CN1319701A - Apparatus and technology for side rear grouting of compresol pile - Google Patents
Apparatus and technology for side rear grouting of compresol pile Download PDFInfo
- Publication number
- CN1319701A CN1319701A CN 00100760 CN00100760A CN1319701A CN 1319701 A CN1319701 A CN 1319701A CN 00100760 CN00100760 CN 00100760 CN 00100760 A CN00100760 A CN 00100760A CN 1319701 A CN1319701 A CN 1319701A
- Authority
- CN
- China
- Prior art keywords
- slip casting
- pile
- grouting
- side rear
- flexible pipe
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Landscapes
- Piles And Underground Anchors (AREA)
Abstract
The grout injection equipment after pile side of compresol pile includes grouting steel conduct pipe vertically attached to the pile body reinforcing cage, upper end portion of said grouting steel conduct pipe is communicated with ground high-pressure grout-conveying flexible pipe, and the lower end portion of said grouting steel conduct pipe is communicated with reinforced PVC flexible pipe, and the reinforced PVC flexible pipe is connected with grouting one-way valve. Because the grouting equipment is positioned outside pile soil boundary, the grouting points can be reasonable arranged according to the pile side soil layer, and have no need of breaking through pile body concrete protection layer. It can enhance pile side resistance and can greatly raise load-bearing capacity.
Description
In construction work, the castinplace pile Piles for Friction Piles that belong to based on pile side friction in order to reinforce the soil body of a side mud skin and certain limit, strengthen pile side resistance more, can take the device of rear flank slip casting and technology.Existing grout pile side grouting device is the slip casting steel conduit of vertical sclerozone grouting valve on the pile body reinforcing cage; it is the internally-arranged type grouting device; during slip casting; need break through the pile concrete topping and implement slip casting; and must slip casting in two days behind pile; just in time intersect, cause working procedure mixed and disorderly, also can stay hidden danger to reinforcement corrosion simultaneously because of breaking through the pile body topping with the pile operation.
The purpose of this invention is to provide a kind of side rear grouting of compresol pile device that can significantly improve the bearing capacity of stake, avoid the pile cross-operation, avoid the hidden danger of pile body reinforcement corrosion.
The technical scheme of side rear grouting of compresol pile device of the present invention: this device comprises vertically attached to the slip casting steel conduit on the pile body reinforcing cage, the defeated slurry of slip casting steel conduit upper end and ground high pressure soft pipe connection, it is characterized in that: slip casting steel conduit lower end all with reinforcement PVC soft pipe connection, be distributed with the slip casting one way valve on the reinforcement PVC flexible pipe.
Above-mentioned reinforcement PVC hose loop is to being the petal reinforcing cage outside that is arranged in, and petal protrudes the position establishes the slip casting one way valve.Pegging graft with reinforcement PVC flexible pipe through the inverted T shape three-way interface and be communicated with in slip casting steel conduit bottom, forms closed circuit.
The vertical undulate of above-mentioned reinforcement PVC flexible pipe arranges that its trough is fixed by finer wire and precast reinforced cage colligation, and its crest place establishes the slip casting one way valve.Reinforcement PVC flexible pipe is vertically arranged 2~6 along the long undulate of stake.
Above-mentioned slip casting one way valve is to be arranged circumferentially 1~2 row's injected hole on reinforcement PVC flexible pipe, lays the movable span cap on injected hole, outer coated rubber strip and adhesive waterproof tape.
Movable span cap on the injected hole can be drawing pin or steel ball, and rubber strip is the rubber pneumatic tyre.
This side rear grouting of compresol pile technology, it is characterized in that: behind pile, implement harmless concrete grouting in 2~30 days, reinforce the soil body of stake side mud skin and certain limit, injection slurry is at the interface implemented slip casting through slip casting steel conduit, reinforcement PVC flexible pipe and slip casting one way valve at stake soil by the defeated slurry of ground high pressure flexible pipe.The slurry water gray scale is according to the classification of soil and whether water saturation is determined:
The water/binder ratio of mud, muddy soft soil and saturated medium coarse sand, gravelly sand, ovum gravel is 0.45~0.55;
The water/binder ratio of saturated general cohesive soil, silt, powder fine sand is 0.50~0.65;
The water/binder ratio of the general cohesive soil of unsaturation, silt, powder fine sand, medium coarse sand, gravelly sand, ovum gravel is 0.70~0.90.In slurries, can add 1~4% Admixture.
Advantage of the present invention: because grouting device is to be in an externally positioned type of pedosphere face; can be according to stake side soil layer reasonable Arrangement slip casting point; improve grouting consolidation effect; need not to break through the pile concrete topping and implement slip casting; thereby needn't slip casting in 2 days behind pile; avoid intersecting with the pile operation, simultaneously also not reason break through the pile body topping and stay hidden danger to reinforcement corrosion.Different classes of and moisture situation according to soil is determined the slurry water gray scale, reaching best consolidation effect, thereby strengthens pile side resistance, significantly improves the bearing capacity of stake.Be respectively through the enhancing amplitude of stake rear flank slip casting to pile side resistance: mud, muddy soft soil are 20~30%, and general fine grained soils (cohesive soil, silt, powder fine sand) is 30~60%, and coarse-grained soil (ovum gravel, gravelly sand, medium coarse sand) is 80~200%.It is not impaired that the slip casting one way valve can bear deep layer high water head pressure, prevents from that silt from pouring in the pipe to stop up, and can make slurries discharge smoothly and do not reflux again.Be applicable to slurry drilled pile, steel sleeve retaining wall castinplace pile and dried operation castinplace pile.
Below in conjunction with drawings and Examples the present invention is described in detail:
Fig. 1 is the structural representation of the embodiment of the invention one;
Fig. 2 is Fig. 1 I-I generalized section;
Fig. 3 is the enlarged diagram of Fig. 2 node A;
Fig. 4 is the enlarged diagram of Fig. 2 Node B;
Fig. 5 is the structural representation of the embodiment of the invention two;
Fig. 6 is the schematic diagram of Fig. 5 II-II section.
The side rear grouting of compresol pile device, comprise vertically attached to the slip casting steel conduit 2 on the pile body reinforcing cage 1, the defeated slurry of slip casting steel conduit 2 upper ends and ground high pressure soft pipe connection, slip casting steel conduit bottom is communicated with reinforcement PVC flexible pipe 3, establishes slip casting one way valve 4 on the reinforcement PVC flexible pipe 3.Slip casting one way valve 4 is arranged circumferentially 1~2 row's injected hole on reinforcement PVC flexible pipe 3, lay drawing pin 6 or steel ball 5 on injected hole, outer coated rubber pneumatic tyre 7 and adhesive waterproof tape 8.
By Fig. 1~4 as seen, embodiment one is an A type side rear grouting of compresol pile device, and reinforcement PVC flexible pipe 3 hoops are petal reinforcing cage 1 outside that is arranged in, and petal protrudes the position establishes slip casting one way valve 4.Slip casting steel conduit 2 bottoms are inverted T shape threeway cone-shaped interface 9, and pegging graft with reinforcement PVC flexible pipe 3 is communicated with, and forms closed circuit.The projection of flexible pipe protrudes reinforcing cage 1 outer rim 15~20cm, and protuberance sets up unidirectional grout valve 4 separately.
By Fig. 5~6 as seen, embodiment two is Type B side rear grouting of compresol pile devices, and reinforcement PVC flexible pipe 3 vertical undulates arrange that its trough is fixed by finer wire and 1 colligation of precast reinforced cage, and its crest place establishes slip casting one way valve 4.Reinforcement PVC flexible pipe 3 lower ends are sealed with heating, but vertically arrange along long 2~6 equal undulates of stake.
Technology of the present invention is to implement stake rear flank slip casting behind pile in 2~30 days any given days, reinforce the soil body of stake side mud skin and certain limit, injection slurry is at the interface implemented slip casting through slip casting steel conduit, reinforcement PVC flexible pipe and slip casting one way valve at stake soil by the defeated slurry of ground high pressure flexible pipe.
Claims (10)
1, a kind of side rear grouting of compresol pile device, comprise vertically attached to the slip casting steel conduit on the pile body reinforcing cage, the defeated slurry of slip casting steel conduit upper end and ground high pressure soft pipe connection, it is characterized in that: slip casting steel conduit bottom and reinforcement PVC soft pipe connection are distributed with the slip casting one way valve on the reinforcement PVC flexible pipe.
2, side rear grouting of compresol pile device according to claim 1 is characterized in that: described reinforcement PVC hose loop is to being the petal reinforcing cage outside that is arranged in, and petal protrudes the position establishes the slip casting one way valve.
3, side rear grouting of compresol pile device according to claim 1 and 2 is characterized in that: pegging graft with reinforcement PVC flexible pipe through the inverted T shape three-way interface and be communicated with in described slip casting steel conduit bottom, forms closed circuit.
4, side rear grouting of compresol pile device according to claim 1 is characterized in that: the vertical undulate of described reinforcement PVC flexible pipe arranges that its trough is fixed by finer wire and precast reinforced cage colligation, and its crest place establishes the slip casting one way valve.
5, according to claim 1 or 4 described side rear grouting of compresol pile devices, it is characterized in that: described reinforcement PVC flexible pipe is vertically arranged 2~6 along the long undulate of stake.
6, side rear grouting of compresol pile device according to claim 1 is characterized in that: described slip casting one way valve is to be arranged circumferentially 1~2 row's injected hole on reinforcement PVC flexible pipe, lays the movable span cap on injected hole, outer coated rubber strip and adhesive waterproof tape.
7, side rear grouting of compresol pile device according to claim 6 is characterized in that: the movable span cap on the described injected hole is drawing pin or steel ball, and rubber strip is the rubber pneumatic tyre.
8, a kind of side rear grouting of compresol pile technology, it is characterized in that: behind pile, implement harmless concrete grouting in 2~30 days, reinforce the soil body of stake side mud skin and certain limit, injection slurry is at the interface implemented slip casting through slip casting steel conduit, reinforcement PVC flexible pipe and slip casting one way valve at stake soil by the defeated slurry of ground high pressure flexible pipe.
9, side rear grouting of compresol pile technology according to claim 8 is characterized in that: the water/binder ratio of described slurries is according to the classification of soil and whether water saturation is determined:
The water/binder ratio of mud, muddy soft soil and saturated medium coarse sand, gravelly sand, ovum gravel is 0.45~0.55;
The water/binder ratio of saturated general cohesive soil, silt, powder fine sand is 0.50~0.65;
The water/binder ratio of the general cohesive soil of unsaturation, silt, powder fine sand, medium coarse sand, gravelly sand, ovum gravel is 0.70~0.90.
10, side rear grouting of compresol pile technology according to claim 8 is characterized in that: add 1~4% Admixture in the described slurries.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNB001007602A CN1138898C (en) | 2000-02-18 | 2000-02-18 | Apparatus and technology for side rear grouting of compresol pile |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNB001007602A CN1138898C (en) | 2000-02-18 | 2000-02-18 | Apparatus and technology for side rear grouting of compresol pile |
Publications (2)
Publication Number | Publication Date |
---|---|
CN1319701A true CN1319701A (en) | 2001-10-31 |
CN1138898C CN1138898C (en) | 2004-02-18 |
Family
ID=4575652
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CNB001007602A Expired - Lifetime CN1138898C (en) | 2000-02-18 | 2000-02-18 | Apparatus and technology for side rear grouting of compresol pile |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN1138898C (en) |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101793027A (en) * | 2010-04-02 | 2010-08-04 | 孔超 | Core-grouted static pressure anchor rod pile |
CN101892665A (en) * | 2010-07-27 | 2010-11-24 | 中冶沈勘工程技术有限公司 | Construction method for grouting and vibro-replacement stone pile composite foundation |
CN102605770A (en) * | 2012-03-14 | 2012-07-25 | 中冶交通工程技术有限公司 | Post grouting device for filling pile and construction method |
CN102644284A (en) * | 2012-04-11 | 2012-08-22 | 沈阳中建东设岩土工程有限公司 | Method and device for post grouting in pile bottom |
CN108104474A (en) * | 2018-01-05 | 2018-06-01 | 广州华土建筑工程技术有限公司 | A kind of high-pressure grouting construction method expected using steel construction and CGM |
CN110409411A (en) * | 2019-08-27 | 2019-11-05 | 建研地基基础工程有限责任公司 | Prestressed ejection type pile side grouting valve and grouting method thereof |
CN110565639A (en) * | 2019-09-11 | 2019-12-13 | 中船第九设计研究院工程有限公司 | Bored concrete pile hole forming and side wall grouting construction method for coral sand foundation |
CN114411727A (en) * | 2022-02-25 | 2022-04-29 | 南京东土建设科技有限公司 | Built-in post-grouting device for realizing multi-depth grouting of tubular pile |
-
2000
- 2000-02-18 CN CNB001007602A patent/CN1138898C/en not_active Expired - Lifetime
Cited By (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101793027A (en) * | 2010-04-02 | 2010-08-04 | 孔超 | Core-grouted static pressure anchor rod pile |
CN101793027B (en) * | 2010-04-02 | 2015-02-25 | 孔超 | Core-grouted static pressure anchor rod pile |
CN101892665A (en) * | 2010-07-27 | 2010-11-24 | 中冶沈勘工程技术有限公司 | Construction method for grouting and vibro-replacement stone pile composite foundation |
CN102605770A (en) * | 2012-03-14 | 2012-07-25 | 中冶交通工程技术有限公司 | Post grouting device for filling pile and construction method |
CN102644284A (en) * | 2012-04-11 | 2012-08-22 | 沈阳中建东设岩土工程有限公司 | Method and device for post grouting in pile bottom |
CN108104474A (en) * | 2018-01-05 | 2018-06-01 | 广州华土建筑工程技术有限公司 | A kind of high-pressure grouting construction method expected using steel construction and CGM |
CN110409411A (en) * | 2019-08-27 | 2019-11-05 | 建研地基基础工程有限责任公司 | Prestressed ejection type pile side grouting valve and grouting method thereof |
CN110409411B (en) * | 2019-08-27 | 2024-07-12 | 建研地基基础工程有限责任公司 | Prestress ejection type pile side grouting valve and grouting method thereof |
CN110565639A (en) * | 2019-09-11 | 2019-12-13 | 中船第九设计研究院工程有限公司 | Bored concrete pile hole forming and side wall grouting construction method for coral sand foundation |
CN110565639B (en) * | 2019-09-11 | 2021-03-23 | 中船第九设计研究院工程有限公司 | Bored concrete pile hole forming and side wall grouting construction method for coral sand foundation |
CN114411727A (en) * | 2022-02-25 | 2022-04-29 | 南京东土建设科技有限公司 | Built-in post-grouting device for realizing multi-depth grouting of tubular pile |
CN114411727B (en) * | 2022-02-25 | 2024-02-20 | 南京东土建设科技有限公司 | Built-in post grouting device for realizing multi-depth grouting of tubular piles |
Also Published As
Publication number | Publication date |
---|---|
CN1138898C (en) | 2004-02-18 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104612134A (en) | Cast-in place pile post-grouting construction method for pouring construction | |
CN201746840U (en) | Foundation pit support system equipped with a plurality of inclined rear anchors capable of recycling | |
CN103993598B (en) | One is drawn hole and is implanted cloth bag crushed stone grouting pile and construction method | |
CN110528533A (en) | A kind of microorganism solidification impacting steel tube for soil-nail and its construction method | |
CN103603379A (en) | Anti-floating system combining anti-floating cement soil pile and anti-floating anchor rod and construction process of anti-floating system | |
CN1067453C (en) | Foundation pit slope flat anchor spray net supporting method | |
CN115233749B (en) | Red bed soft rock side slope grouting drainage anchoring test device and method thereof | |
CN105178285A (en) | Method for widening grouting reinforcement and seepage and blockage prevention range of rock and soil | |
CN107299650A (en) | A kind of remote open caisson casting method for correcting error | |
CN207727546U (en) | A kind of displacement hull and cured layer combined foundation structure | |
CN1138898C (en) | Apparatus and technology for side rear grouting of compresol pile | |
CN202323865U (en) | Novel revetment combined structure | |
CN104895086B (en) | A kind of artificial three-dimensional post jacking structure in grouting layer method stake end and casting method | |
CN107587502A (en) | A kind of spiral-digging pore pressure pour water soil occlusion curtain pile construction method | |
CN101012654A (en) | Self-draining reinforced pipe supporting structure and construction method thereof | |
CN107419628A (en) | A kind of construction method of the rapid build road on reclaimed ground | |
CN104213554A (en) | Construction method of slip-casting variable-cross section steel pipe pile and expansion and extrusion device of slip-casting variable-cross section steel pipe pile | |
CN109826212A (en) | A kind of composite construction and construction method for repairing highfill embankment landslide | |
CN203613568U (en) | Anti-floating cement soil pile and anti-floating anchor rod combined anti-floating system | |
CN105297737A (en) | Grouting scope-controllable bag type micro bearing pile | |
CN208415244U (en) | Anchor pole suitable for the karst area with connected pore channel | |
CN1163654C (en) | Support structure and construction process of foundation pit | |
CN204282147U (en) | A kind of reinforcement Bag Grouting Pile constructing structure | |
CN1376836A (en) | Method for controlling deformation of foundation pit's retaining wall by grouting in passive area of earth body | |
CN106869153A (en) | A kind of method of the quick soft soil foundation treatment of well-points dewatering |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C06 | Publication | ||
PB01 | Publication | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |