CN1309220A - Frame for quickly assembling wall forms and column forms - Google Patents

Frame for quickly assembling wall forms and column forms Download PDF

Info

Publication number
CN1309220A
CN1309220A CN 00100886 CN00100886A CN1309220A CN 1309220 A CN1309220 A CN 1309220A CN 00100886 CN00100886 CN 00100886 CN 00100886 A CN00100886 A CN 00100886A CN 1309220 A CN1309220 A CN 1309220A
Authority
CN
China
Prior art keywords
template
mould
block
post
framework
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN 00100886
Other languages
Chinese (zh)
Inventor
谢明辉
谢瑞莲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 00100886 priority Critical patent/CN1309220A/en
Publication of CN1309220A publication Critical patent/CN1309220A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

A limiting frame for quickly assembling the shutterings of wall and column is disclosed. Said shuttering has link stoppers for mutual match. The link part is used to link shutterings with each other. The pusher for the limiting frame of column is on the frame holder. Its one end has plugging part and its another end has a part for passing rope through it. A regulating pusher is set up on the holder of frame. A pull assembly has screw bolt. A rope passes through the limiting frame for fastening it. Its advantages are fast assembling, no need of nail, quick detaching of shutterings, and straight and smooth columns.

Description

But the bundle frame of Rapid Combination wall mould and post mould
But the present invention relates to the bundle frame of Rapid Combination wall mould and post mould.
In the building operations at present, the form walls of the use of building before carrying out the concrete grouting operation, its used template is generally simple flat board, and the existing building form walls finish on the construction operation set up step after, topple over for avoiding form walls, when template being put after on the support bar, must assemble the binding step again so that adjacent template is connected and fixed with nail in the joint, just can carry out follow-up location again, grouting and form removal step are finished the making of concrete wall, simultaneously, because previous winding binding step makes the form removal step need increase the operation of pulling out nail from template.
Therefore construction is gone up needs two adjacent templates are connected and fixed with nail at the lateral margin place that it joins, also need calibrate the location simultaneously, to guarantee the smooth of form walls, when carrying out next template erection, need be connected and fixed and calibrating operation with nail equally, because the inside and outside side of these templates there is no fastening devices when setting up, be under no restraint, only nail, careless slightly promptly very easy cause inclination or displacement, therefore make complicated calibration location work be difficult to carry out, need veteran professional and technical personnel's operation; And, also need pull out the nail on this template during form removal in the future one by one, since the nail pulling operation loaded down with trivial details and be not easy the construction, therefore utilize instrument will be anchored on nail on the template when pulling out, the very easy damage that causes template, cause the consume of template, increased expending of nail material and mould material.
Equally, generally join in the mould operation building cylinder, also need according to the cylinder profile by common template, cross a set space in advance, for making the post mould firm,, be everlasting during construction and be provided with the dead bolt of many symmetries in twos between the subtend template with anti-concrete impulse force, fixedly the two ends of tightening latch are equipped with screw thread, utilize nut to cooperate with it template is suppressed the location.But avoid skew though adopt this mode fixed form, but the dead bolt that subtend wears, for fixed form effectively must be provided with the quantity of equity relatively, thus, when after concrete dry is solid, template being pulled down, this dead bolt also is fixed in the concrete column, and two ends are protruding with suitable length, make and form many projections on the cylinder, so, usually must will protrude the part removal during construction with mode sawed-off or fusing, polish and make it with cylinder to remake incrustation after smooth, and this gigantic project, construction not only bothers but also time-consuming, and template is damaged and can not be utilized again in the time of also can causing construction, causes the waste of material and increases human cost, and the dead bolt that passes the intensive setting of cylinder damages the pipeline of reserving in the cylinder easily, causes can't using the reservation pipeline in the future.
But main purpose of the present invention provides a kind of Rapid Combination, makes things convenient for form removal, and combination exempts to follow closely solid plate, nail pulling is exempted from form removal, and the template of contraposition automatically during rigging.
Another main purpose of the present invention provides a kind of coupled columns phantom plate and has effective chip hold down, and structure to set up dismounting, combination not only simple fast and easily convenient, and certain pressure holding template, make cylinder whole straight of formation and the post mould bundle frame that facade is smooth.
Another main purpose of the present invention provides a kind of composition member and is making, assembling and using not only fast firmly, and conveniently places, carries, but saves the wall mould and the post mould bundle frame of a kind of Rapid Combination of store in a warehouse space and cost of manufacture.
The object of the present invention is achieved like this: but a kind of wall mould of Rapid Combination and post mould bundle frame, comprise both sides form walls and model of the column bundle frame with grouting space, form walls is formed by several form assemblies, most templates are provided with the block that several protrude from the template side, link with connecting piece between a partiting template;
Model of the column bundle frame comprises some frameworks, and framework is provided with stacker;
Some devices that hold are assembled on the stacker of framework, and it is provided with socket part to the group end, and the other end is provided with wire rope handling portion, and upper and lower is provided with the perforation of some symmetries;
One adjusts and to hold device, is assembled on the stacker of a framework wherein, and it is provided with socket part to the group end, and the other end is a wire rope handling portion, and upper and lower is provided with the adjustment hole of perforation;
One pulls and supports assembly, is located to adjust to hold the device front end, which is provided with a screw rod, rod end connection box gripping member also penetrates and adjusts the hole and connect by adjusting inserted link, the screw rod other end is provided with locating rack, and this locating rack is adjusted the openend that holds device across being placed on, and screws togather by an adjustment nut and screw rod in the outside;
One hawser is worn around aforementioned bundle frame and with binding yarn equipment and is screwed tight.
So, form walls can not need be followed closely and is decided fixture and just can rapidly the template permutation and combination be become form walls, and in twos template closely side by side against, and can make the template metope more smooth; Again when the wall mould engages with column, by the framework frame enclose column and hawser wear around after tightly restrainted by binding yarn equipment, pull and support the adjustment nut of assembly by rotation, make the frame gripping member pulling hawser of screw rod end, just can tighten framework and coupled columns mould generation chip hold down, in case the impulse force impact pole mould of grouted-aggregate concrete is shifted, the cylinder distortion, overall structure is torn group open fast, conveniently in addition, can effectively save manpower, man-hour and manufacturing cost.
Wherein form walls is set up on the pedestal, pedestal is provided with some adjustment seats of adjusting horizontal level, adjust on the seat and set up the support beam, support the horizontal level of beam by adjusting seat adjustment, support the beam top and be provided with a groove, one side of groove is provided with the inclined-plane, is provided with some templates side by side in the groove and forms form walls.
Template can be full wafer sheet template, or be the plate face that a side is provided with the angle block stay, or be formed by connecting for some solid wood chips, or be metal form, wherein be provided with some blocks on each template, block laterally protrudes out to template two sides, is provided with the hook part in template by side edge, close the hook part on the partiting template between the end hook by colluding of connecting piece two ends, reclining mutually between template and the template pushes against.
Form walls sets up one by one side by side, the template press strip is arranged on the two form walls outer panel faces, it can be made of C shaped steel, connecting rod is arranged in the perforation on the template press strip, being provided with retaining nail retaining between form walls inside wall subtend holds, insert the part of pulling in the jack at each connecting rod two ends and fix, this top of inserting the part of pulling is provided with the block piece that can be subjected to retaining location, template press strip backboard end checkpost.
Template forms a fitting portion at block two ora terminalis of horizontally set, and overlap joint is chimeric mutually by fitting portion for the block of adjacent forms butt joint.
The block of template is separated to be arranged on two ora terminalis of template, and the block on block and adjacent another template is up and down and is crisscross arranged, and the block of two adjacent upper and lower settings can be kept out fixed form mutually.
The block of template is turnable strip and block, be located at template by side, when template in twos side by side the time, block transfers to horizontal, block is striden frame and keep off on adjacent template and hold two templates and locate.
The block of template is the tightening latch pattern of laterally slippage.
The wire rope handling portion both sides that hold device are provided with breach.
Holding device is provided with the symmetrically arranged perforation that penetrates for inserted link and adjusts the hole.
Hawser is fixed by binding yarn equipment, hawser is the hard cable wire, be surrounded on the framework periphery, the one end is the line cover, the other end is for wearing end, noose spare one end is provided with the line cover of hook portion hook hawser, the other end be provided with for hawser wear the end wear around lacing hole, for hawser wear the end wear around and tighten fixing binding yarn device, be provided with the U type bar binding yarn spare that two ends have the threaded portion, engagement piece is relative with binding yarn spare to be made up, two threaded portion rod ends of its corresponding binding yarn spare are provided with perforation, engagement piece is provided with the groove that can have the on-slip latch that holds the effect of tightening to hawser, and binding yarn spare passes the perforation of engagement piece, and its threaded portion and forced-together piece are screwed.
Hold device and stacker and be the corresponding pipe shape of external diameter, its back segment connects establishes the socket part that a little external diameter is the inserted link shape, and its place ahead is provided with wire rope handling cylindraceous portion, and microscler breach is offered in both sides, and upper and lower is provided with the jack that symmetry connects.
Its central post and form walls are in succession, be equipped with a plate between the space of wall template and post mould template, this junction plate plate face is provided with some square perforation, one sleeve, correspondence is located at perforation place of junction plate, the perforation symmetry that is the passage and the junction plate of square in this sleeve supplies the shaped steel of framework to pass.
Its central post and form walls in succession, model of the column and framework are gripped by clamping device.
Its central post and form walls in succession, the template press strip in the framework of column and the form walls outside is corresponding kenel, between two shaped steel by pull and support device mutually against.
Wherein pull and support between the framework of device across template press strip that is connected in the metope template outside and column, it is provided with a V-shaped stiffening plate that is fixedly arranged in the template press strip perforation, offer the catching groove of  type on its plate face, screw shaped pull and support bar, one end spiral shell group one fastener, button is organized in the catching groove of stiffening plate, and its other end passes framework and a catch screws togather fixing.
The present invention has following advantage and effect:
One. member assembling of the present invention is fast, conveniently.
Two. hold device dismounting, assembling easily, can save manpower and material effectively simultaneously.
Three. holding device can articulate with hawser, makes things convenient for the management and the harvesting of workpiece, and carrying is convenient, and when reusing, it is affixed to align the location fast, making construction carry out more smooth and easyly.
Four. structure construction is easy, does not need special technology, saves the expensive expenditure of professional.
Five. clamping device sets up fast, firmly by the framework of wall column handing-over, and disassembly and assembly are easy, convenient.
Six. pull and support device wall, post mould are strained effectively, make the whole formation of cylinder and metope structure more smooth, upright.
Seven. metope template and close construction fast, time saving and energy saving.
Eight. adjust same level by adjusting seat, make template take group and exempt to proofread and correct contraposition, exempt from nail and fix, assemble, dismantle more convenient.
Nine. template can be repeatedly used, and reduces the damage rate, reduces manufacturing cost.
Ten. metope wears by connecting rod, and not only fixing device combination is firm fast, and inserts the part of pulling and have block piece block, can prevent to get loose when concrete perfusion from colliding the rotation of vibrations connecting rod.
11. the whole post mould that constitutes is tightened the effective pressure holding post of device mould, makes the whole formation of cylinder and metope structure more smooth, upright.
12. during the handing-over of metope and column, pull and support and make two structural system effective connections pull and support the formation one by pulling and supporting device, it is smooth and easy that grouting is carried out, convenient pipeline construction in the future, and structural system has globality, increases structural strength.
Below in conjunction with the drawings and specific embodiments the present invention is described in further detail.
Fig. 1 is the structural representation of form walls of the present invention.
Fig. 2 is the structure one of template of the present invention.
Fig. 3 is the structure two of template of the present invention.
Fig. 4 is a form walls combined planar schematic diagram of the present invention.
Fig. 5 is the structural representation of connecting piece of the present invention.
Fig. 6 is the structure three of template of the present invention.
Fig. 7 is the structure four of template of the present invention.
Fig. 8 is the structure five of template of the present invention.
Fig. 9 is the structure six of template of the present invention.
Figure 10 is the structure chart of the block of Fig. 9 of the present invention.
Figure 11 is the structure chart of column bundle frame of the present invention.
Figure 12 holds the structure chart one of device for column bundle frame of the present invention.
Figure 13 is the structural representation of another framework of column bundle frame of the present invention.
Figure 14 holds device for column bundle frame of the present invention adjustment and pulls and supports the three-dimensional exploded view of assembly.
Figure 15 is the solid combination schematic diagram of Figure 14 of the present invention.
Figure 16 is the side cross-sectional schematic of Figure 15 of the present invention.
Figure 17 is the reference diagram of Figure 15 binding yarn equipment group member of the present invention.
Figure 18 is the exploded view of Figure 15 binding yarn equipment group member of the present invention.
Figure 19 is the structural representation that holds device two of another embodiment of Figure 15 of the present invention.
Figure 20 holds the reference diagram of device receipts group state for Figure 14 of the present invention, Figure 15.
Figure 21 for another embodiment stacker of Figure 15 of the present invention and the structural behavior that holds device with reference to figure three.
Figure 22 is the wooden frame bar of column bundle frame of the present invention and the state reference map that model of the column is taken group.
Bundle mount structure and assembled state reference diagram thereof when Figure 23 is connected with the metope mould for column of the present invention.
Figure 24 is the organigram of junction plate of the present invention and sleeve.
Figure 25 is the structure reference diagram that pulls and supports device of wall of the present invention, post junction.
Figure 26 is another embodiment state reference map that wall of the present invention, post connect.
As shown in Figures 1 to 4, the pedestal A1 that is fixed on ground is provided with some adjustment seat A10, adjust seat A10 and be provided with support beam A11, and be up to the standard by adjusting a seat A10 adjustable support beam A11, above this support beam A11, be provided with a groove A12, groove A12 one side is provided with inclined-plane A13, makes metope template 10 can insert the composition form walls fast by groove A12 and inclined-plane A13; Form walls is to be arranged in order by a plurality of templates 10 that are arranged on the pedestal A1 to form, the structure of template 10 can be a full wafer sheet template (as shown in Figure 3), or one side be provided with the plate face of angle block stay 100 (as Fig. 2,4, shown in 5), or several solid wood chips are formed by connecting, it also can be metal form, wherein each template 10 is provided with some blocks 101, block 101 laterally protrudes out to template 10 2 sides, be provided with hook part P11 in template 10 by the side appropriate location in addition, make colluding of connecting piece P two ends close hook part P11 (as shown in Figure 5) on the end P10 hook template 10 at interval, template 10 is connected by connecting piece P like this, connecting piece P is similar rubber-like belt, pushes against so that template 10 reclines mutually.
When the template arrangement is set up in assembling, at first adjust the adjustment seat A10 of pedestal A1, the support beam A11 that sets up on it is the level of state; Afterwards, one by one template 10 is arranged and is placed on the horizontal base A1, make template 10 when setting up, can utilize the block 101 on the adjacent forms 10, mutually block, it kept off each other hold, pin down and be difficult for toppling over, in addition, after having assembled two or three template 10, connect with connecting piece P hook, connecting piece P can recline template 10 mutually and pushes against, and two adjacent templates 10 are fitted tightly, and the connection that need not nail increases the stability (shown in Fig. 1,4,5) that template 10 is set up simultaneously; When template 10 set up side by side one by one finish after, template press strip A14 is arranged on the outer panel face by above-mentioned two form walls that form, it can be made of C shaped steel, simultaneously, connecting rod A15 is arranged in perforation A141 on the template press strip A14, and run through two relative form walls, being provided with retaining nail A17 retaining in addition between form walls inside wall subtend holds, make connecting rod A15 two ends can protrude from the outer suitable length of template press strip A14 respectively, and then be provided with microscler jack A150 in each connecting rod A15 two ends, stretch out in outside the perforation A141 of transverse slat press strip A14 backboard, the part A18 insertion combination of pulling is fixing for inserting, and be convexly equipped with block piece A180 in top one end of inserting the part A18 that pulls, just can be subjected to the retaining location, backboard end checkpost of template press strip A14, avoid coming off, and inwardly compress press strip A14 simultaneously, and then make press strip A14 location pressure holding on template 10, hold both sides template metope (as shown in Figure 1) between metope by retaining nail A17 retaining; So, just can fast, easily constitute two relative form walls, and can between this two form walls, be in the milk.
As shown in Figure 6, structure for the another kind of template 11 of the present invention, wherein difference is that block 111 2 ora terminalis of horizontally set on the template 11 are provided with a fitting portion 112, when adjacent forms 11 is set up, the block 111 of its butt joint can overlap joint be chimeric mutually by fitting portion 112, it is more firm that template 11 is set up, and also is connected by connecting piece P 111 of partiting templates.
As shown in Figure 7, kenel for another template 12 of the present invention, in this embodiment, template 12 is provided with block 121, and separated attitude is arranged on two ora terminalis of template 12, and block 121 be with another adjacent template 12 on block 121 be up and down and be crisscross arranged, make the block 121 of two adjacent upper and lower settings can keep off pallet 12 mutually, it is more firm that template 12 is set up, and be fastened and connected by connecting piece P in 12 of partiting templates.
As shown in Figure 8, be the present invention's structure of a template 13 again, in the present embodiment, the block 131 of template 13 is rotating strip and block, and it is arranged at the side that leans on of template 13, when template 13 close combinations in twos, block 131 rotations are horizontal, just can make block 131 stride frame on adjacent template 13, and can allow 13 generations of template in twos hold positioning action, template 13 is firmly set up, can be connected by connecting piece P in 13 of partiting templates again.
In addition, the feasible preferred embodiment of relevant template 15 structures of the present invention, as shown in Figure 9, in the present embodiment, template 15 both sides blocks 151 are the tightening latch pattern of laterally slippage; Its structure as shown in figure 10, set firmly the cap 152 of hollow by side in template 15, open a chute 1520 on the cap 152, chute 1520 two ends form locating slot 1521, block 151 is worn and is organized in cap 152, one side direction chute 1520 openings protrude out a pull bar 1510 that connects, the outboard end of pull bar 1510 is worn group one spring S and pulling block 1511, by pulling pulling block 1511 compression spring S, make pull bar 1510 drive block 151 slippages in cap 152, utilize spring S to make pulling block 1511 contact blocks 151 again and located by locating slot 1521 blocks.
In addition, the technological means that relevant post mould bundle mount structure of the present invention is used, with and attainable expection effect and purpose, enumerate preferable possible embodiments now, and cooperate graphic shown in, details are as follows:
To shown in Figure 14, some frameworks 2 are made by the metal steel as Figure 11, framework can adopt steel such as C shaped steel, U type channel-section steel or steel plate, shown in Figure 12,13, the outside of this framework 2 has opening 20, and the template B of backboard and column fits, the end angle of framework 2 is provided with locating piece 21, can be spacing to hawser E, make it not get loose and the landing displacement, middle appropriate location is provided with a stacker 22 in framework 2 openings 20, stacker 22 is provided with detent inserting groove 220, shown in Figure 12,13;
Some devices 3 that hold, as shown in figure 12, correspondence is mounted on the stacker 22 of framework 2, the one end is provided with socket part 30, be corresponding kenel with the detent inserting groove 220 of stacker 22, if this stacker 22 and detent inserting groove 220 are tubular, then this socket part 30 that holds device 3 is also for circular; If stacker 22 is square or polygon, as another embodiment of Figure 12 and Figure 21, the socket part 30 that then holds device 3 also can be symmetrical square or polygon thereupon.The other end that holds device 3 in addition is provided with wire rope handling portion 31, for hawser E wear around, this wire rope handling portion 31 slightly becomes  shape, both sides form breach 310, hold device 3 upper and lowers and be provided with the jack 311 of some symmetries, wherein breach 310 passes for hawser E, and the jack 311 of symmetry is for plugging inserted link L;
One adjustment holds device 4, as Figure 11,14,15,16, correspondence is mounted on the stacker 22 in the opening 20 of a framework 2 wherein, and the one end is provided with socket part 40, is corresponding kenel with stacker 22, the other end is provided with wire rope handling portion 41, be  shape for hawser E wear around, these wire rope handling portion 41 both sides form breach 410, upper and lower then is provided with the elongated adjustment hole 411 of some symmetries, breach 410 wherein passes for hawser E, and the adjustment hole 411 of symmetry is for plugging inserted link L;
One pulls and supports assembly 5, shown in Figure 14 to 16, hold device 4 with adjustment and match, it is provided with a screw rod 50, and screw rod 50 tail ends have a  shape frame gripping member 51, frame gripping member 51 is provided with perforation 510, correspondence makes adjusts the inserted link L break-through binding that holds device 4, and a locating rack 52 is cross-placed on adjusts the outer openings end that holds device 4, mounts for screw rod 50 break-through, one adjusts nut 53 cooperates with screw rod 50, is used to adjust screw rod 50 and moves back and forth.
One hawser E as Figure 11, Figure 15 to Figure 17, is the hard cable wire of a predetermined length, is surrounded on framework 2 peripheries, one end shape being aligned cover E10, and as Figure 17, the other end is then for wearing end E11;
One noose spare G, as Figure 17, the one end is provided with the line cover E10 part of the G10 of hook portion for hook hawser E, and the other end is provided with lacing hole G11, holds E11 to wear for wearing of hawser E;
A branch of rope device H, as Figure 18, supplying wearing of hawser E to hold E11 to wear around the back and with its tight bundle fixes, binding yarn spare H10 is the U type bar that two ends have threaded portion H12, one engagement piece J, corresponding combination with binding yarn spare H10, the two threaded portion H12 rod ends of its corresponding binding yarn spare H10 are provided with perforation J10, be provided with the groove J11 of band on-slip latch in the middle of the engagement piece J, can play the effect that holds the lock bundle hawser E.Pass the perforation J10 of engagement piece J at binding yarn spare H10 after, its overhanging threaded portion H12 and the forced-together piece H11 that is nut type are screwed.
When assembling is used, shown in Figure 11 to 18, at first the end angle with framework 2 sets firmly locating piece 21, secondly, some predetermined appropriate locations are provided with batten frame K on model of the column B, can be different and adjust quantity and spacing according to post height and size, for example: post encloses big more spacing of then restrainting the framework setting should be more little, general spacing is about 60 centimetres, and batten frame K can be located on the model of the column B, as Figure 11, shown in 22, batten frame K need be solid in the precalculated position on the template B in advance, when setting up template B, the template B of its left and right sides just is placed between front-back template B, and the template B that makes front-back is by being held in the end face of left and right sides template B, and left and right sides template B is then by the solid wooden frame bar K of outside nail, the both sides end face of template B before and after just retaining is held in, so, batten frame K also can relatedly constitute when establishing with the post mould bases, and, affixed in advance wooden frame bar K and template B form mutual limiting block when setting up and hold, and make template facade non-migration.
Secondly, framework 2 is arranged at precalculated position on the model of the column B, finish when taking just framework 2 to be set up simultaneously when putting template, as shown in figure 26, get then and hold device 3,4 align the stacker 22 that is fixedly arranged in advance in framework 2 openings 20, and to hold device 3,4 socket part 30,40 insert in the detent inserting groove 220 of stacker 22, again inserted link L is penetrated the jack 311 that holds device 3 wire rope handling portions 31, in addition, to pull and support assembly 5 holds device with adjustment and establishes for 4 corresponding groups, and inserted link L is passed adjust the perforation 510 that holds the microscler adjustment hole 411 of device 4 and pull and support assembly 5 frame gripping members 51, finish the assembling of bundle frame, as shown in figure 11.
When desiring to tighten the post mould, after at first holding E11 to wear the lacing hole G11 of noose spare G wearing of hawser E, put with binding yarn device H again that to be screwed into the tight bundle of forced-together piece H11 behind the engagement piece J fixing, secondly with the end of line cover E10 of hawser E wear respectively around, framework 2 is subjected to locating piece 21 spacing, again along framework 2 corrals, and respectively hold device 3 around cover, as shown in figure 15, wherein and earlier allow hawser E pass and adjust in the frame gripping member 51 and inserted link L space that holds device 4 and pull and support assembly 5, please cooperate and consult Figure 15 to Figure 17, can finish bundle mount structure as shown in figure 11.
So, only need to be located at the adjustment nut 53 that pulls and supports assembly 5 that adjustment holds device 4 front ends by rotation, screw rod 50 is moved laterally, just can drive the hawser E in the terminal frame gripping member 51, shown in Figure 15,16, make it the generation of coupled columns mould and tighten effect, and then prevent that effectively cylinder and metope are subjected to concrete impact, to keep the smooth, upright and smooth-going of integral body.
Have again, hold another preferred embodiment that device 6 can be designed to another structure kenel, please cooperate and consult graphic being described as follows:
As Figure 19, its mainly be by framework 2, adjust hold device 4, pull and support assembly 5, hawser E and other binding yarn equipment etc. constitute, wherein holding device 6 correspondences is assembled on the stacker 22 of framework 2, it is different from last embodiment, this holds device 6, its back segment connects the socket part 60 that a less external diameter is the inserted link shape, pegs graft with detent inserting groove 220 corresponding on the stacker 22; Hold device 6 the place aheads and be provided with wire rope handling cylindraceous portion 61, microscler breach 610 is offered in its both sides, and upper and lower is provided with the jack 611 that symmetry connects and penetrates for inserted link L, and so, what constitute another kenel ease of assembly holds device 6 structures, its assembling and using with last embodiment.
