear that hangs stake, about hanging a loop wheel machine is prior art, therefore its structure is not done concrete description, operating needs is one and hangs a loop wheel machine hoisting capacity: the 30-50 ton, purposes is 1). the stake that stake is refuted hang pile-driving barge newly-increased deposit on the support 2). will deposit stake on the support and hang and change on the stake device;
2. deposit one group of about 4-5 of a support, deposit the steel structure that a support is the n type, evenly arrange in captain's direction, spacing 10-16 rice, purposes: deposit the 5-10 root and refute the stake of hanging oneself from stake, uniform the lying in of stake held on the support;
3. change the stake device, a commentaries on classics stake device is made up of two external slideway framves, an inner slide frame and a holder pile frame when specifically implementing.The inner slide frame is between two external slideway framves, the holder pile frame lies in above the inside and outside slideway shelf, there is a supporting leg at the holder pile frame back side near the front end place, supporting leg rests on the inner slide frame chute surface, there is a crossbeam at the holder pile frame back side near rear end, crossbeam rests on the external slideway frame chute surface, the curved shape of the chute surface of inner slide frame, hanging a loop wheel machine near being provided with two on the deck of hull ship side one side, depositing a support near being provided with 4-5 on the deck of hull ship side opposite side, the inner slide frame chute surface during enforcement is a glide.
Description of operation: pile-driving barge is refuted by in the of 10 to 100 meters-300 meters apart from the pile sinking work area pile transport voluntarily by strand anchor mode, hangs a loop wheel machine and puts the 5-10 pile according to the load-carrying capacity of pile-driving barge and depositing on the support.
The pile-driving barge reversion is hung a loop wheel machine and is hung oneself one to the holder pile frame that changes the stake device from depositing a support to the pile sinking work area.
The drive mechanism that changes on the stake device will ask pile frame to move to the stem direction, and the holder pile frame front end supporting leg that rests on the inner slide face descends under the glide effect gradually, and whole holder pile frame and stake are just holded up gradually.When the crossbeam of holder pile frame moved to external slideway frame front end, oneself became holder pile frame and stake erectility and shifts to stem.
The little winch steel rope at the holder back side, pile frame rear end eases out, and the former joint hinge 13 that is buckled in a top is Panasonic voluntarily, and is horizontal below pile driving frame.
The suspension hook in pile driving frame top joint hinge of slinging will ask the little winch steel rope at the pile frame front end back side slowly to ease out again, and this enters pile driving frame with erectility pile foundation.
Except having set up three above-mentioned equipment, also need the hull at newly-increased three equipment places is carried out necessary reinforcing, generally can adopt the thickness of local increase steel plate or set up reinforced rib, following table is the investment estimate of newly added equipment.
Newly added equipment investment estimate list position: ten thousand yuan
Title unit of quantity unit price total price remarks
130t-50t single armed frame fixedly hangs 2 40-50 80-100
230t-50t single armed frame fixedly hangs hull and reinforces in the 30-40 ship storehouse
3 change 1 100-120 100-120 of stake device
4 change stake device hull reinforces in the 30-40 ship storehouse
5 hold 5 2.5-3 12.5-15 of a support
6 hold a support hull reinforces in the 8.0-12 ship storehouse
7 reservations take 20% 52-65
8 subtotal 312-390
Annotate: last be for No. 2 the references object estimation with stake in the price, and back one number is references object estimation with foreign mountain
Productivity ratio is:
Analysis according to the ratio of No. 2 work-hourses of stake and service working time roughly can draw following data:
1. No. 2 comparisons of this pile-driving barge and stake, total cost increases by 15%, and capacity rating improves 100%.
2. this pile-driving barge and the comparison of foreign mountain, total cost increases by 10%, and capacity rating improves 70%.
Load-carrying ability analysis about this pile-driving barge
This pile-driving barge is compared with pile-driving barge at present commonly used to have increased and is hung a loop wheel machine, deposits a support and change the stake device, also has 5 piles 9 in addition, and can about 500t that gain in weight altogether, pile-driving barge commonly used bear the 500t weight of increase, now do following analysis.
(1) No. 2 about 2600t of pile-driving barge load-carrying ability of stake, No. 2 deadweights of stake (comprising fresh water and diesel oil) about 1600t, the about 1000t of ballast water.The effect of ballast water has 2 points on the pile-driving barge, and the one, in order to reduce the pile-driving barge center of gravity, increase the stability of pile-driving barge, the 2nd, by regulating hull separately the water yield in four setting-out cabins all around, make pile-driving barge keep horizontality.The effect of ballasting is played in the 500t deadweight of newly added equipment and stake equally, so as long as the 1000t ballast water is reduced to 500t, this has just solved the influence of the deadweight of newly added equipment to piling boat-carrying Beijing South Maxpower Technology Co. Ltd power.
Mountain, ocean pile-driving barge ballast water is 1960t, so the deadweight of newly added equipment does not more have influence to foreign mountain pile-driving barge load-carrying ability.
(2) analysis that the newly added equipment asymmetric arrangement is horizontal to pile-driving barge, the vertical equity degree influences
Be that example is analyzed with No. 2 pile-driving barges of stake still, the weight of symmetric arrangement is 240t in the newly-increased 500t equipment, and the weight of asymmetric arrangement is 260t.500t ballast water weight is greater than the 260t weight of asymmetric arrangement, utilizes the 500t ballast water at pile-driving barge regulating pondage in four setting-out cabins all around, can make pile-driving barge keep horizontal, vertical equity.
(3) the initial stability value of public technology pile-driving barge is more much bigger than the initial stability value of " Rules for the Stability of Sea-going Ships " and " inland navigation craft stability standard " middle regulation, the stability that pile-driving barge is described is good, this pile-driving barge is because of having increased by three equipment, the center of gravity of boats and ships is slightly raised, but its initial stability value still may be bigger than the initial stability value of regulation; Hull of the present invention in addition can suitably be adjusted hull principal dimension and pressur loading weight in design process, make initial stability value greater than the initial stability value of stipulating in " Rules for the Stability of Sea-going Ships " and " inland navigation craft stability standard ", so the stability problem of this pile-driving barge should be soluble with the pile-driving barge that changes the stake device.

Claims (5)

1, a kind of pile-driving barge with commentaries on classics stake device, it mainly comprises hull, is contained in power system and the amplitude variation type pile driving frame that is contained on the hull in the hull, it is characterized in that: a commentaries on classics stake device is housed on hull, deposits a support and hang a loop wheel machine.
2, a kind of pile-driving barge that changes the stake device that has according to claim 1, it is characterized in that: changeing the stake device has two external slideway framves, an inner slide frame and a holder pile frame, the inner slide frame is between two external slideway framves, the holder pile frame is placed on above the inner slide frame, near the front end place one supporting leg is arranged at the holder pile frame back side, this supporting leg rests on the chute surface of inner slide frame, and there is a crossbeam at the holder pile frame back side near rear end, and this crossbeam rests on the chute surface of external slideway frame.
3, a kind of pile-driving barge that changes the stake device that has according to claim 1 and 2 is characterized in that: the curved shape of the chute surface of inner slide frame, it can be circular-arc, parabolic shape, hyperbolic wire, oval wire or other glide shape.
4, a kind of pile-driving barge that changes the stake device that has according to claim 1 and 2 is characterized in that: hanging a loop wheel machine near being provided with two on the deck of hull one side, depositing a support near being provided with 4-5 on the deck of hull opposite side.
5, a kind of pile-driving barge that changes the stake device that has according to claim 1 and 2 is characterized in that: the inner slide frame, external slideway frame and the holder pile frame that change in the stake device are steel construction piece.Change a stake device and be arranged in pile driving frame and hold between the support on the deck near pile driving frame, it is parallel with deck centre line to change the stake device.
CNA021576882A 2002-12-24 2002-12-24 Piling vessel with pile rotating unit Pending CN1509938A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNA021576882A CN1509938A (en) 2002-12-24 2002-12-24 Piling vessel with pile rotating unit

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNA021576882A CN1509938A (en) 2002-12-24 2002-12-24 Piling vessel with pile rotating unit

Publications (1)

Publication Number Publication Date
CN1509938A true CN1509938A (en) 2004-07-07

Family

ID=34236648

Family Applications (1)

Application Number Title Priority Date Filing Date
CNA021576882A Pending CN1509938A (en) 2002-12-24 2002-12-24 Piling vessel with pile rotating unit

Country Status (1)

Country Link
CN (1) CN1509938A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102079365A (en) * 2009-11-27 2011-06-01 三一电气有限责任公司 Pile driving boat
CN102359108A (en) * 2011-07-15 2012-02-22 清华大学 Centrifugal field slope pile driving system

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102079365A (en) * 2009-11-27 2011-06-01 三一电气有限责任公司 Pile driving boat
CN102359108A (en) * 2011-07-15 2012-02-22 清华大学 Centrifugal field slope pile driving system

Similar Documents

Publication Publication Date Title
CN100340470C (en) Sectional hoisting method
EP2724021B1 (en) A self-propelled offshore wind farm installation vessel, and method of installation used in the construction of an offshore wind turbine farm
CN109319041B (en) Method for turning over irregular U-shaped block of chemical tanker
CN101684639A (en) Process method for construction of steel-structured suspension bridge and light type cable carrying crane specially used in same
CN1767976A (en) A vessel for transporting wind turbines, methods of moving a wind turbine, and a wind turbine for an off-shore wind farm
CN102815373A (en) Hybrid deep water mooring system
CN101417693A (en) Oceanography engineering module integral hoisting method
CN106828812B (en) Semi-submersible type deep-sea wind-powered electricity generation mounting platform and its wind power generating set integral installation method
JP2002540329A (en) Method of mounting a plurality of risers or tendons and a ship performing the method
CN107792303B (en) Semi-submersible type ocean hoisting platform and operation method thereof
CN113957892B (en) Pile sinking construction equipment and technology for semi-submersible crane ship
CN108532604A (en) A kind of steady stake platform construction technique
CN216546599U (en) A hang and put device that is used for coastal waters geotechnical engineering shipborne reconnaissance to equip
CN206634171U (en) Semi-submersible type deep-sea wind-powered electricity generation mounting platform
CN115787645A (en) Quick pile sinking construction process for four-pile jacket foundation by offshore wind power deepwater pile-first method
CN106428440A (en) Hinged truss type twin-hull floating crane
CN202169997U (en) Heavy lift vessel with door-shaped trusses
CN1509938A (en) Piling vessel with pile rotating unit
CN219750087U (en) Offshore photovoltaic pile driving ship provided with double-lifting-hook deck crane
CN108689316A (en) A kind of crane barge ship
CN207861722U (en) A kind of Simple water floating type gantry crane
CN109665445B (en) Loading, transporting and conveying process for torch tower crane
WO2022050840A1 (en) Crane vessel with a crane for hoisting wind turbine components
CN114132839A (en) Crane installation method for heavy crane ship
CN106335608A (en) Mounting method of seabed anchor

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication