CN1345677A - Anchor - Google Patents

Anchor Download PDF

Info

Publication number
CN1345677A
CN1345677A CN 01137295 CN01137295A CN1345677A CN 1345677 A CN1345677 A CN 1345677A CN 01137295 CN01137295 CN 01137295 CN 01137295 A CN01137295 A CN 01137295A CN 1345677 A CN1345677 A CN 1345677A
Authority
CN
China
Prior art keywords
anchor
fulcrum
head
anchor head
gravity
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN 01137295
Other languages
Chinese (zh)
Other versions
CN1222440C (en
Inventor
H·波佩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
BROM VOLVES MAINTENANCE AG
Original Assignee
BROM VOLVES MAINTENANCE AG
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by BROM VOLVES MAINTENANCE AG filed Critical BROM VOLVES MAINTENANCE AG
Publication of CN1345677A publication Critical patent/CN1345677A/en
Application granted granted Critical
Publication of CN1222440C publication Critical patent/CN1222440C/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B21/00Tying-up; Shifting, towing, or pushing equipment; Anchoring
    • B63B21/24Anchors
    • B63B21/38Anchors pivoting when in use
    • B63B21/44Anchors pivoting when in use with two or more flukes

Landscapes

  • Chemical & Material Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • Ocean & Marine Engineering (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

The anchor has a shaft (1) and a pivoting head (2) with flukes. Two spaced pivot points are provided, which are eccentrically arranged. The centre of mass (7) of the anchor head lies between and over both pivot points, when the anchor head is vertically on the anchor shaft.

Description

Anchor
Technical field
The present invention relates to by anchor pole and be arranged on the anchor that the band fluke anchor head on the fulcrum constitutes movably.
Background technology
This anchor is known.Except good earth-grasping force, this anchor should not allow anchor head pawl point run into barnacle when anchor is pulled overboard shell, and is impaired to avoid ship.When on the chain before anchor dangles shell overboard anchor head being parallel to dangle anchor pole, realized this purpose.
Realize above-mentioned requirements by following measure as everyone knows, promptly the anchor head center of gravity is below the anchor head fulcrum.This mainly realizes by fulcrum is moved along the anchor bill direction.But in this solution, the changes geometry of grabbing the anchor fluke face in the anchorage is a defective.The anchor fluke face is reduced by following measure, and promptly the lower end head is large-area.In addition, by this different anchor head center-of-gravity position, in the anchor that will pierce the seabed, alleviated the support loading of anchor bill.For eliminating above-mentioned defective as much as possible, can only realize when absolute demand that the center of gravity in the anchor head moves.But the anchor head moment in the right direction that is obtained is very little, and the iron rust in the fulcrum district or impurity may it was not long just hinder adjustment anchor head direction.
Summary of the invention
Therefore, task of the present invention is to eliminate above-mentioned defective and such anchor is provided, be it under extreme usage condition also for anchor head has produced failure-free and sufficiently high moment, and the sharp face of anchor dwindle or the unfavorable center-of-gravity position of anchor when lying low do not weaken the earth-grasping force that anchor is kept a firm hand on the seabed.
According to the present invention, so finished above-mentioned task, promptly be provided with the fulcrum of two spaces, it is eccentric (centrifugal) that fulcrum is configured to, the anchor head center of gravity when anchor pole is in vertical position between them and above these two fulcrums.
When anchor was pulled overboard shell, anchor head was flapped toward the fulcrum of each interval automatically and thereby is parallel to ship.Thereby, although the anchor head center of gravity above the anchor head fulcrum, anchor head obtains stable support.
" swing in " when anchor head is in vertical position at anchor pole in the parallel position that anchor head is parallel to anchor pole is to cause by the position of this center of gravity in two fulcrums spaced apart from each other.
The anchor that lies low on the seabed will bore ground, and this causes that by the anchor chain pull unit it has also constituted the fulcrum in the face of the seabed on reverses direction.Because the anchor head center of gravity is above fulcrum, its load acts on the anchor bill as the people with being willing to." flip angle " of anchor head limited by corresponding anchor pole block face.
By the point supporting situation that changes and and then the clearance envelope in anchor head fulcrum zone that causes thus, in this zone get rusty and/or impurity can not hinder anchor head and rotates around anchor pole.
Description of drawings
In conjunction with illustrated embodiment the present invention is described.
Fig. 1 represents anchor of the present invention with overview.
Fig. 2 represents anchor of the present invention with lateral plan.
Fig. 3 represents the anchor to the level of seabed generation effect.
Fig. 4 is the enlarged drawing of the anchor head supporting of anchor head when vertical.
Fig. 5 is illustrated in the enlarged drawing of anchor head upset anchor head supporting constantly.
Preferred embodiment is described
In Fig. 1-Fig. 5, represent same parts with same tag.In Fig. 1, represent anchor pole with 1, represent anchor head with 2, with the 3 fulcrum districts that represent anchor head 2.In Fig. 2, drawn at the upright position (shown in the dotted line) preceding and the vertical anchor anchor head upset and the corresponding position of the fulcrum 7 that change over to automatically perpendicular to anchor pole.Among Fig. 4 afterwards, 5, with the drawn details of function of the ratio of amplifying.In Fig. 3, the anchor of level will pierce the seabed as shown in figure, and wherein center of gravity 7 has produced a suitable power on anchor head anchor fluke direction.
In Fig. 4, the fulcrum situation that anchor is in vertical position and anchor head is parallel of having drawn.Here, with 8 fulcrums of representing two spaces, wherein center of gravity 7 is between them and be positioned at fulcrum and hold above the neck 6, so that stablize the parallel position of anchor head 2 relative anchor poles 1.
In Fig. 5, the enlarged drawing of the vertical anchor of anchor head 2 upsets of having drawn.Having only one of them fulcrum 8 to be positioned at fulcrum here, holds on the neck 6.The center-of-gravity position 7 of anchor head 2 acts on the fulcrum 8 and has produced reset force and guided switching process subsequently, and it is turned on the position that is parallel to anchor pole 1 anchor head 2.

Claims (1)

1. anchor, it constitutes by an anchor pole with by the band fluke anchor head that is provided with movably on fulcrum, it is characterized in that, be provided with the fulcrum (8) of two spaces, fulcrum (8) is that eccentric (centrifugal) is provided with, anchor head (2) center of gravity (7) anchor pole (1) when being in vertical position between them and in the top of these two fulcrums (8).
CN 01137295 2000-07-11 2001-07-11 Anchor Expired - Fee Related CN1222440C (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
DE10033622.1 2000-07-11
DE2000133622 DE10033622A1 (en) 2000-07-11 2000-07-11 Anchor for ship or boat; has shaft and pivoting head with flukes and has two eccentric spaced pivot points, where centre of mass of anchor head lies between and over pivot points, when it is vertical

Publications (2)

Publication Number Publication Date
CN1345677A true CN1345677A (en) 2002-04-24
CN1222440C CN1222440C (en) 2005-10-12

Family

ID=7648518

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 01137295 Expired - Fee Related CN1222440C (en) 2000-07-11 2001-07-11 Anchor

Country Status (2)

Country Link
CN (1) CN1222440C (en)
DE (1) DE10033622A1 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102050204A (en) * 2009-11-09 2011-05-11 江苏扬远船舶设备铸造有限公司 Self-balancing high holding power anchor
CN102582792A (en) * 2012-03-15 2012-07-18 重庆鑫业船舶件有限公司 Self-balancing high holding power anchor
CN109080774A (en) * 2018-08-21 2018-12-25 安徽亚太锚链制造有限公司 It is a kind of that ship anchor that stablizing convenient folding and unfolding is installed

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102050204A (en) * 2009-11-09 2011-05-11 江苏扬远船舶设备铸造有限公司 Self-balancing high holding power anchor
CN102050204B (en) * 2009-11-09 2014-08-20 江苏扬远船舶设备铸造有限公司 Self-balancing high holding power anchor
CN102582792A (en) * 2012-03-15 2012-07-18 重庆鑫业船舶件有限公司 Self-balancing high holding power anchor
CN109080774A (en) * 2018-08-21 2018-12-25 安徽亚太锚链制造有限公司 It is a kind of that ship anchor that stablizing convenient folding and unfolding is installed

Also Published As

Publication number Publication date
CN1222440C (en) 2005-10-12
DE10033622A1 (en) 2002-01-24

Similar Documents

Publication Publication Date Title
CN201584697U (en) Overhead ground wire crossarm clamp used on 500KV transmission line steel tower
CN106487322B (en) A kind of flat uniaxial tracking bracket
JP2009509889A (en) Suspension device for suspending rails, in particular overhead rails or hoisting rails of hoisting machines
EP2528806A1 (en) Floating support for offshore structure such as a wind generator in particular
CN1222440C (en) Anchor
CN113044717A (en) Pile turning construction method for steel pipe pile
CN203781693U (en) Auxiliary hoisting device of crank arm outer-side cross arm of wine cup-shaped iron tower of ultra-high voltage power transmission line
CN107745784A (en) A kind of high holding power ship anchor and ship
CN206884800U (en) A kind of hinge type forges locator bearing
CN2900089Y (en) Rope tightening device
CN101247986B (en) Welded stockless anchor
CN201214593Y (en) Universal guide rope sheave
CN217780572U (en) Fan blade lifting appliance swing mechanism and fan blade lifting appliance
CN110836035A (en) Electric power electric wire netting wire pole
CN107601288A (en) The wind-proof pull rod of crane
CN201695744U (en) Pole amplitude stay wire
CN212604666U (en) Eccentric wear prevention grooving device for compensating pulley and contact net pulley compensating device
CN207039063U (en) Strain insulator composite insulator outlet flat ladder
CN214564768U (en) Mobile contact net cantilever supporting device
CN209275984U (en) A kind of novel diesel engine cylinder cover lifting device
CN218320429U (en) Windproof structure of tower crane
CN210048382U (en) Gantry crane wind-resistant fixing device and gantry crane system
CN213151002U (en) Balance tower for antenna balance system
CN215711178U (en) Anchoring device for gantry crane
CN213988509U (en) Firm in connection's metallic glass transformer connecting device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20051012

Termination date: 20130711