CN1361474A - Material list establishing method - Google Patents
Material list establishing method Download PDFInfo
- Publication number
- CN1361474A CN1361474A CN 00137780 CN00137780A CN1361474A CN 1361474 A CN1361474 A CN 1361474A CN 00137780 CN00137780 CN 00137780 CN 00137780 A CN00137780 A CN 00137780A CN 1361474 A CN1361474 A CN 1361474A
- Authority
- CN
- China
- Prior art keywords
- bom
- bill
- factory
- data
- mentioned
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The material list establishing method to convert the circuit diagram data into part material data includes the following steps: establishing one factory material data base including part specification, producer number and factory number; converting circuit diagram data into material list file in standard format, and establishing factory part material data with at least one factory number based on the factory material data base and the material list file.
Description
The present invention relates to the method that a kind of Bill of Material (BOM) is set up, relate in particular to the method that the employed Bill of Material (BOM) of a kind of personnel of research and development is set up.
For hardware research and development personnel, the control relation of Bill of Material (BOM) (BOM, i.e. Bill of Material) to system development smoothly whether, its importance is well imagined.
In the past, the mode of setting up of Bill of Material (BOM) (BOM) is the Bill of Material (BOM) (BOM) that is produced according to circuit diagram software by the slip-stick artist, revise Hou through manually, transfer to operating personnel and import a material management system, as MIS8, set up engineering material inventory (EBOM), hand over the research and development personnel to confirm (doublecheck) more again, so the repetitiousness operation is till determining correctly.This operating type is not only spacious day time-consuming, and manual work adds that material quantity is huge, and careless omission is unavoidable, therefore often has the situation of leaking material or wrong material to take place.And the required activity duration is taken more than three days at least.
Moreover present Bill of Material (BOM) (BOM) promptly forms literalization in case key in material management system (MIS8), and the processing again of data is quite difficult.
Have the mirror what this, fundamental purpose of the present invention provides a kind of control system of Bill of Material (BOM) at what, can solve the shortcoming that the mode of setting up of common Bill of Material (BOM) (BOM) produces, and not only avoids the careless omission of manual work, and can increase substantially operating efficiency.
According to above-mentioned purpose, the present invention proposes the control system of a kind of Bill of Material (BOM) (BOM), this system replaces all manual work by a program, only needs to give operating personnel with the particular document that program produced and changes material management system (MIS8) automatically over to, promptly finishes engineering material inventory (EBOM).
According to the present invention, all be to finish by the what All Jobs by Automatic Program, no one's careless omission and consuming time of industry of working, and produce auxiliary document automatically and make things convenient for the research and development personnel to confirm again.
In addition, the invention provides query facility easily, make things convenient for research and development personnel debug and the handling of goods and materials of machine plate.
Material query function provided by the invention can not need to inquire about material with material management system (MIS8) line, has therefore alleviated the burden of material management system (MIS8).
The present invention can shorten engineering material inventory (EBOM) Time Created, finishes Hou a few hours from circuit layout design (Lay-out) and can finish, and can significantly increase work efficiency.
The present invention also provides the comparing function of Bill of Material (BOM) (BOM), the difference of the Bill of Material (BOM) (BOM) of convenient contrast different editions.
And according to the present invention, as long as the control of circuit diagram render phase is proper, error rate can be zero.
For above-mentioned and other purposes, characteristic of the present invention can be become apparent, especially exemplified by a preferred embodiment, conjunction with figs. is described in detail below:
Fig. 1 is for setting up the system architecture diagram in material data storehouse according to the present invention.
Fig. 2 is for setting up the system architecture diagram of Bill of Material (BOM) (BOM) data according to the present invention.
The system architecture diagram of Fig. 3 for Bill of Material (BOM) (BOM) counter-rotating being translated according to the present invention.
With reference to figure 1, at first, research and development bill of materials systems (RDBOM) material literal that material management system (M1S8) is produced comprise part specifications, supplier number, and factory in number and convert database document to, promptly set up material data storehouse (MIS.MDB) in the factory, provide the user can off line line mode to inquire about material information in the material management system (MIS8).
With reference to figure 2, converting system (as pouncing on (CAPTURE) system of catching) is offered research and development bill of materials system (RDBOM) according to .BOM and the .XRF document that circuit diagram produced.Then, research and development bill of materials systems (RDBOM) translate .BOM and the .XRF document is that database document is factory's part materials data, comprise whole materials documents, actual materials document and simplify the materials document, for inquiry, and generation CSV format file, and the CSV format file provides to operating personnel and changes material management system (MIS8) over to set up Bill of Material (BOM) (BOM), and this Bill of Material (BOM) (BOM) is a word or file.
With reference to the 3rd figure, Bill of Material (BOM) (BOM) word or file that material management system (MIS8) is produced offers research and development bill of materials system (RDBOM) again, and research and development bill of materials systems (RDBOM) are set up data file according to material data storehouse (MIS.MDB) in the factory with the counter-rotating of Bill of Material (BOM) (BOM) word or file, so that the contrast of being Bill of Material (BOM) (BOM) to be provided.And contrast difference between two Bill of Material (BOM) (BOM) document, can be thus as the foundation of setting up engineering change requirement (ECR) or the material ratio between different editions.In addition, research and development bill of materials systems (RDBOM) still provide the function of browsing Bill of Material (BOM) (BOM) content.
In addition, research and development bill of materials systems (RDBOM) also include the function of browsing data and element search, are respectively described below:
Browsing data: the content of browsing research and development bill of materials system (RDBOM) the various material documents that produce, its purpose is assisting the research and development personnel to check the material and the consistance of Bill of Material (BOM) (BOM) material in the wiring diagram, with guarantee Bill of Material (BOM) (BOM) correctly.
Element is searched: the purpose of this function is in the materials and the element search in error correction (DEBUG) stage of assisting research and development personnel inspection wiring diagram, and the mode of searching comprises:
(1) the element page number is searched: seek the page number of element in wiring diagram.
(2) single page preparation element search: list in each page number and use (_ NA ,/NA, _ DFS ,/DFS) element assists to indicate the not spent material on the part position figure.
(3) according to the item number search: the material that whether uses on the inquiry wiring diagram.
(4) single page Component List: list employed material in each page wiring diagram.
Though the present invention discloses as above with a preferred embodiment; but be not in order to limiting the present invention, anyly be familiar with this skill person, without departing from the spirit and scope of the present invention; might do a little changes and retouching, but protection scope of the present invention should be as the criterion by the scope that claim defined.
Claims (5)
1. the method for building up of a Bill of Material (BOM) in order to circuit diagram data are converted to factory's part materials data, is characterized in that comprising the following steps:
(a) set up material data storehouse in the factory according to a material data, wherein, above-mentioned material data is provided by a material management system, and the material data storehouse is set up by a research and development material management system in the above-mentioned factory;
(b) convert the foregoing circuit diagram data to a standard Bill of Material (BOM) format file by a converting system;
(c), set up above-mentioned factory part materials data by above-mentioned research and development bill of materials system according to material data storehouse in the above-mentioned factory and standard Bill of Material (BOM) format file.
2. the method for building up of Bill of Material (BOM) as claimed in claim 1 is characterized in that above-mentioned factory part materials data comprise numbering at least one factory.
3. the method for building up of Bill of Material (BOM) as claimed in claim 1 is characterized in that above-mentioned material data comprises part specifications, supplier number, reaches the lteral data of numbering in the factory.
4. the method for building up of Bill of Material (BOM) as claimed in claim 1, the converting system that it is characterized in that step (b) is to pounce on (CAPTURE) system of catching.
5. the method for building up of Bill of Material (BOM) as claimed in claim 1 is characterized in that the material data storehouse provides the user off-line mode to inquire about above-mentioned material data in the above-mentioned factory.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 00137780 CN1361474A (en) | 2000-12-29 | 2000-12-29 | Material list establishing method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 00137780 CN1361474A (en) | 2000-12-29 | 2000-12-29 | Material list establishing method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN1361474A true CN1361474A (en) | 2002-07-31 |
Family
ID=4597816
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 00137780 Pending CN1361474A (en) | 2000-12-29 | 2000-12-29 | Material list establishing method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN1361474A (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102087726A (en) * | 2009-12-03 | 2011-06-08 | 鸿富锦精密工业(深圳)有限公司 | System for generating bill of materials and method thereof |
CN102542389A (en) * | 2010-12-24 | 2012-07-04 | 鸿富锦精密工业(深圳)有限公司 | Part information integration system and method |
CN108268604A (en) * | 2017-12-25 | 2018-07-10 | 广州视源电子科技股份有限公司 | BOM tables data transfer device, system |
CN109754200A (en) * | 2017-11-07 | 2019-05-14 | 深圳前海硬之城信息技术有限公司 | Bill of material management method, apparatus and computer readable storage medium |
CN110033206A (en) * | 2018-01-11 | 2019-07-19 | 国科赛思(北京)科技有限公司 | Bill of materials automatic Check method and device |
-
2000
- 2000-12-29 CN CN 00137780 patent/CN1361474A/en active Pending
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102087726A (en) * | 2009-12-03 | 2011-06-08 | 鸿富锦精密工业(深圳)有限公司 | System for generating bill of materials and method thereof |
CN102542389A (en) * | 2010-12-24 | 2012-07-04 | 鸿富锦精密工业(深圳)有限公司 | Part information integration system and method |
CN109754200A (en) * | 2017-11-07 | 2019-05-14 | 深圳前海硬之城信息技术有限公司 | Bill of material management method, apparatus and computer readable storage medium |
CN108268604A (en) * | 2017-12-25 | 2018-07-10 | 广州视源电子科技股份有限公司 | BOM tables data transfer device, system |
CN110033206A (en) * | 2018-01-11 | 2019-07-19 | 国科赛思(北京)科技有限公司 | Bill of materials automatic Check method and device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US7970795B2 (en) | Data model development tool | |
US7162688B1 (en) | Method for automated generation and assembly of specifications documents in CADD environments | |
US20050021504A1 (en) | Methods, systems, and computer program products for querying a database for employee data and organizing the obtained data | |
US20110302554A1 (en) | Application generator for data transformation applications | |
US20070142961A1 (en) | System and method for providing visual aids | |
US8346773B2 (en) | Product classification system | |
JP2001209562A (en) | System of deducing conversion rules | |
US7644357B2 (en) | Data conversion system | |
CN1361474A (en) | Material list establishing method | |
CN106570189B (en) | Computer application system and convenient document management method | |
CN110490461B (en) | Door and window enterprise resource planning system | |
CN110457019B (en) | Programmed application method of 10kV pole-mounted switch acceptance process | |
JPH1049539A (en) | Data base management system | |
CN100377151C (en) | Off-line programing system and method for measuring equipment | |
JP2017068418A (en) | Plan support system and plan support method | |
US7243114B2 (en) | Electronic document system, electronic document management apparatus, computer program product, and computer memory product | |
US20100057236A1 (en) | Method for selecting equipment resources in a manufacturing process | |
JP3289645B2 (en) | Data input device | |
WO2019202880A1 (en) | Plant apparatus information management system | |
JP5854745B2 (en) | DATA INTERFACE DEVICE, DATA INTERFACE METHOD, DATA INTERFACE PROGRAM, AND PROCESS MANAGEMENT SYSTEM FOR PROCESS MANAGEMENT TOOL | |
CN112632177A (en) | Data loading operation generation method | |
JP7159019B2 (en) | DATA GENERATION DEVICE, DATA GENERATION METHOD, DATA GENERATION PROGRAM, AND RECORDING MEDIUM | |
JPH10105204A (en) | Integrated production support system and its production support information management device | |
JP2002063375A (en) | Apparatus and method for supporting operation | |
CN114154225A (en) | Method and system for automatically identifying adjustment content of three-dimensional component of BIM (building information modeling) model of transformer substation |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C06 | Publication | ||
PB01 | Publication | ||
C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
WD01 | Invention patent application deemed withdrawn after publication |