CN1410921A - Method of establishing stock file using warehouse management system - Google Patents

Method of establishing stock file using warehouse management system Download PDF

Info

Publication number
CN1410921A
CN1410921A CN 01141532 CN01141532A CN1410921A CN 1410921 A CN1410921 A CN 1410921A CN 01141532 CN01141532 CN 01141532 CN 01141532 A CN01141532 A CN 01141532A CN 1410921 A CN1410921 A CN 1410921A
Authority
CN
China
Prior art keywords
materials
parts
warehouse
storehouse
wms
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN 01141532
Other languages
Chinese (zh)
Inventor
李允仲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Via Technologies Inc
Original Assignee
Via Technologies Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Via Technologies Inc filed Critical Via Technologies Inc
Priority to CN 01141532 priority Critical patent/CN1410921A/en
Publication of CN1410921A publication Critical patent/CN1410921A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • General Factory Administration (AREA)

Abstract

In the warehouse management system, the stock file of the materials and workpieces are recorded in the database readable to the computer. The data structure of the stock file of the materials and workpieces includes the number of the warehouse, the number of the material, the position, the unit and quantity. The warehouse where the materials and workpieces is actually located defines the number of the warehouse and is not defined based on the attribute of the management so as to reflect the actual place.

Description

The method of establishing stock file using warehouse management system
Technical field
The present invention relates to the method for a kind of storage management method, particularly a kind of establishing stock file using warehouse management system.
Background technology
For enterprise, stock's operation not only have regulate to produce, buying and the function of selling, also be the some of assets, so stock's management has suitable influence for the operation of enterprise with profit.Particularly along with the expansion of incorporated business's scale, the raw material and the amount of material of turnover are huge, and how to improve these materials and parts circulations and stock's efficient, tend to the operation of enterprise is produced decisive influence.In recent years, because soft, the hardware industry of computer is flourish, relevant WMS is constantly weeded out the old and bring forth the new, and has improved the efficient that each company's industry is carried out stock control.In general, the basic important document of stock control is set up the profile of stock's materials and parts exactly, such as the materials and parts storehouse of depositing not, data such as the position of in the warehouse, depositing, item number, unit, quantity, all need be recorded in stock's shelves, use in order to related systems such as production, buying, sale, finance.
The reserved archive of general WMS can be classified according to the attribute of various materials and parts mostly.For example finished bin is the warehouse of depositing finished product; The semi-manufacture storehouse then is used for depositing semi-manufacture, and that in like manner former feed bin then can be deposited is former, material etc.And, for finished product or semi-manufacture, most WMS, and can its lane place of depositing be divided into sub-quality products storehouse, new product storehouse, old product storehouse, waste product storehouse etc. further according to the state of these article.But for the enterprise that a warehouse is only arranged, in order to yield to the needs that these WMSs are handled and used, often a warehouse must be divided into finished bin, semi-manufacture storehouse, former feed bin etc., can be with correct in system, the calculating and utilization of stock's information.Person more, because it is other that these systems will be distinguished into these storehouses, can be with correct in system, the calculating and utilization of stock's information, also therefore can cause materials and parts in the process of producing or selling, must in system, repeatedly allot/change other operation of storehouse, in the stock control operation, increase the program of operation on foot.
Please refer to Fig. 1, this figure has shown at present and has purchased production/processing by materials and parts, to such an extent as to the related procedure of selling.In general, after carrying out purchasing procedure 10, can be in former feed bin 12 with raw material storage, and carry out stock's work of filing.Allot raw material production/job sequence 14 according to manufacturing planning again, and produce semifinished or finished goods.At this moment, be limited by the operating type of above-mentioned WMS, semifinished or finished goods must be stored in semi-manufacture storehouse 16 or finished bin 18, the work of filing of the line correlation of going forward side by side respectively.For partly dividing more meticulous warehousing system, distinguishing to the semi-manufacture storehouse, still need and consider these half-finished states, and further sort out to the sub-quality products storehouse, the non-defective unit storehouse, with the defective products storehouse.Same, for the finished product that is divided to finished bin, also can further classify as sub-quality products, non-defective unit and defective products according to its state.In addition, then can be transferred to waste product storehouse 20 because make the waste product that is produced of slipping up, to treat further processing.
It should be noted that design, the object in finished bin of being stored in 18 is only arranged, can the Jing marketing sell according to traditional WMS.So, when incorporated business consider based on strategy or business on when needing, when desire is sold the object in former feed bin 12 or the semi-manufacture storehouse 16, need in system, allot/change earlier other operation of storehouse, and these objects are incorporated into to finished bin 18, carry out follow-up marketing procedure 22 again.Even for the operation of can making an inventory accurately when the stock control, the object entity that needs will be stored in earlier in the former feed bin 12 is carried to finished bin 18, or with the Articles transfer in the semi-manufacture 16 to finished bin 18, to carry out the program of follow-up sale.
Please refer to Fig. 2 A, wherein shown the warehouse-in flow process of present WMS.After finishing buying input work 30, then carry out the data input operation 32 of raw material warehouse-in, and import basic documents such as former feed bin is other, raw material item number, deposit position, unit, quantity in regular turn, and write stock's shelves 34, and finish input work 36.Same, shown in Fig. 2 B, when producing input work 40, can be finished product or semi-manufacture 42, and select to carry out input 44 of finished product warehouse-in or semi-manufacture warehouse-in input 46 according to the object state.When carrying out finished product when warehouse-in, can import in regular turn finished bin not, basic documents such as item number, position, unit and quantity, and write stock's shelves 48, and finish the operation 50 of being correlated with.As for when object belongs to semi-manufacture, then, can finish input work 54 at the relevant basic document of input and after writing stock's shelves 52.
Please refer to Fig. 3 A again, wherein shown the outbound flow process of present warehousing system.After beginning to produce the operation 60 of neck material, can be according to the materials and parts plan of needs by former feed bin and semi-manufacture storehouse neck material 62, be raw material or half-finished state 64 according to object again, materials and parts tank farm stock to former feed bin reduces 66, and the materials and parts tank farm stock of double finished bin reduces 68, and the operation 70 of completed product run neck material.Same, please refer to Fig. 3 B, when selling putting up working 72, need to judge whether these objects are finished product 74 earlier.When these objects belong to finished product 74, can be according to the order demand by finished bin shipment 76, and reduce the tank farm stock 78 of finished bin and closing a sale putting up working flow process 80.Otherwise, when object is not finished product 74, then need carry out raw material or semi-manufacture are alloted/roll-over operation 82, wherein need raw material or semi-manufacture storehouse to be alloted/the roll-over program with manual work input related data.
Concerning incorporated business, when it is limited by the size in entity storage place, and can't set up the warehouse of so many kind the time, often a warehouse can only be separated into several virtual storehouses by above-mentioned classification.Thus, when storage materials and parts when too much, for make an inventory, stock's management even turnover goods all is very loaded down with trivial details work.In addition, because relevant material stock quantity is that attribute status according to material is (as finished product, semi-manufacture, raw material, waste product or the like ...) metering, therefore only can provide quantity on the book as the reference of producing, making an inventory, selling, and the part of the not shipment that these materials and parts client can not have been placed an order as yet, hold the part of inquiring the price at the family, enter the part of the production schedule ... wait actual being reflected in the tank farm stock of situation of other relevant operations.
Summary of the invention
Purpose of the present invention defines other inventory management method of its storehouse according to the actual warehouse of depositing of materials and parts providing a kind of.
Another object of the present invention is providing a kind of computer-readable at WMS to get the method for setting up the materials and parts reserved archive in the data bank, wherein when determining that the materials and parts storehouse is other, directly define, and avoid materials and parts are categorized as attributes such as material, finished product, semi-manufacture according to the actual deposit position of materials and parts.
For achieving the above object, the present invention has disclosed a kind of computer-readable at WMS and has got the method for setting up the materials and parts reserved archive in the data bank.Wherein, the data structure of materials and parts stock case comprised the storehouse not, item number, position, unit and quantity, and storehouse herein is not to define according to the actual warehouse of depositing of materials and parts, directly to reflect the actual position of depositing of materials and parts.According to this kind materials and parts reserved archive method for building up, but except economization in data bank the shared storage area, also can when the operation WMS, promote the efficient of flow processs such as materials and parts buying, producing and selling.
