CN1436688A CN 02103531 CN02103531A CN1436688A CN 1436688 A CN1436688 A CN 1436688A CN 02103531 CN02103531 CN 02103531 CN 02103531 A CN02103531 A CN 02103531A CN 1436688 A CN1436688 A CN 1436688A
Authority
CN
China
Prior art keywords
plc
train
programmable logic
logic controller
bus
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN 02103531
Other languages
Chinese (zh)
Other versions
CN1332841C (en
Inventor
佘龙华
陈顺良
施晓红
王洪波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
School Of Mechanical And Electrical Engineering And Automation National University Of Defense Technology Pla
BEIJING HOLDING MAGNETIC SUSPENSION TECHN DEVELOPMENT Co Ltd
Original Assignee
School Of Mechanical And Electrical Engineering And Automation National University Of Defense Technology Pla
BEIJING HOLDING MAGNETIC SUSPENSION TECHN DEVELOPMENT Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by School Of Mechanical And Electrical Engineering And Automation National University Of Defense Technology Pla, BEIJING HOLDING MAGNETIC SUSPENSION TECHN DEVELOPMENT Co Ltd filed Critical School Of Mechanical And Electrical Engineering And Automation National University Of Defense Technology Pla
Priority to CNB021035318A priority Critical patent/CN1332841C/en
Publication of CN1436688A publication Critical patent/CN1436688A/en
Application granted granted Critical
Publication of CN1332841C publication Critical patent/CN1332841C/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02TCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION
    • Y02T90/00Enabling technologies or technologies with a potential or indirect contribution to GHG emissions mitigation
    • Y02T90/10Technologies relating to charging of electric vehicles
    • Y02T90/16Information or communication technologies improving the operation of electric vehicles

Abstract

The magnetic suspension train operation controlling system can realize three functions of steering driving, protecting and monitoring. The hardware system includes programmable logic controller and its in-situ bus part, and three in-situ communication protocols including MPI, DP and FDL are used in train operation data communication. The software system is used to complete steering operation, operation control, network communication, automatic monitoring, failure treatment, automatic protection and other functions. The hardware system structure and the software system structure of the train operation controlling system have the creative features of: system redundance, safety against failure, self diagnosis, adaptive marshalling, safety logic interlocking, and safety function in the four stages of testing, operation, running and maintenance.

Description

Magnetic suspension train operation control system and control method thereof
Technical field
The present invention relates to magnetic suspension train operation control system (being also referred to as CMSC), particularly possess the magnetic suspension train operation control system that can realize driving, protecting and monitor three big functions simultaneously.The invention still further relates to the magnetic suspension train operation control method.
Technical background
Magnetic suspension train has been succeeded in developing for many years, but also lacks the complete operation control system of a cover, makes its useization.The present invention proposes for addressing this problem.
Summary of the invention
The purpose of this invention is to provide a kind of magnetic suspension train operation control system, possess driving simultaneously, protect and monitor three big functions.
Another object of the present invention provides a kind of magnetic suspension train operation control method, possesses driving simultaneously, protects and monitor three big functions.
According to an aspect of the present invention, the magnetic suspension train operation control system possesses driving, protects and monitors three big functions simultaneously, comprising:
Be placed in comprise first bus and trailer respectively save programmable logic controller (PLC) PLC on the car; And
Bus is used to connect the described programmable logic controller (PLC) PLC that respectively saves on the car and forms full train network system;
Wherein, the described programmable logic controller (PLC) PLC that settles on first bus and the trailer is made as master controller (hereinafter referred to as main control PLC), described master controller is controlled full train each several part by described network, described master controller is hot spare each other, and synchronization has only one as train policy of Central Government mechanism.
Provide a kind of magnetic suspension train operation control method according to another object of the present invention, possesses driving simultaneously, protect and monitors three big functions, comprise step: a kind of magnetic suspension train operation control method, possesses driving simultaneously, protect and monitors three big functions, comprise step: master control programmable logic controller (PLC) PLC is set on first bus and trailer, described master control programmable logic controller (PLC) PLC backups each other, and synchronization has only one as train policy of Central Government mechanism;
On each joint car, programmable logic controller (PLC) PLC (hereinafter referred to as vehicle PLC) is set, each equipment on this joint car of connection and control/detection; And form full train network system with described main control PLC of total wire joint and the described vehicle PLC that respectively saves on the car, by this network full train each several part is controlled;
Adopt the FDL agreement between described main control PLC and the described vehicle PLC that respectively saves on the car, to communicate, realize the marshalling of train self adaptation, protection automatically, automatic steering, the safe Redundant Control of master controller and the transmission of train running information;
Adopt the MPI agreement between described main control PLC and the described vehicle PLC that respectively saves on the car and magnetic suspension train checking system PLC (hereinafter referred to as detection PLC) communicate, realize the automatic monitoring function, the online speed calculation of carrying out is carried out speed-limiting protection to train;
Adopt the DP agreement between described main control PLC and the described vehicle PLC that respectively saves on the car, to communicate, the protection of entering the station automatically of realization train system.
The CMSC system comprises programmable logic controller (PLC) PLC and fieldbus parts thereof, uses three kinds of field bus communication agreement: MPI, DP and FDL to carry out the train operation data communication.Functions such as driver behavior, operation control, network service, supervision automatically, fault handling, automatic protection have been realized at software section.The hardware configuration of CMSC and software configuration have following creationary characteristics: 1, system redundancy; 2, fail safe; 3, selfdiagnosis; 4, marshalling self adaptation; 5, security logic interlocking; 6, debugging, moving, runing and safeguarding that four-stage all has safe functioning.This CMSC is reasonable in design, of a tightly knit structure, functional safety, be in, low speed magnetic suspension railway and highway system design-calculated magnetic suspension train operation control system, other magnetic suspension traffic system is also had the important references meaning.
Description of drawings
Fig. 1 is magnetic suspension train operation control system bus architecture scheme drawings.
Fig. 2 is magnetic suspension train operation control system equipment network access mode figure.
Fig. 3 is the network structure under the magnetic suspension train operation control system normal operation mode.
Fig. 4 is the network structure under the protected mode of magnetic suspension train operation control system.
Fig. 5 is main control process flow figure.
Fig. 6 is the vehicle overview flow chart.
Fig. 7 is the scope check diagram of circuit.
Fig. 8 is self adaptation marshalling testing process figure.
Fig. 9 is information transmission flow figure.
Figure 10 is an operation control overview flow chart.
Figure 11 is speed calculation overall flow figure.
Figure 12 is the protection diagram of circuit that enters the station.
Figure 13 is a master control disturbance switching diagram of circuit.
The specific embodiment
As shown in Figure 1, the magnetic suspension train operation control system is on each joint car, and programmable logic controller (PLC) PLC is set, and connects into network by bus and forms.Programmable logic controller (PLC) PLC can buy on market, as digital load module 312-1CH80-0AA0.
According to the difference of systemic-function, adopt three-bus that all magnetic suspension train operation control conveniences are coupled together, adopt different network communication protocols on each bar bus, realize different systemic-functions.Fig. 1 has the FDL protocol bus of driving function, has the MPI protocol bus of function for monitoring and has the connection diagram of the DP protocol bus of defencive function.
To be made as main control PLC 3 on first bus 1 and the trailer 2, main control PLC 3 is backuped each other by the control of himself software system, and synchronization has only one as train policy of Central Government mechanism.Main control PLC 3 main bonded assembly train apparatus (not shown in figure 1)s have: controller, water brake maneuvering device, assisted control equipment, urgent maneuvering device, monitoring equipment, ground data communication apparatus, ground voice communication equipment etc.Main control PLC 3 and vehicle PLC4 corresponding software system are inequality.
The vehicle PLC4 that is provided with on each joint car connects each the equipment (not shown in figure 1) on this joint car, mainly contains: suspension controller, traction invertor, hydraulic brake, car door air-conditioning power supply, velocity location state of progress fault measuring device etc.
Adopt the FDL agreement between described main control PLC and the described vehicle PLC that respectively saves on the car, to carry out the train operation data communication, realize the marshalling of train self adaptation, protection automatically, automatic steering, the safe Redundant Control of master controller and the transmission of train running information;
Adopt multi-point (MPI) agreement to carry out the train operation data communication between described main control PLC 3 and vehicle PLC4 and detection PLC5, realize the automatic monitoring function, the online speed calculation of carrying out is carried out speed-limiting protection to train.Detecting PLC and be the magnetic suspension train checking system provides, has the website of identical network interface and communication standard with the magnetic suspension train operation control system.Detect PLC and be responsible for information such as position, speed and failure mode, rank when main control PLC and vehicle PLC provide train operation.
Adopt distributed principal and subordinate (DP) agreement between described main control PLC and the described vehicle PLC that respectively saves on the car, to carry out the train operation data communication, realize the train system protection of entering the station automatically.
Fig. 2 is the network access mode figure of the concrete equipment of magnetic suspension train operation control system of the present invention.
In Fig. 2, be positioned at master control programmable logic controller (PLC) PLC is set on first bus and the trailer, in operation control system, row ATO bus node (node is the general name of equipment and accessory module thereof), row ATP bus node, row ATS bus node all are that the CPU module by main control PLC constitutes, in Fig. 2 according to the difference of function with the separately expression of these three nodes.Similarly, an ATO bus node, an ATP bus node, an ATS bus node all are that the CPU module by vehicle PLC constitutes, in Fig. 2 also according to the difference of function with the separately expression of these three nodes.The bus that relates among Fig. 2 has train automatic steering bus 1, train to protect the connecting bus 6,7 (representing first bus, trailer connecting bus respectively) of bus 2, the automatic monitor bus 3 of train, train debug bus 4, train emergency braking bus 5, train ATO, ATP, ATS node and magnetic suspension train checking system programmable logic controller (PLC) PLC automatically.
In Fig. 2; be positioned at train automatic steering ATO bus node, train on first bus and the trailer and protect ATP bus node, train to monitor that automatically the ATS bus node is backuped each other by himself software system control automatically, synchronization has only one as train policy of Central Government mechanism.In general, the main bonded assembly train apparatus of main control PLC has: controller, water brake maneuvering device, assisted control equipment, monitoring equipment, ground data communication apparatus, ground voice communication equipment etc., these equipment link to each other by vehicle ATO bus node, vehicle ATP bus node, vehicle ATS bus node, driving ATS bus node, driving ATO bus node, the corresponding bus with each of driving debugging node respectively.
Because each joint compartment of maglev train system all is a motor-car, carry out the motor-car debugging so must save the compartment to each.In order to debug conveniently; the magnetic suspension train operation Control System Design one the cover conv; both can protect ATP bus node, train to monitor that automatically ATS bus node etc. debugs motor-car automatically in the motor-car debug phase by train automatic steering ATO bus node, train; also can directly pass through debug bus, utilize conv to carry out the motor-car debugging.The emergency braking bus then is to require the design-calculated hardwired according to train emergency braking equipment.Bus 6,7 is responsible for accepting utilizing these information to carry out the protection of train running speed by detecting speed and the location information that PLC sends.
The vehicle PLC that is provided with on each joint car need connect each equipment on this joint car, mainly comprises: suspension controller, traction invertor, hydraulic brake, car door air-conditioning power supply, velocity location state of progress fault measuring device etc.These equipment link to each other by vehicle ATO bus node, vehicle ATP bus node, vehicle ATS bus node, vehicle debugging node, the corresponding bus with each of vehicle emergency node respectively.
By the vehicle PLC on train automatic operation system ATO bus 1, train automatic protective system ATP bus 2,3 each main control PLC of bonded assembly of train automatic monitor system ATS bus and each the joint car and detect PLC etc., constituted the full train network of three arbitrages of CMSC of the present invention system.Adopt three kinds of communication protocols to control monitoring in real time respectively, thereby formed CMSC of the present invention system.They are respectively:
Multi-point (MPI) network: mainly realize the data communication of checking system and operation control system, guarantee the correct realization of function for monitoring.
Distributed principal and subordinate (DP) network: the defencive function that is mainly used to realize CMSC;
FDL network: the driving function that is mainly used to realize train.
Referring to Fig. 3, under normal operation mode, carry out data communication by the FDL agreement between all PLC of CMSC system, realize the marshalling of train self adaptation, protection automatically, automatic steering, the safe Redundant Control of master controller and the transmission of train running information.The FDL agreement of CMSC system is to realize by the CP342-5 communication module of programmable logic controller (PLC) PLC.
Referring to Fig. 3; under normal operation mode, between described master control programmable logic controller (PLC) PLC and detection PLC, carry out the train operation data communication by employing multi-point (MPI) agreement between the main control PLC of CMSC system; thereby obtain by information such as the collection position that major part-detection PLC provides of magnetic suspension train checking system, speed, faults; realize the automatic monitoring function; the online speed protection that carries out calculates, and train is carried out speed-limiting protection.The MPI agreement is a kind of communication protocol that the CPU of programmable logic controller (PLC) carries, and therefore need not extra data communication module.
Referring to Fig. 4; under protected mode, between described main control PLC and the described vehicle PLC that respectively saves on the car, carry out the train operation data communication by distributed principal and subordinate (DP) agreement between the programmable logic controller (PLC) PLC of CMSC system, realize the train system protection of entering the station automatically.The DP agreement of CMSC system is to realize by the DP communication interface in the CPU module that is integrated in programmable logic controller (PLC) PLC (DP among Fig. 4 promptly represents the DP interface).
More than by Fig. 1 an embodiment of magnetic suspension train operation control system of the present invention is told about, and each concrete situation of magnetic suspension train operation control system of the present invention is illustrated by Fig. 2~Fig. 4.Magnetic suspension train operation control system of the present invention can have many variations, for example, respectively saves train among Fig. 2 and is provided with detection PLC and train PLC, can detect PLC with the two merging or by train PLC double as fully as required.The quantity of the detection PLC that also can be provided with as the case may be is less than the quantity of vehicle PLC, and detection range does not reduce.
Tell about the software system flow process of CMSC below
(1)
CMSC is made up of two kinds of PLC: main control PLC and vehicle PLC, corresponding software system also has two covers, is called master control overall procedure and vehicle overall procedure here.
Main control PLC has two, all keeps running state in the whole service process, controller of each correspondence.In order to guarantee that the two backups each other and do not conflict (software program is identical), by software a TCN authority is set, only there is a main control PLC can obtain authority at synchronization, carry out network data communication.Authority mainly is to be provided with by operator platform, and the PLC that is in generally speaking on the working direction will obtain authority.The authority that can carry out automatically when the main control PLC et out of order of authority between the main control PLC is switched, and realizes safe Redundant Control.After train powered on fully, two main control PLC need be carried out authority by the relative set of judging controller and be judged that the main control PLC that obtains authority detects train marshalling list.Before authority changes next time, there is the main control PLC of authority to be responsible for receiving the driving order, judge by certain security logic and carry out correct operation, guarantee that maloperation is invalid.Meanwhile, main control PLC constantly and checking system and vehicle PLC carry out data communication, detect the various device state of train in real time.For different failure conditions, look its order of severity and divide certain fault level, different fault levels is adopted different processing modes.
The master control overall procedure as shown in Figure 5, this program is to operate in the programmable logic controller (PLC) PLC that is arranged in first bus and trailer, head and the tail two cover program basically identicals (only network address difference).After operation control system powers on, at first to detect the running condition of MPI network, will check just whether life signal is normal, if normally then indicate system's entry into service.Main programmable logic controller (PLC) PLC is after the authority of judging self, and the PLC that obtains authority just begins the self adaptation marshalling and checks (only checking once after powering on).Can enter the formal operation phase after having checked.The operational order that generates according to driver's driving signal will send to each vehicle programmable logic controller (PLC) PLC in the current marshalling by main programmable logic controller (PLC) PLC, and current train status information then passes to the main control PLC of lack of competence.
The vehicle overall procedure as shown in Figure 6, this program run in the vehicle control programmable logic controller (PLC) PLC in each joint compartment, the program basically identical (only network address difference) in each joint compartment.Vehicle programmable logic controller (PLC) PLC mainly is responsible for receiving and carrying out the control command of autonomous PLC, gives main control PLC with the status report of each vehicle arrangement simultaneously.
(2) ATO network service
ATO network service part mainly needs to solve following problem:
1. life signal detects
Life signal is a signal that is produced and controlled by magnetic suspension train checking system PLC.If life signal keeps the variation of certain frequency, network just is in normal condition so.
2. head and the tail interlocking (inspection authority)
Whether main control PLC has authority mainly is that program circuit as shown in Figure 7 by the head of controller/tail interlocking signal decision.Because the main control PLC that authority arranged can be surrendered authority automatically after the train commutation, when self et out of order, also can cause authority to change, so can realize the warm standby function of system master PLC by scope check owing to the variation of level.
3. the self adaptation marshalling detects
Whether the mode of main control PLC employing transmission data detects certain vehicle PLC and exists.Program circuit as shown in Figure 8.
4. information sends and receives
The information content of main control PLC transmitting-receiving is different because of the difference of destination node.If destination node is another main control PLC, Shou Fa data will be some train status information so, and present status information need not to send; If destination node is vehicle PLC, what send so is some control commands, for example suspension controller reset command, door contact interrupter order lamp, reception be train status information, vehicle door status etc. for example.Table 2 has been listed the type of the information of transmitting between different nodes.
Table 2
Destination node sends message pick-up information
Organization chart (only send once) is had no right main control PLC authority interlocking signal value authority interlocking signal value
Present equipment state
Vehicle PLC device control command facility status information
In fact message pick-up only is the process of a calling communication function, so omitted the message pick-up flow process herein.The information transmission flow as shown in Figure 9.
(3) operation control
The operation control program mainly is an I/O control process, and wherein the place of most critical is the judgement of security logic.Overall procedure is seen Figure 10.
As seen from Figure 10, the operation control program is divided into following module:
Power supply control and treatment module;
The Gray code conversion module;
The urgent key processing module of pressing;
Car door control and treatment module;
The brake signal processing module;
Float processing module.
(4) ATP function
1. speed protection
The key of carrying out speed protection is to calculate each maximum speed limit constantly of train, promptly solves the speed calculation problem.The whole flow process of speed calculation as shown in figure 11.
2. the protection of entering the station
The protection of entering the station can be divided into three phases: enter the station, arrive at a station and surpass the station.The processing that the different stages is corresponding different adopts signalling methods that train is made a response fast.The protection flow process as shown in figure 13.
4. tired driver is vigilant
5. security logic is judged
For prevent maloperation, the driving order that operator platform is sent, just at first will can come into force by the check of following principle:
Meet the power supply electrifying order;
Suspend and the traction interlocking;
Car door and traction interlocking;
Electric braking and traction interlocking.
(5) fault handling
1. the disturbance switching between the main control PLC;
When the PLC of authority et out of order, the PLC of lack of competence must obtain network legal power automatically, and judges next step operation according to the status information that the last time correctly receives.Flow process as shown in figure 14.
2.PLC between communication failure
Table 3 has been listed the garble that all run durations may occur, will have been passed to the respective code and the measures areput that detect PLC.Only it should be noted that and under the situation that the network failure multiplicity can not put up with, just can take measures areput, generally all can ignore for occurrent fault.
Table 3 communication failure type and countermeasure
Error code Explanation Message code Treatment measures
??80c0 Data recording is not readable Wait for
??80c1 The assigned data record is just processed
??80c2 Unfinished work is too much The work that cancellation is called recently
??80c3 Resource (internal memory) is occupied
??80c4 Garble (being generally temporary mistake) Again communicate
??80a0 Read data time refusal is confirmed from module Wait for retry
??8x7f Parameter x generation systems fault (irrelevant) with the user System reset
??8x28 The formation mistake takes place when reading parameter Wait a moment and resend
??8x42 Error in address is attempted to take place by system when peripheral output area is read parameter Report to the police (being generally the marshalling problem)
??8x43 Error in address when attempting to the periphery the output area write parameters, system takes place
??8x44 N (N>1) inferior read access mistake (access denied) Report to the police (being generally bus failure)
??8x45 N (N>1) inferior write access mistake (access denied)
3. breakdown of equipment
Breakdown of equipment is classified three grades to the order of severity of listing influence on system operation according to it.
(6) characteristics
The software system of CMSC have following characteristics:
Software system adopt two redundancy structures, can switch when commutation, can also carry out Autonomous Control power simultaneously and switch under fault condition, guarantee the operation of software system;
Have the train automatic protection functions, fully guarantee the safety of train operation;
Can utilize network service to finish the transmission of train information, guarantee respectively to save the unified action in compartment, unified state;
Can make rapid reaction, in time handle various faults, guarantee that simultaneously various error-logics are invalid;
The calculated off-line velocity curve guarantees the requirement of train operation coincidence circuit and passenger comfort;
Can realize the train marshalling list self adaptation, the car body number does not influence the software system program, promptly for train marshalling list arbitrarily, and the software program unanimity.

Claims (6)

1. a magnetic suspension train operation control system possesses driving, protects and monitors three big functions simultaneously, comprising:
Be placed in comprise first bus and trailer respectively save programmable logic controller (PLC) PLC on the car; And
Bus is used to connect the described programmable logic controller (PLC) PLC that respectively saves on the car and forms full train network system;
Wherein, the described programmable logic controller (PLC) PLC that settles to major general's first bus and the trailer is made as master controller, described master controller is controlled full train each several part by described network, and described master controller is hot spare each other, and synchronization has only one as train policy of Central Government mechanism.
2. magnetic suspension train operation control system according to claim 1 is characterized in that described programmable logic controller (PLC) PLC comprises: CPU and the interface circuit that is used for protocol communication.
3. magnetic suspension train operation control system according to claim 2 is characterized in that described interface circuit comprises that at least three are respectively applied for the FDL protocol interface, MPI protocol interface and DP protocol interface; Described bus comprises at least three, respectively with the interface circuit of the interface circuit of the described FDL of being used for agreement, the described MPI of being used for protocol interface and DP protocol interface interface circuit be connected, form cooresponding three cover networks, be communicated with suitable train apparatus,
Wherein the FDL protocol network is used for the marshalling of train self adaptation, protection automatically, automatic steering, the safe Redundant Control of master controller and the transmission of train running information;
The MPI protocol network is used for the automatic function for monitoring of train system, and the online speed calculation of carrying out is carried out speed-limiting protection to train; And
The DP protocol network is used for train and realizes the train system protection of entering the station automatically.
4. magnetic suspension train operation control system according to claim 2, it is characterized in that described interface circuit is to be used for the FDL protocol interface, MPI protocol interface and DP protocol interface, connect by three-bus, form FDL protocol network, MPI protocol network, DP protocol network three cover communication networks, be communicated with suitable train apparatus
Wherein the FDL protocol network is used for the marshalling of train self adaptation, protection automatically, automatic steering, the safe Redundant Control of master controller and the transmission of train running information;
The MPI protocol network is used for the automatic function for monitoring of train system, and the online speed calculation of carrying out is carried out speed-limiting protection to train; And
The DP protocol network is used for train and realizes the train system protection of entering the station automatically.
5. magnetic suspension train operation control method, possesses driving simultaneously, protect and monitors three big functions, comprise step: master control programmable logic controller (PLC) PLC is set at least on first bus and trailer, described master control programmable logic controller (PLC) PLC backups each other, and synchronization has only one as train policy of Central Government mechanism;
On each joint car, programmable logic controller (PLC) PLC is set, each equipment on this joint car of connection and control/detection;
Form full train network system with total wire joint described master control programmable logic controller (PLC) PLC and the described programmable logic controller (PLC) PLC that respectively saves on the car, full train each several part controlled by this network;
Adopt the FDL agreement between described master control programmable logic controller (PLC) PLC and the described programmable logic controller (PLC) PLC that respectively saves on the car, to communicate, realize the marshalling of train self adaptation, protection automatically, automatic steering, the safe Redundant Control of master controller and the transmission of train running information;
Adopt the MPI agreement to communicate between described master control programmable logic controller (PLC) PLC and the described programmable logic controller (PLC) PLC that respectively saves on the car, realize the automatic monitoring function, the online speed calculation of carrying out is carried out speed-limiting protection to train; And
Adopt the DP agreement between described master control programmable logic controller (PLC) PLC and the described programmable logic controller (PLC) PLC that respectively saves on the car, to communicate, the protection of entering the station automatically of realization train system.
6. magnetic suspension train operation control method according to claim 5, wherein said bus has three at least, described master control programmable logic controller (PLC) PLC and the described programmable logic controller (PLC) PLC that respectively saves on the car are connected to form three cover networks, are used separately as FDL protocol network, MPI protocol network, DP protocol network.
CNB021035318A 2002-02-05 2002-02-05 Magnetic suspension train operation controlling system and method Expired - Lifetime CN1332841C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNB021035318A CN1332841C (en) 2002-02-05 2002-02-05 Magnetic suspension train operation controlling system and method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNB021035318A CN1332841C (en) 2002-02-05 2002-02-05 Magnetic suspension train operation controlling system and method

Publications (2)

Publication Number Publication Date
CN1436688A true CN1436688A (en) 2003-08-20
CN1332841C CN1332841C (en) 2007-08-22

Family

ID=27627862

Family Applications (1)

Application Number Title Priority Date Filing Date
CNB021035318A Expired - Lifetime CN1332841C (en) 2002-02-05 2002-02-05 Magnetic suspension train operation controlling system and method

Country Status (1)

Country Link
CN (1) CN1332841C (en)

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100430260C (en) * 2006-08-28 2008-11-05 中国人民解放军国防科学技术大学 Suspension method for controling module of electromagnetism type magnetic suspension train in normal conduction and low temperature
CN102081402A (en) * 2011-01-25 2011-06-01 中国人民解放军国防科学技术大学 Vehicle-mounted control and diagnosis system for medium-low speed maglev train
CN102476647A (en) * 2010-11-26 2012-05-30 中国北车集团大连机车车辆有限公司 Head-tail automatic setting interlocking device for urban rail vehicle set
CN103048920A (en) * 2012-12-31 2013-04-17 广东申菱空调设备有限公司 Hot standby service redundant control method and system for container water chilling unit
CN103786595A (en) * 2014-01-16 2014-05-14 南车株洲电力机车有限公司 Gateway controller and control system of suspension control node network
CN104908779A (en) * 2015-05-05 2015-09-16 南车株洲电力机车研究所有限公司 Marshalling double-heading data flow redundancy method and system
CN105667338A (en) * 2016-02-29 2016-06-15 同济大学 Levitation controller of magnetic-levitation train
CN105751916A (en) * 2016-02-29 2016-07-13 同济大学 Magnetic-levitation train levitation control method
CN109204007A (en) * 2018-08-29 2019-01-15 江西理工大学 A kind of unpiloted suspension type magnetic suspension train and its control method
CN110597222A (en) * 2019-08-20 2019-12-20 中车青岛四方机车车辆股份有限公司 Fault diagnosis system and fault diagnosis method
CN110968076A (en) * 2019-12-14 2020-04-07 中车大连电力牵引研发中心有限公司 Train intelligent network monitoring system based on Ethernet technology
CN112290844A (en) * 2020-10-20 2021-01-29 江西理工大学 Suspension type medium-low speed permanent magnet suspension train motion control system and control method
CN115476894A (en) * 2022-10-26 2022-12-16 北京交大思诺科技股份有限公司 Switching method for automatic driving and manual driving of freight train

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2239617Y (en) * 1995-11-29 1996-11-06 耿增朝 Sensing railroad track scale railroad circuit signal interlock controlling device
US5881780A (en) * 1997-08-05 1999-03-16 Dcl, Inc. Apapratus for and method of locating the center of an opening in a vehicle
GB2341254A (en) * 1998-07-27 2000-03-08 Alan Donald Yardley Deactivating eg vehicles
JP3747255B2 (en) * 1999-04-23 2006-02-22 株式会社日立製作所 Electric vehicle control device
CA2276981A1 (en) * 1999-07-02 2001-01-02 Ronald Edward Mitchell Rail vehicle operator job memory aid

Cited By (19)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100430260C (en) * 2006-08-28 2008-11-05 中国人民解放军国防科学技术大学 Suspension method for controling module of electromagnetism type magnetic suspension train in normal conduction and low temperature
CN102476647A (en) * 2010-11-26 2012-05-30 中国北车集团大连机车车辆有限公司 Head-tail automatic setting interlocking device for urban rail vehicle set
CN102476647B (en) * 2010-11-26 2014-03-26 中国北车集团大连机车车辆有限公司 Head-tail automatic setting interlocking device for urban rail vehicle set
CN102081402A (en) * 2011-01-25 2011-06-01 中国人民解放军国防科学技术大学 Vehicle-mounted control and diagnosis system for medium-low speed maglev train
CN102081402B (en) * 2011-01-25 2012-11-14 中国人民解放军国防科学技术大学 Vehicle-mounted control and diagnosis system for medium-low speed maglev train
CN103048920A (en) * 2012-12-31 2013-04-17 广东申菱空调设备有限公司 Hot standby service redundant control method and system for container water chilling unit
CN103048920B (en) * 2012-12-31 2015-07-01 广东申菱空调设备有限公司 Hot standby service redundant control method and system for container water chilling unit
CN103786595A (en) * 2014-01-16 2014-05-14 南车株洲电力机车有限公司 Gateway controller and control system of suspension control node network
CN104908779A (en) * 2015-05-05 2015-09-16 南车株洲电力机车研究所有限公司 Marshalling double-heading data flow redundancy method and system
CN105667338A (en) * 2016-02-29 2016-06-15 同济大学 Levitation controller of magnetic-levitation train
CN105751916A (en) * 2016-02-29 2016-07-13 同济大学 Magnetic-levitation train levitation control method
CN105751916B (en) * 2016-02-29 2017-12-05 同济大学 A kind of magnetic floating train suspending control method
CN109204007A (en) * 2018-08-29 2019-01-15 江西理工大学 A kind of unpiloted suspension type magnetic suspension train and its control method
CN109204007B (en) * 2018-08-29 2020-04-28 江西理工大学 Unmanned suspension type magnetic suspension train and control method thereof
CN110597222A (en) * 2019-08-20 2019-12-20 中车青岛四方机车车辆股份有限公司 Fault diagnosis system and fault diagnosis method
CN110968076A (en) * 2019-12-14 2020-04-07 中车大连电力牵引研发中心有限公司 Train intelligent network monitoring system based on Ethernet technology
CN112290844A (en) * 2020-10-20 2021-01-29 江西理工大学 Suspension type medium-low speed permanent magnet suspension train motion control system and control method
CN112290844B (en) * 2020-10-20 2022-05-24 江西理工大学 Suspension type medium-low speed permanent magnet suspension train motion control system and control method
CN115476894A (en) * 2022-10-26 2022-12-16 北京交大思诺科技股份有限公司 Switching method for automatic driving and manual driving of freight train

Also Published As

Publication number Publication date
CN1332841C (en) 2007-08-22

Similar Documents

Publication Publication Date Title
CN1436688A (en) Magnetic suspension train operation controlling system and method
US7474015B2 (en) Method and supply line structure for transmitting data between electrical automotive components
US20190340116A1 (en) Shared backup unit and control system
US6173814B1 (en) Electronic safety system for elevators having a dual redundant safety bus
JP6981357B2 (en) Vehicle control device
US8260487B2 (en) Methods and systems for vital bus architecture
CN107499137B (en) The electrification control method and device of vehicle
CN100382474C (en) Method and system of safety-oriented data transfer
EP3626554A1 (en) Vehicle control system
US10839619B2 (en) Electronic control unit and method for connection authentication
CN110356250A (en) The motor control method and system of automatic driving vehicle
CN101604165A (en) A kind of hybrid vehicle onboard diagnostic system and diagnostic method thereof
CN1267302C (en) Communication error detecting method for vehicular bus communication network
US7861115B2 (en) Multi-component system
WO2011000250A1 (en) Method for detecting can bus of hybrid motor vehicle
CN112918459B (en) System for avoiding unexpected steering and control method
CN109445421B (en) General fault diagnosis method for vehicle electronic control unit
CN114466762A (en) Control device for vehicle
JP2009213092A (en) Abnormity location identifying apparatus, its control program, and abnormity location identifying system
CN212220125U (en) Redundant line control system for electric vehicle
CN115086151B (en) Communication system, communication method, vehicle body controller and storage medium
CN114348027A (en) Vehicle control method, device, platform and storage medium
CN113442849A (en) Vehicle control system, data transmission method, and recording medium having program recorded thereon
JP5833111B2 (en) Apparatus and method for checking a frame used by an electronic device of a communication network according to a type of function using a parameter included in the frame
CN116360389B (en) Synchronous servo controller fault control system and method for electrically driven special vehicle

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term

Granted publication date: 20070822

CX01 Expiry of patent term