CN1429031A - Switching method between frequencies - Google Patents

Switching method between frequencies Download PDF

Info

Publication number
CN1429031A
CN1429031A CN 01144931 CN01144931A CN1429031A CN 1429031 A CN1429031 A CN 1429031A CN 01144931 CN01144931 CN 01144931 CN 01144931 A CN01144931 A CN 01144931A CN 1429031 A CN1429031 A CN 1429031A
Authority
CN
China
Prior art keywords
network
frequencies
dpcch
data
switching
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN 01144931
Other languages
Chinese (zh)
Other versions
CN1184834C (en
Inventor
李志明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huawei Technologies Co Ltd
Original Assignee
Huawei Technologies Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huawei Technologies Co Ltd filed Critical Huawei Technologies Co Ltd
Priority to CN 01144931 priority Critical patent/CN1184834C/en
Publication of CN1429031A publication Critical patent/CN1429031A/en
Application granted granted Critical
Publication of CN1184834C publication Critical patent/CN1184834C/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Mobile Radio Communication Systems (AREA)

Abstract

A method of switching between frequencies includes the follows: Using the Vser's equipment to detect signal quality of original small area, if detected quality of signal is lower than predefined threshold the measurnig result will be reported to network and the network will define to apply gating technique of special physical control channel for carrying on measurement between frequencies and also to dispose transmission format set, UE and DPCCH gate control parameter at base station side according to the reported rsult; UE and network side will carry on gate control according to the gate control parameter, UE will carry on also quality measurement of signal and synchronization for adjacent frequency small area by using gap created with DPCCH gate control technique and to report measuring result to network; the network will judge whether the switching between frequencies is ncessary or not according to measured result.

Description

A kind of switching method between frequencies
Technical field
The present invention relates to subscriber equipment (UE) changing method between different base station, especially switching method between frequencies in the mobile communication system.
Background technology
In mobile communication system; UE is at the switching problem that can relate to usually to the process that target BS moves from home base stations between the base station; because the frequency that UE used when connecting with home base stations or target BS may be different, therefore this switching is switched between coming down to frequently.Handover scheme utilizes compact model to finish between existing frequency, concrete grammar is: when the signal quality that monitors original sub-district as UE is lower than certain predefine thresholding, measurement result is reported network, the network based result who reports, compressed-mode parameter by signaling configuration UE and base station side also starts compact model, the synchronous and signal quality measured of adjacent sub-district frequently carried out in the gap that UE produces by compact model, and measurement result reported network, network based reporting measurement result determines whether to carry out to switch between frequency, when needs switch, UE switches by signaling, after UE receives switching command, getting in touch of the cut-out of the moment of appointment and original sub-district, connect with alien-frequency district.The key of switching is that the synchronous and measurement of adjacent sub-district is frequently carried out in the gap that utilizes compact model to produce between frequency.Because the gap that compact model produces is bigger, may cause the more power control bit information of losing, cause the data transmission link degradation, and in switching process between frequencies, signal quality itself is variation just, need prevent that link-quality from reducing by accurate power controls, therefore existing switching method between frequencies is unfavorable for preventing that link-quality from reducing.
Summary of the invention
The object of the present invention is to provide a kind of switching method between frequencies that helps preventing the link-quality reduction.
For achieving the above object, switching method between frequencies provided by the invention comprises: the signal quality of the original sub-district of (1) subscriber equipment (UE) monitoring when the signal quality that monitors is lower than the predefine thresholding, reports network with measurement result;
(2) the network based result who reports determines to adopt Dedicated Physical Control Channel (DPCCH) gating technology to carry out inter-frequency measurement, and the DPCCH gate parameter of configuration UE and base station side, and configuring transmission format collection (TFS);
(3) UE and network side carry out gate according to the gate parameter, and the synchronous and signal quality measured of adjacent sub-district frequently carried out in the gap that UE utilizes the DPCCH gating technology to produce, and measurement result is reported network;
(4) network based measurement result judges whether to carry out to switch between frequency, and if desired, notice UE switches;
(5) UE finishes switching between frequency according to switching notice in the moment of appointment.
Carrying out the neighbour in the above-mentioned steps (3) finishes by slot synchronization, frame synchronization and code group identification, scrambler identification the sub-district frequently synchronously.
Carry out signal quality measured in the above-mentioned steps (3) for carrying out the chip energy of Common Pilot Channel received signal code power (CPICH RSCP) or Common Pilot Channel and the measurement of the ratio (CPICH Ec/NO) of in-band noise power density.
Above-mentioned steps (3) also comprises: the data to packet domain (PS) cushion, and wait for after finish in the gate gap sending again, and the data of circuit domain (CS) are abandoned.
Foregoing can also be used following content to replace: the data to packet domain (PS) cushion, and wait for after finish in the gate gap sending again, for the data of circuit domain (CS), send and satisfy the data that TFS requires.
Above-mentioned steps (3) also comprises: during the gate gap, read through-put power control (TPC) information among the DPCCH, and utilize this information to keep the continuous of power control.
Because the present invention adopts DPCCH gate gap to carry out inter-frequency measurement, promptly can carry out the synchronous and measurement in sub-district, thereby switch between finishing frequently, so both made full use of the gate gap, improved the resource utilization of system, can shorten the transmission intercal of TPC again, therefore can prevent the reduction of Zone switched interior original link signal quality.
Description of drawings
Fig. 1 is the embodiment flow chart of the method for the invention;
Fig. 2 is gate gap figure;
Fig. 3 is a hand off signaling flow chart between the frequency of using when of the present invention.
Embodiment
The present invention is described in further detail below in conjunction with accompanying drawing.
The DPCCH gating technology is applicable to the up-downgoing data transmission link, when not having data to send, stops to send DPCCH, when data need send, recovers the transmission of DPCCH and DPDCH (Dedicated Physical Control Channel and Dedicated Physical Data Channel) again.Because gating technology adopts such scheme, compares with compact model, the gate gap that it produces in a Frame is discontinuous, makes that the gate gap is less, if adopt gating technology to carry out switching between frequency, can make the TPC information of losing less.Essence of the present invention is that the synchronous and measurement of inter-frequency cell is carried out in the gap that UE produces by the DPCCH gating technology, and it can keep the continuity of power control when the physical frame gap is provided, improve the performance of switching between frequency.
Fig. 1 is the embodiment flow chart of the inventive method.Implement the present invention according to Fig. 1, the 1st step, the signal quality of the original sub-district of user equipment monitors, and the signal quality that monitors judged, when the signal quality that monitors is lower than the predefine thresholding, measurement result is reported network; The 2nd step, the network based result who reports, determine to adopt Dedicated Physical Control Channel (DPCCH) gating technology to carry out inter-frequency measurement, and the DPCCH gate parameter of configuration UE and base station side, and configuring transmission format collection (TFS), finish by slot synchronization, frame synchronization and code group identification, scrambler identification synchronously described neighbour's frequency sub-district of carrying out.Described carry out signal quality measured for carrying out the chip energy of Common Pilot Channel received signal code power (CPICH RSCP) or Common Pilot Channel and the measurement of the ratio (CPICH Ec/NO) of in-band noise power density; In the 3rd step, UE and network side carry out gate according to the gate parameter, and the synchronous and signal quality measured of adjacent sub-district frequently carried out in the gap that UE utilizes the DPCCH gating technology to produce, and measurement result is reported network.During the DPCCH gate gap in this step, the DPDCH for gate gap correspondence handles respectively according to data type, and the data in PS territory are cushioned, and waits for after the gap finishes sending again; And for the CS numeric field data, data are abandoned or sending part divided data only, but the size that sends data satisfies the requirement of TFS, because TFS is limited; During the gate gap in this step, also to read the TPC information among the DPCCH, and utilize this information to keep the continuous of power control, prevent the further variation of original link signal quality; In the 4th step, network based measurement result judges whether to carry out to switch between frequency, and if desired, notice UE switches; In the 5th step, UE finishes switching between frequency according to switching notice in the moment of appointment.
Compare with compact model, because therefore the gap that DPCCH gate gap produces less than compact model can use continuous several gates gap when the present invention specifically uses, altogether with reference to figure 2.Among the figure, S1 is the gate gap to S6, and narrow post is DPCCH partly, can S1 is synchronous as adjacent sub-district to S6 in the reality, and follow-up gap is used for measuring.
Be a concrete application example of the present invention below, with reference to figure 3.Shown in the figure, when the signal quality that UE monitors original sub-district is lower than certain predefine thresholding, the measurement result of original sub-district is reported the serving BS controller (SRNC) of network by measurement report signaling (Measurement Report), SRNC is according to the result who reports, determine to adopt the DPCCH gating technology to carry out inter-frequency measurement, send radio link reconfiguration demand signalling and radio bearer reconfiguration request signaling (Radio Link ReconfigurationRequest and Radio Bearer Recongfiguration Request) the DPCCH gate parameter of configurating base station side and UE side respectively to former cell base station (Home BS) and UE respectively then, and dispose limited TFS, after parameter configuration finished, Home BS and UE reshuffled the message that the signaling that finishes (RadioLink Reconfiguration Complete and Radio Bearer RecongfigurationComplete) finishes to the configuration of SRNC feedback parameter respectively by sending finish signaling and radio bearer of radio link reconfiguration.UE and network side are being specified constantly and startup DPCCH gating technology on the specific radio frames according to configuration parameter, the search of adjacent sub-district is frequently carried out synchronously with signal quality measured in the gap that UE produces by the DPCCH gating technology, during the gap, the advanced row buffering of high-rise data to the PS territory is waited for after the gap finishes sending data again; For the CS numeric field data, high-rise data being abandoned or sending part divided data only, the size that sends the CS numeric field data satisfies the requirement of limited TFS.UE is after finishing adjacent cell measurement frequently, with the neighbour frequently cell measurement results by reporting network by measurement report signaling (Measurement Report), be SRNC, SRNC judges whether that according to the reporting measurement result needs carry out switching between frequency, if desired, set up the link that demand signalling (Radio Link SetupRequest) is set up SRNC and Target cell by sending Radio Link to target BS (Target BS), sending physical channel reconfiguration request signaling (Physical Channel Reconfiguration Request) notice UE to UE then carries out switching between frequency, after UE receives switching command, getting in touch of the cut-out of the moment of appointment and original sub-district, connect with alien-frequency district.Original sub-district, be that Home BS lost efficacy indication signaling (Radio Link Failure Indication) to the inefficacy of SRNC reporting links by Radio Link, SRNC deletes original sub-district link according to the link failure indication by send Radio Link removal request signaling (Radio LinkDelete Request) to Home BS.After UE and Target cell are set up link, reshuffle by physical channel again and finish signaling (Physical Channel ReconfigurationComplete) and report to switch to SRNC and finish.

Claims (6)

1, a kind of switching method between frequencies comprises:
(1) signal quality of the original sub-district of subscriber equipment (UE) monitoring when the signal quality that monitors is lower than the predefine thresholding, reports network with measurement result;
(2) the network based result who reports determines to adopt Dedicated Physical Control Channel (DPCCH) gating technology to carry out inter-frequency measurement, and the DPCCH gate parameter of configuration UE and base station side, and configuring transmission format collection (TFS);
(3) UE and network side carry out gate according to the gate parameter, and the synchronous and signal quality measured of adjacent sub-district frequently carried out in the gap that UE utilizes the DPCCH gating technology to produce, and measurement result is reported network;
(4) network based measurement result judges whether to carry out to switch between frequency, and if desired, notice UE switches;
(5) UE finishes switching between frequency according to switching notice in the moment of appointment.
2, switching method between frequencies according to claim 1 is characterized in that carrying out in the step (3) neighbour and finishes by slot synchronization, frame synchronization and code group identification, scrambler identification synchronously the sub-district frequently.
3, switching method between frequencies according to claim 1 is characterized in that carrying out in the step (3) signal quality measured for carrying out the chip energy of Common Pilot Channel received signal code power (CPICH RSCP) or Common Pilot Channel and the measurement of the ratio (CPICH Ec/NO) of in-band noise power density.
4, switching method between frequencies according to claim 1, it is characterized in that described step (3) also comprises: the data to packet domain (PS) cushion, and wait for after finish in the gate gap sending again, and the data of circuit domain (CS) are abandoned.
5, the changing method between frequency according to claim 1, it is characterized in that described step (3) also comprises: the data to packet domain (PS) cushion, wait for after finish in the gate gap sending again,, send and satisfy the data that TFS requires for the data of circuit domain (CS).
6, according to claim 1,4 or 5 described switching method between frequencies, it is characterized in that described step (3) also comprises: during the gate gap, read through-put power control (TPC) information among the DPCCH, and utilize this information to keep the continuous of power control.
CN 01144931 2001-12-24 2001-12-24 Switching method between frequencies Expired - Fee Related CN1184834C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 01144931 CN1184834C (en) 2001-12-24 2001-12-24 Switching method between frequencies

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 01144931 CN1184834C (en) 2001-12-24 2001-12-24 Switching method between frequencies

Publications (2)

Publication Number Publication Date
CN1429031A true CN1429031A (en) 2003-07-09
CN1184834C CN1184834C (en) 2005-01-12

Family

ID=4677895

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 01144931 Expired - Fee Related CN1184834C (en) 2001-12-24 2001-12-24 Switching method between frequencies

Country Status (1)

Country Link
CN (1) CN1184834C (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2007128226A1 (en) * 2006-04-29 2007-11-15 Huawei Technologies Co., Ltd. A method and ue for measuring the adjacent cell
WO2010048851A1 (en) * 2008-10-31 2010-05-06 华为技术有限公司 Mobility measurement method and user equipment, evolution network base station
CN101715221A (en) * 2004-12-14 2010-05-26 富士通株式会社 Wireless communications system, base station, and mobile station
CN102065452A (en) * 2009-11-12 2011-05-18 中兴通讯股份有限公司 Intersystem measuring method, device and system
CN101390310B (en) * 2005-12-28 2012-06-06 株式会社Ntt都科摩 Mobile station, base station and method of controlling measurement of peripheral cell
CN102572975A (en) * 2010-12-31 2012-07-11 中国移动通信集团公司 Method, system and equipment for switching operating frequency of cells
CN102098690B (en) * 2005-06-15 2013-08-21 日本电气株式会社 Method for estimating reception quality of communication area, apparatus thereof, and program thereof
CN103716813B (en) * 2012-09-28 2017-12-05 华为技术有限公司 Link quality information processing method and base station

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102176783B (en) * 2004-12-14 2013-01-02 富士通株式会社 Wireless communications system, base station, and mobile station
CN101715221B (en) * 2004-12-14 2015-07-08 富士通株式会社 Wireless communications system, base station, and mobile station
CN101715221A (en) * 2004-12-14 2010-05-26 富士通株式会社 Wireless communications system, base station, and mobile station
CN101867952B (en) * 2004-12-14 2012-04-11 富士通株式会社 Wireless communications system, base station, and mobile station
CN101120524B (en) * 2005-06-15 2014-09-24 日本电气株式会社 Method for estimating reception quality of communication area and apparatus thereof
CN102098690B (en) * 2005-06-15 2013-08-21 日本电气株式会社 Method for estimating reception quality of communication area, apparatus thereof, and program thereof
CN101390310B (en) * 2005-12-28 2012-06-06 株式会社Ntt都科摩 Mobile station, base station and method of controlling measurement of peripheral cell
WO2007128226A1 (en) * 2006-04-29 2007-11-15 Huawei Technologies Co., Ltd. A method and ue for measuring the adjacent cell
CN101730135A (en) * 2008-10-31 2010-06-09 华为技术有限公司 Mobile management methods, user equipment and evolved network basestation
CN101730135B (en) * 2008-10-31 2013-08-07 华为技术有限公司 Mobile management methods, user equipment and evolved network basestation
WO2010048851A1 (en) * 2008-10-31 2010-05-06 华为技术有限公司 Mobility measurement method and user equipment, evolution network base station
CN102065452A (en) * 2009-11-12 2011-05-18 中兴通讯股份有限公司 Intersystem measuring method, device and system
CN102065452B (en) * 2009-11-12 2015-08-12 中兴通讯股份有限公司 Method of measurement, device and system between system
CN102572975A (en) * 2010-12-31 2012-07-11 中国移动通信集团公司 Method, system and equipment for switching operating frequency of cells
CN103716813B (en) * 2012-09-28 2017-12-05 华为技术有限公司 Link quality information processing method and base station

Also Published As

Publication number Publication date
CN1184834C (en) 2005-01-12

Similar Documents

Publication Publication Date Title
CN100454794C (en) Hard switchover judging method for wide band CDMA system
CN100525532C (en) Base station synchronization for handover in hybrid GSM/CDMA network
CN100455100C (en) Intersystem base station handover
CN101142839B (en) Method, system and node for improved handover of communication system
KR100952566B1 (en) A Cell Handoff Method and User Equipment Based on TDD SYSTEM
CN100463564C (en) Switching back method after failure of relay switching
CN100493228C (en) Switchover controll method of multiple frequency points system
CN100459802C (en) Method and system for implementing cellular communication system switching
CN1433650A (en) Control of compressed mode transmission in WCDMA
CN1276655A (en) Macro diversity control system having macro diversity mode based on work class
CN104780581A (en) Method and arrangement for event triggered adaptive cell detection activity level in discontinuous reception
CN1168327C (en) Witching method between systems
CN101835224A (en) Switching method and terminal of HSPA (High Speed Packet Access) channel
CN100484310C (en) Switchover method between system of mobile communication service
WO2007111485A1 (en) Method and system for high speed intra-domain mobility management using dual interfaces in wireless lan/man
CN1184834C (en) Switching method between frequencies
CN101064920B (en) Method for realizing cross-zone handoff in TD-SCDMA multi-frequency point cell
CN100442782C (en) Method for improving packet service on-line user number
CN101360338A (en) Self-organizing network switch implementing method based on TD-SCDMA
CN102264113B (en) Virtual soft switching method in time division-synchronous code division multiple access (TD-SCDMA) system
CN1263239C (en) Soft switching method in wideband CDMA system
CN102892130B (en) A kind of handoff parameter adjusting method
CN100403665C (en) Method of uplink synchronization on soft switch or softer switch
CN102364980A (en) Method and user equipment (UE) for dynamically controlling inner-loop power
CN100479581C (en) Method for increasing switch success rate

Legal Events

Date Code Title Description
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20050112

Termination date: 20161224