In addition, the device 3 (or 6) that holds of the present invention, after unclasping hawser E, can conveniently receive and keep, workpiece control and carrying, during dismounting, can directly hang over hawser E last (as shown in figure 20) with holding device 3 (or 6), when treating that use next time, as long as the device 3 (or 6) that holds that is enclosed within hawser E in framework 2 openings 20 and will hangs on the hawser E is adjusted to stacker 22 places and aligns, again its socket part 30 (or 60) is inserted corresponding detent inserting groove 220 location, after tension hawser E tightens, adjust the elasticity of hawser E, can make things convenient for by pulling and supporting assembly 5, fixed leg mould bundle frame fast, and tightly restraint, the operation of pressure holding post mould makes constructing operation simpler and easy, convenient.
Have again, about the present invention is used in when being connected with metope, extremely shown in Figure 25 as Figure 23, the form walls of arranging at wall and model of the column B junction are failed driving fit and are connected and produce the space, between this space, be equipped with a plate 8, can use the thick metal sheet of 3mm, and spread and put on the handing-over end face that is connected in metope, model of the column, these junction plate 8 plate faces are reserved some square perforation 80; One sleeve 9, as Figure 23, shown in 24, correspondence is located at the pre-position of the perforation 80 of junction plate 8, and connect between the metope template, can follow closely fixed or spiral shell prescription formula engages with template, as shown in figure 24, this sleeve 9 can be slightly like the taper kenel, be provided with the passage 90 that is square in this sleeve 9, and perforation 80 symmetries of this square duct 90 and junction plate 8, the shaped steel of framework 2 is passed, the structural steel frame 2 of column bundle frame is when passing metope template space, hold the location of pulling with model of the column B under the arm by clamping device 70, but effect with Rapid Combination, this clamping device 70 can make wall, the framework 2 Rapid Combination location of post junction, which is provided with the location-plate 700 that is the L type, its vertical plane fits in model of the column B and goes up affixed, another horizontal plane then is attached to the plate face of framework 2, on its jointing plate face, connect and be inserted with a clamping components 701, be bent into reservation shape and have certain elasticity by the crude iron silk, by pull clip hold member 701 can rapid holding frame 2 and location-plate 700, allow framework 2 set up fast and assembling firm, if only need switching clamping components 701 again when desire breaks away from clamped condition, make it to have ease of Use, tear open, adorn convenience fast;
Shown in Figure 23,25, pull and support device 71, be connected between the template press strip A14 and model of the column B lateral frame 2 in metope template 10 outsides, which is provided with a stiffening plate 710, be fixedly arranged in advance in the suitable perforation A141 of template press strip A14, its shape approximation V-arrangement is provided with the catching groove 711 of  type on its side plate plate face, this stiffening plate 710 is fixedly arranged in the template press strip A14 with its two plates end and is the V shape; One pulls and supports bar 712, constitute by threaded rod, the one end screws togather a fastener 713, and pass the perforation A141 of template press strip A14, be held in the catching groove 711 of stiffening plate 710, the other end then extends through the opposite side of framework 2, screws togather with a catch 714 with perforation, screw togather by spiral shell spare N again, make to pull and support bar 712 the past post mould direction tension of wall mould.
During the overlap joint assembling, please cooperate consult shown in Figure 26, at first with model of the column B, after comprising wooden frame bar K and framework 2 assemblings, form walls foregoing means in both sides overlap the formation metope fast, and framework 2 passed sleeve 9, with make things convenient for hawser E wear around, and it is framework 2 is corresponding with template press strip A14 on the metope template 10, and utilize clamping device 70 and clamping components 701 thereof, fasten two panels faces with it fastening clamp by rotating clamping components 701, secondly this stiffening plate 710 that pulls and supports device 71 is perforation A141 places of predetermined fixed appropriate location correspondence in template press strip A14, pull and support bar 712 and penetrate perforation A141 with the end that it has fastener 714 as long as get, and will pull and support bar 712 and buckle into snaps into position in the catching groove 711 of stiffening plate 710, the other end is cover group catch 714 then, and the oblique long framework 2 of opposite side that passes slides onto the end angle, fastening with spiral shell spare N again, so that the metope mould is fastening, and column mould sidewall produces chip hold down simultaneously; Remaining component and assembling mode be embodiment as described above, repeat no more in this, after grouting is done, unclamp the screw rod 50 that pulls and supports assembly 5 in regular turn, unclamping the line cover E10 of hawser E and the colluding of the G10 of hook portion of noose spare G holds, just hawser E can be pulled out, pull down and have framework 2, template and the junction plate 8 that holds frame 3,4 (or 6), after again sleeve 9 being released the wall moulds and filling up hole, just can form the cylinder that joins with metope with burnishing surface.
In addition, wooden frame bar K that this wall, post engage and model of the column B and framework 2 can be fixed on the appropriate location in advance, as shown in figure 26, be the another kind of embodiment state of column and metope handing-over, it can be fixed on moulding on the model of the column B, framework 2 be bearing on wooden frame bar K again with model of the column B spiral shell group, earlier both sides model of the column B is erected, and after allowing framework 2 pass sleeve 9, again front pillars template B is located after being held in front end face, so can make shut die and framework 2 combinations quicker.
Assembling of the present invention, dismounting, processing ease, rapidly, and can prevent effectively that existing construction formwork is impacted and the disadvantage of quick-fried mould, distortion by concrete make grouting back cylinder have straight, even curface really, not only structure innovation and have the progressive effect of essence.

Claims (16)

  1. But 1, a kind of wall mould of Rapid Combination and post mould bundle frame, comprise both sides form walls and model of the column bundle frame with grouting space, form walls is formed by several form assemblies, it is characterized in that: most templates are provided with several blocks that protrudes from the template side, link with connecting piece between a partiting template;
    Model of the column bundle frame comprises some frameworks, and framework is provided with stacker;
    Some devices that hold are assembled on the stacker of framework, and it is provided with socket part to the group end, and the other end is provided with wire rope handling portion, and upper and lower is provided with the perforation of some symmetries;
    One adjusts and to hold device, is assembled on the stacker of a framework wherein, and it is provided with socket part to the group end, and the other end is a wire rope handling portion, and upper and lower is provided with the adjustment hole of perforation;
    One pulls and supports assembly, is located to adjust to hold the device front end, which is provided with a screw rod, rod end connection box gripping member also penetrates and adjusts the hole and connect by adjusting inserted link, the screw rod other end is provided with locating rack, and this locating rack is adjusted the openend that holds device across being placed on, and screws togather by an adjustment nut and screw rod in the outside;
    One hawser is worn around aforementioned bundle frame and with binding yarn equipment and is screwed tight.
  2. But 2, the wall mould of Rapid Combination as claimed in claim 1 and post mould bundle frame, it is characterized in that: wherein form walls is set up on the pedestal, pedestal is provided with some adjustment seats of adjusting horizontal level, adjust on the seat and set up the support beam, support the horizontal level of beam by adjusting seat adjustment, support the beam top and be provided with a groove, a side of groove is provided with the inclined-plane, is provided with some templates side by side in the groove and forms form walls.
  3. But 3, the wall mould of Rapid Combination as claimed in claim 1 and post mould bundle frame, it is characterized in that: template can be full wafer sheet template, or be the plate face that a side is provided with the angle block stay, or be formed by connecting for some solid wood chips, or be metal form, wherein on each template, be provided with some blocks, block laterally protrudes out to template two sides, template be provided with the hook part by side edge, close the hook part on the partiting template between the end hook by colluding of connecting piece two ends, reclining mutually between template and the template pushes against.
  4. But 4, the wall mould of Rapid Combination as claimed in claim 1 and post mould bundle frame, it is characterized in that: form walls sets up one by one side by side, the template press strip is arranged on the two form walls outer panel faces, it can be made of C shaped steel, connecting rod is arranged in the perforation on the template press strip, be provided with retaining nail retaining between form walls inside wall subtend and hold, insert the part of pulling in the jack at each connecting rod two ends and fix, this top of inserting the part of pulling is provided with the block piece that can be subjected to retaining location, template press strip backboard end checkpost.
  5. But 5, the wall mould of Rapid Combination as claimed in claim 1 and post mould bundle frame, it is characterized in that: template forms a fitting portion at block two ora terminalis of horizontally set, and overlap joint is chimeric mutually by fitting portion for the block of adjacent forms butt joint.
  6. But 6, the wall mould of Rapid Combination as claimed in claim 1 and post mould bundle frame, it is characterized in that: the block of template is separated to be arranged on two ora terminalis of template, and the block on block and adjacent another template is up and down and is crisscross arranged, and the block of two adjacent upper and lower settings can be kept out fixed form mutually.
  7. But 7, the wall mould of Rapid Combination as claimed in claim 1 and post mould bundle frame, it is characterized in that: the block of template is turnable strip and block, be located at template by side, when template in twos side by side the time, block transfers to horizontal, block stride frame on adjacent template, keep off hold two templates and the location.
  8. But 8, the wall mould of Rapid Combination as claimed in claim 1 and post mould bundle frame, it is characterized in that: the block of template is the tightening latch pattern of laterally slippage.
  9. But 9, the wall mould of Rapid Combination as claimed in claim 1 and post mould bundle frame, it is characterized in that: the wire rope handling portion both sides that hold device are provided with breach.
  10. But 10, the wall mould of Rapid Combination as claimed in claim 1 and post mould bundle frame is characterized in that: hold device and be provided with the symmetrically arranged perforation that penetrates for inserted link and adjust the hole.
  11. 11, but the wall mould of Rapid Combination as claimed in claim 1 and post mould bundle frame, it is characterized in that: hawser is fixed by binding yarn equipment, hawser is the hard cable wire, be surrounded on the framework periphery, the one end is the line cover, the other end is for wearing end, noose spare one end is provided with the line cover of hook portion hook hawser, the other end be provided with for hawser wear the end wear around lacing hole, for hawser wear end wear around and tighten fixing binding yarn device, be provided with the U type bar binding yarn spare that two ends have the threaded portion, engagement piece is relative with binding yarn spare to be made up, and two threaded portion rod ends of its corresponding binding yarn spare are provided with perforation, and engagement piece is provided with the groove that can have the on-slip latch that holds the effect of tightening to hawser, binding yarn spare passes the perforation of engagement piece, and its threaded portion and forced-together piece are screwed.
  12. But 12, the wall mould of Rapid Combination as claimed in claim 1 and post mould bundle frame, it is characterized in that: hold device and stacker and be the corresponding pipe shape of external diameter, its back segment connects establishes the socket part that a little external diameter is the inserted link shape, its the place ahead is provided with wire rope handling cylindraceous portion, microscler breach is offered in both sides, and upper and lower is provided with the jack that symmetry connects.
  13. 13. but the wall mould of Rapid Combination as claimed in claim 1 and post mould bundle frame, it is characterized in that: its central post and form walls are in succession, be equipped with a plate between the space of wall template and post mould template, this junction plate plate face is provided with some square perforation, one sleeve, correspondence is located at perforation place of junction plate, is the perforation symmetry of the passage and the junction plate of square in this sleeve, supplies the shaped steel of framework to pass.
  14. But 14, the wall mould of Rapid Combination as claimed in claim 1 and post mould bundle frame is characterized in that: its central post and form walls in succession, model of the column and framework are gripped by clamping device.
  15. But 15, the wall mould of Rapid Combination as claimed in claim 1 and post mould bundle frame is characterized in that: its central post and form walls in succession, the template press strip in the framework of column and the form walls outside is corresponding kenel, between two shaped steel by pull and support device mutually against.
  16. 16. but the wall mould of Rapid Combination as claimed in claim 15 and post mould bundle frame, it is characterized in that: wherein pull and support between the framework of device across template press strip that is connected in the metope template outside and column, it is provided with a V-shaped stiffening plate that is fixedly arranged in the template press strip perforation, offer the catching groove of  type on its plate face, screw shaped pull and support bar, one end spiral shell group one fastener, button is organized in the catching groove of stiffening plate, and its other end passes framework and a catch screws togather fixing.
CN 00100886 2000-02-17 2000-02-17 Frame for quickly assembling wall forms and column forms Pending CN1309220A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 00100886 CN1309220A (en) 2000-02-17 2000-02-17 Frame for quickly assembling wall forms and column forms

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 00100886 CN1309220A (en) 2000-02-17 2000-02-17 Frame for quickly assembling wall forms and column forms

Publications (1)

Publication Number Publication Date
CN1309220A true CN1309220A (en) 2001-08-22

Family

ID=4575721

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 00100886 Pending CN1309220A (en) 2000-02-17 2000-02-17 Frame for quickly assembling wall forms and column forms

Country Status (1)

Country Link
CN (1) CN1309220A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101818571A (en) * 2010-04-16 2010-09-01 国家电网公司 Method for building wall
CN103334582A (en) * 2013-07-05 2013-10-02 天津住宅集团建设工程总承包有限公司 Method for installing and constructing short-leg shear wall formwork supporting system
CN104806008A (en) * 2015-03-10 2015-07-29 山东电力工程咨询院有限公司 General composite steel formwork device for concrete firewall and assembly method thereof
CN110388047A (en) * 2019-02-15 2019-10-29 浙江中益建材科技有限公司 A kind of concrete wooden frame template system
CN111677269A (en) * 2020-05-16 2020-09-18 浙江新中源建设有限公司 Formwork for manufacturing crack-resistant concrete wall and construction method thereof
CN114753617A (en) * 2022-03-27 2022-07-15 中煤第三建设(集团)有限责任公司 Aluminum mold for assembly type building and using method thereof

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101818571A (en) * 2010-04-16 2010-09-01 国家电网公司 Method for building wall
CN103334582A (en) * 2013-07-05 2013-10-02 天津住宅集团建设工程总承包有限公司 Method for installing and constructing short-leg shear wall formwork supporting system
CN103334582B (en) * 2013-07-05 2015-03-18 天津住宅集团建设工程总承包有限公司 Method for installing and constructing short-leg shear wall formwork supporting system
CN104806008A (en) * 2015-03-10 2015-07-29 山东电力工程咨询院有限公司 General composite steel formwork device for concrete firewall and assembly method thereof
CN110388047A (en) * 2019-02-15 2019-10-29 浙江中益建材科技有限公司 A kind of concrete wooden frame template system
CN111677269A (en) * 2020-05-16 2020-09-18 浙江新中源建设有限公司 Formwork for manufacturing crack-resistant concrete wall and construction method thereof
CN111677269B (en) * 2020-05-16 2021-10-12 浙江新中源建设有限公司 Formwork for manufacturing crack-resistant concrete wall and construction method thereof
CN114753617A (en) * 2022-03-27 2022-07-15 中煤第三建设(集团)有限责任公司 Aluminum mold for assembly type building and using method thereof

Similar Documents

Publication Publication Date Title
CN107408915B (en) The supporting arrangement of solar energy module, the photovoltaic apparatus with multiple supporting arrangements and the method for installing such supporting arrangement
CN1309220A (en) Frame for quickly assembling wall forms and column forms
CN1893815A (en) Structure used as roof assembly of greenhouse, roof assembly of greenhouse, greenhouse, and framework construction method for greenhouse
CN204781607U (en) Prestressing force carbon fiber plate stretch -draw anchored integrated device
CN108400750A (en) A kind of cable-stayed type flexible photovoltaic carrier unit and photovoltaic bracket
JP4457146B2 (en) Core drill equipment base mounting structure
CN1564914A (en) System, clamping element and counter-element for the connector of profiled elements
CN2489161Y (en) Electric wire clip
CN207134740U (en) A kind of cable makes fixed support
CN210369872U (en) High mortise-tenon joint formula scaffold frame of security
CN115233976A (en) Assembled building structure concrete structure template for engineering
US11359400B2 (en) Shade-providing structure
CN115076197A (en) Rotary-pulling connecting structure, rapid mounting bracket, lifting assembly and mounting method
CN210974065U (en) Small-size MBR is with single membrane case that arranges
JP2008291438A (en) Anchor frame
CN208316650U (en) A kind of fixture convenient for array distribution installation photovoltaic panel
CN221073637U (en) Temporary support column
CN108365798A (en) A kind of cable truss formula flexible photovoltaic carrier unit and photovoltaic bracket
CN218193434U (en) Welding tool for fixing Bailey beam
CN217460891U (en) Assembled steel girt beam connection structure
KR200190418Y1 (en) A carriage for transporting plate glass
CN218715431U (en) Steel structure support frame
CN212176550U (en) Conical shell type roof formwork system
CN220686990U (en) Pipeline inspection protective fence
CN215957377U (en) Greenhouse agricultural shed convenient and fast to install

Legal Events

Date Code Title Description
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C06 Publication
PB01 Publication
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication