CN1472400A - Method for positioning whole floatation transported steel caisson by pre-exerting tension at anchor pier and being drilling platform - Google Patents
Method for positioning whole floatation transported steel caisson by pre-exerting tension at anchor pier and being drilling platform Download PDFInfo
- Publication number
- CN1472400A CN1472400A CNA031282199A CN03128219A CN1472400A CN 1472400 A CN1472400 A CN 1472400A CN A031282199 A CNA031282199 A CN A031282199A CN 03128219 A CN03128219 A CN 03128219A CN 1472400 A CN1472400 A CN 1472400A
- Authority
- CN
- China
- Prior art keywords
- steel
- steel box
- pier
- construction
- anchor
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 136
- 239000010959 steel Substances 0.000 title claims abstract description 136
- 238000005553 drilling Methods 0.000 title claims abstract description 10
- 238000000034 method Methods 0.000 title claims description 8
- 238000010276 construction Methods 0.000 claims description 60
- 238000013461 design Methods 0.000 claims description 19
- 230000008569 process Effects 0.000 claims description 7
- 238000004519 manufacturing process Methods 0.000 claims description 6
- 238000003466 welding Methods 0.000 claims description 6
- 230000008878 coupling Effects 0.000 claims description 3
- 238000010168 coupling process Methods 0.000 claims description 3
- 238000005859 coupling reaction Methods 0.000 claims description 3
- 230000011218 segmentation Effects 0.000 claims description 2
- 238000004260 weight control Methods 0.000 claims description 2
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 abstract description 19
- 238000007667 floating Methods 0.000 abstract description 4
- 230000008901 benefit Effects 0.000 abstract description 2
- 238000010586 diagram Methods 0.000 description 5
- 230000008859 change Effects 0.000 description 3
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 238000012544 monitoring process Methods 0.000 description 2
- 238000012360 testing method Methods 0.000 description 2
- 238000010009 beating Methods 0.000 description 1
- 230000015572 biosynthetic process Effects 0.000 description 1
- POIUWJQBRNEFGX-XAMSXPGMSA-N cathelicidin Chemical compound C([C@@H](C(=O)N[C@@H](CCCNC(N)=N)C(=O)N[C@@H](CCCCN)C(=O)N[C@@H](CO)C(=O)N[C@@H](CCCCN)C(=O)N[C@@H](CCC(O)=O)C(=O)N[C@@H](CCCCN)C(=O)N[C@@H]([C@@H](C)CC)C(=O)NCC(=O)N[C@@H](CCCCN)C(=O)N[C@@H](CCC(O)=O)C(=O)N[C@@H](CC=1C=CC=CC=1)C(=O)N[C@@H](CCCCN)C(=O)N[C@@H](CCCNC(N)=N)C(=O)N[C@@H]([C@@H](C)CC)C(=O)N[C@@H](C(C)C)C(=O)N[C@@H](CCC(N)=O)C(=O)N[C@@H](CCCNC(N)=N)C(=O)N[C@@H]([C@@H](C)CC)C(=O)N[C@@H](CCCCN)C(=O)N[C@@H](CC(O)=O)C(=O)N[C@@H](CC=1C=CC=CC=1)C(=O)N[C@@H](CC(C)C)C(=O)N[C@@H](CCCNC(N)=N)C(=O)N[C@@H](CC(N)=O)C(=O)N[C@@H](CC(C)C)C(=O)N[C@@H](C(C)C)C(=O)N1[C@@H](CCC1)C(=O)N[C@@H](CCCNC(N)=N)C(=O)N[C@@H]([C@@H](C)O)C(=O)N[C@@H](CCC(O)=O)C(=O)N[C@@H](CO)C(O)=O)NC(=O)[C@H](CC=1C=CC=CC=1)NC(=O)[C@H](CC(O)=O)NC(=O)CNC(=O)[C@H](CC(C)C)NC(=O)[C@@H](N)CC(C)C)C1=CC=CC=C1 POIUWJQBRNEFGX-XAMSXPGMSA-N 0.000 description 1
- 238000007796 conventional method Methods 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 238000001514 detection method Methods 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 230000018109 developmental process Effects 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 230000003628 erosive effect Effects 0.000 description 1
- 230000002349 favourable effect Effects 0.000 description 1
- 230000004907 flux Effects 0.000 description 1
- 229910052742 iron Inorganic materials 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 238000000465 moulding Methods 0.000 description 1
- 238000012545 processing Methods 0.000 description 1
- 238000000275 quality assurance Methods 0.000 description 1
Images
Landscapes
- Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
Abstract
Description
Claims (3)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 03128219 CN1186503C (en) | 2003-06-26 | 2003-06-26 | Method for positioning whole floatation transported steel caisson by pre-exerting tension at anchor pier and being drilling platform |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 03128219 CN1186503C (en) | 2003-06-26 | 2003-06-26 | Method for positioning whole floatation transported steel caisson by pre-exerting tension at anchor pier and being drilling platform |
Publications (2)
Publication Number | Publication Date |
---|---|
CN1472400A true CN1472400A (en) | 2004-02-04 |
CN1186503C CN1186503C (en) | 2005-01-26 |
Family
ID=34153277
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 03128219 Expired - Lifetime CN1186503C (en) | 2003-06-26 | 2003-06-26 | Method for positioning whole floatation transported steel caisson by pre-exerting tension at anchor pier and being drilling platform |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN1186503C (en) |
Cited By (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN100402755C (en) * | 2005-06-16 | 2008-07-16 | 上海市第二市政工程有限公司 | Large scale prefabricated box girder mounting and positioning method |
CN101148890B (en) * | 2007-11-08 | 2010-05-19 | 中交公路规划设计院有限公司 | Bridge caisson composite pile foundation and reverse construction method thereof |
CN101469543B (en) * | 2007-12-28 | 2010-09-29 | 上海市基础工程有限公司 | Steel boxed cofferdam construction technique for steel-concrete combined bottom board |
CN101967827A (en) * | 2010-02-26 | 2011-02-09 | 中交一公局厦门工程有限公司 | Method for constructing bridge deepwater foundation steel pile casing |
CN101434344B (en) * | 2008-12-30 | 2011-07-20 | 天津第三市政公路工程有限公司 | Self-floating transportation method of bridge box girder |
CN101666097B (en) * | 2009-08-04 | 2011-10-26 | 中交第二航务工程局有限公司 | Positioning settlement method of large steel suspension box or sinking well |
CN102828496A (en) * | 2012-08-23 | 2012-12-19 | 中交第二航务工程局有限公司 | Tool type pile foundation drilling platform based on HSE (Health, Safety and Environmental) management system |
CN103362113A (en) * | 2012-04-11 | 2013-10-23 | 黄灿光 | Local buoyancy ocean platform of offshore wind power, bridge and ocean structure, and construction method |
CN103572770A (en) * | 2013-11-15 | 2014-02-12 | 中交第二航务工程局有限公司 | Pile box hydraulic structure object and building method thereof |
WO2015135471A1 (en) * | 2014-03-14 | 2015-09-17 | 香港强光海洋工程有限公司 | Hollow cylindrical pier for fixing offshore platform structure to bed and method of installing and constructing same |
CN107489106A (en) * | 2017-09-27 | 2017-12-19 | 中铁二十局集团有限公司 | A kind of rocky bed subaqueous bearing platform construction method |
CN108035372A (en) * | 2017-11-14 | 2018-05-15 | 中铁二十二局哈尔滨铁路建设集团有限责任公司 | A kind of method using drilling platform gooseneck suspension steel lifted trunk |
CN110939144A (en) * | 2019-11-12 | 2020-03-31 | 中国铁建大桥工程局集团有限公司 | Double-wall steel suspension box cofferdam system under tidal alternating current condition in typhoon area and positioning method |
-
2003
- 2003-06-26 CN CN 03128219 patent/CN1186503C/en not_active Expired - Lifetime
Cited By (17)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN100402755C (en) * | 2005-06-16 | 2008-07-16 | 上海市第二市政工程有限公司 | Large scale prefabricated box girder mounting and positioning method |
CN101148890B (en) * | 2007-11-08 | 2010-05-19 | 中交公路规划设计院有限公司 | Bridge caisson composite pile foundation and reverse construction method thereof |
CN101469543B (en) * | 2007-12-28 | 2010-09-29 | 上海市基础工程有限公司 | Steel boxed cofferdam construction technique for steel-concrete combined bottom board |
CN101434344B (en) * | 2008-12-30 | 2011-07-20 | 天津第三市政公路工程有限公司 | Self-floating transportation method of bridge box girder |
CN101666097B (en) * | 2009-08-04 | 2011-10-26 | 中交第二航务工程局有限公司 | Positioning settlement method of large steel suspension box or sinking well |
CN101967827A (en) * | 2010-02-26 | 2011-02-09 | 中交一公局厦门工程有限公司 | Method for constructing bridge deepwater foundation steel pile casing |
CN101967827B (en) * | 2010-02-26 | 2011-09-14 | 中交一公局厦门工程有限公司 | Method for constructing bridge deepwater foundation steel pile casing |
CN103362113A (en) * | 2012-04-11 | 2013-10-23 | 黄灿光 | Local buoyancy ocean platform of offshore wind power, bridge and ocean structure, and construction method |
CN103362113B (en) * | 2012-04-11 | 2016-03-30 | 黄灿光 | Offshore wind farm, bridge and marine works local buoyancy ocean platform and construction method |
CN102828496A (en) * | 2012-08-23 | 2012-12-19 | 中交第二航务工程局有限公司 | Tool type pile foundation drilling platform based on HSE (Health, Safety and Environmental) management system |
CN103572770A (en) * | 2013-11-15 | 2014-02-12 | 中交第二航务工程局有限公司 | Pile box hydraulic structure object and building method thereof |
CN103572770B (en) * | 2013-11-15 | 2016-04-20 | 中交第二航务工程局有限公司 | A kind of stake case hydraulic structures and construction method thereof |
WO2015135471A1 (en) * | 2014-03-14 | 2015-09-17 | 香港强光海洋工程有限公司 | Hollow cylindrical pier for fixing offshore platform structure to bed and method of installing and constructing same |
CN107489106A (en) * | 2017-09-27 | 2017-12-19 | 中铁二十局集团有限公司 | A kind of rocky bed subaqueous bearing platform construction method |
CN108035372A (en) * | 2017-11-14 | 2018-05-15 | 中铁二十二局哈尔滨铁路建设集团有限责任公司 | A kind of method using drilling platform gooseneck suspension steel lifted trunk |
CN108035372B (en) * | 2017-11-14 | 2019-09-24 | 中铁二十二局哈尔滨铁路建设集团有限责任公司 | A method of steel lifted trunk is hung using drilling platform gooseneck |
CN110939144A (en) * | 2019-11-12 | 2020-03-31 | 中国铁建大桥工程局集团有限公司 | Double-wall steel suspension box cofferdam system under tidal alternating current condition in typhoon area and positioning method |
Also Published As
Publication number | Publication date |
---|---|
CN1186503C (en) | 2005-01-26 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN1186503C (en) | Method for positioning whole floatation transported steel caisson by pre-exerting tension at anchor pier and being drilling platform | |
CN101476326B (en) | Bearing platform prefabrication and construction method | |
CN107130600B (en) | A kind of construction method for migrating formula automatic deviation correction single pile pile gripper construction mechanism | |
CN102490003B (en) | Method for installing telescopic full-rotating rudder propeller device | |
CN102535529A (en) | Construction method of self-balancing method pile foundation bearing capacity test device | |
CN102134854B (en) | Slipway underwater pile foundation and construction method thereof | |
CN1884719A (en) | High opening, low edge-foot double-wall steel-cofferdams construction process for coffer without back cover concrete | |
CN105987850A (en) | Water area vane shear test platform with bucket truss and installation method | |
CN110453709A (en) | A kind of offshore wind farm large-diameter pile process for sinking | |
CN102328732A (en) | Offshore pile driving, pile pressing and installing united engineering ship | |
CN1242128C (en) | Tunnel pipe section floating conveying, sinking and joining construction process | |
CN104480865A (en) | Precise positioning method for large-scale steel open caisson | |
CN114197439B (en) | Construction method and construction equipment for high-current deepwater underwater gravel pile | |
CN103938638A (en) | Buoy type deepwater single-wall steel cofferdam construction method | |
CN110185057B (en) | Tool and construction method for lifting and erecting steel pipe piles of offshore wind power single pile foundation | |
CN1186502C (en) | Method for positioning floatation transported heavy anchor of steel caisson of deep underwater foundation of bridge | |
CN110939148A (en) | Construction method of double-wall steel suspension box cofferdam serving as drilling platform | |
CN113981961A (en) | Barge type pile planting method for deep water bare rock | |
CN109552563A (en) | A kind of accurate positioning method of barge | |
CN1676758A (en) | Tremie frame for marine bridge construction and platform construction process of tremie frame method | |
CN204510221U (en) | Rotary marine piling saddle | |
CN107447771A (en) | A kind of land bearing platform construction system and construction method | |
CN115897575B (en) | Underwater pile sinking process based on suction barrel type pile stabilizing platform | |
CN204643604U (en) | Door-shaped hanging bracket waterborne | |
CN205954616U (en) | Deep water steel protects a section of thick bamboo and joins in marriage and connect device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
ASS | Succession or assignment of patent right |
Owner name: CHINA RAILWAY BRIDGE BUREAU GROUP CO., LTD.; CHIN Free format text: FORMER OWNER: CHINA RAILWAY BRIDGE BUREAU GROUP CO., LTD. Effective date: 20081017 |
|
C41 | Transfer of patent application or patent right or utility model | ||
TR01 | Transfer of patent right |
Effective date of registration: 20081017 Address after: No. 38, Hanyang Avenue, Hubei, Wuhan Province, China: 430050 Co-patentee after: CHINA RAILWAY MAJOR BRIDGE ENGINEERING Co.,Ltd. Patentee after: CHINA RAILWAY MAJOR BRIDGE ENGINEERING GROUP Co.,Ltd. Address before: No. 38, Hanyang Avenue, Hubei, Wuhan Province, China: 430050 Patentee before: CHINA RAILWAY MAJOR BRIDGE ENGINEERING GROUP Co.,Ltd. |
|
ASS | Succession or assignment of patent right |
Free format text: FORMER OWNER: CHINA ZHONGTIE MAJOR BRIDGE ENGINEERING CO., LTD. Effective date: 20150205 |
|
C41 | Transfer of patent application or patent right or utility model | ||
TR01 | Transfer of patent right |
Effective date of registration: 20150205 Address after: 430050 No. 38, Hanyang Avenue, Wuhan, Hubei Patentee after: CHINA RAILWAY MAJOR BRIDGE ENGINEERING GROUP Co.,Ltd. Address before: 430050 No. 38, Hanyang Avenue, Wuhan, Hubei Patentee before: CHINA RAILWAY MAJOR BRIDGE ENGINEERING GROUP Co.,Ltd. Patentee before: CHINA RAILWAY MAJOR BRIDGE ENGINEERING Co.,Ltd. |
|
CX01 | Expiry of patent term |
Granted publication date: 20050126 |
|
CX01 | Expiry of patent term |