Another purpose of the present invention is providing a kind of the minimizing to allot/roll-over operation and effectively simplify buying to the storage management method of selling work flow.
For achieving the above object, the present invention has disclosed a kind of flow process of using WMS to carry out the materials and parts buying, produce and sell, this is flow process such as following partly: at first, purchase first materials and parts and deposit in the warehouse, and get at computer-readable and set up first reserved archive in the data bank by the operation WMS, the storehouse that first reserved archive comprises first materials and parts not, item number, deposit position, unit and stockpile number, and the storehouse is not the warehouse definition of depositing according to first materials and parts, can directly reflect the actual deposit position of first materials and parts.Then, read first reserved archive and according to the production plan of needs by lead out first materials and parts in the warehouse, relending operate WMS with revise and updatedb in first reserved archive.Wherein, reduce stockpile number according to the first materials and parts situation of leading out.Then, first materials and parts are carried out job sequence and produce second materials and parts.Deposit second materials and parts again to the warehouse, and the operation WMS is so that set up second reserved archive in data bank.Wherein, the storehouse that second reserved archive comprises second materials and parts not, item number, deposit position, unit and quantity, and the storehouse is not to define according to the actual warehouse of depositing of second materials and parts, can directly reflect the actual deposit position of second materials and parts.Then, can read first and second reserved archive and according to the order demand by leading outlet in the warehouse, wherein materials and parts can be first materials and parts, second materials and parts or its combination in any.Operate WMS again to revise first reserved archive and second reserved archive and to be recorded in this data bank, wherein reduce the stockpile number of first materials and parts and second materials and parts respectively according to neck outlet situation.
The present invention also provides a kind of flow process of using WMS to carry out the materials and parts warehouse-in, and it comprises the following step at least: at first, materials and parts are stored in the warehouse; Secondly, operate this WMS so that get the reserved archive that writes down these materials and parts in the data bank at computer-readable, wherein the data structure of this reserved archive comprised these materials and parts the storehouse not, item number, deposit position, unit and quantity, and this storehouse is not to define according to the actual warehouse of depositing of these materials and parts, directly to reflect the actual position of depositing of these materials and parts.
The present invention provides a kind of flow process of using WMS to carry out the materials and parts outbound again, wherein this WMS can write down have the storehouse not, the materials and parts reserved archive of item number, position, unit and quantity is in the data bank that computer-readable is got, this flow process comprises the following step at least: at first, operate this WMS so that by the reserved archive that reads these materials and parts in this data bank, and other according to the item number and the storehouse of this reserved archive, judge the actual warehouse of depositing of these materials and parts; Then, by leading out this materials and parts in this warehouse; Moreover, revise and write down this reserved archive to this data bank, wherein have troubles and reduce the quantity of this reserved archive according to this materials and parts neck.
Description of drawings
Fig. 1 shown in classic method, carry out materials and parts buyings, produce, processing, with the related procedure of selling;
Fig. 2 A has shown the related procedure of purchasing input work in classic method;
Fig. 2 B has shown the related procedure of producing input work in classic method;
Fig. 3 A has shown the materials and parts outbound process flow diagram when producing the operation of neck material in classic method;
Fig. 3 B has shown the materials and parts outbound process flow diagram when selling putting up working in classic method;
Fig. 4 shows the process flow diagram that carries out materials and parts buying, producing, processing and selling according to the inventive method;
Fig. 5 A has shown the related procedure of purchasing input work in classic method;
Fig. 5 B has shown the materials and parts outbound process flow diagram when producing the operation of neck material in classic method;
Fig. 5 C has shown the related procedure of producing input work in classic method; And
Fig. 5 D has shown the materials and parts outbound process flow diagram when selling putting up working in classic method.
Embodiment
The invention provides a utilization WMS record materials and parts reserved archive and get method in the data bank in computer-readable.The data structure of this materials and parts reserved archive comprised the storehouse not, item number, position, unit and quantity, so and to define above-mentioned storehouse other in various materials and parts actual store position, and exempt with the materials and parts attribute (as finished product, semi-manufacture, raw material or the like ...) other practice of division storehouse.So, utilizing this kind reserved archive to set up mode, purchasing, produce, when processing is sold, can significantly reduce and allot/the roll-over program to such an extent as to carry out materials and parts, and improve materials and parts stock efficient.Shown in relevant of the present invention being described in detail as follows:
Please refer to Fig. 4, the present invention of this figure display application sets up materials and parts reserved archive method, to such an extent as to the situation in related procedure such as buying, production/processing sale.Wherein, after carrying out purchasing procedure 100, materials and parts can be stored in the warehouse 110, and in WMS, set up relevant reserved archive in computer-readable is got data bank.Wherein the data structure of materials and parts reserved archive comprised the materials and parts storage compartment not, item number, position, unit and quantity.It is other to it should be noted that reserved archive that the present invention sets up only defines above-mentioned storehouse at various materials and parts actual store position, and does not distinguish according to the attribute of materials and parts.In other words, do not need in the reserved archive herein materials and parts are divided into finished product, semi-manufacture and raw material, need be, to divide the storehouse other with former feed bin with finished bin, semi-manufacture storehouse yet.
Relevant application the present invention sets up the situation of reserved archive method in buying warehouse-in flow process, shown in Fig. 5 A, after finishing buying input work 102, can carry out materials and parts rewinding loading routine 104, that is the operation WMS is set up the reserved archive of materials and parts.Data is being write reserved archive 106 and be recorded to computer-readable when getting data bank, can be according to the data structure of above-mentioned reserved archive, import respectively storehouse that materials and parts deposit not, basic documents such as item number, deposit position, unit, quantity, and finish materials and parts input work program 108.As above-mentioned, in input during basic document, the attribute status that does not need to define especially materials and parts is a raw material, and the storehouse that does not yet need to deposit materials and parts is not defined as former feed bin, but it is other to define the storehouse according to the actual warehouse of depositing of materials and parts, directly to reflect the actual position of depositing of these materials and parts.
So, when the production/job sequence 120 that will carry out among Fig. 4, can operate WMS, so that by reading above-mentioned reserved archive in the data bank, and other according to item number in the reserved archive data structure and storehouse, and judge the actual warehouse of depositing of materials and parts.Then, can directly raw material be taken out by materials and parts actual store position, the production and processing operation of the line correlation of going forward side by side, and have troubles according to raw material neck and to reduce stockpile number, and revise and upgrade the materials and parts reserved archive that is stored in the data bank.It should be noted that because when setting up the materials and parts reserved archive it is other to be not that attribute according to materials and parts defines the storehouse of storage, so after finishing production operation, can be stored in the warehouse 110 directly with the materials and parts after the processing.
Relevant materials and parts outbound operation, shown in Fig. 5 B, because above-mentioned reserved archive is not that to distinguish the storehouse according to the attribute status of materials and parts other, so when producing the operation 113 of neck material, only need the operation WMS, by reading relevant reserved archive in the data bank, can judge that materials and parts actual store position and storehouse and directly do not get material.Wherein, can be according to the materials and parts plan of needs by neck material in the warehouse 115, and, the tank farm stock in the reserved archive is reduced 117 according to the materials and parts of being led, and revise reserved archive and be recorded in the data bank, to finish the operation 119 of neck material.What specify is distinguish because the materials and parts of lead press attribute, so its actual attribute can be raw material, semifinished or finished goods, no matter but the attribute status of these materials and parts why, need carry out quantity and reduce and get final product at the reserved archive materials and parts of being correlated with.
Certainly, after finishing the predetermined production plan, finished materials and parts can be deposited back in the warehouse again.Relevant materials and parts warehouse-in flow process shown in Fig. 5 C, when producing input work 112, can be operated WMS to carry out materials and parts warehouse-in loading routine 114.Wherein when writing reserved archive 116, not needing to distinguish materials and parts is semifinished or finished goods, therefore can not produce the problem that to deposit in semi-manufacture storehouse or finished bin yet, and can directly import basic documents such as the actual storehouse of depositing of materials and parts is other, item number, deposit position, unit, quantity, and the relevant reserved archive of foundation, and completed product run input work program 118.Same, storehouse herein is not to define according to the actual warehouse of depositing of these materials and parts, directly to reflect the actual position of depositing of these materials and parts.
In general, after materials and parts predetermined production/job sequence is finished, as shown in Figure 4, can sell 130 by taking out the marketing of going forward side by side in the warehouse 110 with materials and parts.Wherein, consider based on commerce, the materials and parts attribute of selling might not be a finished product, also might be semi-manufacture.And, because in the present invention, to distinguishing in the warehouse,, will can not take place so in traditional WMS, have only the vendible situation of materials and parts of finished product attribute according to the materials and parts attribute.In other words, because do not distinguish in the present invention with regard to the materials and parts attribute, and can be directly by taking out materials and parts in the warehouse 110 of physical holding of the stock and selling.
Related procedure shown in Fig. 5 D, when selling putting up working 132, can be earlier by the reserved archive that reads relevant materials and parts in the data bank, more directly according to the order demand by warehouse shipment 134.Then, the operation WMS so that reduce the tank farm stock 136 of the materials and parts of leading in reserved archive, and is finished the shipment program 138 of selling.That is, the materials and parts of when selling, being led out, its actual attribute status may be raw material, semifinished or finished goods.But because the materials and parts attribute status,,, the reserved archive in the data bank is carried out stockpile number reduce and get final product therefore as long as by the operation WMS in the present invention not as the foundation of dividing materials and parts or the restriction of sale.
Certainly, as shown in Figure 4, along with the carrying out of production/work flow, partly materials and parts can be waste product by ownership.At this moment, can be with relevant materials and parts by taking out in the warehouse 110, and carry out waste disposal program 140.Same, because these materials and parts do not carry out the differentiation of warehouse location according to the waste product attribute status, so when carrying out the waste disposal program, only need directly to get final product by depositing in the warehouse materials and parts are taken out to handle.
That is provide a kind of WMS that uses to carry out the flow process that materials and parts are purchased, produced and sold in the present invention.This flow process has comprised the following step.At first, purchase first materials and parts and depositing in the warehouse.Then, the operation WMS is so that set up first reserved archive in the data bank that computer-readable is got.Wherein, the storehouse that this first reserved archive comprises first materials and parts not, item number, deposit position, unit and stockpile number, and the storehouse is not the warehouse definition of depositing according to first materials and parts, with the actual deposit position of direct reflection first materials and parts.Person more when setting up above-mentioned first reserved archive, need not judge that first materials and parts are raw material, semifinished or finished goods.Can when setting up above-mentioned first reserved archive, add the annotation field in addition to indicate the relevent information of these materials and parts.Wherein, the annotation field comprised at least that the storehouse does not belong to that company, storehouse are not distinguished, materials and parts ownership company, materials and parts management attribute.
When carrying out production routine, can read first reserved archive earlier and according to the production plan of needs by leading out first materials and parts in this warehouse.Then revise and write down first reserved archive to data bank.Wherein, reduce stockpile number according to the situation of leading out first materials and parts.Subsequently, first materials and parts are carried out job sequence and produce second materials and parts, and deposit second materials and parts to the warehouse.Operate WMS again so that in data bank, set up second reserved archive.Wherein, the storehouse that second reserved archive comprises second materials and parts not, item number, deposit position, unit and quantity, and its storehouse is not to define according to the actual warehouse of depositing of second materials and parts, directly to reflect the actual deposit position of second materials and parts.Same, when setting up above-mentioned second reserved archive, can add the annotation field to indicate the relevent information of materials and parts.Wherein, the annotation field comprised at least that the storehouse does not belong to that company, storehouse are not distinguished, materials and parts ownership company, materials and parts management attribute.
When carrying out marketing procedure, can read first reserved archive and second reserved archive earlier, and according to the order demand by in the warehouse directly the neck outlet.Wherein, these materials and parts can be first materials and parts, second materials and parts or its combination in any.And the operation WMS to be revising first reserved archive and second reserved archive, and is recorded in this data bank.Wherein, reduce the stockpile number of first materials and parts and second materials and parts respectively according to neck outlet situation.And, when leading out first materials and parts in by the warehouse, need not allot/the roll-over operation according to the order demand.
What particularly point out is, the storage compartment of reserved archive data structure of the present invention is other, be to define at various materials and parts actual store position, rather than other according to attribute (as finished product, semi-manufacture, former material or the like) the definition storehouse of materials and parts.Certainly, the operator judges the state that materials and parts are present for convenience, can also add the annotation field in the data structure of reserved archive, to show the relevent information of materials and parts.The annotation field that wherein, can add in reserved archive can be subdivided into that the storehouse does not belong to that company, storehouse are not distinguished again, materials and parts ownership company, materials and parts management attribute ... or the like.
Thus, when certain materials and parts of certain enterprise are when depositing in external processing factory, materials and parts itself still belong to this enterprise's inventory assets, but in order to distinguish the actual deposit position of materials and parts, can not belong to company's field in the storehouse, annotation is a company under this external processing factory, as a means of identification and utilization.Same, the operator understands the state of materials and parts for convenience, and relevant materials and parts management attribute (as non-defective unit, sub-quality products, defective products or consignment merchandise) all can be with dosing method in reserved archive, is defined in materials and parts attribute field and is illustrated.For example certain materials and parts of certain enterprise belong to other company's inventory assets, but deposit in this enterprise warehouse, belong to consignment character person, can annotation materials and parts management attribute be that consignment merchandise is as differentiation.
The present invention has considerable advantage, it is other that the attribute (as finished product, semi-manufacture, raw material or the like) of disobeying materials and parts at first in the present invention defines different storehouses, so in production or sales process, can significantly reduce and allot/the roll-over operation, and simplify various materials and parts by purchasing, produce/be worked into the job procedure of selling in the flow process.
Secondly, be other among the present invention according to the actual warehouse record storage compartment of depositing of materials and parts, thus do not need earlier same warehouse to be divided into each warehouses such as finished bin, semi-manufacture storehouse, former material bin, and cause the puzzlement in the storehouse management.In other words, by using method of the present invention, can directly reflect the actual position of depositing of materials and parts.Thus, by not and the annotation field, for depositing in other company warehouse but belong to the materials and parts of this enterprise inventory assets, can follow the trail of its actual deposit position really in conjunction with actual storage compartment.And, because the storehouse in the reserved archive does not only show the physical location of materials and parts, rather than distinguishes with attributes such as finished product, semi-manufacture, raw materials, so when setting up related libraries and file, can abbreviate, and save its storage area shared in data bank.
In addition owing to can set for management attribute by the method for filling field among the present invention with a kind of materials and parts, therefore the person of being easy to use to understand the attribute status of these materials and parts be non-defective unit, sub-quality products, defective products, new product, old product or waste product or the like ...And,, also can belong to the setting of company, and distinguish easily and the materials and parts of following the trail of in the warehousing storage by above-mentioned materials and parts for the consignment character materials and parts that belong to other company's inventory assets in the warehouse.
Person more, because method of the present invention can fully reflect the influence of each related system to the stock, so the Inventory Performance data that stock's shelves are provided more can be reacted the situation of each related system, and make the operator when the utilization WMS, can further promote the efficient of flow processs such as materials and parts buying, producing and selling.
The above embodiment only is explanation technological thought of the present invention and characteristics, its purpose makes the personage who has the knack of this skill can understand content of the present invention and is implementing according to this, when not limiting claim of the present invention with it, promptly the equalization of doing according to disclosed spirit generally changes or modifies, and must be encompassed in the claim scope of the present invention.

Claims (10)

1. one kind is write down the method for materials and parts reserved archive in computer-readable is got data bank in WMS, it is characterized in that: the data structure of this materials and parts reserved archive comprise at least the storehouse not, item number, position, unit and quantity, and this storehouse is not to define according to the actual warehouse of depositing of these materials and parts;
Wherein, the operator can directly learn the actual deposit position of these materials and parts by this reserved archive, and materials and parts are alloted, the roll-over operation and exempt, and promotes the efficient of materials and parts buying, producing and selling flow process.
2. as claimed in claim 1 in WMS the record method of materials and parts reserved archive in computer-readable is got data bank, it is characterized in that: can be not and this item number, and judge the actual warehouse of depositing of these materials and parts according to this storehouse of above-mentioned materials and parts reserved archive.
3. the method for materials and parts reserved archive in computer-readable is got data bank that write down in WMS as claimed in claim 1 is characterized in that: when setting up above-mentioned reserved archive, and add the annotation field to indicate the relevent information of these materials and parts.
4. as claimed in claim 3 in WMS the record method of materials and parts reserved archive in computer-readable is got data bank, it is characterized in that: above-mentioned annotation field has comprised that the storehouse does not belong to that company, storehouse are not distinguished, materials and parts ownership company, materials and parts management attribute.
5. one kind is used WMS to carry out the flow process that materials and parts are put in storage, it is characterized in that: comprise the following step at least:
Materials and parts are stored in the warehouse; And
Operate this WMS so that get the reserved archive that writes down these materials and parts in the data bank at computer-readable, wherein the data structure of this reserved archive comprised these materials and parts the storehouse not, item number, deposit position, unit and quantity, and this storehouse is not to define according to the actual warehouse of depositing of these materials and parts, directly to reflect the actual position of depositing of these materials and parts.
6. utilization WMS as claimed in claim 5 carries out the flow process of materials and parts warehouse-in, it is characterized in that: above-mentioned materials and parts warehouse-in flow process need not judge that these materials and parts are raw material, semifinished or finished goods.
7. utilization WMS as claimed in claim 5 carries out the flow process of materials and parts warehouse-in, it is characterized in that: when setting up above-mentioned reserved archive, and add the annotation field to indicate the relevent information of these materials and parts.
8. utilization WMS as claimed in claim 7 carries out the flow process of materials and parts warehouse-ins, it is characterized in that: above-mentioned annotation field has comprised that the storehouse does not belong to that company, storehouse are not distinguished, materials and parts ownership company, materials and parts management attribute.
9. flow process of using WMS to carry out the materials and parts outbound, it is characterized in that: this WMS can write down have the storehouse not, the materials and parts reserved archive of item number, position, unit and quantity in the data bank that computer-readable is got, this flow process comprises the following step at least:
Operate this WMS so that by the reserved archive that reads these materials and parts in this data bank, and other according to the item number and the storehouse of this reserved archive, judge the actual warehouse of depositing of these materials and parts;
By leading out this materials and parts in this warehouse; And
Correction is also write down this reserved archive to this data bank, wherein has troubles according to this materials and parts neck and reduces the quantity of this reserved archive.
10. one kind is used WMS to carry out the flow process that materials and parts are purchased, produced and sold, and it is characterized in that: this flow process comprises the following step at least:
Purchase first materials and parts and deposit in the warehouse;
The operation WMS is so that set up first reserved archive in the data bank that computer-readable is got, the storehouse that this first reserved archive comprises these first materials and parts not, item number, deposit position, unit and stockpile number, and this storehouse is not the warehouse definition of depositing according to these first materials and parts, directly to reflect the actual deposit position of these first materials and parts;
Read this first reserved archive and according to the production plan of needs by leading out this first materials and parts in this warehouse;
Correction is also write down this first reserved archive to this data bank, wherein according to leading out this first materials and parts situation to reduce this stockpile number;
These first materials and parts are carried out job sequence and produce second materials and parts;
Deposit these second materials and parts to this warehouse;
Operate this WMS so that in this data bank, set up second reserved archive, wherein this second reserved archive comprise these second materials and parts the storehouse not, item number, deposit position, unit and quantity, and this storehouse is not to define according to the actual warehouse of depositing of these second materials and parts, directly to reflect the actual deposit position of these second materials and parts;
Read this first reserved archive and this second reserved archive and according to the order demand by leading outlet in this warehouse, wherein these materials and parts can be first materials and parts, second materials and parts or its combination in any; And
Operate this WMS to revise this first reserved archive and this second reserved archive and to be recorded in this data bank, wherein reduce the stockpile number of these first materials and parts and these second materials and parts respectively according to neck outlet situation.
CN 01141532 2001-10-10 2001-10-10 Method of establishing stock file using warehouse management system Pending CN1410921A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 01141532 CN1410921A (en) 2001-10-10 2001-10-10 Method of establishing stock file using warehouse management system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 01141532 CN1410921A (en) 2001-10-10 2001-10-10 Method of establishing stock file using warehouse management system

Publications (1)

Publication Number Publication Date
CN1410921A true CN1410921A (en) 2003-04-16

Family

ID=4676234

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 01141532 Pending CN1410921A (en) 2001-10-10 2001-10-10 Method of establishing stock file using warehouse management system

Country Status (1)

Country Link
CN (1) CN1410921A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107798363A (en) * 2016-09-07 2018-03-13 柯尼卡美能达株式会社 Management system, managing device, management method and recording medium
CN113065778A (en) * 2021-04-07 2021-07-02 苏州索芙特威尔软件科技有限公司 Production management method and system

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107798363A (en) * 2016-09-07 2018-03-13 柯尼卡美能达株式会社 Management system, managing device, management method and recording medium
CN113065778A (en) * 2021-04-07 2021-07-02 苏州索芙特威尔软件科技有限公司 Production management method and system

Similar Documents

Publication Publication Date Title
US6529797B2 (en) System and method for automatically releasing collections of goods for shipment
EP1695282B1 (en) Data processing system and method
US6505094B2 (en) System and method for shipping items from a distribution facility
US6560509B2 (en) System and method for automated management of a distribution facility
CN112249574A (en) Device and system for material to enter and exit warehouse
US20070295808A1 (en) Hierarchical counting of inventory
CN111598506A (en) Inventory management system
CN112249573B (en) System and method for classified and centralized warehousing and storing of products with multiple specifications
CN111292045A (en) Warehouse-out management method for intelligent warehousing
US8423429B2 (en) Method, apparatus and program storage device for providing an advanced material management center
CN1083752C (en) System for and method of working out production start plans
Baxendale et al. what ERP can offer ABC.
CN1410921A (en) Method of establishing stock file using warehouse management system
Wen et al. Cost-benefit analysis of RFID application in apparel retailing for SME: a case from Taiwan
CN101241588A (en) Technology and business combined inventory management system multidimensional material management method
CN116402437A (en) Batch management method, device, equipment and storage medium
TWI244016B (en) Method using warehousing management to create inventory file
CN115208913A (en) Chip incoming material storage management method and system
Salee et al. Warehouse management improvement for a leather dyeing factory
CN110910058A (en) Method and device for managing materials
CN1510563A (en) System and method for stock control
CN1510601A (en) Material shortage management system and method
US20040128177A1 (en) System and method for balancing manufacturing orders
JP2003532202A (en) Method, system and storage medium for analyzing product delivery
TWI776139B (en) Production method and production system

Legal Events

Date Code Title Description
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication