CN1505324A - Transmission line resource dynamic management adapting process - Google Patents

Transmission line resource dynamic management adapting process Download PDF

Info

Publication number
CN1505324A
CN1505324A CNA021511845A CN02151184A CN1505324A CN 1505324 A CN1505324 A CN 1505324A CN A021511845 A CNA021511845 A CN A021511845A CN 02151184 A CN02151184 A CN 02151184A CN 1505324 A CN1505324 A CN 1505324A
Authority
CN
China
Prior art keywords
circuit
far
chain
link
group
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CNA021511845A
Other languages
Chinese (zh)
Other versions
CN100433628C (en
Inventor
许粤萍
朱延功
陈多磊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZTE Corp
Original Assignee
ZTE Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZTE Corp filed Critical ZTE Corp
Priority to CNB021511845A priority Critical patent/CN100433628C/en
Publication of CN1505324A publication Critical patent/CN1505324A/en
Application granted granted Critical
Publication of CN100433628C publication Critical patent/CN100433628C/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The invention discloses a kind of dynamic managing adapting method for transmission line resources, carries on dynamic plan to the static planed resources, carries on chain adding or deleting operation, realizes the dynamic management to the line resources. It not only can provide dynamic transmission resources allocation through each data input unit, provides the user the maximal transmission line resources; it can also carries on reallocation of resources to input unit when the line is fail, guarantees enough bandwidth for user; the method enhances the utilization ratio of line resources.

Description

Transmission line resource dynamic management adaptation method
Technical field
The invention belongs to data communication field, relate in particular to the management of connecting system line resource.
Background technology:
The E1 circuit is a kind of main transmission medium in the connecting system.Article one, the E1 circuit provides the transmission channel of a 2M.Under the situation that many E1 circuit coexistences are arranged, existing system is not generally done dynamic management and planning to line resource, that is to say, finishes the static allocation of line resource from the beginning, and after the starting device, the user of each bar circuit can not change again.When a variety of causes causes circuit unavailable, when perhaps the lane assignment scheme changed, existing system is interrupting service at first, then line resource was reallocated.
To the reallocation of line resource is that method by artificial configuration realizes.When implementing reallocation, must guarantee that all there are administrative staff at two ends and need processing simultaneously, time-consuming bothersome; At one end under no one's the situation, can not make real-time processing as required, not meet intellectuality, real-time operation, the remote-operated demand of present resource management.
Artificial intervention not only needs interrupting service, and influences Qos, brings loss to operator.By retrieval, also do not have to find and to carry out the method for dynamic management to inserting system communications line road (E1 trunk line) resource domestic and international patent.
Summary of the invention
Technical problem to be solved by this invention is: a kind of method to access system communications line road resource is carried out dynamic management is provided, solve the problem that to carry out Dynamic Programming to line resource in the prior art, overcome the shortcoming that in the prior art line resource is only had the static management function, line resource is carried out dynamic management flexibly and effectively.
A kind of transmission line resource dynamic management adaptation method comprises following operating procedure:
Step 1 is carried out static programming to line resource, and starts the resource use;
Step 2 is done Dynamic Programming to line resource;
The step 3 local network management is assigned the webmaster order;
The step 4 resource management module is analyzed the webmaster order;
Does the step 5 judgement add chain? still delete chain?
If step 6 adds chain, then add the pre-negotiation of chain, and implement to add the order of chain webmaster
If step 7 is deleted chain, then delete chain link analysis process, and implement to delete the order of chain webmaster;
Adopt the method for the invention, not only can distribute, for the user distributes maximum transfer resource in system by each data access unit being provided dynamic transmission resources; Can also when breaking down, transmission line carry out redistributing of resource, the bandwidth that the user of guarantee acceptance service is enough and required to access unit; Do not influence system's operate as normal.Compare with existing method, realizing the substance progress from static state to the dynamic management aspect the circuit resource management, reached flexible management, do not needed the effect of human intervention, improved the utilance of line resource.
Description of drawings
Fig. 1 system group network rough schematic
The method of Fig. 2 Link Resource Manager
Fig. 3 system adds the state diagram of chain operation
Fig. 4 system deletes the state diagram of chain operation
Embodiment
Be described in further detail implementing the present invention below in conjunction with accompanying drawing:
Fig. 1 is a simple system group network schematic diagram.Node A and Node B are represented two data access units respectively, and always total between the two M+N bar E1 link links to each other, and wherein the M bar is the circuit of actual use, and the N bar is an extension wire.
Fig. 2 has described the step of line resource management.
Step 1 is carried out static programming to line resource, and starts the resource use;
Main consideration is come into operation and alternative two kinds of circuit purposes.Circuit to plan is come into operation divides into groups according to the actual requirements again.Because circuit is used to carry out broadband data transmission, data mode is an ATM cell, abides by new IMA (the Inverse Multiplexing for ATM) consensus standard of releasing of atm forum, and circuit is carried out preliminary grouping.
Step 2 is done Dynamic Programming to line resource
Line resource in using is rethought distribution, and possible purpose has two kinds: a kind of is active mode, promptly does suitably on lane assignment according to the traffic requirement of business datum and adjusts; A kind of is passive mode, uses when disconnected in the line, and this is a kind of emergency measures of reducing the loss.
The step 3 local network management is assigned the webmaster order;
The webmaster personnel issue an order according to the actual requirements, require to give assigned I MA group to increase a circuit, perhaps reduce by a circuit from assigned I MA group.The reason of issuing orders may be that the bandwidth that the data traffic rising causes originally distributing to certain IMA group can not continue to satisfy the demands, or resource redundancy appears in utilized bandwidth that data traffic decline causes originally distributing to certain IMA group now.When the circuit that is coming into operation unavailable for a certain reason, when can't recover rapidly again in the short time, in order business not to be caused excessive influence, minimization of loss, the webmaster personnel also can issue an order, and reinstate alternative circuit, are increased in the IMA group of generation problem to go temporarily.After the problem for the treatment of solves, recover original use configuring condition again.All be that remote operation is carried out as this step 1.
The step 4 resource management module is analyzed the webmaster order
Resource management module is received the webmaster order, at first distinguishes command type, sends the dynamic management request to far-end then, whether supports this resource management mode to determine opposite equip..The transmission of solicited message can be by network management system, also can be other reliably communication modes rapidly.If in preset time, received the support response of remote equipment, so next further analyze order, whether need to confirm pre-negotiation.If newly-increased circuit must be consulted in advance.If reduce by a circuit, must finish link analysis earlier.
Does the step 5 judgement add chain? still delete chain?
If step 6 adds chain, then add the pre-negotiation of chain, and implement to add the order of chain webmaster
The pre-negotiations process that increases link is as follows:
The negotiations process of IMA group itself, the IMA group state machine that has comprised the circuit two ends is unavailable from using, and returns to the process of upstate then again, though the needed time of this process is very short, the influence of business is more or less all existed.The operation that increases link must cause the negotiations process of an IMA group.The purpose of consulting is to confirm the availability of extension wire not disturbing under the professional situation in advance, guarantee for the order of successful implementation webmaster provides to greatest extent, thereby it is minimum to order enforcement to drop to the harmful effect that business is brought.
The circuit coupling is initiated by near-end, carries out successively at an extension wire.If circuit can be used, write down this line number, the match is successful, finishes pre-negotiations process.If circuit is unavailable, turns to and investigate next bar circuit, until having investigated all extension wires.
Fig. 3 is the state diagram signal that system adds the chain operation, and a circuit matching process of initiating with near-end A is an example, is described in detail:
1) proximal device A sends matching request information for far-end B, for extension wire is created interim IMA group.Matching request information comprises: the group number and the IMA of circuit matching request sign, the alternative line number of near-end, interim IMA group are set up upright parameter.
2) far-end is received matching request, extracts all solicited messages of record.
3) remote equipment is selected article one from the extension wire set, creates interim IMA group.
4) IMA group in two ends begins to consult.
5) if consult successfully, to step 8).If the merit of failing to consultations, remote equipment are deleted interim IMA group, and order is selected next bar from the extension wire set, creates interim IMA group once more, gets back to step 4).If remote equipment has traveled through all extension wires, still not success, it fails to match for this secondary line, to step 6).
6) remote equipment sends to near-end that it fails to match replys.Interim IMA group is separately deleted at two ends respectively.
7) proximal device order from the extension wire set is selected next bar, gets back to step 1).If proximal device has traveled through all extension wires, still not success, then pre-negotiation failure, near-end notice local network management does not allow to increase link.
8) the match is successful for this secondary line, and remote equipment is write down the extension wire number of current use, sends to near-end that the match is successful replys.Proximal device is also write down the line number that this coupling is used.Interim IMA group is separately deleted at two ends respectively.
9) proximal device notice local network management allows to increase link, and reports this secondary line near-end that the match is successful uses, distal line number.Continue step 6.
It is as follows that enforcement adds the command operation of chain webmaster:
The A proximal device sends formal interpolation LINK request to far-end.Solicited message comprises: the group number and the IMA that formally add request flag, alternative line number, assigned I MA group are set up upright parameter.
The B proximal device adds the pre-circuit of consulting to obtain in the assigned I MA group to.
The C far-end is received request, extracts solicited message, and the selected circuit in front is added in the assigned I MA group.
D two ends IMA organizes negotiation.
E consults successfully, to local network management report command execution results, comprises the number of links of current configuration, the actual number of links that activates.
If step 7 is deleted chain, then delete chain link analysis process, and implement to delete the order of chain webmaster
The operation of deletion link can cause the negotiations process of an IMA group too.The purpose of link analysis is not disturb under the situation of regular traffic as far as possible, knows a link in the current use at the line number of two ends correspondence, thus will order implement to drop to the harmful effect that business is brought minimum.
Circuit analysis is initiated by near-end, and the current use circuit of organizing at an IMA carries out.
Fig. 4 is the state diagram signal that system deletes the chain operation, and a circuit analytic process of initiating with near-end A is an example, is described in detail:
1) proximal device is given far-end transmitting line analysis request information.Analysis request information comprises: circuit analysis request flag, current line number to be analyzed, the IMA group at this circuit place.
2) proximal device is the selected circuit confinement of analyzing.
3) far-end is received analysis request, extracts record request information.And the state of local IMA group analyzed.
4) if far-end is observed IMA group state to change (one of certain IMA group is used circuit to move to the confinement state by operating state), to step 6).If do not change, this circuit analysis failure of far-end notice near-end.Proximal device is removed the circuit confinement.
5) near-end order from the current use line set of assigned I MA group is selected next bar, gets back to step 1).If proximal device has traveled through all circuits in the set, still not success, then circuit analysis failure, near-end is removed the circuit confinement, and the notice local network management does not allow to carry out the deletion link operation.
6) far-end is noted the line number of the link that state transition takes place, and analyzes successful respond to the near-end transmitting line, reports the line number of this link at local terminal.
7) proximal device is removed the circuit confinement.Require far-end this link of being kept in detention simultaneously.
8) far-end this link of being kept in detention.
9) near-end is analyzed IMA group state, if find that this circuit is kept in detention, and then link analysis success.Near-end reports webmaster can carry out the deletion link operation.Continue step 7.
The order of chain webmaster is deleted in enforcement
The A proximal device sends formal deletion LINK request to far-end.Solicited message comprises: the IMA group at formal removal request sign, deletion line number, this circuit place.
The B proximal device is the circuit of knowing in circuit analysis deletion from assigned I MA group.
The C far-end is received request, extracts solicited message, also the deletion from the IMA group of selected circuit.
D two ends IMA organizes negotiation.
E consults successfully, to local network management report command execution results, comprises the number of links of current configuration, the actual number of links that activates.
In sum, adopt the method for the invention, obtaining breakthrough aspect the circuit resource dynamic management, compared with prior art, realizing from static state to dynamic lifting, improved the utilance of line resource, reached flexible management, do not needed the effect of human intervention, satisfied in the communication connecting system line resource managed may command, the demand that can monitor is applicable to and utilizes the E1/T1 narrowband resource to carry out the occasion of wideband transmit.

Claims (7)

1 one kinds of transmission line resource dynamic management adaptation methods is characterized in that: may further comprise the steps:
Step 1 is carried out static programming to line resource, opens moving resource use;
Step 2 is done Dynamic Programming to line resource;
The step 3 local network management is assigned the webmaster order;
The step 4 resource management module is analyzed the webmaster order;
Does the step 5 judgement add chain? still delete chain?
If step 6 adds chain, then add the pre-negotiation of chain, and implement to add the order of chain webmaster
If step 7 is deleted chain, then delete chain link analysis process, and implement to delete the order of chain webmaster.
2 transmission line resource dynamic management adaptation methods as claimed in claim 1, it is characterized in that: described static programming is to realize by the mode that the circuit that comes into operation is divided into groups.
3 transmission line resource dynamic management adaptation methods as claimed in claim 1, it is characterized in that: described Dynamic Programming is according to the business datum flow, carries out adaptive again to lane assignment; When perhaps disconnected in the line, carry out adaptive again to lane assignment.
4 as claim 1 or 2 or 3 described transmission line resource dynamic management adaptation methods, it is characterized in that, step 6 is described, and to add the pre-negotiation step of chain as follows:
1) proximal device A sends matching request information for far-end B, for extension wire is created interim IMA group;
2) far-end is received matching request, extracts all solicited messages of record;
3) remote equipment is selected article one from the extension wire set, creates interim IMA group;
4) IMA group in two ends begins to consult;
5) successfully forward step 8) to if consult; If the merit of failing to consultations, remote equipment are deleted interim IMA group, and order is selected next bar from the extension wire set, creates interim IMA group once more, gets back to step 4); If remote equipment has traveled through all extension wires, still not success, it fails to match for this secondary line, to step 6);
6) remote equipment sends to near-end that it fails to match replys; Interim IMA group is separately deleted at two ends respectively;
7) proximal device order from the extension wire set is selected next bar, gets back to step 1); If proximal device has traveled through all extension wires, still not success, then pre-negotiation failure, near-end notice local network management does not allow to increase the instruction of link;
8) the match is successful for this secondary line, and remote equipment is write down the extension wire number of current use, sends to near-end that the match is successful replys; Proximal device is also write down the line number that this coupling is used; Interim IMA group is separately deleted at two ends respectively;
Near-end is established and is respectively notified local network management allow to increase link, and reports this secondary line near-end that the match is successful uses, distal line number; Continue step 6;
The operating procedure that enforcement adds the order of chain webmaster is as follows:
The A proximal device sends formal interpolation LINK request to far-end;
The B proximal device adds the pre-circuit of consulting to obtain in the assigned I MA group to;
The C far-end is received request, extracts solicited message, and the selected circuit in front is added in the assigned I MA group;
D two ends IMA organizes negotiation;
E consults successfully, to local network management report command execution results, comprises the number of links of current configuration, the actual number of links that activates.
5 transmission line resource dynamic management adaptation methods as claimed in claim 4 is characterized in that: the described matching request information of step 1) comprises: the group number and the IMA of circuit matching request sign, the alternative line number of near-end, interim IMA group are set up upright parameter.
6 as claim 1 or 2 or 3 described transmission line resource dynamic management adaptation methods, it is characterized in that the described chain link analysis process of deleting of step 7 is as follows:
1) proximal device is given far-end transmitting line analysis request;
2) proximal device is the selected circuit confinement of analyzing;
3) far-end is received analysis request, extracts record request information; And the state of local IMA group analyzed;
4) state changes if far-end is observed the IMA group, then forwards step 6) to; If do not change, this circuit analysis failure of far-end notice near-end; Proximal device is removed the circuit confinement;
5) near-end order from the current use line set of assigned I MA group is selected next bar, gets back to step 1); If proximal device has traveled through all circuits in the set, still not success, then circuit analysis failure, near-end is removed the circuit confinement, and the notice local network management does not allow to carry out the deletion link operation;
6) far-end is noted the line number of the link that state transition takes place, and analyzes successful respond to the near-end transmitting line, reports the line number of this link at local terminal;
7) proximal device is removed the circuit confinement; Require far-end this link of being kept in detention simultaneously;
8) far-end this link of being kept in detention;
9) near-end is analyzed IMA group state, if find that this circuit is kept in detention, and then link analysis success; Near-end reports webmaster can carry out the deletion link operation; Continue step 7;
It is as follows that chain webmaster command operation step is deleted in enforcement:
The A proximal device sends formal deletion LINK request to far-end;
The B proximal device is the circuit of knowing in circuit analysis deletion from assigned I MA group;
The C far-end is received request, extracts solicited message, also the deletion from the IMA group of selected circuit;
D two ends IMA organizes negotiation;
E consults successfully, to local network management report command execution results.
7 transmission line resource dynamic management adaptation methods as claimed in claim 6 is characterized in that: the described analysis request information of step 1) comprises: circuit analysis request flag, current line number to be analyzed, the IMA group at this circuit place.
CNB021511845A 2002-12-03 2002-12-03 Transmission line resource dynamic management adapting process Expired - Fee Related CN100433628C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNB021511845A CN100433628C (en) 2002-12-03 2002-12-03 Transmission line resource dynamic management adapting process

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNB021511845A CN100433628C (en) 2002-12-03 2002-12-03 Transmission line resource dynamic management adapting process

Publications (2)

Publication Number Publication Date
CN1505324A true CN1505324A (en) 2004-06-16
CN100433628C CN100433628C (en) 2008-11-12

Family

ID=34234315

Family Applications (1)

Application Number Title Priority Date Filing Date
CNB021511845A Expired - Fee Related CN100433628C (en) 2002-12-03 2002-12-03 Transmission line resource dynamic management adapting process

Country Status (1)

Country Link
CN (1) CN100433628C (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100361469C (en) * 2004-08-30 2008-01-09 华为技术有限公司 Circuit distributing method in transmission net resource management system
CN102833166B (en) * 2012-08-28 2017-02-08 广东欧珀移动通信有限公司 Method and device for data flow distribution and mobile communication terminal
CN109255450A (en) * 2018-10-12 2019-01-22 深圳市双合电气股份有限公司 Power Fault Recorder definite value on-line intelligence management method, system and computer readable storage medium

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE19948414C2 (en) * 1999-10-07 2002-04-18 Nortel Dasa Network Systems Gm Method of establishing a communication network
JP2002271416A (en) * 2001-03-13 2002-09-20 Nippon Telegr & Teleph Corp <Ntt> Integrated access service system

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100361469C (en) * 2004-08-30 2008-01-09 华为技术有限公司 Circuit distributing method in transmission net resource management system
CN102833166B (en) * 2012-08-28 2017-02-08 广东欧珀移动通信有限公司 Method and device for data flow distribution and mobile communication terminal
CN109255450A (en) * 2018-10-12 2019-01-22 深圳市双合电气股份有限公司 Power Fault Recorder definite value on-line intelligence management method, system and computer readable storage medium
CN109255450B (en) * 2018-10-12 2022-03-18 深圳市双合电气股份有限公司 Method and system for online intelligent fixed value management of power fault recorder and computer readable storage medium

Also Published As

Publication number Publication date
CN100433628C (en) 2008-11-12

Similar Documents

Publication Publication Date Title
CN1735043A (en) Method, system, and cluster for the update of management objects
CN1582551A (en) Technique of determining connectivity solutions for network elements
DE20023887U1 (en) Architecture for a USB based PC flash memory device
RU96116124A (en) DEVICE FOR MANAGING NETWORKED COMPUTER SYSTEMS AND METHOD FOR ITS IMPLEMENTATION
JPH03220837A (en) Resource allocation method for transmitting data in data communication network and wide-band isdn communication network and terminal adapter for connecting to data communication network
CN109639388A (en) A kind of teleservice management method based on OTN/SDH fusion device
CN1379967A (en) Channel set-up in wideband, code division multiple access systems
CN1158812C (en) Method and system for management of network domains
US8311056B2 (en) Device and method for selecting time slots based on resource use state
CN101043373A (en) Apparatus and method for improving reliability of communication system and communication system thereof
CN102970621B (en) Transmission resource management device and method in a kind of network element
CN1384618A (en) Optical path establishing method for automatically exchanging optical network
US20020174136A1 (en) Method and system for high performance transaction processing using a relational database management system
CN1505324A (en) Transmission line resource dynamic management adapting process
CN1933451A (en) Interplate communicating method and interface plate
CN102857836B (en) The method and apparatus of batch service treatment
CN1145317C (en) Method for realizing business phonetic dynamic loading in intelligent network and system network establishment
CN1227916C (en) Device and method for improving load distribution in signaling network
CN1777117A (en) Apparatus and method to set the signaling rate of a network
CN1921412A (en) System and method of circuit shearing and connecting
CN113419745A (en) Application instance number management method and device, electronic equipment and computer readable medium
CN1863108A (en) Method for controlling SC/SPC connection in automatic exchange optical network
CN107330064A (en) A kind of method and system that small documents are created based on CIFS agreements
JPH09261232A (en) Method for controlling plural response communication in atm exchange
CN100337440C (en) Method and system for testing intercommunity between equipments

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20081112

Termination date: 20171203

CF01 Termination of patent right due to non-payment of annual fee