CN1417370A CN01135887A CN01135887A CN1417370A CN 1417370 A CN1417370 A CN 1417370A CN 01135887 A CN01135887 A CN 01135887A CN 01135887 A CN01135887 A CN 01135887A CN 1417370 A CN1417370 A CN 1417370A
Authority
CN
China
Prior art keywords
blade
coating
spraying
water
water erosion
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN01135887A
Other languages
Chinese (zh)
Inventor
范文献
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MUDANJIANG AIDI ELECTRICAL POWER TECHN CO Ltd
Original Assignee
MUDANJIANG AIDI ELECTRICAL POWER TECHN CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MUDANJIANG AIDI ELECTRICAL POWER TECHN CO Ltd filed Critical MUDANJIANG AIDI ELECTRICAL POWER TECHN CO Ltd
Priority to CN01135887A priority Critical patent/CN1417370A/en
Publication of CN1417370A publication Critical patent/CN1417370A/en
Pending legal-status Critical Current

Links

Abstract

The spraying process of water erosion resisting coating for water turbine vanes includes repair welding, sand blasting, spraying transition layer, applying pore sealing agent and vane protecting steps. It has high binding strength between the coating and vane surface resulting in coating life as long as four years and without peeling, leads to low use cost and is suitable for vanes operating in wet steam area and last stage vanes operating in low load condition.

Description

The spraying coating process of water erosion resisting coating for water turbine vanes
Technical field:
The present invention relates to the multistage foil assembly of a kind of steam turbine or nuclear power generating sets, relate to a kind of spraying coating process of blade water erosion-proof coating specifically.
Background technology:
The final stage of steam turbine and secondary multistage blade with nuclear power generating sets be all in wet-steam region work, when wet steam flow during to stator blades, the sub-fraction water droplet is arranged since the effect aggregation of mass force on the surface of blade with, especially at the intrados of stator blade leading edge.The water droplet of stator blade surface aggregation will form moisture film, constantly flow to exit edge from blade surface, form the big water droplet suitable with trailing edge thickness, water droplet flows into rotor blade before by refinement with steam, the water droplet of refinement is accelerated to friction-motion speed by steam and impacts rotor blade, causes the water erosion of rotor blade leading edge.
Turbine driven set often needs the peak regulation running at present, therefore last stage blade often is in underload, high back pressure work down, and when being reduced to a certain value with volumetric flow rate, the movable vane root produces the separation of flow, make movable vane root exit edge water brush phenomenon occur, aggravated the damage of rotor blade.The breakage of rotor blade not only can make stage efficiency descend, and owing to produce the fracture that water erosion may cause blade, from causing unit vibration, makes the unit safety reliability be subjected to very big influence.Therefore say that the anti-water erosion problem of blade is the hard nut to crack of puzzlement steam turbine manufacturing always.For addressing this problem, each steamer mechanism factory adopts electrospark impregnation and weldering department to make very much the way of alloy slice prevent water erosion more, makes its complex process, and effect is not good enough.
Summary of the invention:
The objective of the invention is water erosion problem, and a kind of spraying coating process of anti-water erosion layer is provided for solution steam turbine blade leading edge, thus the work-ing life of improving rotor blade.
Technical solution of the present invention adopts following processing step to finish:
A, repair welding: at first blade is carried out repair welding, the reblading molded lines into and out of the serious position of vapour limit water erosion;
B, sandblast: select the Buddha's warrior attendant sand blasting about 60 orders to sweep blade reparation position, " activation " blade surface becomes frosting;
C, blade protection:
Before the blade sprayed coating, can smear the yellow glycerine of protection on the surface of non-spraying part;
D, spray transition layer: select the material identical for use, the repair materials of fusing is sprayed transition layer to repairing the position by arc-spraying machine, air compressor machine with blade;
E, sprayed coating: choosing the spraying material is two strands of fuses of NicrsiB nickel chromium triangle silicon boron, is contained in respectively on the electrode holder clip, send fuse automatically by arc-spraying machine, and the pressurized air by air compressor machine sprays to blade surface with the spray material of fusing and forms water erosion-proof coating;
F, be coated with hole sealing agent: coating-Ti alloy water or 823 water on sprayed coating, again by smearing paraffin wax on the coating; Blade repaired promptly finish.
Described water erosion-proof coating total thickness is 0.3~0.6mm.
The characteristics that water erosion resisting coating for water turbine vanes of the present invention has are:
1, the spraying material of choosing is imitative magnetic material nickel chromium triangle silicon boron, makes the bonding strength height of coating and blade surface, can not produce obscission, and its coating life can reach more than 4 years and (surpass an overhaul phase);
2, spraying is to implement under cold conditions, and blade is not needed preheating, has reduced the influence to Blade Properties;
3, in the process of implementing spraying, the blade heating temperature can not influence the mechanicalness of blade material below 200 ℃;
4, total coating thickness influences very little to the rotor dynamic balancing precision in 0.3~0.6mm scope.
5, this spraying coating process method is applicable to the real coating that adds of new, old blade;
6, spraying process can not influence the overhaul duration because of the blade spraying as a grade blade is only needed two working dayss;
7, adopt the spraying method reblading to be equivalent to buy 1/3~1/6 of new blade cost, can reduce the production cost of enterprise.
Embodiment:
Processing step:
A, repair welding: at first blade is carried out repair welding into and out of the serious blade of vapour limit water erosion, with the reblading molded lines;
B, sandblast: rotor is winched to zero rice platform, level places on the carriage, and protect axle journal with soft cloth, then the silicon carbide about 60 orders is put into container, open air compressor machine (rated pressure is at 0.6mpa), by sand-blasting gun the Buddha's warrior attendant sand blasting is swept by the blade edge of water erosion, destroy by the water erosion position, sandblast simultaneously also makes blade surface " activation " become frosting;
C, blade protection:
Blade can be smeared on the surface at non-spraying position and anti-smear yellow glycerine and protect before sprayed coating, in order to avoid the coating in the spraying and change original surface;
D, spray transition layer: according to the blade of unlike material, select identical material for use, can select to be fit to the Nicr welding rod, the pressurized air by arc-spraying machine, air compressor machine with the buffer layer material of fusing to repairing position spray transition layer;
E, sprayed coating: adopt special-purpose protection body to cover blade non-spraying surface, accurate to guarantee the spraying position, choosing the spraying material is two strands of fuses of NicrsiB nickel chromium triangle silicon boron, be contained in respectively on the electrode holder clip, after the igniting, automatically send fuse by arc-spraying machine, the pressurized air of the spray material that is melted by air compressor machine sprays to the spray material of fusing and forms water erosion-proof coating on the blade surface, and its coat-thickness is in 0.3~0.6 scope;
F, be coated with hole sealing agent: coating-Ti alloy water or 823 water on the sprayed coating after the reparation, finish by smearing paraffin wax on the coating and blade being repaired promptly again.

Claims (2)

1, the spraying coating process of water erosion resisting coating for water turbine vanes, it comprises following processing step:
A, repair welding: at first blade is carried out repair welding into and out of water erosion position, vapour limit, the reblading molded lines;
B, sandblast are selected the Buddha's warrior attendant sand blasting about 60 orders to sweep blade and are repaired the position, activate blade surface and become frosting;
C, blade protection: blade can be smeared the yellow glycerine of protection on the surface of non-spraying part before spraying;
D, spray transition layer: select the material identical for use, the repair materials of fusing is sprayed transition layer to repairing the position by electric arc machine, air compressor machine with blade;
E, sprayed coating: choosing the spraying material is the fuse of NicrsiB nickel chromium triangle silicon boron material, is contained in respectively on the electrode holder clip, send fuse automatically by arc-spraying machine, and the pressurized air by air compressor machine sprays to blade surface with the spray material of fusing and forms anti-water erosion layer;
F, be coated with hole sealing agent: coating-Ti alloy water or 823 water on sprayed coating, by smearing paraffin wax on the coating, blade is repaired promptly finished again.
2, by the spraying coating process of the described water erosion resisting coating for water turbine vanes of claim, it is characterized in that described water erosion-proof coating thickness is in 0.3~0.6mm scope.
CN01135887A 2001-11-05 2001-11-05 Spraying process of water erosion resisting coating for water turbine vanes Pending CN1417370A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN01135887A CN1417370A (en) 2001-11-05 2001-11-05 Spraying process of water erosion resisting coating for water turbine vanes

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN01135887A CN1417370A (en) 2001-11-05 2001-11-05 Spraying process of water erosion resisting coating for water turbine vanes

Publications (1)

Publication Number Publication Date
CN1417370A true CN1417370A (en) 2003-05-14

Family

ID=4673332

Family Applications (1)

Application Number Title Priority Date Filing Date
CN01135887A Pending CN1417370A (en) 2001-11-05 2001-11-05 Spraying process of water erosion resisting coating for water turbine vanes

Country Status (1)

Country Link
CN (1) CN1417370A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101551197B (en) * 2009-05-14 2012-04-18 瓮福(集团)有限责任公司 A pyrite-based sulphuric acid roaster cooling calandria repairing method
CN101566077B (en) * 2009-06-04 2012-05-02 湖南省湘电锅炉压力容器检验中心有限公司 Last stage vane of steam turbine and preparation method thereof
US8845281B2 (en) 2008-06-12 2014-09-30 General Electric Company Centrifugal compressor for wet gas environments and method of manufacture
CN104858607A (en) * 2015-04-24 2015-08-26 湘潭杰熙环境科技有限责任公司 Full-repairing technology for housing of desulphurization circulating pump
CN113025944A (en) * 2021-03-04 2021-06-25 哈动国家水力发电设备工程技术研究中心有限公司 Corrosion protection method for movable guide vane of seawater pump water turbine

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8845281B2 (en) 2008-06-12 2014-09-30 General Electric Company Centrifugal compressor for wet gas environments and method of manufacture
CN102119052B (en) * 2008-06-12 2015-11-25 通用电气公司 For centrifugal compressor and the preparation method of wet gas environments
CN101551197B (en) * 2009-05-14 2012-04-18 瓮福(集团)有限责任公司 A pyrite-based sulphuric acid roaster cooling calandria repairing method
CN101566077B (en) * 2009-06-04 2012-05-02 湖南省湘电锅炉压力容器检验中心有限公司 Last stage vane of steam turbine and preparation method thereof
CN104858607A (en) * 2015-04-24 2015-08-26 湘潭杰熙环境科技有限责任公司 Full-repairing technology for housing of desulphurization circulating pump
CN113025944A (en) * 2021-03-04 2021-06-25 哈动国家水力发电设备工程技术研究中心有限公司 Corrosion protection method for movable guide vane of seawater pump water turbine
CN113025944B (en) * 2021-03-04 2023-01-13 哈动国家水力发电设备工程技术研究中心有限公司 Corrosion protection method for movable guide vane of seawater pump water turbine

Similar Documents

Publication Publication Date Title
KR100704805B1 (en) Turbine element repair
EP0176942B1 (en) Method for repairing metal in an article
US5972424A (en) Repair of gas turbine engine component coated with a thermal barrier coating
CA2445237C (en) Method of repairing a stationary shroud of a gas turbine engine using plasma transferred arc welding
EP1721697B2 (en) Superalloy repair methods and inserts
EP1013788B1 (en) Repair of high pressure turbine shrouds
US20040086635A1 (en) Method of repairing a stationary shroud of a gas turbine engine using laser cladding
US20080038575A1 (en) Method for applying environmental-resistant mcraly coatings on gas turbine components
US20120000890A1 (en) Method for repairing gas turbine blades and gas turbine blade
BRPI0708484A2 (en) process for repairing and restoring dynamically tensioned components comprised of aluminum alloys for aircraft applications
EP2171124B1 (en) Method for manufacturing an abrasive coating on a gas turbine component
JPH10502302A (en) Turbine blade flow area restoration method
US20070111119A1 (en) Method for repairing gas turbine engine compressor components
EP1685923A1 (en) Repair and reclassification of superalloy components
EP2327812A1 (en) Near net shape composite airfoil leading edge protective strips made using cold spray deposition
EP1217090A1 (en) Vapor deposition repair of superalloy articles
EP1361339A1 (en) Method for producing a bladed rotor for a gas turbine engine having an aluminium bronze protective coating
US6376800B1 (en) Maskant for use during laser welding or drilling
CN111334744A (en) Processing method for regulating and controlling micro texture on surface of thermal barrier coating bonding layer by utilizing laser impact
CN1417370A (en) Spraying process of water erosion resisting coating for water turbine vanes
WO2014182481A1 (en) Laser casting blade repair
EP3213864A1 (en) Braze composition, brazing process, and brazed article
EP3282034A1 (en) Aluminum fan blade tip prepared for thermal spray deposition of abrasive by laser ablation
EP3748125A1 (en) Methods for repairing a multi-layer coated component
CN111041475B (en) Method for preparing reinforced coating by laser alloying/polishing composite integration

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication