CN1465743A - Protective treatment method for oil sucking rod, oil pipe and sleeve used specially for oil field - Google Patents

Protective treatment method for oil sucking rod, oil pipe and sleeve used specially for oil field Download PDF

Info

Publication number
CN1465743A
CN1465743A CNA021212627A CN02121262A CN1465743A CN 1465743 A CN1465743 A CN 1465743A CN A021212627 A CNA021212627 A CN A021212627A CN 02121262 A CN02121262 A CN 02121262A CN 1465743 A CN1465743 A CN 1465743A
Authority
CN
China
Prior art keywords
oil
pipe
plating
bar
coating
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CNA021212627A
Other languages
Chinese (zh)
Other versions
CN1212424C (en
Inventor
付建影
马长虹
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Family has litigation
First worldwide family litigation filed litigation Critical https://patents.darts-ip.com/?family=34142153&utm_source=google_patent&utm_medium=platform_link&utm_campaign=public_patent_search&patent=CN1465743(A) "Global patent litigation dataset” by Darts-ip is licensed under a Creative Commons Attribution 4.0 International License.
Application filed by Individual filed Critical Individual
Priority to CN 02121262 priority Critical patent/CN1212424C/en
Publication of CN1465743A publication Critical patent/CN1465743A/en
Application granted granted Critical
Publication of CN1212424C publication Critical patent/CN1212424C/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Application Of Or Painting With Fluid Materials (AREA)
  • Electroplating Methods And Accessories (AREA)

Abstract

The present invention adopts the technological steps of degreasing, removing rust, surface activating, cathode plating and multifunctional plating or degreasing, removing rust, spray-coating inner wall, spray-coating outer wall, drying and solidifying paint film so as to obtain the invented pumping rod, oil pipe and sleeve with several protective layers. Besides, said invention also adopts the processes of plating inner layer and painting outer layer or plating inner layer and outer layer or coating inner layer and outer layer, also can add anti-scaling layer, paraffin-inhibiting layer, corrosion-inhibiting layer or other functional layer.

Description

The special-purpose sucker rod in oil field, oil pipe and telescopic protection processing method
Technical field
The present invention relates to the protective treatment technology of metal tube bar, more particularly, is sucker rod, oil pipe, telescopic protection and the restorative procedure that oil production is used.
Background technology
At present, the sucker rod of petroleum industry, oil pipe protection have nickel plating and coating, repair to be car button, alignment etc.; method is simple; cure the symptoms, not the disease, and nickel plating price height, of poor quality; pin hole is arranged; go out rust staining, the life-span is short, coated pipe in oil well because the friction of motion of sucker rod; easily the decortication holddown blocks up the stratum after the decortication in well.
Summary of the invention
The objective of the invention is to overcome the shortcoming of prior art, propose the protection processing method of a kind of sucker rod, oil pipe and sleeve pipe (hereinafter to be referred as bar, pipe).
Main technical schemes of the present invention: at first protect body from protective mechanism, the method that adopts the spraying of duplex plating and/or inside and outside wall is to reach anticorrosion, antiscale, lubricious, attrition resistant purpose simultaneously.
The concrete treatment process of the present invention may further comprise the steps:
1. oil removing: pending rod tube is put into the degreasing tank with degreasing fluid,, heat dope or the sump oil promptly removed after 2 hours on pipe, the bar, the composition of described degreasing fluid and weight percentage with 60-90 ℃ of groove internal heater heating:
Clear clear agent 30%, concentration is the sodium hydroxide 15% of 20-30%, all the other are tap water, the amount of degreasing fluid with expired bar, tube-surface exceeds;
2. rust cleaning: bar, pipe after step (1) oil removing are put into the rust cleaning groove that fills rust remover, soak grease, rust staining and the oxide film that to remove bar, tube-surface in 2-8 minute down at 10-35 ℃, the hydrochloric acid 50% of the composition of described rust remover and percentage composition: concentration 31-38%, inhibiter hexamethylenetetramine 3-5%, all the other are water, its add-on for expired bar, tube-surface exceeds;
3. surface active: step (2) rust cleaning back bar, pipe are put into the activated bath that fills activation solution, soak 40-60 second down at 5-30 ℃, the composition of described activation solution and weight percentage are: concentration is that the sulfuric acid 40% of 94-96% is blended into 60% clear water, its add-on with expired bar, tube-surface exceeds;
4. Ni-Zn-P is promptly plated in the anode plating: bar, pipe after step (3) is handled are put into the coating bath with chemical plating fluid, controlling pH value down at 98 ℃ is 8.8-9.2, handled the Ni-Zn-P coating of the Zn promptly obtain containing 12-15% through 4 hours, described Ni-Zn-P chemical liquids prescription is by g/L: NiSO 47H 2O27-35, NaH 2PO 2H 2O 10, Trisodium Citrate 85, NH 4Cl 50,25% NH 4OH 0-60, ZnSO 47H 2O 7.5-15, the add-on of chemical plating fluid expired bar, pipe 10cm;
5. Ni-P/PTFE (tetrafluoroethylene) is promptly plated in multi-functional plating, step (4) anode plating back sucker rod or oil pipe are placed the coating bath of the Ni-P/PTFE composite plating bath behind the mixing, the control pH value is 4.5-5.0, handles 4 hours down at 80-90 ℃, described Ni-P/PTFE composite plating bath prescription: NiSO 47H 2O29g/L, NaH 2PO 2H 2O 35g/L, propionic acid 2mg/L, thiocarbamide 1mg/L, PTFE dispersion liquid 36g/L, complex acid 24mg/L, the amount of described composite plating bath expired bar, pipe 10cm.
The present invention can also adopt inside and outside wall spraying, stoving process, detailed process in above-mentioned processing step (2) rust cleaning back:
1. inner-wall spraying: with the atomizing of spraying paint of interior varnish spray gun, the pressure that sprays paint is 4-6kg/cm 2, interior varnish spray gun is in the oil pipe endoporus, and the speed of travel is 20-30m/min, to-and-fro movement, with 500 commentaries on classics/min rotation, spray 2-3 each coat-thickness is the 15-20 micron to body in situ, every spray once all needs the baking and curing paint film;
2. outer wall spraying: with spray gun is 150g/min spray 2-3 time with the flow, and each thickness is the 20-25 trace, and every spray once all needs the baking and curing paint film;
3. baking and curing is sprayed paint: oil pipe and the every spray of sleeve pipe inside and outside wall are intact once promptly imports in the stoving oven continuously, 180-200 ℃ of oven dry, oil pipe is from advancing stove to the 60 minutes time of coming out of the stove, the paint film of each spraying back oven dry is brown, as bright as a sixpence, adopt the oil-pipe external wall spraying method for sucker rod, same each spraying back baking and curing is sprayed paint.
The present invention can also adopt wall anode plating, the multi-functional plating of inwall, outer wall spraying, baking and curing paint film technology for oil pipe or sleeve pipe behind surface active, obtain interior wall coating, outer wall is coated with structural sheet or the plating of inside and outside wall anode, inner-wall spraying, outer wall spraying, baking and curing paint film technology obtain mixolimnion again.
When the present invention repairs for the sucker rod, oil pipe or the telescopic that use the day after for some time, after its oil removing, rust cleaning, adopt method scale removal, alignment, reparation screw thread commonly used, finish thermal treatment on, the overclocking heat-treating machine middle and high, carry out coating and/or coating by above-mentioned technological process then at sucker rod, oil pipe and sleeve pipe that the anticorrosion new technology development in Beijing group produces.
The described clean-out system of step of the present invention (1) is that the trade mark that Harbin promotes the chemical plant to produce is the HB-9801 clean-out system;
The described PTFE dispersion liquid of step of the present invention (5) is to provide its technical indicator by the anticorrosion new technology development in Beijing group: PTFE solids content (heavy %): 60; Surfactant content (heavy %): 6 ± 1; PH value 9-10; Proportion (20 ℃) is 1.5-1.530.
The spraying paint of the present invention spraying comprises any in epoxy phenolics, petroleum resin, vibrin, powder coating, the bituminous composition, 30-40 second when the viscosity of lacquer is 25 °.
Described other industrial chemicals of the present invention is commercially available product.
The structure of degreasing tank, rust cleaning groove, activated bath, coating bath and heating system thereof that step of the present invention (1)-(5) are used all is identical.
Described trough is made of R a T mast-up, well heater control valve, groove internal heating comb (being well heater), trough is of a size of long 11 meters, the wide and high 0.8-1.4 of being rice, wall thickness with No. 20 steel plate welderings is 5-10mm, pending R a T can place in the groove, be provided with the well heater with heat-conducting oil heating in the groove, the liquid in the groove is by heater heats.
The heating system of described trough is by 0.3m 3Heat conducting oil boiler, oil return control valve, go out oil control valve, thermometer, oil-gas separator, expansion and add oil sump, transporting hot oil pump, delivery valve, fuel charging valve, heating calancria (well heater) and constitute, wherein said heating calancria is No. 20 steel pipes of Φ 76 * 3, spacing 100mm, long 10.5 meters, at the sidewall and the bottom uniform distribution of groove.
Described heat conducting oil boiler and thermal oil are produced by Heilongjiang Province's Anda City boiler factory.
Described valve, thermometer, Heat-transfer Oil Pump are produced by the water pump works, Changchun.
Described oil-gas separator, expansion add oil sump, well heater and groove and are produced by the anticorrosion new technology development in Beijing group.
The stoving oven that baking and curing paint film of the present invention is used is by upper furnace, upper furnace body heating calancria scatterer and thermal oil delivery valve thereof, upper furnace, upper furnace body well heater pylon, upper furnace body asbestos lagging material, enters upper furnace body heating tube scatterer thermal oil valve, the stokehold chain that transmits pipe to be dried, bar, lower hearth heating calancria scatterer, control lower hearth heating calancria scatterer turnover heat conduction fuel tap, speed reduction unit and driving chain thereof and driving chain wheel and forms.Described body of heater is long * and wide * high=6 * 12 * 2 meters, the burner hearth inside dimension is 11 * 6 * 0.6 meter, and Control for Kiln Temperature is by the control of heat transfer oil heater output temperature by-pass cock, and the stove internal heater is the calandria structure, and heating carrier is 320 ℃ of thermal oils, with 18m per hour 3Discharge capacity in well heater, flow, heating heat-conducting oil boiler export temperature is 290 ± 10 ℃, temperature is controlled at 190 ± 10 ℃ of 220 ± 10 ℃, oil pipe, sleeve pipe oven dry in the burner hearth, oil pipe, sleeve pipe are 5.8 meters two heat conduction supportings by spacing in stove, on guide rail, have 2 cun chains to creep with 6 meters speed per hour, guarantee oil pipe, sleeve pipe from advance stove to the used time of coming out of the stove be 60 minutes.
The present invention is that Beijing anticorrosion new technology development group produces repairing sucker rod, oil pipe and the effective heat-treating machine of cover, and the trade mark is the GR-1 type.
Advantage of the present invention and effect:
Method of the present invention realizes galvanic protection because bar, pipe are carried out anodic coating; Because bar, pipe are carried out multi-functional coating, particularly coating embeds tetrafluoroethylene, bar, anticorrosion, the antiscale of pipe, performance such as lubricated, wear-resisting are increased substantially, so after treatment bar, pipe are particularly suitable for rod-pumped well, polymer injection and carbonic acid gas well; Method of the present invention can also be that the endoporus anode plates multi-functional plating, outer wall spraying then, it can also be the internal and external anode plating, inside and outside wall spraying again obtains mixolimnion, can be according to customer requirements, select arbitrary processes to become antiscale layer, wax control layer, preservative coat or other multi-functional layer, with strong points like this, can reduce cost, and particularly suitable; Method of the present invention can be repaired used old bar, pipe equally; in reparation, add the surface heat treating processes; can recover the performance of old bar, pipe; and make old bar, pipe increase multiple means of defence and protective layer; make old bar, manage the use of going into the well again, can obtain considerable economic benefit.
Brief Description Of Drawings
Fig. 1 is the structural representation of groove.
Fig. 2 is Figure 1A-A sectional view.
Fig. 3 is the heating system synoptic diagram of groove.
Fig. 4 is the dried furnace structure synoptic diagram of stove.
Fig. 5 is the oil pipe synoptic diagram with coating structure.
Fig. 6 is the oil pipe synoptic diagram with coating structure.
Fig. 7 is coated with the oil pipe synoptic diagram of protective layer structure for inwall plating, outer wall.
By illustrated in figures 1 and 2, the both sides of groove 4 are provided with vertical loading board, pipe holder 1, and processed bar, pipe 3 place in the groove 4, be provided with in the both sides of groove 4 and bottom heating carrier take conduction oil as heating calancria heater 6, the both sides of groove 4 are heater control valve 5.
By shown in Figure 3, the heating system of groove 4 has heat-conducting oil heating boiler 1, hot oil pump 7, with heat-conducting oil heating boiler 1 be arranged on the pipeline that the heating calancria heater 6 of groove 4 is communicated with and be provided with oil return control valve 2 and oil return valve 8, be connected with gs-oil separator 9 with pipeline with heat-conducting oil heating boiler 1 top, be provided with out oil control valve 3 at its pipeline, the other end of gs-oil separator 5 links to each other with heating calancria 6 by pipeline, its pipeline is provided with inlet valve 5, the pipeline that is connected with transporting hot oil pump 7 at oil return valve 8 is provided with that receivable expansion added oil sump 10 when conduction oil is overheated to be overflowed, and at the pipeline of gs-oil separator 9 and inlet valve 5 thermometer 11 is housed.
By shown in Figure 4, drying oven has upper furnace 2, upper furnace body heating calancria (heater) 3 and pylon 4 thereof, upper furnace body has asbestos heat-insulation layer 5, lower furnace body heating calancria 11, transmit oil pipe to be dried, the chain 10 of sleeve pipe 7 (arrow is the chain drive direction), the speed of service of control chain 10 and the decelerator 15 that links to each other with motor 13 and the drive sprocket 17 that is connected by driving chain 16 thereof, in addition, also have the upper furnace body heating calancria to advance stokehold supporting leg 9 and the fire door 18 of conduction oil inlet valve 6, delivery valve 1, lower furnace body heating calancria inlet valve 12 (right side is delivery valve), stokehold chain 8, a fixed support.
By shown in Figure 5, the oil pipe behind the coating is made of body 3, anode coating 2 and functional coating.
By shown in Figure 6, the oil pipe after the coating is made of body 3 and coating 4-1 and coating 4-2.
By shown in Figure 7, the oil pipe after inwall plating, outer wall are coated with is made of coating 4, body 3, anode coating 2, functional coating 1.
Embodiment
Example 1
This example adopts oil removing → rust cleaning → surface active → anode plating → multi-functional depositing process to oil pipe, obtain compound bed thickness as Fig. 1 coating structure and be 10 microns oil pipe, its performance coating is non-crystalline state, frictional coefficient 0.1-0.2, configuration of surface is shiny black look, transformation temperature is 342.4 ℃, unit elongation 3-6%, free of pinholes, acid-and base-resisting, salt soak, and other performance sees Table 1-table 4.
Example 2
This example adopts the spraying of oil removing → rust cleaning → inner-wall spraying → outer wall to oil pipe, and inside and outside wall all sprays 2 times, and every spray once all needs baking and curing to spray paint, and obtains the oil pipe with coating structure as shown in Figure 2, used spraying paint is petroleum resin.
The performance of oil pipe is: film thickness 65 μ m, hardness (HV) 300, flexible 1mm, shock-resistant 50kg/cm 3, acidproof: in concentration is to soak 100 hours no changes in 80% the sulfuric acid, alkaline-resisting: as to soak 106 hours no changes in the sodium hydroxide of concentration 10%, salt tolerant: in concentration is to soak 100 hours no changes in 30% salt solution.
Example 3
This example adopts the multi-functional plating of oil removing → rust cleaning → surface active → wall anode plating → inwall → outer wall spraying → baking and curing spraying coating process to oil pipe, obtains the interior wall coating as Fig. 3, the oil pipe of outer wall sprayed coating structure.Outer wall spraying 2 times, used spraying paint is vibrin, its performance: the outer wall performance is example 2 performances, inwall is example 1 performance.
The nickel content in table 1 anodic coating and the relation of hardness and steady potential
Alloy composition Hardness (kg/mm 2) Steady potential (V SCE)/N
?Zn ????60 ????-1.01
?15%Ni ????330 ????-0.80
?16%Ni ????370 ????-0.78
?20%Ni ????400 ????-0.74
?50%Ni ????550 ????-0.71
Carbon steel ????550 ????-0.55
Table 2 hardness
PTFE content (%) 13.4 ?18.0 ?20.8 ?24.0
Hardness (HV) 380 ?300 ?250 ?230
Table 3 solidity to corrosion *
PTFE content (%) 10.0 ??15.0 ??18.6 ??23.2 ??25.4 ??30.0
Corrosion class 7 ??6 ??6 ??5 ??5 ??5
*Solidity to corrosion ISO1462 standard detection
Table 4 thermal treatment is to the anti-corrosion influence of composite bed *
PTFE content (%) 10.0 ??15.0 ??18.6 ??23.2 ??25.4 ??30.0
Corrosion class 6 ??5 ??5 ??4 ??4 ??3
*300 ℃ of thermal treatment temps, 1 hour, 10 microns of bed thickness.

Claims (8)

1. the special-purpose sucker rod in an oil field, oil pipe, casing pipe protection method is characterized in that may further comprise the steps:
(1). oil removing: pending rod tube is put into the degreasing tank with degreasing fluid,, heat dope or the sump oil promptly removed after 2 hours on pipe, the bar, the composition of described degreasing fluid and weight percentage with 60-90 ℃ of groove internal heater heating:
Clear clear agent 30%, concentration is the sodium hydroxide 15% of 20-30%, all the other are tap water, the amount of degreasing fluid with expired bar, tube-surface exceeds;
(2). rust cleaning: bar, pipe after step (1) oil removing are put into the rust cleaning groove that fills rust remover, soak grease, rust staining and the oxide film that to remove bar, tube-surface in 2-8 minute down at 10-35 ℃, the composition of described rust remover and percentage composition: concentration is hydrochloric acid 50%, the inhibiter hexamethylenetetramine 3-5% of 31-38%, all the other are water, its add-on for expired bar, tube-surface exceeds;
(3). surface active: step (2) rust cleaning back bar, pipe are put into the activated bath that fills activation solution, soak 40-60 second down at 5-30 ℃, the composition of described activation solution and weight percentage are: concentration is that the sulfuric acid 40% of 94-96% is blended into 60% clear water, its add-on with expired bar, tube-surface exceeds;
(4). Ni-Zn-P is promptly plated in the anode plating: bar, pipe after step (3) is handled are put into the coating bath with chemical plating fluid, controlling pH value down at 98 ℃ is 8.8-9.2, handled the Ni-Zn-P coating of the Zn promptly obtain containing 12-15% through 4 hours, described Ni-Zn-P chemical liquids prescription is by g/L: NiSO 47H 2O27-35, NaH 2PO 2H 2O 10, Trisodium Citrate 85, NH 4The NH of Cl 50, (25%) 4OH 0-60, ZnSO 47H 2O 7.5-15, the add-on of its chemical plating fluid was for expiring bar, pipe 10cm.
(5). Ni-P/PTFE is promptly plated in multi-functional plating, step (4) anode plating back sucker rod or oil pipe are placed the coating bath of the Ni-P/PTFE composite plating bath behind the mixing, the control pH value is 4.5-5.0, handles 4 hours down at 80-90 ℃, described Ni-P/PTFE composite plating bath prescription: NiSO 47H 2O 29g/L, NaH 2PO 2H 2O 35g/L, propionic acid 2mg/L, thiocarbamide 1mg/L, PTFE dispersion liquid 36g/L, complex acid 24mg/L, the amount of described composite plating bath expired bar, pipe 10cm.
2. in accordance with the method for claim 1, it is characterized in that step (2) rust cleaning after, oil pipe and the spraying of sleeve pipe inside and outside wall, concrete steps are:
(1). inner-wall spraying: with the atomizing of spraying paint of interior varnish spray gun, the pressure that sprays paint is 4-6kg/cm 2, interior varnish spray gun is in the oil pipe endoporus, and the speed of travel is 20-30m/min, to-and-fro movement, with 500 commentaries on classics/min rotation, spray 2-3 each coat-thickness is the 15-20 micron to body in situ, every spray once all needs the baking and curing paint film;
(2). the outer wall spraying: with spray gun is 150g/min spray 2-3 time with the flow, and each thickness is the 20-25 trace, and every spray once all needs the baking and curing paint film;
(3). the baking and curing paint film: oil pipe and the every spray of sleeve pipe inside and outside wall are intact once promptly imports in the stoving oven continuously, 180-200 ℃ of oven dry, oil pipe is from advancing stove to the 60 minutes time of coming out of the stove, the paint film of each spraying back oven dry is brown, as bright as a sixpence, adopt the oil-pipe external wall spraying method for sucker rod, same each spraying back baking and curing is sprayed paint.
3. in accordance with the method for claim 2, it is characterized in that described spraying paint comprises in epoxy phenolics, petroleum resin, vibrin, powder coating, the bituminous composition any.
4. according to claim 1,2 described methods is characterized in that wall anode plating behind oil pipe or sleeve pipe oil removing successively, rust cleaning, the surface active, the multi-functional plating of inwall, outer wall spraying or the plating of inside and outside wall anode, inside and outside wall spraying are obtained mixolimnion.
5. according to claim 1,2 described methods, scale removal according to a conventional method after the rust cleaning, alignment, flaw detection, repairing screw thread is characterized in that heat-treating successively after pressure testing, coating is or/and coating protection.
6. in accordance with the method for claim 1, it is characterized in that step (1) to the structure of the described degreasing tank of step (5), rust cleaning groove, activated bath, coating bath is: the both sides of groove are provided with vertical loading board, tube support, to be provided with the thermal oil be the comb well heater of heating carrier both sides and bottom in groove, groove is of a size of long 11 meters, the wide and high 0.8-1.4 rice that is, the wall thickness of groove is 5-10mm.
7. in accordance with the method for claim 1, it is characterized in that step (1) is to the described degreasing tank of step (5), the rust cleaning groove, activated bath, the heating system of coating bath has the heat-conducting oil heating boiler, the transporting hot oil pump is that well heater links to each other with the heat-conducting oil heating boiler with groove internal heating comb, heat-conducting oil heating boiler top is connected with oil-gas separator with pipeline, the oil-gas separator the other end links to each other with well heater by pipeline, the pipeline that the transporting hot oil pump links to each other with the comb well heater is provided with to expand and adds oil sump, on oil-gas separator and pipeline that the comb well heater links to each other, be provided with thermometer, in addition, on the pipeline that connects, also be provided with fuel charging valve, delivery valve, described heating calancria is No. 20 steel pipes of φ 76 * 3, spacing 100mm, long 10.5m, uniform in the sidewall and the bottom of groove.
8. in accordance with the method for claim 2, it is characterized in that the stoving oven that described baking and curing paint film is used has upper furnace, upper furnace body heating calancria and pylon thereof, upper furnace body has thermal insulation layer, the lower furnace body heating calancria, bar, pipe and the upper and lower body of heater heating calancria intermediary chain of process that transmission is to be dried by the fire, control chain travelling speed and the speed reduction unit that links to each other with motor, speed reduction unit is linked to each other with driving chain wheel by driving chain, also has the upper furnace body heating calancria to advance heat conduction fuel tap and delivery valve, lower furnace body heating calancria fuel charging valve and delivery valve in addition.
CN 02121262 2002-06-12 2002-06-12 Protective treatment method for oil sucking rod, oil pipe and sleeve used specially for oil field Expired - Lifetime CN1212424C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 02121262 CN1212424C (en) 2002-06-12 2002-06-12 Protective treatment method for oil sucking rod, oil pipe and sleeve used specially for oil field

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 02121262 CN1212424C (en) 2002-06-12 2002-06-12 Protective treatment method for oil sucking rod, oil pipe and sleeve used specially for oil field

Publications (2)

Publication Number Publication Date
CN1465743A true CN1465743A (en) 2004-01-07
CN1212424C CN1212424C (en) 2005-07-27

Family

ID=34142153

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 02121262 Expired - Lifetime CN1212424C (en) 2002-06-12 2002-06-12 Protective treatment method for oil sucking rod, oil pipe and sleeve used specially for oil field

Country Status (1)

Country Link
CN (1) CN1212424C (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101220471B (en) * 2007-12-18 2011-04-06 华南理工大学 Chemical plating reinforcing method and apparatus for airborne tank internal surface protection
CN103305819A (en) * 2012-03-16 2013-09-18 中国石油化工集团公司 Chemical plating solution of oilfield drilling tool and anti-corrosion protection method of drilling tool
CN103909054A (en) * 2014-03-11 2014-07-09 盘锦中际特种管材制造有限公司 Method for producing silicate composite tube
CN104259067A (en) * 2014-08-26 2015-01-07 濮阳市顺康石油工程技术有限公司 Scale inhibition and anticorrosion internal coating process for old oil pipes by aid of sintering method
CN109572006A (en) * 2016-07-13 2019-04-05 范秀红 A kind of sucker rod renovation technique

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101786732A (en) * 2010-03-22 2010-07-28 许昌东方化工有限公司 Scale remover and preparation method thereof

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101220471B (en) * 2007-12-18 2011-04-06 华南理工大学 Chemical plating reinforcing method and apparatus for airborne tank internal surface protection
CN103305819A (en) * 2012-03-16 2013-09-18 中国石油化工集团公司 Chemical plating solution of oilfield drilling tool and anti-corrosion protection method of drilling tool
CN103305819B (en) * 2012-03-16 2016-04-27 中国石油化工集团公司 A kind of oil field tool chemical plating fluid and drilling tool corrosionproof protection method
CN103909054A (en) * 2014-03-11 2014-07-09 盘锦中际特种管材制造有限公司 Method for producing silicate composite tube
CN104259067A (en) * 2014-08-26 2015-01-07 濮阳市顺康石油工程技术有限公司 Scale inhibition and anticorrosion internal coating process for old oil pipes by aid of sintering method
CN104259067B (en) * 2014-08-26 2016-07-20 濮阳市顺康石油工程技术有限公司 Technique it is coated with in the old oil pipe scale inhibition anticorrosion of sintering process
CN109572006A (en) * 2016-07-13 2019-04-05 范秀红 A kind of sucker rod renovation technique

Also Published As

Publication number Publication date
CN1212424C (en) 2005-07-27

Similar Documents

Publication Publication Date Title
CN102114460A (en) Pretreatment process for coating
CN101773901A (en) Method for improving property of dacromet coating on surface of metal member
CN111411332A (en) Anhydrous low-cost imitation electroplating film and surface treatment method thereof
CN103710688B (en) The without phosphorus transforming agent of a kind of faintly acid
CN105643208A (en) Production process suitable for high-strength round link chain under marine environment
CN1212424C (en) Protective treatment method for oil sucking rod, oil pipe and sleeve used specially for oil field
JP2006187679A (en) Rustproof coated article and coating film forming method
CN105149192A (en) Metal surface coating process
CN101591541A (en) The rotproofing material and the anticorrosion construction method of a kind of chimney and flue
JPS6167773A (en) Surface treatment of metal
CN101153195B (en) Anticorrosion paint special for polyphenylene sulfide and method of producing polyphenylene sulfide compound steel tube
CN109538133A (en) A kind of corrosion resisting alloy box cupling and its coating process
CN101591568A (en) The surface modified polytetrafluoroethylsurface surface layer material that is used for chimney and flue rotproofing
CN101602927A (en) The bottom bonding material that is used for chimney and flue rotproofing
CN103397328B (en) A kind of absolutely dry method of carrying out high decoration functions composite film coating in metallic surface
CN1294204A (en) Multifunctional treating liquid for surface of iron or steel
CN1302858C (en) Process for coating polyurethane on inner and outer surface of nodular graphite cast iron pipe
CN104313554B (en) Cylinder sleeve of automobile engine surface corrosion-resisting wear-proof composite coating towards bio oil application
CN1251417A (en) Metal tube with anti-corrosion, antiscale and anti-wax-precipitation coating and producing method thereof
CN1114665C (en) Zinc base water soluble anti-corrosion paint for metal surface and its prepn. method
CN117443694B (en) Teflon coating optimization treatment method for connector structural member
CN112853247B (en) Surface treatment process of anti-corrosion fastener
CN104250790A (en) Steel surface phosphatization technology of pretreatment before thermal spraying
CN213778739U (en) Environment-friendly coating redundant heat recycling device
CN115975500B (en) Insulating high-heat-conductivity anticorrosive coating and preparation method thereof

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
EE01 Entry into force of recordation of patent licensing contract

Assignee: Harbin rising building materials Co., Ltd.

Assignor: Fu Jianying|Ma Changhong

Contract record no.: 2010230000049

Denomination of invention: Protective treatment method for oil sucking rod, oil pipe and sleeve used specially for oil field

Granted publication date: 20050727

License type: Exclusive License

Open date: 20040107

Record date: 20100728

CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20050727